Results of studies on a twin-gyro attitude- control system for space vehicles
Twin gyroscopic control system for three orthogonal axes of space vehicle attitude control
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Twin gyroscopic control system for three orthogonal axes of space vehicle attitude control
Air bearing platform simulators for testing space vehicle attitude control systems
Fuel container design for space vehicles, discussing impact protection, reusability and long term cryogenic storage
Cabling material problems associated with military standard connectors for space vehicles, discussing reliability, fabrication, assembly and design
Space vehicle and control system dynamic response to atmospheric disturbances
Design of dynamic models for predicting structural behavior of space vehicles
Analysis of space vehicle structures using transfer function concept
Nonlinear adaptive reaction jet attitude control for long life space vehicles, providing optimal performance over bias acceleration disturbances
Attitude orientation control of spin stabilized final stage space vehicles, using horizon scanners
Nonlinear adaptive reaction jet attitude control for long life space vehicles, providing optimal performance over bias acceleration disturbances
A space vehicle adapted to provide an artificial gravity and earthlike atmospheric environment for occupants is disclosed. The vehicle comprises a cylindrically shaped, hollow pressure-tight body, one end of which is tapered from the largest diameter of the body, the other end is flat and transparent to sunlight. The vehicle is provided with thrust means which rotates the body about its longitudinal axis, generating an artificial gravity effect upon the interior walls of the body due to centrifugal forces. The walls of the tapered end of the body are maintained at a temperature below the dew point of water vapor in the body and lower than the temperature near the transparent end of the body. The controlled environment and sunlight permits an earth like environment to be maintained wherein the CO2/O2 is balanced, and food for the travelers is supplied through a natural system of plant life grown on spacecraft walls where soil is located.
A meeting on Space Vehicle Landing and Recovery was held on July 10-11, 1962 at NASA Headquarters. The Centers were asked to participate in this meeting in accordance with their interest, activities, and requirements in the subject area. Primary emphasis was directed toward parachutes, parachute-rocket systems, paragliders, and lifting rotor concepts applicable to bothe booster and spacecraft landing and recovery.
With special reference to design of fuel tanks in space vehicles, the principles of fracture mechanics are reviewed. An approximate but extremely simple relationship is derived among the operating stress level, the length of crack, and the number of cycles of failure. Any one of the variables can be computed approximately from the knowledge of the other two, if the loading schedule (mission of the tank) is not greatly altered. Two sample examples illustrating the procedures of determining the allowable safe operating stress corresponding to a set of assumed loading schedule are included. The selection of sample examples is limited by the relatively meager available data on the candidate material for various stress ratios in the cycling.
The authors present an Orbital Maneuvering Vehicle space station communications systems design approach which is intended to satisfy the stringent link requirements. The operational scenario, system configuration, signal design, antenna system management, and link performance analysis are discussed in detail. It is shown that the return link can transmit up to 21.6 Mb/s and maintain at least a 3-dB link margin through proper power and antenna management control at a maximum distance of 37 km. It is suggested that the proposed system, which is compatible with the space station multiple-access system, can be a model for other space station interoperating elements or users to save the development cost and reduce the technical and schedule risks.
Measured performance of water vapor jets in space vacuum environment for space vehicle attitude control systems
Launch vehicles and most of their payloads spend the majority of their time on the ground. The cost of ground operations is very high. So, why so often is so little attention given to ground processing during development? The current global space industry and economic environment are driving more need for efficiencies to save time and money. Affordability and sustainability are more important now than ever. We can not continue to treat space vehicles as mere science projects. More RLV's (Reusable Launch Vehicles) are being developed for the gains of reusability which are not available for ELV's (Expendable Launch Vehicles). More human-rated vehicles are being developed, with the retirement of the Space Shuttles, and for a new global space race, yet these cost more than the many unmanned vehicles of today. We can learn many lessons on affordability from RLV's. DFO (Design for Operations) considers ground operations during design, development, and manufacturing-before the first flight. This is often minimized for space vehicles, but is very important. Vehicles are designed for launch and mission operations. You will not be able to do it again if it is too slow or costly to get there. Many times, technology changes faster than space products such that what is launched includes outdated features, thus reducing competitiveness. Ground operations must be considered for the full product Lifecycle, from concept to retirement. Once manufactured, launch vehicles along with their payloads and launch systems require a long path of processing before launch. Initial assembly and testing always discover problems to address. A solid integration program is essential to minimize these impacts, as was seen in the Constellation Ares I-X test rocket. For RLV's, landing/recovery and post-flight turnaround activities are performed. Multi-use vehicles require reconfiguration. MRO (Maintenance, Repair, and Overhaul) must be well-planned--- even for the unplanned problems. Defect limits and standard repairs need to be in-place as well as easily added. Many routine inspections and maintenance can be like an aircraft overhaul. Modifications and technology upgrades should be expected. Another factor affecting ground operations efficiency is trending. It is essential for RLV's, and also useful for ELV's which fly the same or similar models again. Good data analysis of technical and processing performance will determine fixes and improvements needed for safety, design, and future processing. Collecting such data on new or low-frequency vehicles is a challenge. Lessons can be learned from the Space Shuttle, or even the Concorde aircraft. For all of the above topics, efficient business systems must be established for comprehensive program management and good throughput. Drawings, specifications, and manuals for an entire launch vehicle are often in different formats from multiple vendors, plus they have proprietary constraints. Nonetheless, the integration team must ensure that all data needed is compatible and visible to each appropriate team member. Ground processing systems for scheduling, tracking, problem resolution, etc. must be well laid-out. The balance between COTS (commercial off the shelf) and custom software is difficult. Multiple customers, vendors, launch sites, and landing sites add to the complexity of efficient IT (Information Technology) tools.
Equations for computing noise transmitted to space vehicle inside from random loading on outside
This paper presents several concepts of chemical-propulsion Space Vehicles (SVs) for manned Mars landing missions. For vehicle sizing purposes, several specific missions were chosen from opportunities in the late 1990's and early 2000's, and a vehicle "system" concept is then described which is applicable to the full range of missions and opportunities available. In general, missions utilizing planetary opposition alignments can he done with smaller vehicles than those utilizing planetary opposition alignments (reference I) The conjunction missions have a total mission time of about 3 years, including a required stay-time of about 60 days. Both types of missions might be desirable during a Mars program, the opposition type for early low-risk missions and/or for later unmanned cargo missions, and the conjunction type for more extensive science/exploration missions and/or for Mars base activities. Since the opposition missions appeared to drive the SV size more severely, there were probably more cases examined for them. Some of the concepts presented utilize all-propulsive braking, some utilize an all aerobraking approach, and some are hybrids. Weight statements are provided for various cases. The aerobraking cases have significant advantages in size and weight. Cryogenic propellants were used for the main propulsive elements in all cases, due to their significant weight advantage over storable propellants (reference 1). Extensive use is made of existing propulsive elements and other systems. Most of the work was done on O-g vehicle concepts, but partial-g and 1-g concepts are also provided and discussed. A recommendation is added that efforts be made to find ways to offset the long-term O-g effects on the crew, other than providing a g-field for the total SV or spacecraft, since this causes significant design and operations impacts. Several options for habitable elements are shown, such as large-diameter modules and Space Station (SS) types of modules. The latter were used as a reference because of their cost advantage as existing elements Several options are shown for the Mars landing vehicle, and a landing "system" is recommended which makes use of a large aeroshell to allow landing of payloads of various sizes and shapes over the course of a multi-year program. Because of the large size and weight of the SV it will be necessary to launch individual elements and assemble them in low Earth orbit (LEO). A configuration of one potential assembly concept is provided.