AP1000{sup R} severe accident features and post-Fukushima considerations

The AP1000{sup R} passive nuclear power plant is uniquely equipped to withstand an extended station blackout scenario such as the events following the earthquake and tsunami at Fukushima without compromising core and containment integrity. The AP1000 plant shuts down the reactor, cools the core, containment and spent fuel pool for more than 3 days using passive systems that do not require AC or DC power or operator actions. Following this passive coping period, minimal operator actions are needed to extend the operation of the passive features to 7 days using installed equipment. To provide defense-in-depth for design extension conditions, the AP1000 plant has engineered features that mitigate the effects of core damage. Engineered features retain damaged core debris within the reactor vessel as a key feature. Other aspects of the design protect containment integrity during severe accidents, including unique features of the AP1000 design relative to passive containment cooling with water and air, and hydrogen management. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Coupled simulation of the reactor core using CUPID/MASTER

The CUPID is a component-scale thermal hydraulics code which is aimed for the analysis of transient two-phase flows in nuclear reactor components such as the reactor vessel, steam generator, containment. This code adopts a three-dimensional, transient, two-phase and three-field model, and includes physical models and correlations of the interfacial mass, momentum, and energy transfer for the closure. In the present paper, a multi-physics simulation was performed by coupling CUPID with a three dimensional neutron kinetics code, MASTER. MASTER is merged into CUPID as a dynamic link library (DLL). The APR1400 reactor core during a control rod drop/ejection accident was simulated as an example by adopting a porous media approach to employ a fuel assembly. The following sections present the numerical modeling for the reactor core, coupling of the kinetics code, and the simulation results. And also, a preliminary study for multi-scale simulation between CUPID and system-scaled thermal hydraulics code, MARS will be introduced as well. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Emergency response and solutions for damaged fuel assembly handling events - Lessons learned from a 2013 fuel positioning issue

In 2013, during the refueling of a French 1300 MWe reactor, a fuel assembly (FX3599) was damaged by a fuel assembly positioning tool in the reactor vessel. The upper part of a corner rod of the fuel assembly was twisted and the top end grid was torn off. Because of the protruding fuel rod, the assembly could not be easily transferred for repair to the fuel storage pool via the transfer tube. This unexpected and rarely encountered situation was assessed jointly by EDF and AREVA NP. The chosen option was to directly perform the field service inside the reactor building in cells generally used for intermediate storage during refueling. This operation, performed by EDF and AREVA, involved removing the twisted rod and positioning it in a special-purpose canister by means of a gripper-type tool for removal (KIPCI gripper) and a gripper for holding the rod in place. The special-purpose canister was designed, ordered and supplied by a sub-supplier within one week. The operation went through 3 phases. First a preparation step in the fuel building: The stripper was disassembled and technical checks carried out to ensure correct operation. The gripper tightening force was checked in real-life conditions with the gripper suspended from auxiliary crane. The fuel rod removal was simulated several times by trained operators. Second, the equipment was installed in the reactor building. And third, the operation took place in the reactor cavity: the special-purpose canister was opened, the radioactive waste canister placed in the special-purpose canister, the twisted fuel rod was then grasped by the KIPCI gripper and removed from the fuel assembly. The twisted fuel rod was positioned above the canister and dropped into it. Once the fuel rod had been removed, the canister and fuel assembly FX3599 were transferred to the fuel building and refueling resumed. The canister containing the fuel rod is currently in interim storage in the reactor pool until appropriate action is taken for it to be shipped and eventually reprocessed. EDF has performed improvement in its handling procedures and in its handling tools to avoid a similar new event.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Experimental Studies of Coolant Temperature and Velocity on an Integrated Water Model of a Fast Reactor in Different Operating Regimes

The results of experimental studies of a next-generation fast reactor performed using an integrated water model (scale 1:10) are presented: local velocity over height and radius of the top chamber in a plane in a direction from core center to the intermediate heat exchangers and coolant temperature in the top chamber and other elements of the circulation loop with forced circulation and emergency cool-down by natural convection. The data were obtained using a specially designed system for performing measurements which is incorporated in the bench and provides high accuracy and rate of acquisition. Stable temperature stratification of the coolant is observed in the top, cold, and pressure chambers of the reactor, elevator enclosure, and reactor vessel cooling system as well as at the exit from the intermediate and autonomous heat exchangers in different operating regimes.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SATURATED-SUBCOOLED STRATIFIED FLOW IN HORIZONTAL PIPES

Advanced light water reactor systems are designed to use passive emergency core cooling systems with horizontal pipes that provide highly subcooled water from water storage tanks or passive heat exchangers to the reactor vessel core under accident conditions. Because passive systems are driven by density gradients, the horizontal pipes often do not flow full and thus have a free surface that is exposed to saturated steam and stratified flow is present.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Control of physical properties on solid surface via laser processing

In a safety operation of a nuclear power plant, vapor conditions such as a droplet or liquid membrane toward a solid surface of a heat exchanger and reactor vessel is important. In the present study, focusing on the droplet, the wettability on solid surface and surface free energy of solid are evaluated. In addition, wettability on a metal plate fabricated by laser processing is also considered for the nuclear engineering application.

36 MATERIALS SCIENCE↗

A search for minimum volume of Breed and Burn cores

The objective of the present study is to quantify the minimum volume a Breed and Burn (B and B) core can be designed to have and the corresponding burnup required for sustaining the breed-and-burn mode of operation based on neutronics; radiation damage constraints are ignored. The minimum radius for an idealized spherical B and B reactor is 136 cm or 110 cm for, respectively, 40% or 28% coolant volume fraction. The peak required burnup is about 25%. The minimum volume of a more realistic cylindrical B and B core is estimated to be only {approx}15% larger than that of the idealized spherical core but is only 43% of the volume of the medium-size B and B core previously designed to fit within the S-Prism reactor vessel. Thus it appears that SMR s can, in principle, be designed to have a B and B core. It was also found that the minimum volume B and B core does not necessarily coincide with the maximum permissible leakage from a core that can sustain the B and B mode of operation. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SIT Makeup Effect on the Loss of Residual Heat Removal during Mid-loop Operation

For the loss of cooling during the mid-loop operation, the plant needs to have a sufficient time for operator action without active makeup measures such as a loss of alternating current (AC) power. This concern is raised after the Fukushima accident. Especially, in addition to the loss of residual heat removal (LORHR), if the AC power or active makeup measures are unavailable, the passive makeup using gravity feed or pressurized feed will provide sufficient time before core uncovery. This paper investigates means of the passive makeup measures using safety injection tank (SIT) after the LORHR event to prevent or delay the core uncovery and fuel failure for the typical advanced power reactor 1400 (APR1400). Unfortunately, the refueling water storage tank of APR1400 cannot be used for gravity makeup since it is located on the bottom of the containment with a lower elevation than the reactor vessel. So, the SIT makeup and the effect on the core uncovery are investigated. The results show that gravity makeup of a SIT provides insufficient means but the slightly pressurized SIT is required for sufficient operator action time for the LORHR with the station black out (SBO) during the mid-loop operation for the APR1400. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Steam Dryer Segmentation and Packaging at Grand Gulf Nuclear Station - 13577

Entergy recently performed an Extended Power Up-rate (EPU) on their Grand Gulf Nuclear Station, near Port Gibson, Mississippi. To support the EPU, a new Steam Dryer Assembly was installed during the last refueling outage. Due to limited access into the containment, the large Replacement Steam Dryer (RSD) had to be brought into the containment in pieces and then final assembly was completed on the refueling floor before installation into the reactor. Likewise, the highly contaminated Original Steam Dryer (OSD) had to be segmented into manageable sections, loaded into specially designed shielded containers, and rigged out of containment where they will be safely stored until final disposal is accomplished at an acceptable waste repository. Westinghouse Nuclear Services was contracted by Entergy to segment, package and remove the OSD from containment. This work was performed on critical path during the most recent refueling outage. The segmentation was performed underwater to minimize radiation exposure to the workers. Special hydraulic saws were developed for the cutting operations based on Westinghouse designs previously used in Sweden to segment ABB Reactor Internals. The mechanical cutting method was selected because of its proven reliability and the minimal cutting debris that is generated by the process. Maintaining stability of the large OSD sections during cutting was accomplished using a custom built support stand that was installed into the Moisture Separator Pool after the Moisture Separator was installed back in the reactor vessel. The OSD was then moved from the Steam Dryer Pool to the Moisture Separator Pool for segmentation. This scenario resolved the logistical challenge of having two steam dryers and a moisture separator in containment simultaneously. A water filtration/vacuum unit was supplied to maintain water clarity during the cutting and handling operations and to collect the cutting chips. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Photon spectrum behind biological shielding of the LVR-15 research reactor

The LVR-15 reactor is a light water research reactor situated at the Research Centre Rez, near Prague. It operates as a multipurpose facility with a maximum thermal power of 10 MW. The reactor core usually contains from 28 to 32 fuel assemblies with a total mass of {sup 235}U of about 5 kg. Emitted radiation from the fuel caused by fission is shielded by moderating water, a steel reactor vessel, and heavy concrete. This paper deals with measurement and analysis of the gamma spectrum near the outer surface of the concrete wall, behind biological shielding, mainly in the 3- to 10-MeV energy range. A portable HPGe detector with a portable multichannel analyzer was used to measure gamma spectra. The origin of energy lines in gamma detector spectra was identified. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Benchmarking of Probabilistic Fracture Mechanics Models in Grizzly

In 2020, as part of contract/task order 31310019N0006/31310020F0060, the Nuclear Regulatory Commission tasked Idaho National Laboratory (INL) with benchmarking the MOOSE/GRIZZLY code against the NRC’s Fracture Analysis of Vessels - Oak Ridge (FAVOR), version 16.1 code. Both codes can predict large light-water reactor vessel integrity deterministically and probabilistically. In fact, such predictions are the primary purpose of the FAVOR code, and are a main focus of the GRIZZLY code, although GRIZZLY is capable of modeling a wider range of geometries and problems. The vessel integrity modeling capabilities of the GRIZZLY code are still under development and being gradually expanded, and the capability to model vessel fracture by crack growth has not yet been integrated into GRIZZLY (although it does exist in pre-release versions). Thus, the present benchmark study focused on comparing predictions for the conditional probability of crack growth initiation (CPI) between GRIZZLY and FAVOR v16.1. The present benchmarking study expands on a previous study completed in 2020, which focused on single plate regions, various flaw types, and full vessel studies. The previous study was limited in scope and revealed some relatively large discrepancies, particularly in the case of weld regions. In the present study, detailed investigations into the sources of discrepancies between GRIZZLY and FAVOR were performed, with a focus on weld regions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

CFD INVESTIGATION OF EXPERIMENTAL DATA PROPOSED TO BE A VALIDATION DATA SET

The U. S. Department of Energy (DOE) is currently supporting the development of a next generation nuclear plant (NGNP). The NGNP is based on the very high temperature reactor (VHTR), which is a Gen. IV gas-cooled reactor concept that will use helium as the coolant. Computational fluid dynamics (CFD) calculations are to be employed to estimate the details of the flow and heat transfer in the lower plenum where the heated coolant empties before exiting the reactor vessel. While it is expected that CFD will be able to provide detailed information about the flow, it must be validated using experimental data. Detailed experimental data have been taken in the INL’s matched index of refraction (MIR) facility of a scaled model of a section of the prismatic VHTR lower plenum. The present article examines the data that were taken to determine the suitability of such data to be a validation data set for CFD calculations. CFD calculations were made to compare with the experimental data to explore potential issues and make recommendations regarding the MIR data.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Successes and Challenges of the Integrated Waste Treatment Unit's 50-Day Demonstration Run - 20151

The Integrated Waste Treatment Unit (IWTU) has been tasked with using steam reforming technology to treat 3.4 million liters (900,000 gallons) of radioactive sodium-bearing waste (SBW) at the Idaho National Laboratory (INL). The project has been hampered by a number of processing issues associated with process equipment during simulant testing, with the two main issues involving the fluidizing gas distribution system in the main reactor vessel, the denitration mineralization reformer (DMR), and high differential pressures in the main filter vessel, the process gas filter (PGF). Following the replacement of the fluidizing gas distribution system in the DMR, a successful 30-day demonstration run was performed that revealed unacceptable bridging in the filter bundles of the PGF. The bundles were replaced with new ones, and a 50-day demonstration run was performed. The main purpose of this run was to operate the IWTU over a range of operating conditions. Overall, the run was a success; however, there were multiple challenges that arose from the run. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modelling of transport processes in concrete exposed to elevated temperatures – An alternative formulation for sorption isotherms

There is a significant need to understand, analyse and assess moisture transport in cementitious materials exposed to elevated temperatures in order to confidently predict the behaviour and ultimately the development of damage in safety critical applications such as nuclear reactor vessels, structures exposed to fire and well bore grouts. In view of this need a rigorous and robust formulation to describe water retention curves (sorption isotherms) as a function of temperature based on the evolution of physical parameters is presented. The model formulation is successfully validated against independent sets of experimental data up to temperatures of 80 °C. It is then further validated under isothermal drying conditions and then high temperature conditions through the numerical reproduction of laboratory experiments following implementation in a fully coupled hygro-thermo-mechanical finite element model. The new formulation is found to work well under a variety of conditions in a variety of cementitious material types.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Technical Letter Report, An Evaluation of Ultrasonic Phased Array Testing for Reactor Piping System Components Containing Dissimilar Metal Welds, JCN N6398, Task 2A

Research is being conducted for the U.S. Nuclear Regulatory Commission at the Pacific Northwest National Laboratory to assess the effectiveness and reliability of advanced nondestructive examination (NDE) methods for the inspection of light-water reactor components. The scope of this research encom¬passes primary system pressure boundary materials including dissimilar metal welds (DMWs), cast austenitic stainless steels (CASS), piping with corrosion-resistant cladding, weld overlays, inlays and onlays, and far-side examinations of austenitic piping welds. A primary objective of this work is to evaluate various NDE methods to assess their ability to detect, localize, and size cracks in steel components that challenge standard and/or conventional inspection methodologies. This interim technical letter report provides a summary of a technical evaluation aimed at assessing the capabilities of phased-array (PA) ultrasonic testing (UT) methods as applied to the inspection of small-bore DMW components that exist in the reactor coolant systems (RCS) of pressurized water reactors (PWRs). Operating experience and events such as the circumferential cracking in the reactor vessel nozzle-to-RCS hot leg pipe at V.C. Summer nuclear power station, identified in 2000, show that in PWRs where primary coolant water (or steam) are present under normal operation, Alloy 82/182 materials are susceptible to pressurized water stress corrosion cracking. The extent and number of occurrences of DMW cracking in nuclear power plants (domestically and internationally) indicate the necessity for reliable and effective inspection techniques. The work described herein was performed to provide insights for evaluating the utility of advanced NDE approaches for the inspection of DMW components such as a pressurizer surge nozzle DMW, a shutdown cooling pipe DMW, and a ferritic (low-alloy carbon steel)-to-CASS pipe DMW configuration.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Material Characterization and Analysis for Selection of Refractories Used in Black Liquor Gasification

Black liquor gasification provides the pulp and paper industry with a technology which could potentially replace recovery boilers with equipment that could reduce emissions and, if used in a combined cycle system, increase the power production of the mill allowing it to be a net exporter of electrical power. In addition, rather than burning the syngas produced in a gasifier, this syngas could be used to produce higher value chemicals or fuels. However, problems with structural materials such as the refractory lining of the reactor vessel have caused unplanned shutdowns and resulted in component replacement much sooner than originally planned. Through examination of exposed materials, laboratory corrosion tests and cooperative efforts with refractory manufacturers, many refractory materials issues in high-temperature black liquor gasification have been addressed and optimized materials have been selected for this application. In this paper, an updated summary of the characterization and analysis techniques used for refractory screening and selection will be discussed along with characteristic results from these methods which have led to the selection of optimized materials for both the hot-face and back-up linings used in this application.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Corium crust strength measurements.

Corium strength is of interest in the context of a severe reactor accident in which molten core material melts through the reactor vessel and collects on the containment basemat. Some accident management strategies involve pouring water over the melt to solidify it and halt corium/concrete interactions. The effectiveness of this method could be influenced by the strength of the corium crust at the interface between the melt and coolant. A strong, coherent crust anchored to the containment walls could allow the yet-molten corium to fall away from the crust as it erodes the basemat, thereby thermally decoupling the melt from the coolant and sharply reducing the cooling rate. This paper presents a diverse collection of measurements of the mechanical strength of corium. The data is based on load tests of corium samples in three different contexts: (1) small blocks cut from the debris of the large-scale MACE experiments, (2) 30 cm-diameter, 75 kg ingots produced by SSWICS quench tests, and (3) high temperature crusts loaded during large-scale corium/concrete interaction (CCI) tests. In every case the corium consisted of varying proportions of UO{sub 2}, ZrO{sub 2}, and the constituents of concrete to represent a LWR melt at different stages of a molten core/concrete interaction. The collection of data was used to assess the strength and stability of an anchored, plant-scale crust. The results indicate that such a crust is likely to be too weak to support itself above the melt. It is therefore improbable that an anchored crust configuration could persist and the melt become thermally decoupled from the water layer to restrict cooling and prolong an attack of the reactor cavity concrete.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Preliminary Evaluation of Removing Spent Nuclear Fuel from Shutdown Nuclear Power Plant Sites - 2018 - 19101

This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. The U.S. Department of Energy Office of Integrated Waste Management (DOE-IWM) continues to conduct evaluations of removing spent nuclear fuel (SNF) from shutdown nuclear power plant sites. The 14 shutdown sites included in the evaluation to date have nuclear power reactors that have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The 14 shutdown sites are Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, Vermont Yankee, and Fort Calhoun. The Oyster Creek Nuclear Generating Station ceased operations in September 2018 and will be included in future evaluations. The evaluations of the shutdown sites contain four components: - A characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory; - A description of the on-site infrastructure at the shutdown sites; - An evaluation of the near-site transportation infrastructure and experience at the shutdown sites - An evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF were the DOE GC-859 and RW-859 spent nuclear fuel inventory databases. This inventory has been augmented with data obtained from the shutdown sites for SNF discharges that occurred after June 2013. The primary sources for information on the conditions of site and near-site transportation infrastructure and experience included field observations and information collected during visits to the 14 shutdown sites, information provided by managers and staff at the shutdown sites, and Google Earth imagery. Extensive photographs taken during the shutdown site visits have proven to be particularly useful in documenting the current conditions at and near the shutdown sites. Tribal and state representatives, State and Regional Group representatives, and Federal Railroad Administration representatives have participated in 11 of the shutdown site visits. In addition to visiting the shutdown site, site visits often include activities such as meeting with local railroads to discuss the near-site railroad infrastructure and meeting with community engagement panels. Oyster Creek permanently ceased power operations on September 17, 2018 and fuel was removed from the reactor vessel on September 25, 2018. Planning for the Oyster Creek site visit has begun and is conducted in three stages. In the first stage, data and documents that are applicable to Oyster Creek are collected. In the second stage, questions are developed based on the data and documents collected during the first stage. These questions are submitted to the Oyster Creek site approximately one month before the site visit. The third stage involves establishing specific schedules and participants. Participants will likely include tribal and state representatives, the Council of State Governments - Eastern Regional Conference, and the Federal Railroad Administration. State participation will likely include a representative of the State Rail Safety Participation Program, the New Jersey Department of Transportation, and the New Jersey Bureau of Nuclear Engineering. The site visit is tentatively expected to occur in April or May of 2019. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗