Search NASA⌕ Search

SEARCH · Search NASA

Results for “September 2012”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Turbulent flame speeds and NOx kinetics of HHC fuels with contaminants and high dilution levels

This progress report documents the second year of the project, from October 1, 2011 through September 30, 2012. Characterization of the new turbulent flame speed vessel design was completed. Turbulence statistics of three impellers with different geometric features were measured using particle image velocimetry inside a Plexiglas model (~1:1 scale) of a cylindrical flame speed vessel (30.5 cm ID × 35.6 cm L). With four impellers arranged in a central-symmetric configuration, turbulence intensities between 1.2 and 1.7 m/s with negligible mean flow (0.1u´) were attained at the lowest fan speeds. Acceptable ranges for homogeneity and isotropy ratios of the velocity fields were set within a narrow bandwidth near unity (0.9-1.1). Homogeneity ratios were unaffected by changes to the impeller geometry, and the prototype with the higher number of blades caused the flow to become anisotropic. The integral length scale of the flow fields varied between 27 and 20 mm, which correlates well with those typically observed inside a gas turbine combustor. The mechanism to independently vary the intensity level and the integral length scale was established, where turbulence intensity level was dependent on the rotational speed of the fan, and the integral length scale decreased with increasing blade pitch angle. Ignition delay times of H₂/O₂ mixtures highly diluted with Ar and doped with various amounts of N₂O (100, 400, 1600, 3200 ppm) were measured in a shock tube behind reflected shock waves over a wide range of temperatures (940-1675 K). The pressure range investigated during this work (around 1.6, 13, and 30 atm) allows studying the effect of N₂O on hydrogen ignition at pressure conditions that have never been heretofore investigated. Ignition delay times were decreased when N₂O was added to the mixture only for the higher nitrous oxide concentrations, and some changes in the activation energy were also observed at 1.5 and 30 atm. When it occurred, the decrease in the ignition delay time was proportional to the amount of N₂O added and depended on pressure and temperature conditions. A detailed chemical kinetics model was developed using kinetic mechanisms from the literature. This model predicts well the experimental data obtained during this study and from the literature. The chemical analysis using this model showed that the decrease in the ignition delay time was mainly due to the reaction N₂O +M ⇌ N₂ + O +M which provides O atoms to strengthen the channel O + H₂ ⇌ OH + H. Ignition delay times have been measured behind reflected shock waves at 1.5, 12 and 30 atm for a mixture representative of a syngas produced from biomass (0.29659% CO / 0.29659% H₂ / 0.15748% CO₂ / 0.08924% CH₄ / 0.20997% H₂O / 0.95013% O₂ in 98% Ar (mol.%)) and for the same biomass-derived syngas mixture doped with 200 ppm of NH₃. The importance of the various constituents on the ignition delay time was investigated by comparing the results with data from various baseline mixtures (H₂/O₂/Ar, H₂/CO/O₂/Ar and H₂/CO/O₂/Ar with one of the other constituent of the syngas (i.e. CO₂, H₂O, CH₄ or NH₃)). The equivalence ratio was set to 0.5 during this study. Several recent detailed kinetics mechanisms from the literature were computed against these data, with fair agreement. Results showed that the mixture composition can have an important effect on the ignition delay time, with most of the effect being due to CH₄ addition through the reaction CH₄+OH⇌CH₃+H₂O. The ammonia impurity had very little effect on the ignition delay time over the range of conditions studied.

Petersen, Eric↗

Renewable Electricity Generation

This document highlights DOE's Office of Energy Efficiency and Renewable Energy's advancements in renewable electricity generation technologies including solar, water, wind, and geothermal.

concentrating solar power↗

Sustainable Transportation

This document highlights DOE's Office of Energy Efficiency and Renewable Energy's advancements in transportation technologies, alternative fuels, and fuel cell technologies.

batteries↗

Remote Dismantling and Packaging of the RPV and Thermal Shield at the Obrigheim NPP - 16073

The Obrigheim Nuclear Power Plant (KWO) is located in the Federal State of Baden- Wuerttemberg in Germany and was operated by the EnKK-KWO. The Nuclear Power Plant - a light water pressurized water reactor with 357 MW of electrical power - was operated from 1968 to 2005. In June 2009 the Energiewerke Nord GmbH (EWN) was charged with the dismantling planning and dismantling of the reactor. According to the German nuclear and radiation protection law, several licenses will be required for the realisation of this task. This also applies to the disposal of the waste produced by dismantling, which must finally be stored in the German final repository for low and medium-radioactive waste (underground repository 'Konrad'). In spring 2010 EWN completed all application documents for the dismantling of the reactor pressure vessel (RPV) and the RPV internals and EnKK-KWO delivered them to the responsible Environmental Ministry of Baden-Wuerttemberg. Since then it has been worked intensively on the design, construction and manufacturing of the facilities for dismantling. With a separate notification of amendment, it was applied for the license to install and commission the facilities for the dismantling of the RPV and the RPV internals at the Environmental Ministry of Baden-Wuerttemberg in October 2010. This notification of amendment was confirmed in summer 2012. In September 2011 the work process and test plan and the technical information about the campaign for the removal of the radioactive waste resulting from the RPV with internals, peripheral components and secondary waste with the aim of final disposal in the Federal Repository 'Konrad' was submitted to the Federal Office for Radiation Protection. The evaluation and assessment of the work process and test plan was concluded in August 2013, when it was audited by TUV Nord EnSys without any further measures and indications. On September 10 the work process and test plan was released by the Federal Office for radiation protection. The dismantling of the RPV internals upper core and lower core structure started in September 2013 in the wet cutting area in room 01.106/306 and were finished in October 2014. In the presentation 'Dismantling of the Obrigheim NPP Reactor and Waste Management' held on the WM Symposia in Phoenix, 2014, an overview about the remote cutting and packaging of the upper and lower core structure was given. In today's presentation the subsequent dismantling activities will be outlined and evaluated. The presentation will start with the short description of the basic frame conditions for the nuclear licensing procedure, important procedural principles, and necessary plant-specific conditions. After the remote cutting and packing of the reactor internals of the upper and lower core structure was completed, the wet cutting area 'reactor room 01.106/306' was cleaned and the reactor room rebuilt into a cutting area for peripheral components. After the peripheral components were dismantled, all preconditions were set to lift the RPV from its mounting position and to arrange it in the upper reactor room 01.306. After these activities were completed, the lifting of the RPV was prepared and the cutting area 'Dismantling of the RPV insulation in the reactor room 01.106/306' was set up. To carry out this task, a strand jack unit with connection block was installed on the bridge of the reactor building crane. The opening created by the dismantling of the pool plate was closed with a flap door. The manipulators used for the wet cutting of the RPV internals were also used for the remote dismantling of the RPV insulation and mounted in the cutting area. The remote facilities were handled from a control centre and/or control stand. The air-technical housing which has already been used for the remote dismantling of the RPV internals was designed for the dismantling of the RPV insulation and was extended for this dismantling scope with appropriate ventilation systems. A special feature is the fixation of the RPV insulation at the RPV corpus. The RPV insulation consists of insulation wool, wire mesh and metal-sheet insulation. This 'Sandwich Construction' is detached with a steel corset at the RPV corpus and partly tightened. The insulation of the RPV bottom dome is tightened at the supporting frame. Due to the activation of the material in the core area and the resulting high ambient dose rate the RPV insulation can only be dismantled remotely. Additionally, as asbestos fibers are expected to be found in the insulation the dismantling has to be performed according to the Technical Rules for hazardous substances. The demolition, restoration or maintenance works have to be performed remotely according to the Technical Rules for hazardous substances when the RPV is located in the cutting area. But in case of dismantling of a power reactor no such experience can be found. Beginning with the explanation of the technical, radiological and substantial boundary conditions this presentation will not only impart knowledge about the dismantling of the RPV insulation but also about the remote controlled packaging of the metal sheet insulation and the manual conditioning of the RPV insulation. Subsequently, reports on the remotely controlled cutting and packaging of the RDB are given. Here is particularly interesting that cutting methods have been used and how the activity determination of the segments was carried out. On the basis of the evaluation of the realisation the subsequent dismantling activities will be lined out. In parallel to the dismantling tasks, the waste package documentation for the final repository was issued, checked and confirmed for the containers loaded with parts of the RDB internals. The most important stages are exemplified in this presentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Second Line of Defense, Port of Buenos Aires and Exolgan Container Terminal Operational Testing and Evaluation Plan, Buenos Aires, Argentina

The Office of the Second Line of Defense (SLD) Megaports project team for Argentina will conduct operational testing and evaluation (OT&E) at Exolgan Container Terminal at the Port of Dock Sud from July 16-20, 2012; and at the Port of Buenos Aires from September 3-7, 2012. SLD is installing radiation detection equipment to screen export, import, and transshipment containers at these locations. The purpose of OT&E is to validate and baseline an operable system that meets the SLD mission and to ensure the system continues to perform as expected in an operational environment with Argentina Customs effectively adjudicating alarms.

Roberts, Bryan W.↗

Wind ramp events validation in NWP forecast models during the second Wind Forecast Improvement Project (WFIP2) using the Ramp Tool and Metric (RT&M)

The second Wind Forecast Improvement Project (WFIP2) is a multi-agency field campaign held in the Columbia Gorge area (October 2015 - March 2017). The main goal of the project is to understand and improve the forecast skill of numerical weather prediction (NWP) models in complex terrain, particularly beneficial for the wind energy industry. This region is well-known for its excellent wind resource. One of the biggest challenges for wind power production is the accurate forecasting of wind ramp events (large changes of generated power over short periods of time). Poor forecasting of the ramps requires large and sudden adjustments in conventional power generation, ultimately increasing the costs of power. A Ramp Tool and Metric (RT&M) was developed during the first WFIP experiment, held in the U.S. Great Plains (September 2011 - August 2012). The RT&M was designed to explicitly measure the skill of NWP models at forecasting wind ramp events. Here we apply the RT&M to 80-m (turbine hub-height) wind speeds measured by 19 sodars and 3 lidars, and to forecasts from the High Resolution Rapid Refresh (HRRR), 3-km, and from the High Resolution Rapid Refresh Nest (HRRRNEST), 750-m horizontal grid spacing, models. The diurnal and seasonal distribution of ramp events are analyzed, finding a noticeable diurnal variability for spring and summer but less for fall and especially winter. Also, winter has fewer ramps compared to the other seasons. The model skill at forecasting ramp events, including the impact of the modification to the model physical parameterizations, was finally investigated.

Djalalova, Irina V.↗

Is satellite Sun-Induced Chlorophyll Fluorescence more indicative than vegetation indices under drought condition?

Droughts represent one of the most severe abiotic stress factors that could result in great crop yield loss. Numerous vegetation indices have been proposed for monitoring the vegetation condition under stress and assessing drought impacts on yield loss. However, the understanding and comparison between traditional vegetation indices (VIs) and the newly emerging satellite Sun-Induced Chlorophyll Fluorescence (SIF) for monitoring vegetation condition is still limited especially under drought stress and at multiple spatial scales. In this study, the potential of satellite observation SIF for monitoring corn response to drought was investigated based on the 2012 drought in the US Corn Belt. The standardized precipitation evapotranspiration index (SPEI) was used here to quantify drought. We found that all SPEI were above –1, except for July (–1.27), August (–1.39) and September (–1.14) in 2012, indicating the severity of this drought. We examined the relationship between satellite measurements of SIF, SIF yield , VIs (e.g., NDVI and EVI) and SPEI. Results indicated that SIF yield was sensitive to drought and SIF captured the stress more accurately both at the regional and state scales for the US Corn Belt. Quantitatively, SIF yield had a high correlation with SPEI (r = 0.987, p < 0.05) over the entire Corn Belt, and it indicated losses in response to drought approximately one month earlier than SIF/NDVI/EVI. Furthermore, our results demonstrated that SIF could be trusted as an effective indicator to study the relationship between GPP (R 2 ≥ 0.8664, p < 0.01) under drought conditions across the Corn Belt. Finally, this study highlighted the advantage of using satellite SIF observations to monitor the drought stress on crop growth especially GPP at regional scale.

54 ENVIRONMENTAL SCIENCES↗

Supply Warehouse#3, SWMU 088 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This document presents the findings, observations, and results associated with Operations, Maintenance, and Monitoring (OM&M) activities of Corrective Measures Implementation (CMI) activities conducted at Supply Warehouse #3 (SW3) located at John F. Kennedy Space Center (KSC), Florida from October 8, 2015, to September 12, 2016, and performance monitoring results for semi-annual sampling events conducted in March and September 2016. The primary objective of SW3 CMI is to actively decrease concentrations of trichloroethene (TCE) and vinyl chloride (VC) to less than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs), and the secondary objective is to reduce TCE, cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), 1,1-dichloroethene (11DCE), and VC concentrations to less than FDEP Groundwater Cleanup Target Levels (GCTLs). The SW3 facility has been designated Solid Waste Management Unit (SWMU) 088 under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Based on the results to date, the SW3 air sparging (AS) system is operating at or below the performance criteria as presented in the 2008 SW3 Corrective Measures Implementation (CMI) Work Plan and 2009 and 2012 CMI Work Plan Addenda. Since the start of AS system operations on December 19, 2012, through the September 2016 groundwater sampling event, TCE concentrations have decreased to less than the GCTL in all wells within the Active Remediation Zone (ARZ), and VC results remain less than NADC but greater than GCTL. Based on these results, team consensus was reached at the October 2016 KSC Remediation Team (KSCRT) meeting to continue AS system operations and semi-annual performance monitoring of volatile organic compounds in March 2017 at ten monitoring wells at select locations, and in September 2017 at four monitoring wells at select locations to reduce VC concentrations to below GCTL. Additionally, surface water samples will be collected at locations SW0001, SW0002, and SW0003 during both the March and September 2017 events. Team consensus was also reached at the October 2017 KSCRT meeting to continue with operation and maintenance (O&M) of the AS system at SW3.

REPORT↗

INTERACTING SUPERNOVAE AND SUPERNOVA IMPOSTORS: SN 2009ip, IS THIS THE END?

We report the results of a three-year-long dedicated monitoring campaign of a restless luminous blue variable (LBV) in NGC 7259. The object, named SN 2009ip, was observed photometrically and spectroscopically in the optical and near-infrared domains. We monitored a number of erupting episodes in the past few years, and increased the density of our observations during eruptive episodes. In this paper, we present the full historical data set from 2009 to 2012 with multi-wavelength dense coverage of the two high-luminosity events between 2012 August and September. We construct bolometric light curves and measure the total luminosities of these eruptive or explosive events. We label them the 2012a event (lasting {approx}50 days) with a peak of 3 Multiplication-Sign 10{sup 41} erg s{sup -1}, and the 2012b event (14 day rise time, still ongoing) with a peak of 8 Multiplication-Sign 10{sup 42} erg s{sup -1}. The latter event reached an absolute R-band magnitude of about -18, comparable to that of a core-collapse supernova (SN). Our historical monitoring has detected high-velocity spectral features ({approx}13,000 km s{sup -1}) in 2011 September, one year before the current SN-like event. This implies that the detection of such high-velocity outflows cannot, conclusively, point to a core-collapse SN origin. We suggest that the initial peak in the 2012a event was unlikely to be due to a faint core-collapse SN. We propose that the high intrinsic luminosity of the latest peak, the variability history of SN 2009ip, and the detection of broad spectral lines indicative of high-velocity ejecta are consistent with a pulsational pair-instability event, and that the star may have survived the last outburst. The question of the survival of the LBV progenitor star and its future fate remain open issues, only to be answered with future monitoring of this historically unique explosion.

79 ASTRONOMY AND ASTROPHYSICS↗

Corrective Action Units 101 and 102: Central and Western Pahute Mesa

Well ER-EC-14 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Management Operations Underground Test Area (UGTA) Activity at the Nevada National Security Site (NNSS; formerly Nevada Test Site), Nye County, Nevada. The well was drilled in September and October 2012, as part of the Central and Western Pahute Mesa Corrective Action Unit Phase II drilling program. The primary purpose of the well was to provide detailed hydrogeologic information for the Fortymile Canyon composite hydrostratigraphic unit in the Timber Mountain moat area, within the Timber Mountain caldera complex, that will help address uncertainties within the Pahute Mesa–Oasis Valley hydrostratigraphic framework model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Proceedings of the Scientific Visit on Crystalline Rock Repository Development

A scientific visit on Crystalline Rock Repository Development was held in the Czech Republic on September 24-27, 2012. The visit was hosted by the Czech Radioactive Waste Repository Authority (RAWRA), co-hosted by Sandia National Laboratories (SNL), and supported by the International Atomic Energy Agency (IAEA). The purpose of the visit was to promote technical information exchange between participants from countries engaged in the investigation and exploration of crystalline rock for the eventual construction of nuclear waste repositories. The visit was designed especially for participants of countries that have recently commenced (or recommenced) national repository programmes in crystalline host rock formations. Discussion topics included repository programme development, site screening and selection, site characterization, disposal concepts in crystalline host rock, regulatory frameworks, and safety assessment methodology. Interest was surveyed in establishing a "club", the mission of which would be to identify and address the various technical challenges that confront the disposal of radioactive waste in crystalline rock environments. The idea of a second scientific visit to be held one year later in another host country received popular support. The visit concluded with a trip to the countryside south of Prague where participants were treated to a tour of the laboratory and underground facilities of the Josef Regional Underground Research Centre.

Mariner, Paul E.↗

Thoughts on Uncertainties in the Moments Formalism of the Statistical Theory of Fission Chains

A LANL paper says it provides an uncertainty analysis of subcritical benchmark measurements using the Hage-Cifarelli moment’s formalism. The goal of the LANL work is to provide uncertainties in the leakage and total multiplication values for use in subcritical benchmark measurements. Data of the bare BeRP ball taken September 17-20 2012 as part of exper iment IER-161 for the Department of Energy Nuclear Criticality Safety Program are used as an example to determine the measured uncertainties in leakage and total multiplication. The contribution of each parameter to the total uncertainty is then examined.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Preliminary Investigation for Corrective Action Unit 572: Test Cell C Ancillary Building and Structures, Corrective Action Site 25-33-05: Building 3901, Engine Transport System Maintenance Building, Nevada National Security Site, Nevada, Revision 0

Navarro-Intera, LLC (N-I), personnel—assisted by National Security Technologies, LLC (NSTec), radiological control personnel—conducted a preliminary field investigation to obtain information about Corrective Action Unit (CAU) 572, Test Cell C Ancillary Building and Structures; Corrective Action Site (CAS) 25-33-05, Building 3901, Engine Transport System Maintenance (ETSM) building. The ETSM building is located in Area 25 of the Nevada National Security Site (NNSS). The information learned from the investigation will reduce uncertainty about the nature and scope of potential releases and, therefore, reduce management risk associated with the planning and scheduling of future corrective action investigation activities. Site reconnaissance efforts for CAS 25-33-05 were conducted on June 18 and September 10–11, 2012. Detailed site conditions, building contents, potential waste streams, photographic documentation as well as radiological and chemical survey results are contained within this preliminary investigation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Soil temperature, soil moisture and thaw depth, Utqiagvik (Barrow), Alaska, Ver. 1

This dataset consists of field measurements of soil properties made during 2012 and 2013 in areas A to D of Intensive Site 1 at the Next-Generation Ecosystem Experiments (NGEE) Arctic site near Utqiagvik (Barrow), Alaska. Included are i) weekly measurements of thaw depth, soil moisture, presence and depth of standing water and soil temperature made during the 2012 and 2013 growing seasons (June to September) and ii) half-hourly measurements of soil temperature logged continuously during the period June 2012 to September 2013. There are a total of 47 files in this dataset. Some data were originally provided in Excel workbooks, these files have been preserved as XLSX files within the zip "Original_Files" and also separated by plot ID, year, and/or depth into CSV files. Some functions, features, and formatting were lost during the transformation. Regarding "additional temperature" CSVs, data curators made their best attempt to label plot titles and measurements in those files. Additional documentation and information can be found in file(s) labelled as BEO_soil_properties_user_file.pdf.The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research.The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska.Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global

54 ENVIRONMENTAL SCIENCES↗

2012 Groundwater Monitoring and Inspection Report Gnome-Coach, New Mexico, Site

Gnome-Coach was the site of a 3-kiloton underground nuclear test conducted in 1961. Surface and subsurface contamination resulted from the underground nuclear testing, post-test drilling, and a groundwater tracer test performed at the site. Surface reclamation and remediation began after the underground testing. A Completion Report was prepared, and the State of New Mexico is currently proceeding with a conditional certificate of completion for the surface. Subsurface corrective action activities began in 1972 and have generally consisted of annual sampling and monitoring of wells near the site. In 2008, the annual site inspections were refined to include hydraulic head monitoring and collection of samples from groundwater monitoring wells onsite using the low-flow sampling method. These activities were conducted during this monitoring period on January 18, 2012. Analytical results from this sampling event indicate that concentrations of tritium, strontium-90, and cesium-137 were generally consistent with concentrations from historical sampling events. The exceptions are the decreases in concentrations of strontium-90 in samples from wells USGS-4 and USGS-8, which were more than 2.5 times lower than last year's results. Well USGS-1 provides water for livestock belonging to area ranchers, and a dedicated submersible pump cycles on and off to maintain a constant volume in a nearby water tank. Water levels in wells USGS-4 and USGS-8 respond to the on/off cycling of the water supply pumping from well USGS-1. Well LRL-7 was not sampled in January, and water levels were still increasing when the transducer data were downloaded in September. A seismic reflection survey was also conducted this year. The survey acquired approximately 13.9 miles of seismic reflection data along 7 profiles on and near the site. These activities were conducted from February 23 through March 10, 2012. The site roads, monitoring well heads, and the monument at surface ground zero were in good condition at the time of the site inspection. However, it was reported in September 2012 that the USGS-1 well head had been damaged by a water truck in April 2012.

54 ENVIRONMENTAL SCIENCES↗

Sea Ice Extents Continue to Set New Records: Arctic, Antarctic, and Global Results

The multi-channel satellite passive-microwave record of Earth’s sea ice coverage, extending back to the late 1970s, has long revealed declining sea ice coverage in the Arctic but through 2015 revealed an overall increase rather than decrease in Antarctic sea ice coverage. Following major decreases in Antarctic sea ice since 2015, the 42-year 1979-2020 satellite dataset now shows losses in sea ice coverage in both hemispheres, and this is convincingly demonstrated by the enumeration of monthly and yearly record high and record low sea ice extents experienced over the course of the 42 years. In fact, one of the most convincing statistics on the declining Arctic sea ice cover is the fact that since 1986 the Arctic has not experienced a single monthly record high sea ice extent in any month but has experienced 93 monthly record lows. In contrast, all 12 calendar months have their 42-year Antarctic monthly record high sea ice extents in the period 2007-2015, while 8 of the 12 calendar months have had Antarctic record lows since 2015. Globally, every calendar month has registered a new monthly record low within the past 5 years. These results are complemented (and somewhat tempered) by quantification of the range of monthly and yearly sea ice extent values over the 42 years. For instance, although the Arctic’s lowest September monthly average sea ice extent (in 2012) is 53% lower than its highest September monthly average sea ice extent (in 1980), the other months have far smaller percent differences between their lowest and highest Arctic values. For yearly average sea ice extents, the Arctic’s lowest value (in 2020) is 18% lower than its highest value (in 1982), the Antarctic’s lowest value (in 2017) is 16% lower than its highest value (in 2014), and the global lowest value (in 2019) is only 12% lower than its highest value (in 1982).

sea ice↗

SECARB Report on Post-Injection In-Situ Monitoring

The Southeast Carbon Sequestration Partnership Phase III Anthropogenic Test at Citronelle Field is the United States’ largest prototype of commercial CO 2 capture from a coal-fired power station and transportation, injection, storage and monitoring. This report focuses on the results of the post-injection monitoring period for the Anthropogenic Test. Monitoring methods include both direct and indirect measurements. The Class V Experimental Permit requires extensive monitoring of injected CO 2 at the surface and at deep and shallow depths. The safety, integrity and information objectives of the CO 2 monitoring plan are in place to: (1) create and sustain wellbore integrity; (2) assure safe CO 2 injection operations; (3) verify the location and migration of the injected CO 2 plume; and (4) monitor for any CO 2 leakage. A robust suite of monitoring approaches is utilized for the in-situ monitoring and include, pressure monitoring, various seismic surveys, pulsed neutron logging, reservoir fluid sampling and injection surveys. Data and observations collected using these monitoring methods will be used in the numerical model to inform the post-injection site care monitoring plan. This report describes actions pertaining to in situ monitoring at the Anthropogenic Test Site that were undertaken during the period of September 2014 to May 2016. These monitoring techniques include the acquisition of pressure data, seismic data, pulsed neutron capture logs, reservoir fluid sampling, and tracer gas monitoring. CO 2 injection operations began on August 20, 2012 and terminated on September 1, 2014.

01 COAL, LIGNITE, AND PEAT↗