Search NASA⌕ Search

SEARCH · Search NASA

Results for “Safety Design Approach”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

An Economics-by-Design Approach Applied to a Heat Pipe Microreactor Concept

Microreactors present a potential paradigm shift in the nuclear industry. Emphasis thus far has been on large-scale multi-billion-dollar projects that cater solely to grid electricity market. These projects can be challenging to finance and execute. On the other hand, microreactors are intended to target a wide variety of smaller niche markets and are expected to be factory-fabricated and more readily deployable. While diseconomies of scale for microreactors may tend to raise their costs per energy output (MWh) relative to large nuclear plants, offsetting gains can be expected from standardization, simplification, passive safety, lower radionuclide inventories, factory fabrication, fast installation, and low financing costs. To adequately assess these contributions, designers should have a different perspective on cost drivers than for large nuclear plants and can utilize novel approaches for systematic cost reduction. To account for these important aspects of microreactors, this report proposes an economics-by-design approach that places economic considerations at the center of the design process. The methodology builds on existing frameworks such as design-to-cost and value engineering, expanding them to new markets (beyond the grid), new attributes (beyond costs alone), and introducing the approach at earlier points in the design cycle. Design parameters and technical specifications are systematically evaluated until costs meet market entry points, while also providing the high-priority performance attributes of the particular use case. Determining first-order estimates for different components early in the process enables designers to focus R&D efforts on the biggest overall cost contributors and components with the most cost uncertainty. The analysis is always guided by market needs and threshold prices. In addition to microreactors, the approach is expected to be useful for other classes of nuclear reactors as well. The analysis was applied to a concept found in the open literature (the Design A heat-pipe reactor). A comprehensive bottom-up estimate was generated by leveraging a new microreactor-specific code of accounts and a range of cost equations. The initial estimate for levelized cost of electricity (LCOE) unsurprisingly exceeded market ranges since the use case had prioritized technological readiness over economic considerations in design choices. An alternate concept was then proposed, with various assumptions/targets made to reduce the largest cost contributors. Changes in the neutron spectrum, the power output, and building structures were found to make even the first-of-a-kind of this modified concept competitive with diesel generation in some remote communities. Learning rate (LR) assumptions indicated cost reductions achieved from sequential unit deployments could expand the range of competitiveness to include additional markets as deployments proceed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Gateway Program Safety and Mission Assurance Integration - the Future of Safe Deep Space Human Exploration

As a foundational element of the National Aeronautics and Space Administration (NASA) Artemis Campaign, the Gateway is an incrementally built cislunar spacecraft that will serve as a platform for deep space human exploration, science, and technology demonstration. The Gateway will be a unifying catalyst for international partners around the world to establish sustained deep space scientific investigations, lunar surface access, and missions to Mars. As human exploration moves farther away from Earth, spacecraft designs must prioritize and optimize mass and volume allocations, while minimizing human and spacecraft risk. To accomplish this objective, the Gateway Program Safety and Mission Assurance functions develop, implement, and ensure compliance with requirements, in concert with the accurate characterization and transparent communication of residual hazard risks, for integrated safety, reliability and maintainability and quality assurance. Safety and Mission Assurance was a key contributor during Gateway program pre-formulation and formulation activities where safety and reliability analysis was embedded in the Gateway Systems Engineering and Integration team. During these early program stages, a preliminary Gateway Integrated Hazard Analysis and Preliminary Gateway Probabilistic Risk Assessment assisted in Gateway architectural and operational definition as part of a risk-informed design process. As the deep space architecture has matured, the integrated Safety and Mission Assurance analyses have matured, new safety review processes have been developed, and requirements have been refined to ensure compliance with integrated safety and mission assurance objectives. The Gateway Program is currently concluding the preliminary design review informed milestone, where the primary objectives included: - Ensured completeness and consistency of the preliminary design, including the meeting of all requirements within appropriate margins and acceptable risk posture. - Identification of any major issues moving forward to the Critical Design phase. At this milestone, Safety and Mission Assurance provided numerous products, including Gateway Top Risks and Risk Mitigation Plans, updated integrated hazard analyses, updated probabilistic risk assessment, Crew Survival Analysis Report, and updated Safety and Mission Assurance Requirements and Plans. These products provide a many-faceted perspective on the inherent risk and available mitigations involved in flying the current proposed vehicle design and anticipated stack configurations. In addition, Safety and Mission Assurance identified top technical, process and workforce concerns to be addressed as the program progresses toward the critical design phase. This paper will detail the evolution of the Gateway Program Safety and Mission Assurance integration functions, provide its current status and lessons learned for future human spaceflight programs. Throughout this paper the key tenets of the Gateway Program Safety and Mission Assurance will be discussed: - Application of a risk-informed approach to identify and mitigate areas of highest risk. - Leverage of valuable processes and lessons learned from earlier spaceflight programs. - Development of Safety and Mission Assurance products to inform design risk trades. - Utilization of common Safety and Mission Assurance practices to identify safety risks for multiple perspectives: top-down, bottom-up, and across lines of integration. - Approval of safety hazards at the appropriate level of authority, keeping most deliberation closest to design expertise and elevating risks of greatest concern for program-level consideration. - Championing of Safety and Mission Assurance processes and forums to foster a pervasive safety culture that is transparent, inclusive, and collaborative between all partners. These tenets have allowed the Gateway Safety and Mission Assurance function to play a key role in optimized vehicle design evolution, and early identification and mitigation of Gateway program and Artemis mission risk.

Helen Vaccaro↗

Launch operations efficiency

The paper discusses launch operations from a program perspective. Launch operations cost is a significant part of program cost. New approaches to launch operations, integrated with lessons learned, have the potential to increase safety and reliability as well as reduce cost. Operational efficiency must be an initial program goal. Design technology and management philosophy must be implemented early to ensure operational cost goals. Manufacturing cost and launch cost are related to operational efficiency. True program savings can be realized through implementation of launch operations cost saving approaches which do not correspondingly increase cost in other program areas such as manufacturing and software development and maintenance. Launch rate is a key factor in the cost/flight analysis and the determination of launch operations efficiency goals.

Diloreto, Clem↗

A Structural Design Approach Tailored for the Rapid Preliminary Design of Microreactor Components

High-temperature microreactors can play a role in developing reliable, portable energy sources for off-grid remote locations, microgrid concepts, and industrial process heat. Portability and passive safety criteria tend to skew microreactor structural component designs toward complex geometries, high thermal stresses, and design bases with large numbers of startup/shutdown cycles. Current design rules, as typified by Section III of the American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code, are less than optimal for these conditions, particularly for preliminary component designs where developers need to rapidly consider a large number of potential component configurations. This paper presents a design method targeted toward rapid, efficient evaluation of preliminary component designs using modern finite element analysis. The new method retains key connections with the ASME Code rules and design data while streamlining the design approach. This paper presents the design method, several verification examples illustrating the similarities and differences between the new method and the current ASME rules, and the application of the new approach to the evaluation of a test article mimicking key features of a heat pipe–cooled microreactor.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Interplanetary Terminal Procedure Design Applied to Lunar Landing

The impending NASA Artemis mission to the Moon will enable deep space exploration. The planned cadence of crewed Moon missions under Artemis necessitates scalable, safe lunar landings. This paper describes the development of Interplanetary Terminal Procedure Design (iTERP) which leverages current terminal procedure design criteria augmented with lunar physics to support the exploration of the Moon, Mars and beyond. The iTERPS model combines lessons learned from decades of commercial airspace operations with novelties of human space exploration on other worlds. This paper will highlight some of the key functional areas in procedure design safety, training, and operations reimagined for human space flight.

lunar approach procedures, Artemis Moon base, inte↗

Adaptive Flight Control Research at NASA

A broad overview of current adaptive flight control research efforts at NASA is presented, as well as some more detailed discussion of selected specific approaches. The stated objective of the Integrated Resilient Aircraft Control Project, one of NASA s Aviation Safety programs, is to advance the state-of-the-art of adaptive controls as a design option to provide enhanced stability and maneuverability margins for safe landing in the presence of adverse conditions such as actuator or sensor failures. Under this project, a number of adaptive control approaches are being pursued, including neural networks and multiple models. Validation of all the adaptive control approaches will use not only traditional methods such as simulation, wind tunnel testing and manned flight tests, but will be augmented with recently developed capabilities in unmanned flight testing.

Motter, Mark A.↗

A Variable Dynamic Testbed Vehicle

This paper describes the concept of a potential test vehicle for the National Highway Traffic Safety Administration (NHTSA) that is designed to evaluate the dynamics, human factors, and safety aspects of advanced technologies in passenger class automobiles expected to be introduced as a result of the Intelligent Vehicle/Highway System (IVHS) Program. The Variable Dynamic Testbed Vehicle (VDTV) requirements were determined from the inputs of anticipated users and possible research needs of NHTSA. Design and implementation approaches are described, the benefits of the vehicle are discussed and costs for several options presented.

System IVHS automobiles testbed safety human facto↗

Mission planning for photogrammetry-based autonomous 3D Mapping of Dams using a commercial UAV

The application of autonomous unmanned aerial vehicles (UAVs) for conducting inspections of dams represents an innovative approach aimed at enhancing safety, efficiency, and cost-effectiveness. In this context, this paper presents algorithms for UAV mission design in autonomous dam inspections that include the creation of a 3D map based on photogrammetry. The algorithms were systematically developed to incorporate a comprehensive set of parameters that account for the geometric characteristics of the dam and adhere to photogrammetry specifications. To validate the proposed methodology, we utilized a commercial programmable quadrotor, specifically the Parrot Anafi USA Gov drone, which is equipped with high-quality cameras and can be programmed with the help of a software development kit (SDK) provided by the manufacturer. Our results demonstrate the efficacy of our method, highlighting how the generated maps can be used for hazard detection in the downstream slope of dams.

42 ENGINEERING↗

DECOVALEX-2023: Task A Final Report

Task A, also known as HGFrac, examines the fracturing processes that may occur in the Callovo-Oxfordian claystone (COx) in the context of the high-level (HLW) and intermediate-level long-lived (ILW-LL) radioactive waste repository in France. Understanding these processes and improving numerical models to reproduce them will aid in the design, optimization, and safety of the repository. Heat and gas fracturing are studied in two independent subtasks following a stepwise approach: laboratory tests/benchmark exercises, in-situ experiment, and finally, an application case. The in-situ heater experiment aimed to thermally induce a hydraulic fracture; temperature and pore pressure were monitored to detect any evidence of fracturing. The in-situ gas injection experiment aimed to study the effect of the stress orientation and gas injection kinetics on the gas fracturing process. The occurrence of fracturing was monitored by gas pressure measured in the injection interval. In both experiments, the excavation-induced fracture network around the heater/injection boreholes played an important role in the reduction of the compressive stress state, leading to both a tensile and shear failure response of the COx. During the first two years of the project, the research teams working on each task developed and/or proposed numerical approaches for reproducing the occurrence of fracturing in the in-situ experiments. The failure criteria were defined by reproducing the measurements from laboratory extension tests for the heat fracturing subtask. In the gas fracturing subtask, their approaches were used for simulating several benchmark exercises, and an inter-comparison between models was carried out. In both tasks, the developed approaches were compared with a simplified approach considering poro-elasticity for the mechanical behaviour of the COx. Most of the developed approaches are based on a continuous medium that takes into account variations in hydraulic properties due to mechanical degradation, such as plastic deformation or damage. Other approaches implicitly modelled weak planes or embedded discontinuities to reproduce fracture propagation. The potential for fracture initiation was also studied through of a discrete approach. In the second half of the project, the research teams mainly focused on interpretative modelling of two in-situ experiments and a blind prediction exercise to test their respective approaches. The models developed by the research teams were also applied at the repository scale to evaluate fracture initiation in a case study under vi unfavourable conditions, particularly in terms of spacing between High-Level Waste cells. The results showed that the poro-elasticity approach could be an efficient tool for understanding the main processes occurring in the COx. One example is the explicit representation of the excavation-induced fracture network around the boreholes, which yielded acceptable results compared to the measurement data. However, advanced approaches were needed to evaluate the potential increase of the excavation-induced fracture network extend and better understand fracture initiation. The stress analyses carried out by the teams revealed that hydraulic boundary conditions had a strong impact on fracture initiation in the heater experiment. Furthermore, in most cases, the results required higher pore pressure increments to reach fracturing than those measured in the experiment. This implies that the measurements may have been biased by the packer’s capacity to fully isolate the piezometric chambers, leading to lower pressures. On the contrary, there was no agreement on the fracturing mode, as some reported either shear or tensile fracturing, while others reported a combination of the two modes. In the case of gas fracturing, the research teams were limited to the comparison of a single point, which complicated their task. Nonetheless, the numerical results were able to reproduce the measurements and capture processes such as longitudinal gas flow through the excavation-induced fracture network, as suggested by some evidence in the observation piezometric chambers. The numerical models also agreed with the measurements in the sense of higher probability of developing along the injection borehole than radially towards the sound rock. The approaches developed by the research teams showed that they are capable of analysing and reproducing fracture initiation in the COx. However, areas of future work should focus on the fracture propagation and fracture aperture, which were out of the scope of this task. To this end, additional data must be gathered for the parameter characterisation and validation of the numerical models. Nonetheless, various approaches showed promising results as they were able to reproduce fracture development under certain conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NASIS data base management system - IBM 360/370 OS MVT implementation. 1: Installation standards

The installation standards for the NASA Aerospace Safety Information System (NASIS) data base management system are presented. The standard approach to preparing systems documentation and the program design and coding rules and conventions are outlined. Included are instructions for preparing all major specifications and suggestions for improving the quality and efficiency of the programming task.

Source record↗

Advanced manned launch system (AMLS) review

The current status of NASA's AMLS conceptual studies, part of a broader effort aimed at determining options for the next manned space transportation system, is reported. The primary goal of the studies is to identify means for lowering the cost of manned access to space while fulfilling mission needs. Vehicle systems, technologies, and operations factors affecting launch costs, mission success, and safety are identified. Emphasis is placed on partially and fully reusable launch concepts that employ an operations-oriented design approach.

Talay, Theodore A.↗

A New Approach to Extreme Value Estimation Applicable to a Wide Variety of Random Variables

Designing reliable structures requires an estimate of the maximum and minimum values (i.e., strength and load) that may be encountered in service. Yet designs based on very extreme values (to insure safety) can result in extra material usage and hence, uneconomic systems. In aerospace applications, severe over-design cannot be tolerated making it almost mandatory to design closer to the assumed limits of the design random variables. The issue then is predicting extreme values that are practical, i.e. neither too conservative or non-conservative. Obtaining design values by employing safety factors is well known to often result in overly conservative designs and. Safety factor values have historically been selected rather arbitrarily, often lacking a sound rational basis. To answer the question of how safe a design needs to be has lead design theorists to probabilistic and statistical methods. The so-called three-sigma approach is one such method and has been described as the first step in utilizing information about the data dispersion. However, this method is based on the assumption that the random variable is dispersed symmetrically about the mean and is essentially limited to normally distributed random variables. Use of this method can therefore result in unsafe or overly conservative design allowables if the common assumption of normality is incorrect.

Holland, Frederic A., Jr.↗

UNDERSTANDING THE SEMI-PROBABILISTIC APPROACHES IN STRUCTURAL RELIABILITY USED TO SET DESIGN RELIABILITY TARGETS FOR GRAPHITE COMPONENTS USING ASME BPVC METHODS

Graphite is a quasi-brittle material, resulting in random variability in tensile strength distributions. To account for the random variability in strength, HHA-3000 of the ASME BPVC provides two semi-probabilistic methods for qualifying nuclear graphite components in the design stage, the simplified and full assessments. The full and simplified assessments apply statistical methods to engineering-based design problems. This is often referred to as reliability-based design. Reliability-based design (RBD) is a method to develop reliable designs by accounting for uncertainties and result in small chances of failure when also considering safety factors. RBDs provide reliability targets using semi-probabilistic approaches. RBD is implemented in ASME BPVC HHA-3000 for nuclear graphite components, but is not specific to that application. There has been much confusion around the methods implemented in ASME BPVC HHA-3000 for qualifying nuclear graphite components. To address the confusion, this paper takes a hierarchical approach. First, the general RBD framework is presented. Then, the semi-probabilistic methods and the underlying assumptions implemented in the assessments are presented. The semi-probabilistic methods are separated from the engineering modifications that have been made to the assessments. After building the framework and underlying assumptions, the specific methods in the full and simplified assessments are explained in three steps: inputs, methods, outputs. The methods are applied to an H-451 reflector block. Tensile strength properties for other graphite grades are provided.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A New Approach to Overcoming Spatial Aliasing in Structural Damage Detection

Aircraft, reusable launch vehicles,unmanned aircraft, and other advanced structures are being built using lightweight composite materials/metals with design safety factors as low as 1.25. These advanced structures operate in uncertain and severe environments and are susceptible to damage such as delamination, fiber/matrix damage, hydrothermal strain in composite materials, and fatigue and cracking in metals. To ensure human safety and load-bearing integrity these structures must be inspected to detect and locate often invisible damage and faults before they become catastrophic. Conventional methods of non-destructive evaluation sometimes miss significant damage and are time consuming and expensive to perform. In contrast, vibrometry or vibration signature techniques are a global method of structural integrity monitoring that potentially can efficiently detect damage on large structures, including damage that is away from sensor locations, and in the interior of structures. However, a barrier problem in damage detection using vibration measurements is the need to measure the vibration response at a large number of points on the structure. Typically, model reduction or expansion procedures such as Guyan reduction or dynamic expansion are attempted to overcome the problem of insufficient measurements or spatial aliasing. These approaches depend on using information from the healthy model, and thus put error into the reduction used to represent the damaged structure. In this paper, a Frequency Response Function technique is used to detect damage to a fixed-free beam. The technique uses measured frequency response functions from the healthy structure as reference data, and then monitors vibration measurements during the life of the structure to detect damage. In an analytical simulation using a finite-element model of a beam, damage was located using only sparse measurements because the technique uses both rotation and translation measurements from the damaged structure.

Schulz, Mark J.↗

Identification of High Performance, Low Environmental Impact Materials and Processes Using Systematic Substitution (SyS)

Process analysis can identify opportunities for efficiency improvement including cost reduction, increased safety, improved quality, and decreased environmental impact. A thorough, systematic approach to materials and process selection is valuable in any analysis. New operations and facilities design offer the best opportunities for proactive cost reduction and environmental improvement, but existing operations and facilities can also benefit greatly. Materials and processes that have been used for many years may be sources of excessive resource use, waste generation, pollution, and cost burden that should be replaced. Operational and purchasing personnel may not recognize some materials and processes as problems. Reasons for materials or process replacement may include quality and efficiency improvements, excessive resource use and waste generation, materials and operational costs, safety (flammability or toxicity), pollution prevention, compatibility with new processes or materials, and new or anticipated regulations.

Dhooge, P. M.↗

Stress analysis and design considerations for Shuttle pointed autonomous research tool for astronomy /SPARTAN/

The Shuttle Pointed Autonomous Research Tool for Astronomy (SPARTAN) family of spacecraft are intended to operate with minimum interfaces with the U.S. Space Shuttle in order to increase flight opportunities. The SPARTAN I Spacecraft was designed to enhance structural capabilities and increase reliability. The approach followed results from work experience which evolved from sounding rocket projects. Structural models were developed to do the analyses necessary to satisfy safety requirements for Shuttle hardware. A loads analysis must also be performed. Stress analysis calculations will be performed on the main structural elements and subcomponents. Attention is given to design considerations and program definition, the schematic representation of a finite element model used for SPARTAN I spacecraft, details of loads analysis, the stress analysis, and fracture mechanics plan implications.

Ferragut, N. J.↗

Guidance, Navigation, and Control System Design in a Mass Reduction Exercise

Early Orion GN&C system designs optimized for robustness, simplicity, and utilization of commercially available components. During the System Definition Review (SDR), all subsystems on Orion were asked to re-optimize with component mass and steady state power as primary design metrics. The objective was to create a mass reserve in the Orion point of departure vehicle design prior to beginning the PDR analysis cycle. The Orion GN&C subsystem team transitioned from a philosophy of absolute 2 fault tolerance for crew safety and 1 fault tolerance for mission success to an approach of 1 fault tolerance for crew safety and risk based redundancy to meet probability allocations of loss of mission and loss of crew. This paper will discuss the analyses, rationale, and end results of this activity regarding Orion navigation sensor hardware, control effectors, and trajectory design.

Crain, Timothy↗