Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM 2009

Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2009 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2009 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per LWO-LWE-2008-00423, HLW Tank Farm Inspection Plan for 2009, were completed. All Ultrasonic measurements (UT) performed in 2009 met the requirements of C-ESG-00006, In-Service Inspection Program for High Level Waste Tanks, Rev. 1, and WSRC-TR-2002-00061, Rev.4. UT inspections were performed on Tank 29 and the findings are documented in SRNL-STI-2009-00559, Tank Inspection NDE Results for Fiscal Year 2009, Waste Tank 29. Post chemical cleaning UT measurements were made in Tank 6 and the results are documented in SRNL-STI-2009-00560, Tank Inspection NDE Results Tank 6, Including Summary of Waste Removal Support Activities in Tanks 5 and 6. A total of 6669 photographs were made and 1276 visual and video inspections were performed during 2009. Twenty-Two new leaksites were identified in 2009. The locations of these leaksites are documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.4. Fifteen leaksites at Tank 5 were documented during tank wall/annulus cleaning activities. Five leaksites at Tank 6 were documented during tank wall/annulus cleaning activities. Two new leaksites were identified at Tank 19 during waste removal activities. Previously documented leaksites were reactivated at Tanks 5 and 12 during waste removal activities. Also, a very small amount of additional leakage from a previously identified leaksite at Tank 14 was observed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Timely Result-Data Offloading for Improved HPC Center Scratch Provisioning and Serviceability

Modern High-Performance Computing (HPC) centers are facing a data deluge from emerging scientific applications. Supporting large data entails a significant commitment of the highthroughput center storage system, scratch space. However, the scratch space is typically managed using simple purge policies, without sophisticated end-user data services to balance resource consumption and user serviceability. End-user data services such as offloading are performed using point-to-point transfers that are unable to reconcile center s purge and users delivery deadlines, unable to adapt to changing dynamics in the end-toend data path and are not fault-tolerant. Such inefficiencies can be prohibitive to sustaining high performance. In this paper, we address the above issues by designing a framework for the timely, decentralized offload of application result data. Our framework uses an overlay of user-specified intermediate and landmark sites to orchestrate a decentralized fault-tolerant delivery. We have implemented our techniques within a production job scheduler (PBS) and data transfer tool (BitTorrent). Our evaluation using both a real implementation and supercomputer job log-driven simulations show that: the offloading times can be significantly reduced (90.4% for a 5 GB data transfer); the exposure window can be minimized while also meeting center-user Service Level Agreements.

99 GENERAL AND MISCELLANEOUS↗

ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

In Vivo Monitoring Program Manual, PNL-MA-574

An overview of the administration for the In Vivo Monitoring Program (IVMP) for Hanford. This includes organizational structure and program responsibilities; coordination of in vivo measurements; scheduling measurements; performing measurements; reporting results; and quality assurance. Overall responsibility for the management of the IVMP rests with the Program Manager (PM). The PM is responsible for providing the required in vivo counting services for Hanford Site contractor employees in accordance with Department of Energy (DOE) requirements and the specific statements of work.

61 RADIATION PROTECTION AND DOSIMETRY↗

2011 Annual Report [WESTERN AREA POWER ADMINISTRATION]

Western’s achievements for 2011 are reported and include: Experienced a banner water year – meaning more hydropower delivered; Changed energy scheduling— to better support intermittent renewable resources; Maintained reliability— ensuring maximum use of the grid by reducing the frequency and duration of planned and unplanned outages; Connected communities— providing customers energy products and related services at cost-based rates; Managed transmission projects.

13 HYDRO ENERGY↗

NYSEG Seneca Compressed Air Energy Storage (CAES) Demonstration Project

Compressed Air Energy Storage (CAES) is a hybrid energy storage and generation concept that has many potential benefits especially in a location with increasing percentages of intermittent wind energy generation. The objectives of the NYSEG Seneca CAES Project included: for Phase 1, development of a Front End Engineering Design for a 130MW to 210 MW utility-owned facility including capital costs; project financials based on the engineering design and forecasts of energy market revenues; design of the salt cavern to be used for air storage; draft environmental permit filings; and draft NYISO interconnection filing; for Phase 2, objectives included plant construction with a target in-service date of mid-2016; and for Phase 3, objectives included commercial demonstration, testing, and two-years of performance reporting. This Final Report is presented now at the end of Phase 1 because NYSEG has concluded that the economics of the project are not favorable for development in the current economic environment in New York State. The proposed site is located in NYSEG’s service territory in the Town of Reading, New York, at the southern end of Seneca Lake, in New York State’s Finger Lakes region. The landowner of the proposed site is Inergy, a company that owns the salt solution mining facility at this property. Inergy would have developed a new air storage cavern facility to be designed for NYSEG specifically for the Seneca CAES project. A large volume, natural gas storage facility owned and operated by Inergy is also located near this site and would have provided a source of high pressure pipeline quality natural gas for use in the CAES plant. The site has an electrical take-away capability of 210 MW via two NYSEG 115 kV circuits located approximately one half mile from the plant site. Cooling tower make-up water would have been supplied from Seneca Lake. NYSEG’s engineering consultant WorleyParsons Group thoroughly evaluated three CAES designs and concluded that any of the designs would perform acceptably. Their general scope of work included development of detailed project construction schedules, capital cost and cash flow estimates for both CAES cycles, and development of detailed operational data, including fuel and compression energy requirements, to support dispatch modeling for the CAES cycles. The Dispatch Modeling Consultant selected for this project was Customized Energy Solutions (CES). Their general scope of work included development of wholesale electric and gas market price forecasts and development of a dispatch model specific to CAES technologies. Parsons Brinkerhoff Energy Storage Services (PBESS) was retained to develop an air storage cavern and well system design for the CAES project. Their general scope of work included development of a cavern design, solution mining plan, and air production well design, cost, and schedule estimates for the project. Detailed Front End Engineering Design (FEED) during Phase 1 of the project determined that CAES plant capital equipment costs were much greater than the $\$$125.6- million originally estimated by EPRI for the project. The initial air storage cavern Design Basis was increased from a single five million cubic foot capacity cavern to three, five million cubic foot caverns with associated air production wells and piping. The result of this change in storage cavern Design Basis increased project capital costs significantly. In addition, the development time required to complete the three cavern system was estimated at approximately six years. This meant that the CAES plant would initially go into service with only one third of the required storage capacity and would not achieve full capability until after approximately five years of commercial operation. The market price forecasting and dispatch modeling completed by CES indicated that the CAES technologies would operate at only 10 to 20% capacity factors and the resulting overall project economics were not favorable for further development. As a result of all of these factors, the Phase 1 FEED developed an installed CAES plant cost estimate of approximately $\$$2,300/KW for the 210MW CAES 1A and 2 cycles. The capital cost for the 136 MW CAES 1 cycle was even higher due to the lower generating capacity of the cycle. Notably, the large equipment could have generated additional capacity (up to 270MW) which would have improved the cost per KW; however, the output was limited by the night time transmission system capability. The research herein, therefore, is particular to the site-specific factors that influenced the design and the current and forecasted generation mix and energy prices in Upstate New York and may not necessarily indicate that CAES plants cannot be economically constructed in other places in New York State or the world.

25 ENERGY STORAGE↗

Method development for comprehensive extraction and analysis of marine toxins: Liquid-liquid extraction and tandem liquid chromatography separations coupled to electrospray tandem mass spectrometry

Toxins from biological sources are recognized as potential chemical weapon threats, with saxitoxin and ricin listed by the chemical weapons convention (CWC) as schedule one agents (CWC reference). These two toxins represent a metabolite (saxitoxin) and protein (ricin) from algal and plant sources, respectively. An array of toxins have been listed as "select agents" by the Health and Human Services (HHS) select agent program, including ricin, abrin, saxitoxin, tetrodotoxin, specific paralytic alpha conotoxin peptides, T-2 toxin, diacetoxyscirpenols, botulinum toxins, and staphylococcal enterotoxins [1]. The quantities of these toxins dictate whether they are considered select agents with federal oversight of their storage and use. While this list captures some of the naturally occurring toxins that may pose a threat to the public, there are a number of other naturally occurring toxins that may also be a concern.

biodetection↗

Opportunities for Automated Demand Response in Wastewater Treatment Facilities in California - Southeast Water Pollution Control Plant Case Study

This report details a study into the demand response potential of a large wastewater treatment facility in San Francisco. Previous research had identified wastewater treatment facilities as good candidates for demand response and automated demand response, and this study was conducted to investigate facility attributes that are conducive to demand response or which hinder its implementation. One years' worth of operational data were collected from the facility's control system, submetered process equipment, utility electricity demand records, and governmental weather stations. These data were analyzed to determine factors which affected facility power demand and demand response capabilities The average baseline demand at the Southeast facility was approximately 4 MW. During the rainy season (October-March) the facility treated 40% more wastewater than the dry season, but demand only increased by 4%. Submetering of the facility's lift pumps and centrifuges predicted load shifts capabilities of 154 kW and 86 kW, respectively, with large lift pump shifts in the rainy season. Analysis of demand data during maintenance events confirmed the magnitude of these possible load shifts, and indicated other areas of the facility with demand response potential. Load sheds were seen to be possible by shutting down a portion of the facility's aeration trains (average shed of 132 kW). Load shifts were seen to be possible by shifting operation of centrifuges, the gravity belt thickener, lift pumps, and external pump stations These load shifts were made possible by the storage capabilities of the facility and of the city's sewer system. Large load reductions (an average of 2,065 kW) were seen from operating the cogeneration unit, but normal practice is continuous operation, precluding its use for demand response. The study also identified potential demand response opportunities that warrant further study: modulating variable-demand aeration loads, shifting operation of sludge-processing equipment besides centrifuges, and utilizing schedulable self-generation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A brief parallel I/O tutorial.

This document provides common best practices for the efficient utilization of parallel file systems for analysts and application developers. A multi-program, parallel supercomputer is able to provide effective compute power by aggregating a host of lower-power processors using a network. The idea, in general, is that one either constructs the application to distribute parts to the different nodes and processors available and then collects the result (a parallel application), or one launches a large number of small jobs, each doing similar work on different subsets (a campaign). The I/O system on these machines is usually implemented as a tightly-coupled, parallel application itself. It is providing the concept of a 'file' to the host applications. The 'file' is an addressable store of bytes and that address space is global in nature. In essence, it is providing a global address space. Beyond the simple reality that the I/O system is normally composed of a small, less capable, collection of hardware, that concept of a global address space will cause problems if not very carefully utilized. How much of a problem and the ways in which those problems manifest will be different, but that it is problem prone has been well established. Worse, the file system is a shared resource on the machine - a system service. What an application does when it uses the file system impacts all users. It is not the case that some portion of the available resource is reserved. Instead, the I/O system responds to requests by scheduling and queuing based on instantaneous demand. Using the system well contributes to the overall throughput on the machine. From a solely self-centered perspective, using it well reduces the time that the application or campaign is subject to impact by others. The developer's goal should be to accomplish I/O in a way that minimizes interaction with the I/O system, maximizes the amount of data moved per call, and provides the I/O system the most information about the I/O transfer per request.

99 GENERAL AND MISCELLANEOUS↗

Resilient Disaster Recovery Logistics of Distribution Systems: Co-Optimize Service Restoration With Repair Crew and Mobile Power Source Dispatch

Repair crews (RCs) and mobile power sources (MPSs) are critical resources for distribution system (DS) outage management after a natural disaster. However, their logistics have not been well investigated. We propose a resilient scheme for disaster recovery logistics to co-optimize DS restoration with the dispatch of RCs and MPSs. A novel co-optimization model is formulated to route RCs and MPSs in the transportation network, schedule them in the DS, and reconfigure the DS for microgrid formation coordinately, etc. The model incorporates different timescales of DS restoration and RC/MPS dispatch, the coupling of transportation and power networks, etc. To ensure radiality of the DS with variable physical structure and MPS allocation, we also model topology constraints based on the concept of spanning forest. The model is convexified equivalently and linearized into a mixed-integer linear programming. To reduce its computation time, preprocessing methods are proposed to preassign a minimal set of repair tasks to depots and reduce the number of candidate nodes for MPS connection. Resilient recovery strategies thus are generated to enhance service restoration, especially by dynamic formation of microgrids that are powered by MPSs and topologized by repair actions of RCs and network reconfiguration of the DS. Case studies demonstrate the proposed methodology.

Disaster recovery logistics↗

Respirator Cartridge Performance on Mixed Vapors from Hanford Tank Headspaces and Exhausters - 20427

Between 2016 and 2018, the Hanford Tank Operations Contractor - Washington River Protection Solutions (WRPS) - conducted a series of tests of air-purifying respirator (APR) chemical cartridges commonly used at Hanford tank farms to determine the period of time for which the cartridges would provide adequate performance when used in APRs and powered-air-purifying respirators (PAPRs) to protect workers when exposed to a mixture of vapors exiting tank headspaces. Although cartridge manufacturers provide service life estimating tools for individual chemical compounds, the projected performance of these cartridges on complex vapor mixtures is not available, and the adequacy of APRs for tank farm applications represents an important workforce concern. The Occupational Safety and Health Administration identifies cartridge testing as a valid approach for establishing cartridge service life. The primary function of the WRPS Cartridge Test Program was to obtain objective data to determine service lives for the APR and PAPR cartridges used at Hanford tank farms. WRPS contracted with Pacific Northwest National Laboratory to analyze the test data and offer an independent analysis of and recommendations based on respirator cartridge performance. A total of 28 APR and 10 PAPR cartridge tests were conducted between 2016 and 2018 on 12 different tank headspaces and tank farm exhauster slipstreams. Two APR cartridges from SCOTT (now 3M) and two PAPR cartridges from MSA Safety, Inc. and 3M were evaluated using a cartridge testing system specifically designed to measure and monitor test conditions and sample cartridge inlet and outlet vapor streams for important chemical compounds. Testing focused on analysis of approximately 61 tank vapor chemicals of potential concern (COPCs) that have been previously detected in tank vapors at levels above 10% of their occupational exposure limits (OELs). Each test was conducted over 16 hours of run time. Evidence of chemical breakthrough was assessed by comparing inlet and outlet COPC concentrations over the duration of each test. The breakthrough threshold was normally defined as exceeding 10% of the compounds OEL at the cartridge outlet. Ammonia breakthrough was observed in a majority of the cartridge tests and occurred earlier than breakthrough of any other chemical compound. Several other COPCs did exhibit breakthrough behavior, including mercury, 1,3-butadiene, furan, 2,5 dihydrofuran, and N-nitrosodimethylamine (NDMA), but only in a very limited number of cartridge tests and only after ammonia breakthrough had occurred. In addition, tests results suggest that breakthrough of some of these COPCs may have been affected by competition with and breakthrough of other non-COPC organics, such as ethanol and acetone, with substantially lower toxicological hazard. Comparison of cartridge manufacturers' service life estimates with the experimentally derived breakthrough times indicates that manufacturers' estimates are generally conservative, even in the presence of the complex mixed vapor streams experienced in these tests. With consideration of appropriate safety margins, these results provide valuable insights on cartridge performance to inform industrial hygiene professionals in establishing appropriate cartridge change-out schedules for APR and PAPR use in the Hanford tank farms. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Hierarchical Control Architecture: Utilization of Behind-the-Meter Appliances with Increased Visibility and Controllability

Optimal operations of distribution systems to enhance reliability and resiliency can be achieved if information with higher fidelity can be accessed from grid premise devices. This paper discusses a hierarchical control architecture that can introduce higher visibility and controllability by utilizing the estimated injection and absorption of different behind-the-meter controllable loads, and DERs, including EVs, within a premise. The acquired information is used to make control decisions for scheduling the premise appliances to reduce energy consumptions. The premise controller can also optimize the consumptions on a day-to-day basis in addition to taking input signals from the utility operators to support grid-service events (e.g., peak shaving). The entire control architecture is designed in a modular and scalable fashion that provides benefits to the utility from the reuse of existing infrastructure while creating opportunities for various grid services to be enabled by the operation of premise controllers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Atmospheric pressure ionisation - mass spectrometry for argon online monitoring in ASTRID

Safety, operability, waste transmutation and mastered investment costs are key issues for the development of generation IV reactors, especially sodium cooled fast reactors. To achieve a development scheduled around 2040, the nuclear energy division of CEA, France, is studying a prototype called ASTRID (Advanced Sodium Technological Reactor for Industrial Demonstration) which is in its conceptual design phase. To achieve a high level of maturity, In Service Inspection and Repair is very important, in particular fuel cladding failure detection. If such a failure occurs, fission products Xenon and Krypton are released. Their fast and sensitive detection is a challenge. The use of a commercial API-MS is evaluated in this work. Detection limits below 10 ppt have been measured for Kr 84 and for Xe 132. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Facilitating Staging-based Unstructured Mesh Processing to Support Hybrid In-Situ Workflows

In-situ and in-transit processing alleviate the gap between the computing and I/O capabilities by scheduling data analytics close to the data source. Hybrid in-situ processing splits data analytics into two stages: the data processing that runs in-situ aims to extract regions of interest, which are then transferred to staging services for further in-transit analytics. To facilitate this type of hybrid in-situ processing, the data staging service needs to support complex intermediate data representations generated/consumed by the in-situ tasks. Unstructured (or irregular) mesh is one such derived data representation that is typically used and bridges simulation data and analytics. However, how staging services efficiently support unstructured mesh transfer and processing remains to be explored. This paper investigates design options for transferring and processing unstructured mesh data using staging services. Using polygonal mesh data as an example, we show that hybrid in-situ workflows with staging-based unstructured mesh processing can effectively support hybrid in-situ workflows, and can significantly decrease data movement overheads.

data-driven↗

Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Water Use Optimization Toolset Project: Development and Demonstration Phase Draft Report

This report summarizes the results of the development and demonstration phase of the Water Use Optimization Toolset (WUOT) project. It identifies the objective and goals that guided the project, as well as demonstrating potential benefits that could be obtained by applying the WUOT in different geo-hydrologic systems across the United States. A major challenge facing conventional hydropower plants is to operate more efficiently while dealing with an increasingly uncertain water-constrained environment and complex electricity markets. The goal of this 3-year WUOT project, which is funded by the U.S. Department of Energy (DOE), is to improve water management, resulting in more energy, revenues, and grid services from available water, and to enhance environmental benefits from improved hydropower operations and planning while maintaining institutional water delivery requirements. The long-term goal is for the WUOT to be used by environmental analysts and deployed by hydropower schedulers and operators to assist in market, dispatch, and operational decisions.

13 HYDRO ENERGY↗

Fracture Toughness Properties of Tritium Charged and Aged Stainless Steels: SRNL and SNL Collaboration Test Plan and 2018 Results

Forged stainless steels are used as the materials of construction for tritium reservoirs. During service, tritium diffuses into the reservoir walls and radioactively decays to helium-3. Tritium and decay helium cause a higher propensity for cracking which could lead to a tritium leak or failure of a tritium reservoir. Fracture toughness properties are needed for designing tritium reservoirs and evaluating the long-term effects of tritium on their structural properties. A key result of prior studies is that the long-term cracking resistance of stainless steels in tritium service depends greatly on the interaction between decay helium and the steels’ forged microstructure. Designers and modelers at Sandia National Laboratories (SNL) have identified key gaps in the data available on material performance in tritium. Thus, a collaborative plan and schedule of tests have been developed with SRNL and SNL to fill these gaps using a range of tensile test and fracture mechanics test geometries, at stockpile relevant temperatures. These studies target the fundamental deformation mechanisms and the influence of tritium-decay-helium on their behavior. This report outlines the goals of each program and describes the sample test matrices and experimental conditions. This report fulfills the requirements for a portion of the Enhanced Surveillance Campaign (ESC) FY19 Level 2 milestone 6725 to deliver an annual report on the aging studies of reservoir materials.

36 MATERIALS SCIENCE↗

Advance Network Reservation and Provisioning for Science

We are witnessing a new era that offers new opportunities to conduct scientific research with the help of recent advancements in computational and storage technologies. Computational intensive science spans multiple scientific domains, such as particle physics, climate modeling, and bio-informatics simulations. These large-scale applications necessitate collaborators to access very large data sets resulting from simulations performed in geographically distributed institutions. Furthermore, often scientific experimental facilities generate massive data sets that need to be transferred to validate the simulation data in remote collaborating sites. A major component needed to support these needs is the communication infrastructure which enables high performance visualization, large volume data analysis, and also provides access to computational resources. In order to provide high-speed on-demand data access between collaborating institutions, national governments support next generation research networks such as Internet 2 and ESnet (Energy Sciences Network). Delivering network-as-a-service that provides predictable performance, efficient resource utilization and better coordination between compute and storage resources is highly desirable. In this paper, we study network provisioning and advanced bandwidth reservation in ESnet for on-demand high performance data transfers. We present a novel approach for path finding in time-dependent transport networks with bandwidth guarantees. We plan to improve the current ESnet advance network reservation system, OSCARS [3], by presenting to the clients, the possible reservation options and alternatives for earliest completion time and shortest transfer duration. The Energy Sciences Network (ESnet) provides high bandwidth connections between research laboratories and academic institutions for data sharing and video/voice communication. The ESnet On-Demand Secure Circuits and Advance Reservation System (OSCARS) establishes guaranteed bandwidth of secure virtual circuits at a certain time, for a certain bandwidth and length of time. Though OSCARS operates within the ESnet, it also supplies end-to-end provisioning between multiple autonomous network domains. OSCARS gets reservation requests through a standard web service interface, and conducts a Quality-of-service (QoS) path for bandwidth guarantees. Multi-protocol Label Switching (MPLS) and the Resource Reservation Protocol (RSVP) enable to create a virtual circuit using Label Switched Paths (LSP's). It contains three main components: a reservation manager, a bandwidth scheduler, and a path setup subsystem. The bandwidth scheduler needs to have information about the current and future states of the network topology in order to accomplish end-to-end bandwidth guaranteed paths.

97 MATHEMATICS AND COMPUTING↗