Search NASA⌕ Search

SEARCH · Search NASA

Results for “REACTOR MAINTENANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Poisoning of Heat Pipes

Thermal management is critical to space exploration efforts. In particular, efficient transfer and control of heat flow is essential when operating high energy sources such as nuclear reactors. Thermal energy must be transferred to various energy conversion devices, and to radiators for safe and efficient rejection of excess thermal energy. Applications for space power demand exceptionally long periods of time with equipment that is accessible for limited maintenance only. Equally critical is the hostile and alien environment which includes high radiation from the reactor and from space (galactic) radiation. In space or lunar applications high vacuum is an issue, while in Martian operations the systems will encounter a CO2 atmosphere. The effect of contact at high temperature with local soil (regolith) in surface operations on the moon or other terrestrial bodies (Mars, asteroids) must be considered.

Gillies, Donald↗

Dismantling Structures and Equipment of the MR Reactor and its Loop Facilities at the National Research Center 'Kurchatov Institute' - 12051

In 2008 a design of decommissioning of research reactors MR and RFT has been developed in the National research Center 'Kurchatov institute'. The design has been approved by Russian State Authority in July 2009 year and has received the positive conclusion of ecological expertise. In 2009-2010 a preparation for decommissioning of reactors MR and RFT was spent. Within the frames of a preparation a characterization, sorting and removal of radioactive objects, including the irradiated fuel, from reactor storage facilities and pool have been executed. During carrying out of a preparation on removal of radioactive objects from reactor sluice pool water treating has been spent. For these purposes modular installation for clearing and processing of a liquid radioactive waste 'Aqua - Express' was used. As a result of works it was possible to lower volume activity of water on three orders in magnitude that has allowed improving essentially of radiating conditions in a reactor hall. Auxiliary systems of ventilation, energy and heat supplies, monitoring systems of radiating conditions of premises of the reactor and its loop-back installations are reconstructed. In 2011 the license for a decommissioning of the specified reactors has been received and there are begun dismantling works. Within the frames of works under the design the armature and pipelines are dismantled in a under floor space of a reactor hall where a moving and taking away pipelines of loop facilities and the first contour of the MR reactor were replaced. A dismantle of the main equipment of loop facility with the gas coolant has been spent. Technologies which were used on dismantle of the radioactive contaminated equipment are presented, the basic works on reconstruction of systems of maintenance of on the decommissioning works are described, the sequence of works on the decommissioning of reactors MR and RFT is shown. Dismantling works were carried out with application of means of a dust suppression that, in aggregate with standard means at such works of individual protection of the personnel and devices of radiating control, has allowed to lower risk of action of radiation on the personnel, the population and environment at the expense of reduction of volume activity of radioactive aerosols in air. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Princeton Field-Reversed Configuration for Compact Nuclear Fusion Power Plants

The Princeton Field-Reversed Configuration (PFRC) nuclear fusion reactor concept is an innovative approach to fusion power generation prioritizing low neutron production and small size. Here, a combination of analytical modeling and numerical simulation shows that the novel heating approach generates an FRC with closed field lines. Simulation data from a single-particle Hamiltonian code predicts ms-scale plasma heating in reactor-scale conditions while PIC codes predict formation of warm FRC plasmas from initial mirror fields. The PFRC-1 and PFRC-2 experiments have heated electrons to energies well in excess of 100 eV and plasma durations to 300 ms, more than 10 4 times longer than the predicted tilt instability growth time. From these data, we have created a development plan and anticipated performance metrics for a fusion reactor based on the PFRC concept. The resulting 1–10 MW PFRC reactors would be suitable for diverse applications, from submarines to urban environments to space propulsion. PFRC is a steady-state, driven magnetic confinement device. Plasma, inside a cylindrical array of coils, is confined and heated by external RF antennae. PFRC would be ultra-low radiation due to both its fuel and small size. The choice of advanced fuels, deuterium and helium-3 (D– 3 He), may be enabled by the high-β FRC configuration. The small size of the reactor would enable rapid exhaust of the dangerous tritium ash. Low radiation would make the reactor safer to operate and, in combination with simple geometry and small size, dramatically lowers development and maintenance costs. This review paper gives an introduction to the physics of the PFRC and a summary of the PFRC-2 experiment results to date. It then discusses the future program plan and how PFRC reactors would be commercialized.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

I&C System Sensors for Advanced Nuclear Reactors

As advanced reactor designers proceed with further research, design implementation, testing, and deployment, it is now time to address their instrumentation and control (I&C) needs. First, we must identify the process variables that must be measured to control an advanced reactor and monitor its safety. As with any nuclear power plant, it is safe to assume that temperature, pressure, flow, level, and neutron flux are the predominant variables to be measured. As a second step, the range of process values must be established as well as the level of accuracy, redundancy, and speed of response of sensors that must be deployed to measure these values. The harsh environments of advanced reactors such as high temperatures, high levels of nuclear radiation, potential for corrosion, and limited access to sensors for maintenance are just a few examples of instrumentation challenges. This is compounded by the relatively small market for new sensors that must be designed, developed, and qualified for advanced reactors. That is, the cost of these activities can deter major sensor manufacturers from entering the advanced reactor market. Furthermore, the operating cycles of most advanced reactors are expected to be much longer than conventional plants adding to the need for instrumentation that can maintain calibration and response time over extended intervals. The fact that there are now a variety of advanced reactors under design and development adds to the complexity of instrumentation that may differ for various types of advanced plants. A few examples of the most commonly discussed advanced reactors are reviewed in this paper followed by a brief discussion of their instrumentation needs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

NuScale Power Module Instrumentation

The safe and efficient operation of any nuclear power plant (NPP) depends on accurate and timely measurement of the primary system temperature, pressure, level, flow, and neutron flux. Integral pressurized water reactor (iPWR) or small modular reactors (SMRs) present unique challenges to instrumentation and control (I&C) sensors and their maintenance strategies. More specifically, the calibration and response time of these sensors may have to be verified periodically to ensure that they maintain their required degree of accuracy and speed of response. A review of technical reports and safety analysis documentation of the NuScale Power Module (NPM) by Analysis and Measurement Services Corporation (AMS), together with NuScale engineers, confirms that the I&C sensors within the NPM will need to be testable as installed to verify their static and dynamic performance at plant operating conditions. Sensor placement and installation as well as the process conditions expected in natural circulation integral SMRs like the NPM are very different from those in large scale NPPs with conventional primary system loop piping. In particular, reactor coolant system (RCS) flows are more complex and flow rates much lower, the average containment temperature is higher, nuclear radiation levels in some areas are greater, and the accessibility of sensors for hands-on maintenance is very limited. These challenges among others related to I&C sensors can be overcome by adapting existing I&C sensor test methods, developing new techniques for non-conventional I&C sensors, and incorporating online monitoring (OLM) technologies into the I&C architecture of the plant to verify the calibration and response time of sensors within the NPM prior to startup, during operation, and during subsequent refueling outages. These methods and technologies will be demonstrated and validated through a research and development (R&D) grant recently awarded to AMS by the U.S. Department of Energy (DOE) to facilitate timely deployment of the first NuScale SMR in the United States and to enable efficient I&C maintenance strategies during the life of the plant. Lastly, this paper presents the R&D plan for the DOE project with a focus on temperature measurement needs of NuScale.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Prognostics and Life Beyond 60 Years for Nuclear Power Plants

Safe, secure, reliable and sustainable energy supply is vital for advanced and industrialized life styles. To meet growing energy demand there is interest in longer term operation (LTO) for the existing nuclear power plant fleet and enhancing capabilities in new build. There is increasing use of condition based maintenance (CBM) for active components and growing interest in deploying on-line monitoring instead of periodic in service inspection (ISI) for passive systems. Opportunities exist to move beyond monitoring and diagnosis based on pattern recognition and anomaly detection to prognostics with the ability to provide an estimate of remaining useful life (RUL). The adoption of digital I&C systems provides a framework within which added functionality including on-line monitoring can be deployed, and used to maintain and even potentially enhance safety, while at the same time improving planning and reducing both operations and maintenance costs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

RAMI Analysis for Designing and Optimizing Tokamak Cooling Water System (TCWS) for the ITER's Fusion Reactor

U.S.-ITER is responsible for the design, engineering, and procurement of the Tokamak Cooling Water System (TCWS). TCWS is designed to provide cooling and baking for client systems that include the first wall/blanket, vacuum vessel, divertor, and neutral beam injector. Additional operations that support these primary functions include chemical control of water provided to client systems, draining and drying for maintenance, and leak detection/localization. TCWS interfaces with 27 systems including the secondary cooling system, which rejects this heat to the environment. TCWS transfers heat generated in the Tokamak during nominal pulsed operation - 850 MW at up to 150 C and 4.2 MPa water pressure. Impurities are diffused from in-vessel components and the vacuum vessel by water baking at 200-240 C at up to 4.4 MPa. TCWS is complex because it serves vital functions for four primary clients whose performance is critical to ITER's success and interfaces with more than 20 additional ITER systems. Conceptual design of this one-of-a-kind cooling system has been completed; however, several issues remain that must be resolved before moving to the next stage of the design process. The 2004 baseline design indicated cooling loops that have no fault tolerance for component failures. During plasma operation, each cooling loop relies on a single pump, a single pressurizer, and one heat exchanger. Consequently, failure of any of these would render TCWS inoperable, resulting in plasma shutdown. The application of reliability, availability, maintainability, and inspectability (RAMI) tools during the different stages of TCWS design is crucial for optimization purposes and for maintaining compliance with project requirements. RAMI analysis will indicate appropriate equipment redundancy that provides graceful degradation in the event of an equipment failure. This analysis helps demonstrate that using proven, commercially available equipment is better than using custom-designed equipment with no field experience and lowers specific costs while providing higher reliability. This paper presents a brief description of the TCWS conceptual design and the application of RAMI tools to optimize the design at different stages during the project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Taking in Nuclear Operation of the Plasma Facility for Treatment Industrial Radioactive Waste - 19346

The operation and maintenance of nuclear power plants, the nuclear fuel cycle in general, research laboratories and pharmaceutical, medical and industrial facilities generate low-level radioactive waste which, along with the historical radioactive waste from past nuclear activities, needs to be treated and stored, awaiting final disposal. Plasma technology offers a very effective way of treating this waste with a high volume reduction factor (VRF), free from organics, liquids and moisture, and meets without a doubt the acceptance criteria for safe storage and disposal. By means of a plasma beam of approximately 5000 deg. C, the inorganic materials are melted into a glassy slag, containing most of the radioactive isotopes while the organic material is gasified and afterwards oxidized in an afterburner and purified in an off-gas cleaning system. This paper describes the principles of plasma, the different waste feed systems, off-gas treatment and operational experience and future plasma plants. More specifically, it presents the new full-scale plasma facility for the treatment of radioactive waste at the Kozloduy Nuclear Power Plant in Bulgaria for which construction and assembly was finalized end of August 2016. It also describes in more detail the Site Acceptance Tests (SAT) of this facility. Previous paper describes the construction and testing of the plasma melting facility at the Kozloduy NPP in Bulgaria. Now the paper focus on the nuclear starting up conducted in May 2018 with real radioactive waste and illustrates the first operational results such as types of waste treated, volume reduction factors, etc The Project was co-financed through a grant by Kozloduy International Decommissioning fund (KIDSF) administrated by the EBRD and through Bulgarian national funding -Nuclear Facilities Decommissioning Fund and Radioactive Waste Fund. The KIDSF is funded by the European Union as well by the contributors to the KIDSF - Austria, Belgium, France, Greece, Ireland, The Netherlands, Spain, United Kingdom and Switzerland. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fiscal Year 2023 Software Quality Assurance Activities for the ARC Software

The Argonne Reactor Code (ARC) software suite [1-17] has been developed by Argonne researchers for fast reactor design and analysis since the 1970s. With the ARC software suite, a user can quickly build a model of a proposed or existing fast spectrum reactor and carry out fuel cycle, nominal thermal analysis and flow requirements, and assess, as is appropriate, whether the core design and constraint system yield an acceptable mechanical behavior. For transient reactor analysis with SAS4A [18], the ARC software suite can be used to generate reactivity coefficients and kinetics parameters at any modeled fuel cycle time point which forms part of the input to SAS4A. The ARC suite was consistently being developed until the 1990s and followed a software QA program which was an appropriate standard for the time. In the 1990s, the DOE funding to fast reactor research and development was all but eliminated and the ARC software was put into maintenance mode. In the early 2000s, the software quality assurance (SQA) program for ARC was still in place to define an official version, but by 2005 it all but was abandoned as there were insufficient staff to fill the work roles. Since 2005, there has been a considerable increase in research and design work on fast spectrum reactors. The ARC software as a whole has since been exported to many universities and commercial companies and ANL support has been given to the various projects over the years [19-23]. Further, MC 2 -3, PERSENT, and DASSH were all developed after 2005 without any adherence to a software standard. In recent time, the DOE VTR project [22] paid for verification work to be done on the ARC software as part of the goal of making it NQA-1 complaint. The VTR project was not considered the appropriate pathway to fund and maintain a SQA program for the ARC software and while software developments (DASSH) were made and several manuals were updated and software verification work was carried out, the ARC software is not NQA-1 compliant. More recently the Advanced Reactor Development Program (ARDP [23]) has funded the creation of manuals for some ARC utility programs and funded additional software verification work on DIF3D [6, 7] and MC 2 -3 [2-5] for the purpose of commercial grade dedication. Because of the VTR and ARDP projects, software verification work was completed on MC 2 -3 and DIF3D, and detailed reports were created for each piece of software, which discuss the inputs and outputs from the codes that are covered by the verification work and link various analytic, code-to-code, and hand calculation based verification work presented in the report with verification test problems provided with the software. This is a key part of the commercial grade dedication work and constitutes the bulk of the cost to get the ARC software to commercial grade. The ARC software suite is a valuable asset as a fast reactor design and analysis tool set that has been reasonably well verified and validated with various fast reactor benchmark problems and experiments over decades. Some or all of the ARC software suite has been utilized for designing the IFR [20], PGSFR [21], VTR [22], and Natrium [23] reactors and we can expect it to continue to be used for advanced fast reactor design and/or confirmatory calculation purposes in the future. Due to increased interest by commercial companies and regulatory bodies, it is becoming more important to make the ARC software suite complete and ready-to-use in terms of its SQA pedigree and commercial grade dedication needs. This report discusses the achievements made towards building a new SQA program for the ARC software and dealing with outstanding identified QA gaps.

97 MATHEMATICS AND COMPUTING↗

PLANNING TOOLS FOR ESTIMATING RADIATION EXPOSURE AT THE NATIONAL IGNITION FACILITY

A set of computational tools was developed to help estimate and minimize potential radiation exposure to workers from material activation in the National Ignition Facility (NIF). AAMI (Automated ALARA-MCNP Interface) provides an efficient, automated mechanism to perform the series of calculations required to create dose rate maps for the entire facility with minimal manual user input. NEET (NIF Exposure Estimation Tool) is a web application that combines the information computed by AAMI with a given shot schedule to compute and display the dose rate maps as a function of time. AAMI and NEET are currently used as work planning tools to determine stay-out times for workers following a given shot or set of shots, and to help in estimating integrated doses associated with performing various maintenance activities inside the target bay. Dose rate maps of the target bay were generated following a low-yield 10{sup 16} D-T shot and will be presented in this paper.

42 ENGINEERING↗

Prognostics and Health Management in Nuclear Power Plants: An Updated Method-Centric Review With Special Focus on Data-Driven Methods

In a carbon-constrained world, future uses of nuclear power technologies can contribute to climate change mitigation as the installed electricity generating capacity and range of applications could be much greater and more diverse than with the current plants. To preserve the nuclear industry competitiveness in the global energy market, prognostics and health management (PHM) of plant assets is expected to be important for supporting and sustaining improvements in the economics associated with operating nuclear power plants (NPPs) while maintaining their high availability. Of interest are long-term operation of the legacy fleet to 80 years through subsequent license renewals and economic operation of new builds of either light water reactors or advanced reactor designs. Recent advances in data-driven analysis methods—largely represented by those in artificial intelligence and machine learning—have enhanced applications ranging from robust anomaly detection to automated control and autonomous operation of complex systems. The NPP equipment PHM is one area where the application of these algorithmic advances can significantly improve the ability to perform asset management. This paper provides an updated method-centric review of the full PHM suite in NPPs focusing on data-driven methods and advances since the last major survey article was published in 2015. The main approaches and the state of practice are described, including those for the tasks of data acquisition, condition monitoring, diagnostics, prognostics, and planning and decision-making. Research advances in non-nuclear power applications are also included to assess findings that may be applicable to the nuclear industry, along with the opportunities and challenges when adapting these developments to NPPs. Finally, this paper identifies key research needs in regard to data availability and quality, verification and validation, and uncertainty quantification.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Industrial Productivity

NASTRAN is an offshoot of the computer-design technique used in construction of airplanes and spacecraft. [n this technique engineers create a mathematical model of the aeronautical or space vehicle and "fly" it on the ground by means of computer simulation. The technique enables them to study performance and structural behavior of a number of different designs before settling on the final configuration and proceeding with construction. From this base of aerospace experience, NASA-Goddard developed the NASTRAN general purpose computer program, which offers an exceptionally wide range of analytic capability with regard to structures. NASTRAN has been applied to autos, trucks, railroad cars, ships, nuclear power reactors, steam turbines, bridges, and office buildings. NASA-Langley provides program maintenance services regarded as vital by many NASTRAN users. NASTRAN is essentially a predictive tool. It takes an electronic look at a computerire$.dedgn and reports how the structure will react under a great many different conditions. It can, for example, note areas where high stress levels will occur-potential failure points that need strengthening. Conversely, it can identify over-designed areas where weight and material might be saved safely. NASTRAN can tell how pipes stand up under strong fluid flow, how metals are affected by high temperatures, how a building will fare in an earthquake or how powerful winds will cause a bridge to oscillate. NASTRAN analysis is quick and inexpensive. It minimizes trial-and-error in the design process and makes possible better, safe, lighter structures affording large-scale savings in development time and materials. Some examples of the broad utility NASTRAN is finding among industrial firms are shown on these pages.

Source record↗

A Tool for Performing Link Analysis, Operational Sequence Analysis, and Workload Analysis to Support Nuclear Power Plant Control Room Modernization

Nuclear power continues to have an imperative role for the U.S.’s electricity generation. However, for these nuclear power plants (NPPs) to remain economically viable, new strategies for reducing operations and maintenance costs must be explored. The U.S. Department of Energy Light Water Reactor Sustainability Program is researching how to digitally transform existing analog and hybrid main control rooms into a fully integrated control room that addresses this challenge. The transformation will fundamentally change the conduct of operations for these U.S. NPPs. Human factors engineering has a vital role in this effort, where traditional task analysis methods are important in informing the design of advanced human-system interface displays. This work describes a preliminary tool to support task analysis for the development of these advanced displays. Details on the use of this tool, including the specific task analysis methods offered, are presented in this paper.

99 GENERAL AND MISCELLANEOUS↗

Modeling Predictive Maintenance for NuScale’s Condensate and Feedwater System Using EMRALD

Event Modeling Risk Assessment using Linked Diagrams (EMRALD) is used to model of NuScale’s feedwater and condenser system to capture component degradation and repairing process. To model the reliability of the components, a three-stage failure rate is used contrary to a constant rate leading to component failure. Results from EMRALD will be used to compare different maintenance strategies to reduce system downtime. The outcome of the project will assist in maximizing remaining useful life of the overall system and increasing the availability and revenue of the plant.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Streamlining of the RELAP5-3D Code

RELAP5-3D is widely used by the nuclear community to simulate general thermal hydraulic systems and has proven to be so versatile that the spectrum of transient two-phase problems that can be analyzed has increased substantially over time. To accommodate the many new types of problems that are analyzed by RELAP5-3D, both the physics and numerical methods of the code have been continuously improved. In the area of computational methods and mathematical techniques, many upgrades and improvements have been made decrease code run time and increase solution accuracy. These include vectorization, parallelization, use of improved equation solvers for thermal hydraulics and neutron kinetics, and incorporation of improved library utilities. In the area of applied nuclear engineering, expanded capabilities include boron and level tracking models, radiation/conduction enclosure model, feedwater heater and compressor components, fluids and corresponding correlations for modeling Generation IV reactor designs, and coupling to computational fluid dynamics solvers. Ongoing and proposed future developments include improvements to the two-phase pump model, conversion to FORTRAN 90, and coupling to more computer programs. This paper summarizes the general improvements made to RELAP5-3D, with an emphasis on streamlining the code infrastructure for improved maintenance and development. With all these past, present and planned developments, it is necessary to modify the code infrastructure to incorporate modifications in a consistent and maintainable manner. Modifying a complex code such as RELAP5-3D to incorporate new models, upgrade numerics, and optimize existing code becomes more difficult as the code grows larger. The difficulty of this as well as the chance of introducing errors is significantly reduced when the code is structured. To streamline the code into a structured program, a commercial restructuring tool, FOR_STRUCT, was applied to the RELAP5-3D source files. The methodology employed follows Dijkstra's structured programming paradigm, which is based on splitting programs into sub-sections, each with single points of entry and exit and in which control is passed downward through the structure with no unconditional branches to higher levels. GO TO commands are typically avoided, since they alter the flow and control of a program’s execution by allowing a jump from one place in the routine to another. The restructuring of RELAP5-3D subroutines is complicated by several issues. The first is use of code other than standard FORTRAN77. The second is restructuring limitations of FOR_STRUCT. The third is existence of pre-compiler directives and the complication of nested directives. Techniques were developed to overcome all these difficulties and more and these are reported. By implementing these developments, all subroutines of RELAP were restructured. Measures of code improvement relative to maintenance and development are presented.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Embedded Sensors and Controls to Improve Component Performance and Reliability -- Loop-scale Testbed Design Report

Embedded instrumentation and control systems that can operate in extreme environments are challenging to design and operate. Extreme environments limit the options for sensors and actuators and degrade their performance. Because sensors and actuators are necessary for feedback control, these limitations mean that designing embedded instrumentation and control systems for the challenging environments of nuclear reactors requires advanced technical solutions that are not available commercially. This report details the development of testbed that will be used for cross-cutting embedded instrumentation and control research for nuclear power applications. This research is funded by the Department of Energy's Nuclear Energy Enabling Technology program's Advanced Sensors and Instrumentation topic. The design goal of the loop-scale testbed is to build a low temperature pump that utilizes magnetic bearing that will be incorporated into a water loop to test control system performance and self-sensing techniques. Specifically, this testbed will be used to analyze control system performance in response to nonlinear and cross-coupling fluid effects between the shaft axes of motion, rotordynamics and gyroscopic effects, and impeller disturbances. This testbed will also be used to characterize the performance losses when using self-sensing position measurement techniques. Active magnetic bearings are a technology that can reduce failures and maintenance costs in nuclear power plants. They are particularly relevant to liquid salt reactors that operate at high temperatures (700 C). Pumps used in the extreme environment of liquid salt reactors provide many engineering challenges that can be overcome with magnetic bearings and their associated embedded instrumentation and control. This report will give details of the mechanical design and electromagnetic design of the loop-scale embedded instrumentation and control testbed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Lifecycle Prognostics Architecture for Selected High-Cost Active Components

There are an extensive body of knowledge and some commercial products available for calculating prognostics, remaining useful life, and damage index parameters. The application of these technologies within the nuclear power community is still in its infancy. Online monitoring and condition-based maintenance is seeing increasing acceptance and deployment, and these activities provide the technological bases for expanding to add predictive/prognostics capabilities. In looking to deploy prognostics there are three key aspects of systems that are presented and discussed: (1) component/system/structure selection, (2) prognostic algorithms, and (3) prognostics architectures. Criteria are presented for component selection: feasibility, failure probability, consequences of failure, and benefits of the prognostics and health management (PHM) system. The basis and methods commonly used for prognostics algorithms are reviewed and summarized. Criteria for evaluating PHM architectures are presented: open, modular architecture; platform independence; graphical user interface for system development and/or results viewing; web enabled tools; scalability; and standards compatibility. Thirteen software products were identified and discussed in the context of being potentially useful for deployment in a PHM program applied to systems in a nuclear power plant (NPP). These products were evaluated by using information available from company websites, product brochures, fact sheets, scholarly publications, and direct communication with vendors. The thirteen products were classified into four groups of software: (1) research tools, (2) PHM system development tools, (3) deployable architectures, and (4) peripheral tools. Eight software tools fell into the deployable architectures category. Of those eight, only two employ all six modules of a full PHM system. Five systems did not offer prognostic estimates, and one system employed the full health monitoring suite but lacked operations and maintenance support. Each product is briefly described in Appendix A. Selection of the most appropriate software package for a particular application will depend on the chosen component, system, or structure. Ongoing research will determine the most appropriate choices for a successful demonstration of PHM systems in aging NPPs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗