Search NASA⌕ Search

SEARCH · Search NASA

Results for “Solid propellant rocket engine”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Essays on the History of Rocketry and Astronautics: Proceedings of the Third through the Sixth History Symposia of the International Academy of Astronautics, Volume 1

This two volume publication presents the proceedings of the third through sixth history symposia of the International Academy of Astronautics. Thirty-nine papers are divided into four categories: (1) Early Solid Propellant Rocketry; (2) Rocketry and Astronautics: Concepts, Theory, and Analyses after 1880; (3) The Development of Liquid and Solid Propellant Rockets from 1880 to 1945; and (4) Rocketry and Astronautics after 1945. Categories 1 and 2 will be found in volume 1 and the remainder in volume 2. Among other diciplines, Rocketry and Astronautics encompasses the physical and engineering sciences including fluid mechanics, thermodynamics, vibration theory, structural mechanics, and celestial mechanics. Papers presented in these two volumes range from those of empirical experimenters who used the time-honored cut and try methods to scientists wielding theoretical principles. The work traces the coupling of the physical and engineering sciences, industrial advances, and state support that produced the awesome progress in rocketry and astronautics for the most part within living memory. The proceedings of the four symposia present in these two volumes contain information on the work of leading investigators and their associates carried out in the first two-thirds of the twentieth century.

R Cargill Hall↗

MLAS and LAS: Project Comparison of Lessons Learned

The development of new and safer manned space vehicles is a top priority at NASA. Recently two different approaches of how to accomplish this mission of keeping astronauts safe was successfully demonstrated. With work already underway on an Apollo-like launch abort system for the Orion Crew Exploration Vehicle (CEV), an alternative design concept named the Max Launch Abort System, or MLAS, was developed as a parallel effort. The Orion system, managed by the Constellation office, is based on the design of a single solid launch abort motor in a tower positioned above the capsule. The MLAS design takes a different approach placing the solid launch abort motor underneath the capsule. This effort was led by the NASA Engineering and Safety Center (NESC). Both escape systems were designed with the Ares I Rocket as the launch vehicle and had the same primary requirement to safely propel a crew module away from any emergency event either on the launch pad or during accent. Beyond these two parameters, there was little else in common between the two projects, except that they both concluded in successful launches that will further promote the development of crew launch abort systems. This presentation will compare both projects from the standpoint of technical requirements; program management and flight test objectives and highlight the synergistic lessons learned by two engineers who worked on each program.

Dittemore, Gary↗

Comparison of Two Recent Launch Abort Platforms

The development of new and safer manned space vehicles is a top priority at NASA. Recently two different approaches of how to accomplish this mission of keeping astronauts safe was successfully demonstrated. With work already underway on an Apollo-like launch abort system for the Orion Crew Exploration Vehicle (CEV), an alternative design concept named the Max Launch Abort System, or MLAS, was developed as a parallel effort. The Orion system, managed by the Constellation office, is based on the design of a single solid launch abort motor in a tower positioned above the capsule. The MLAS design takes a different approach placing the solid launch abort motor underneath the capsule. This effort was led by the NASA Engineering and Safety Center (NESC). Both escape systems were designed with the Ares I Rocket as the launch vehicle and had the same primary requirement to safely propel a crew module away from any emergency event either on the launch pad or during accent. Beyond these two parameters, there was little else in common between the two projects, except that they both concluded in successful launches that will further promote the development of crew launch abort systems. A comparison of these projects from the standpoint of technical requirements; program management and flight test objectives will be done to highlight the synergistic lessons learned by two engineers who worked on each program. This comparison will demonstrate how the scope of the project architecture and management involvement in innovation should be tailored to meet the specific needs of the system under development.

Dittemore, Gary D.↗

Development, Verification and Validation of Parallel, Scalable Volume of Fluid CFD Program for Propulsion Applications

There are many instances involving liquid/gas interfaces and their dynamics in the design of liquid engine powered rockets such as the Space Launch System (SLS). Some examples of these applications are: Propellant tank draining and slosh, subcritical condition injector analysis for gas generators, preburners and thrust chambers, water deluge mitigation for launch induced environments and even solid rocket motor liquid slag dynamics. Commercially available CFD programs simulating gas/liquid interfaces using the Volume of Fluid approach are currently limited in their parallel scalability. In 2010 for instance, an internal NASA/MSFC review of three commercial tools revealed that parallel scalability was seriously compromised at 8 cpus and no additional speedup was possible after 32 cpus. Other non-interface CFD applications at the time were demonstrating useful parallel scalability up to 4,096 processors or more. Based on this review, NASA/MSFC initiated an effort to implement a Volume of Fluid implementation within the unstructured mesh, pressure-based algorithm CFD program, Loci-STREAM. After verification was achieved by comparing results to the commercial CFD program CFD-Ace+, and validation by direct comparison with data, Loci-STREAM-VoF is now the production CFD tool for propellant slosh force and slosh damping rate simulations at NASA/MSFC. On these applications, good parallel scalability has been demonstrated for problems sizes of tens of millions of cells and thousands of cpu cores. Ongoing efforts are focused on the application of Loci-STREAM-VoF to predict the transient flow patterns of water on the SLS Mobile Launch Platform in order to support the phasing of water for launch environment mitigation so that vehicle determinantal effects are not realized.

West, Jeff↗

Successful First Flight of NASA’s SLS (Space Launch System) Super Heavy-Lift Rocket Lays Groundwork for U. S.’s Most Ambitious Missions

In late 2022, NASA’s SLS (Space Launch System) super heavy-lift rocket launched for the first time. Artemis I sent an uncrewed Orion spacecraft on a 25.5-day round-trip mission to lunar orbit. The near-perfect performance laid the groundwork for the next flights and for NASA’s return of humans to the Moon. The SLS team is now preparing for the launch of Artemis II, which will be the first launch of astronauts to cislunar space since Apollo 17 in December 1972. In addition to preparations on the Artemis II launch vehicle, significant progress is being made on the hardware and software for future flights. Artemis II will include a test of a new military-grade GPS system, which will be fully utilized on Artemis III. Progress is also being made on the exploration upper stage (EUS) for the Block 1B SLS variant, which will debut on Artemis IV. New production RS-25 liquid-propellant engines will be used beginning with Artemis V. These new engines, which are in a final qualification test firing program at the time of writing, realize a cost savings of at least 30 percent and reduced production time due to streamlined manufacturing and advances in technology, including additive manufacturing. The evolved solid rocket boosters, which will debut on Artemis IX as part of the Block 2 variant, are in development now. In addition to propulsion updates, each variant of SLS maintains payload configuration flexibility and can fly crew-only, cargo-only, and crew-cargo combinations. This adaptability ensures that SLS, with its significant mass and volume capability – including the ability to launch large co-manifested payloads with Orion directly to trans-lunar injection (TLI) – can support the country’s most ambitious missions. Results from the Artemis I mission, as well as progress to the next flights and SLS variants, will be covered in the paper and presentation.

Bruce R. Askins↗

Successful First Flight of NASA’s SLS (Space Launch System) Super Heavy-Lift Rocket: Laying Groundwork for U. S.’s Most Ambitious Missions

In late 2022, NASA’s SLS (Space Launch System) super heavy-lift rocket launched for the first time. Artemis I sent an uncrewed Orion spacecraft on a 25.5-day round-trip mission to lunar orbit. The near-perfect performance laid the groundwork for the next flights and for NASA’s return of humans to the Moon. The SLS team is now preparing for the launch of Artemis II, which will be the first launch of astronauts to cislunar space since Apollo 17 in December 1972. In addition to preparations on the Artemis II launch vehicle, significant progress is being made on the hardware and software for future flights. Artemis II will include a test of a new military-grade GPS system, which will be fully utilized on Artemis III. Progress is also being made on the exploration upper stage (EUS) for the Block 1B SLS variant, which will debut on Artemis IV. New production RS-25 liquid-propellant engines will be used beginning with Artemis V. These new engines, which are in a final qualification test firing program at the time of writing, realize a cost savings of at least 30 percent and reduced production time due to streamlined manufacturing and advances in technology, including additive manufacturing. The evolved solid rocket boosters, which will debut on Artemis IX as part of the Block 2 variant, are in development now. In addition to propulsion updates, each variant of SLS maintains payload configuration flexibility and can fly crew-only, cargo-only, and crew-cargo combinations. This adaptability ensures that SLS, with its significant mass and volume capability – including the ability to launch large co-manifested payloads with Orion directly to trans-lunar injection (TLI) – can support the country’s most ambitious missions. Results from the Artemis I mission, as well as progress to the next flights and SLS variants, will be covered in the paper and presentation.

Bruce Askins↗

Facility design consideration for continuous mix production of class 1.3 propellant

In November of 1989, NASA awarded the Advanced Solid Rocket Motor (ASRM) contract to Lockheed Missiles and Space Company (LMSC) for production of advanced solid rocket motors using the continuous mix process. Aerojet ASRM division (AAD) was selected as the facility operator and RUST International Corporation provided the engineering, procurement, and construction management services. The continuous mix process mandates that the mix and cast facilities be 'close-coupled' along with the premix facilities, creating unique and challenging requirements for the facility designer. The classical approach to handling energetic materials-division into manageable quantities, segregation, and isolation-was not available due to these process requirements and quantities involved. This paper provides a description of the physical facilities, the continuous mix process, and discusses the monitoring and detection techniques used to mitigate hazards and prevent an incident.

Williamson, K. L.↗

A One-Dimensional Global-Scaling Erosive Burning Model Informed by Blowing Wall Turbulence

This paper makes no attempt to comprehensively review erosive burning models or the data collected in pursuit of them; the interested reader could begin with Landsbaum for a historical summary. However, a discussion and comparison to recent work by McDonald and Rettenmaier and Heister will be included, along with data generated by Strand, et. al. Suffice it to say that the search for a way to predict erosive burning in any size motor with formulas cleanly applicable to a typical 1D ballistics analysis has been long thwarted. Some models were based on testing that failed to adequately simulate the solid rocket motor environment. In most cases, no real‐time burn rate measurement was available. Two popular models, even when calibrated to recent motor‐like real‐time burn rate data obtained by Furfaro, were shown by McMillin to be inadequate at modeling erosive burning in the Space Shuttle Reusable Solid Rocket Motor (RSRM), the Space Launch Systems' Five‐Segment RSRM (RSRMV), and the five‐segment Engineering Test Motor (ETM)‐3. Subsequently to the data cited from Strand and Furfaro, additional motors of the same kind as Furfaro's were tested with RSRMV propellant, utilizing 7 segments per motor and 3 throat sizes. By measuring propellant web thickness with ultrasonic gages, the burn rate was determined at cross‐flow Mach numbers up to Mach 0.8. Furthermore, because of the different throat sizes in otherwise identical motors, this provides a unique look at the effect of pressure and base burn rate on the erosive response. Figure 1 shows example of the data pertaining to the high Mach motor, where the port area is initially less than the throat area. The burn rate data was processed using a smoothing method developed to reduce the noise without too severely introducing end effects that limit the range of useful data. Then, an empirical ballistics scheme was used to estimate the flow condition based on the burn rate measurements and pressure measured between each segment.

Kibbey, Timothy P.↗

A Historical Analysis of Crane Mishaps at Kennedy Space Center

Cranes and hoists are widely used in many areas. Crane accidents and handling mishaps are responsible for injuries, costly equipment damage, and program delays. Most crane accidents are caused by preventable factors. Understanding these factors is critical when designing cranes and preparing lift plans. Analysis of previous accidents provides insight into current recommendations for crane safety. Cranes and hoists are used throughout Kennedy Space Center to lift everything from machine components to critical flight hardware. Unless they are trained crane operators, most NASA employees and contractors do not need to undergo specialized crane training and may not understand the safety issues surrounding the use of cranes and hoists. A single accident with a crane or hoist can injure or kill people, cause severe equipment damage, and delay or terminate a program. Handling mishaps can also have a significant impact on the program. Simple mistakes like bouncing or jarring a load, or moving the crane down when it should go up, can damage fragile flight hardware and cause major delays in processing. Hazardous commodities (high pressure gas, hypergolic propellants, and solid rocket motors) can cause life safety concerns for the workers performing the lifting operations. Most crane accidents are preventable with the correct training and understanding of potential hazards. Designing the crane with human factors taken into account can prevent many accidents. Engineers are also responsible for preparing lift plans where understanding the safety issues can prevent or mitigate potential accidents. Cranes are widely used across many areas of KSC. Failure of these cranes often leads to injury, high damage costs, and significant delays in program objectives. Following a basic set of principles and procedures during design, fabrication, testing, regular use, and maintenance can significantly minimize many of these failures. As the accident analysis shows, load drops are often caused or influenced by human factors. Therefore, proper training and understanding of crane safety throughout the workforce is critical. It is important that the engineers designing the cranes, lift planners preparing the lift plans, operators performing the lifts, and training officers conducting the operator training all understand the problems that can happen with cranes and how to ensure the safety of the workforce and equipment being lifted.

Materials Handling↗

An experimental determination in Calspan Ludwieg tube of the base environment of the integrated space shuttle vehicle at simulated Mach 4.5 flight conditions (test IH5 of model 19-OTS)

A model test program was conducted to determine heat transfer and pressure distributions in the base region of the space shuttle vehicle during simulated launch trajectory conditions of Mach 4.5 and pressure altitudes between 90,000 and 210,000 feet. Model configurations with and without the solid propellant booster rockets were examined to duplicate pre- and post-staging vehicle geometries. Using short duration flow techniques, a tube wind tunnel provided supersonic flow over the model. Simultaneously, combustion generated exhaust products reproduced the gasdynamic and thermochemical structure of the main vehicle engine plumes. Heat transfer and pressure measurements were made at numerous locations on the base surfaces of the 19-OTS space shuttle model with high response instrumentation. In addition, measurements of base recovery temperature were made indirectly by using dual fine wire and resistance thermometers and by extrapolating heat transfer measurements.

Drzewiecki, R. F.↗

NASA's Space Launch System Progress Toward the Launch Pad

NASA’s Space Launch System (SLS) took a substantial step toward the launch site in2020 with the move of the Artemis I core stage from the manufacturing site to the test stand as the program plans for a 2021 launch. (Fig. 1) SLS is NASA’s evolvable super-heavy-lift launch vehicle to support deep space exploration. It is based on evolutionary improvement to existing proven propulsion systems. Its twin solid rocket boosters employ a five-segment motor based on the four-segment space shuttle motor. Its four RS-25 main engines will operate at thrust levels higher than those in the space shuttle program. The core stage is anew design that will support propellant tanks for the engines and serve as the attach point for the boosters. Modern streamlined manufacturing processes and materials have been incorporated into the initial configuration with planned onramps for improved performance and/or affordability in subsequent versions. The primary role of SLS is to anchor the transportation for NASA’s Artemis Program to return humans to the Moon and build on the exploration that began during the Apollo Program. This paper will discuss progress to date for the SLS Program and look ahead to important milestones in 2020 and beyond.

John H Honeycutt↗

Space Shuttle with rail system and aft thrust structure securing solid rocket boosters to external tank

The configuration and relationship of the external propellant tank and solid rocket boosters of space transportation systems such as the space shuttle are described. The space shuttle system with the improved propellant tank is shown. The external tank has a forward pressure vessel for liquid hydrogen and an aft pressure vessel for liquid oxygen. The solid rocket boosters are joined together by a thrust frame which extends across and behind the external tank. The thrust of the orbiter's main rocket engines are transmitted to the aft portion of the external tank and the thrust of the solid rocket boosters are transmitted to the aft end of the external tank.

Vonpragenau, G. L.↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

Thermal Insulation Strips Conserve Energy

Launching the space shuttle involves an interesting paradox: While the temperatures inside the shuttle s main engines climb higher than 6,000 F hot enough to boil iron for fuel, the engines use liquid hydrogen, the second coldest liquid on Earth after liquid helium. Maintained below 20 K (-423 F), the liquid hydrogen is contained in the shuttle s rust-colored external tank. The external tank also contains liquid oxygen (kept below a somewhat less chilly 90 K or -297 F) that combines with the hydrogen to create an explosive mixture that along with the shuttle s two, powdered aluminum-fueled solid rocket boosters allows the shuttle to escape Earth s gravity. The cryogenic temperatures of the main engines liquid fuel can cause ice, frost, or liquefied air to build up on the external tank and other parts of the numerous launch fueling systems, posing a possible debris risk when the ice breaks off during launch and causing difficulties in the transfer and control of these cryogenic liquid propellants. Keeping the fuel at the necessary ultra-cold temperatures while minimizing ice buildup and other safety hazards, as well as reducing the operational maintenance costs, has required NASA to explore innovative ways for providing superior thermal insulation systems. To address the challenge, the Agency turned to an insulating technology so effective that, even though it is mostly air, a thin sheet can prevent a blowtorch from igniting a match. Aerogels were invented in 1931 and demonstrate properties that make them the most extraordinary insulating materials known; a 1-inch-thick piece of aerogel provides the same insulation as layering 15 panes of glass with air pockets in between. Derived from silica, aluminum oxide, or carbon gels using a supercritical drying process - resulting in a composition of almost 99-percent air - aerogels are the world s lightest solid (among 15 other titles they hold in the Guinness World Records), can float indefinitely on water if treated to be hydrophobic, and can withstand extremely hot temperatures (from 1,100 F to 3,000 F depending on the type of aerogel) down to cryogenic levels, making this "frozen smoke" ideal for use in space. Because of its low weight and ability to withstand temperature extremes, an aerogel was even used as the space-based catcher s mitt to trap comet particles and space dust for NASA s Stardust mission, launched in 1999. All of this remarkable technology s characteristics were ideal for NASA s purposes except one: The aerogels were extremely brittle. Through a long-term partnership between Kennedy Space Center and Aspen Aerogels Inc., of Northborough, Massachusetts, researchers developed a flexible, durable form of aerogel that NASA has since used as cryogenic insulation for space shuttle launch systems. Through Aspen Aerogels, the technology has made oil pipeline insulation, extreme weather clothing, and infrared shielding for combat helicopters.

Source record↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗

Systems engineering challenges of the Space Shuttle

Problems encountered during the Space Shuttle's development that were due to the unique configuration of the vehicle are discussed. While conventional rocket space vehicles have been symmetric, greatly simplifying the analysis and integration of constituent elements, the Space Shuttle's combination of a winged orbiter with side-mounted solid rocket boosters and a large propellant tank presented a more complex system for the analysis and testing of ascent flight control, propulsion system, aerothermodynamics and structural dynamics. Attention is given first and second stage flight operations, return-to-launch-site, abort-once-around and abort-to-orbit mission modes, propulsion system and propulsion test development, and the aerothermodynamics of the external propellant tank and Orbiter.

Day, L. E.↗

Advancement of Metal Additive Manufacturing Processes and Alloys for Rocket Propulsion Applications

NASA has been involved in the development and maturation of metal additive manufacturing (AM) for space applications since the 2000’s. Several efforts have focused on the understanding of AM processes through material characterization and testing, standards development, component fabrication, and infusion into development and flight applications. While many common aerospace alloys have been and continue to be a focus of ongoing development, the need for custom-alloy developments for high performance applications enabled by various AM processes has been realized. The applications being targeted are liquid rocket engines with high heat fluxes, high pressure, and that utilize propellants such as hydrogen, which can degrade the alloy. NASA has recently focused on the development and advancement of novel alloy advancement using AM for use in these harsh environments, such as GRCop-42, GRCop-84, NASA HR-1, and JBK-75. These alloys have been evaluated using powder bed fusion (PBF), directed energy deposition (DED), and solid-state AM processes. The results from these processes have demonstrated that AM can enable rapid development of new alloy systems that can yield higher performances across various metal AM processes. These alloys have undergone the fundamental metallurgical evaluations, heat treatment study, and microstructure characterization and mechanical testing campaign. This, combined with direct application-specific component fabrication and hot-fire testing, enabled the increase of the Technology Readiness Level (TRL). This presentation will provide a background and overview of various AM-enabled novel alloys, a comparison across the AM processes, and development including metallurgical and mechanical property studies. It will also cover the latest advancement in the parallel component development and testing and future developments. The goal of these alloy development and use of various AM processes is to allow for technology infusion into NASA and commercial spaceflight missions as well as to establish and sustain the needed commercial AM supply chain.

Additive Manufacturing↗