Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling and spacing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

A Coupled Probabilistic Wake Vortex and Aircraft Response Prediction Model

Wake vortex spacing standards along with weather and runway occupancy time, restrict terminal area throughput and impose major constraints on the overall capacity and efficiency of the National Airspace System (NAS). For more than two decades, the National Aeronautics and Space Administration (NASA) has been conducting research on characterizing wake vortex behavior in order to develop fast-time wake transport and decay prediction models. It is expected that the models can be used in the systems level design of advanced air traffic management (ATM) concepts that safely increase the capacity of the NAS. It is also envisioned that at a later stage of maturity, these models could potentially be used operationally, in groundbased spacing and scheduling systems as well as on the flight deck.

Gloudemans, Thijs↗

MUSTANG Applications

Reducing nonrecurring cost and shortening the build schedule for space qualified avionics has been a recurring theme in Space Industry. The NASA Goddard Space Flight Center has leverage its heritage flight qualified design and developed a portfolio of modular avionics comprised of 22 different board designs in a form factor named MUSTANG (Modular Unified Space Technology Avionics for Next Generation) that can be utilized in a variety flight applications. Since the design has no backplane, the modules can be mixed and match to meet the needed requirements. The MUSTANG form factor is sized to fill the void between 3U and 6U form factor and with flexibility to adapting the design without relaying out the boards.

Space↗

Crew Scheduling Performance

As NASA considers long-duration exploration missions (LDEMs), it is envisioned that crew will behave more autonomously as compared to low-Earth orbit missions. The necessary shift of Ops Planners’ complete management of scheduling and planning to provide flexibility for crew to manage their own schedule in real-time requires significant research and investigation in evaluation of concepts of operations, of software tools to support tasks, and of crew performance to complete scheduling tasks. Our research objective is to characterize the human performance envelope for the task of planning and scheduling (crew self-scheduling), develop countermeasures to mitigate adverse performance effects due to plan complexity, and inform performance standards and guidelines based on research results. In our efforts to understand and characterize scheduling performance of crew members, we have conducted subject matter expert interviews to obtain feedback on scheduling plan complexity drivers and plan goodness. Following the pilot study conducted last year, we designed a study and have begun remote human subject testing to evaluate non-expert human performance, workload, and situational awareness for the task of planning and scheduling. This study investigates the effects of the number and type of constraints on human performance, and the differences in scheduling metrics between scheduling and rescheduling tasks. Subject testing is currently in progress, and we aim to collect data from approximately thirty subjects. We will summarize the methods used and impacts of the number and type of scheduling constraints. We will also present lessons learned as well as relevant results of the study.

crew scheduling↗

Rendezvous with a star

The spacecraft Ulysses carrying five European and four American instruments is described. The instruments are designed to investigate the properties of the solar wind, the sun-wind interface, the heliospheric magnetic field, solar radio burst and plasma waves, solar X-rays, solar and galactic cosmic rays, and gas and dust in interplanetary space. Ulysses is scheduled to be carried into orbit aboard the Space Shuttle in October 1990, when Jupiter's position relative to the earth is suitable for a minimum-energy trajectory. Once in orbit, a three-stage, solid-fuel vehicle known as the Inertial Upper Stage plus Payload Assist Module (Special), will then propel Ulysses on a 16-month journey to Jupiter. In February 1992, Ulysses is scheduled to fly past Jupiter toward its rendezvous with the sun. Ulysses will then head for a region of interplanetary space never before explored and is scheduled to have two solar encounters. Its official mission ends soon after September 1995.

Bennett, Gary L.↗

An optimal spacecraft scheduling model for the NASA deep space network

A computer model is described which uses mixed-integer linear programming to provide optimal DSN spacecraft schedules given a mission set and specified scheduling requirements. A solution technique is proposed which uses Bender's method and a heuristic starting algorithm.

Webb, W. A.↗

Incremental Scheduling Engines: Cost Savings through Automation

As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and ob.jectives are met and resources are not over-booked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper, presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

Jaap, John↗

Incremental Scheduling Engines for Human Exploration of the Cosmos

As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

Jaap, John↗

Prediction and Measurement of X-Ray Spectral and Intensity Distributions from Low Energy Electron Impact Sources

In-vacuum electron beam welding is a technology that NASA considered as a joining technique for manufacture of space structures. The interaction of energetic electrons with metal produces x-rays. The radiation exposure to astronauts performing the in-vacuum electron beam welding must be characterized and minimized to insure safe operating conditions. This investigation characterized the x-ray environment due to operation of an in-vacuum electron beam welding tool. NASA, in a joint venture with the Russian Space Agency, was scheduled to perform a series of welding in space experiments on board the United States Space Shuttle. This series of experiments was named the International Space Welding Experiment (ISWE). The hardware associated with the ISWE was leased to NASA, by the Paton Welding Institute (PWI) in Ukraine, for ground based welding experiments in preparation for flight. Two tests were scheduled, using the ISWE electron beam welding tool, to characterize the radiation exposure to an astronaut during the operation of the ISWE. These radiation exposure tests consisted of Thermoluminescence Dosimeters (TLD's) shielded with material currently used by astronauts during Extra Vehicular Activities (EVA) and exposed to x-ray radiation generated by operation of an in-vacuum electron beam welding tool. This investigation was the first known application of TLD's to measure absorbed dose from x-rays of energy less than 10 KeV. The ISWE hardware was returned to Ukraine before the issue of adequate shielding for the astronauts was verified. Therefore, alternate experimental and analytical methods were developed to measure and predict the x-ray spectral and intensity distribution generated by electron impact with metal. These x-ray spectra were used to calculate the absorbed radiation dose to astronauts. These absorbed dose values were compared to TLD measurements obtained during actual operation of the in-vacuum electron beam welding tool. The calculated absorbed dose values were found to be in good agreement with the TLD values.

Edwards, David L.↗

Absorbed Dose Determination Using Experimental and Analytical Predictions of X-Ray Spectra

Electron beam welding in a vacuum is a technology that NASA is investigating as a joining technique for manufacture of space structures. This investigation characterizes the x-ray environment due to operation of an in-vacuum electron beam welding tool and provides recommendations for adequate shielding for astronauts performing the in-vacuum electron beam welding. NASA, in a joint venture with the Russian Space Agency, was scheduled to perform a series of welding in space experiments on board the U.S. Space Shuttle. This series of experiments was named the international space welding experiment (ISWE). The hardware associated with the ISWE was leased to NASA by the Paton Welding Institute (PWI) in Ukraine for ground-based welding experiments in preparation for flight. Two ground tests were scheduled, using the ISWE electron beam welding tool, to characterize the radiation exposure to an astronaut during the operation of the ISWE. These radiation exposure tests used thermoluminescence dosimeters (TLD's) shielded with material currently used by astronauts during extravehicular activities to measure the radiation dose. The TLD's were exposed to x-ray radiation generated by operation of the ISWE in-vacuum electron beam welding tool. This investigation was the first known application of TLD's to measure absorbed dose from x rays of energy less than 10 keV. The ISWE hardware was returned to Ukraine before the issue of adequate shielding for the astronauts was completely verified. Therefore, alternate experimental and analytical methods were developed to measure and predict the x-ray spectral and intensity distribution generated by ISWE electron beam impact with metal. These x-ray spectra were normalized to an equivalent ISWE exposure, then used to calculate the absorbed radiation dose to astronauts. These absorbed dose values were compared to TLD measurements obtained during actual operation of the ISWE in-vacuum electron beam welding tool. The calculated absorbed dose values were found to be in agreement with the measured TLD values.

Edwards, D. L.↗

Automated Scheduling of Personnel to Staff Operations for the Mars Science Laboratory

Leveraging previous work on scheduling personnel for space mission operations, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] to the domain of scheduling personnel for operations of the Mars Science Laboratory. Automated scheduling of personnel is not new. We compare our representations to a sampling of employee scheduling systems available with respect to desired features. We described the constraints required by MSL personnel schedulers and how each is handled by the scheduling algorithm.

MSL↗