Search NASA⌕ Search

SEARCH · Search NASA

Results for “Space Station Payloads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Suggestions for Layout and Functional Behavior of Software-Based Voice Switch Keysets

Marshall Space Flight Center (MSFC) provides communication services for a number of real time environments, including Space Shuttle Propulsion support and International Space Station (ISS) payload operations. In such settings, control team members speak with each other via multiple voice circuits or loops. Each loop has a particular purpose and constituency, and users are assigned listen and/or talk capabilities for a given loop based on their role in fulfilling the purpose. A voice switch is a given facility's hardware and software that supports such communication, and may be interconnected with other facilities switches to create a large network that, from an end user perspective, acts like a single system. Since users typically monitor and/or respond to several voice loops concurrently for hours on end and real time operations can be very dynamic and intense, it s vital that a control panel or keyset for interfacing with the voice switch be a servant that reduces stress, not a master that adds it. Implementing the visual interface on a computer screen provides tremendous flexibility and configurability, but there s a very real risk of overcomplication. (Remember how office automation made life easier, which led to a deluge of documents that made life harder?) This paper a) discusses some basic human factors considerations related to keysets implemented as application software windows, b) suggests what to standardize at the facility level and what to leave to the user's preference, and c) provides screen shot mockups for a robust but reasonably simple user experience. Concepts apply to keyset needs in almost any type of operations control or support center.

Scott, David W.↗

Designing an Alternate Mission Operations Control Room

The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a serviceoriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building. This paper presents the HPOC architecture and lessons learned during testing and the planned maiden operational commissioning. Additionally, this paper documents the necessity of an HPOC capability given the unplanned HOSC Facility power outage on April 27th, 2011, as a result of the tornado outbreak that damaged the electrical grid to such a degree that significantly inhibited the Tennessee Valley Authority's ability to transmit electricity throughout the North Alabama region.

Montgomery, Patty↗

Cost Analysis in a Multi-Mission Operations Environment

Spacecraft control centers have evolved from dedicated, single-mission or single mission-type support to multi-mission, service-oriented support for operating a variety of mission types. At the same time, available money for projects is shrinking and competition for new missions is increasing. These factors drive the need for an accurate and flexible model to support estimating service costs for new or extended missions; the cost model in turn drives the need for an accurate and efficient approach to service cost analysis. The National Aeronautics and Space Administration (NASA) Huntsville Operations Support Center (HOSC) at Marshall Space Flight Center (MSFC) provides operations services to a variety of customers around the world. HOSC customers range from launch vehicle test flights; to International Space Station (ISS) payloads; to small, short duration missions; and has included long duration flagship missions. The HOSC recently completed a detailed analysis of service costs as part of the development of a complete service cost model. The cost analysis process required the team to address a number of issues. One of the primary issues involves the difficulty of reverse engineering individual mission costs in a highly efficient multi-mission environment, along with a related issue of the value of detailed metrics or data to the cost model versus the cost of obtaining accurate data. Another concern is the difficulty of balancing costs between missions of different types and size and extrapolating costs to different mission types. The cost analysis also had to address issues relating to providing shared, cloud-like services in a government environment, and then assigning an uncertainty or risk factor to cost estimates that are based on current technology, but will be executed using future technology. Finally the cost analysis needed to consider how to validate the resulting cost models taking into account the non-homogeneous nature of the available cost data and the decreasing flight rate. This paper presents the issues encountered during the HOSC cost analysis process, and the associated lessons learned. These lessons can be used when planning for a new multi-mission operations center or in the transformation from a dedicated control center to multi-center operations, as an aid in defining processes that support future cost analysis and estimation. The lessons can also be used by mature service-oriented, multi-mission control centers to streamline or refine their cost analysis process.

Felton, Larry↗

Designing an Alternate Mission Operations Control Room

The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a service-oriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building.

Montgomery, Patty↗

Cost Analysis In A Multi-Mission Operations Environment

Spacecraft control centers have evolved from dedicated, single-mission or single missiontype support to multi-mission, service-oriented support for operating a variety of mission types. At the same time, available money for projects is shrinking and competition for new missions is increasing. These factors drive the need for an accurate and flexible model to support estimating service costs for new or extended missions; the cost model in turn drives the need for an accurate and efficient approach to service cost analysis. The National Aeronautics and Space Administration (NASA) Huntsville Operations Support Center (HOSC) at Marshall Space Flight Center (MSFC) provides operations services to a variety of customers around the world. HOSC customers range from launch vehicle test flights; to International Space Station (ISS) payloads; to small, short duration missions; and has included long duration flagship missions. The HOSC recently completed a detailed analysis of service costs as part of the development of a complete service cost model. The cost analysis process required the team to address a number of issues. One of the primary issues involves the difficulty of reverse engineering individual mission costs in a highly efficient multimission environment, along with a related issue of the value of detailed metrics or data to the cost model versus the cost of obtaining accurate data. Another concern is the difficulty of balancing costs between missions of different types and size and extrapolating costs to different mission types. The cost analysis also had to address issues relating to providing shared, cloud-like services in a government environment, and then assigning an uncertainty or risk factor to cost estimates that are based on current technology, but will be executed using future technology. Finally the cost analysis needed to consider how to validate the resulting cost models taking into account the non-homogeneous nature of the available cost data and the decreasing flight rate. This paper presents the issues encountered during the HOSC cost analysis process, and the associated lessons learned. These lessons can be used when planning for a new multi-mission operations center or in the transformation from a dedicated control center to multi-center operations, as an aid in defining processes that support future cost analysis and estimation. The lessons can also be used by mature serviceoriented, multi-mission control centers to streamline or refine their cost analysis process.

Newhouse, M.↗

CEO Sites Mission Management System (SMMS)

Late in fiscal year 2011, the Crew Earth Observations (CEO) team was tasked to upgrade its science site database management tool, which at the time was integrated with the Automated Mission Planning System (AMPS) originally developed for Earth Observations mission planning in the 1980s. Although AMPS had been adapted and was reliably used by CEO for International Space Station (ISS) payload operations support, the database structure was dated, and the compiler required for modifications would not be supported in the Windows 7 64-bit operating system scheduled for implementation the following year. The Sites Mission Management System (SMMS) is now the tool used by CEO to manage a heritage Structured Query Language (SQL) database of more than 2,000 records for Earth science sites. SMMS is a carefully designed and crafted in-house software package with complete and detailed help files available for the user and meticulous internal documentation for future modifications. It was delivered in February 2012 for test and evaluation. Following acceptance, it was implemented for CEO mission operations support in April 2012. The database spans the period from the earliest systematic requests for astronaut photography during the shuttle era to current ISS mission support of the CEO science payload. Besides logging basic image information (site names, locations, broad application categories, and mission requests), the upgraded database management tool now tracks dates of creation, modification, and activation; imagery acquired in response to requests; the status and location of ancillary site information; and affiliations with studies, their sponsors, and collaborators. SMMS was designed to facilitate overall mission planning in terms of site selection and activation and provide the necessary site parameters for the Satellite Tool Kit (STK) Integrated Message Production List Editor (SIMPLE), which is used by CEO operations to perform daily ISS mission planning. The CEO team uses the SMMS for three general functions - database queries of content and status, individual site creation and updates, and mission planning. The CEO administrator of the science site database is able to create or modify the content of sites and activate or deactivate them based on the requirements of the sponsors. The administrator supports and implements ISS mission planning by assembling, reporting, and activating mission-specific site selections for management; deactivating sites as requirements are met; and creating new sites, such as International Charter sites for disasters, as circumstances warrant. In addition to the above CEO internal uses, when site planning for a specific ISS mission is complete and approved, the SMMS can produce and export those essential site database elements for the mission into XML format for use by onboard Earth-location systems, such as Worldmap. The design, development, and implementation of the SMMS resulted in a superior database management system for CEO science sites by focusing on the functions and applications of the database alone instead of integrating the database with the multipurpose configuration of the AMPS. Unlike the AMPS, it can function and be modified within the existing Windows 7 environment. The functions and applications of the SMMS were expanded to accommodate more database elements, report products, and a streamlined interface for data entry and review. A particularly elegant enhancement in data entry was the integration of the Google Earth application for the visual display and definition of site coordinates for site areas defined by multiple coordinates. Transfer between the SMMS and Google Earth is accomplished with a Keyhole Markup Language (KML) expression of geographic data (see figures 3 and 4). Site coordinates may be entered into the SMMS panel directly for display in Google Earth, or the coordinates may be defined on the Google Earth display as a mouse-controlled polygonal definition and transferred back into the SMMS as KML input. This significantly reduces the possibility of errors in coordinate entries and provides visualization of the scale of the site being defined. CEO now has a powerful tool for managing and defining sites on the Earth's surface for both targets of astronaut photography or other onboard remote sensing systems. It can also record and track results by sponsor, collaborator, or type of study.

Trenchard, Mike↗

Use of Nack Oriented Reliable Multicast (NORM) Protocol for Transport of Spacecraft Telemetry in Ground Networks

Frequently it is necessary to distribute spacecraft telemetry to multiple destinations on Internet Protocol (IP) networks. There are various methods of delivering this data, but when the data is high rate and there are many destinations IP multicast provides the best solution from a network perspective. However, IP multicast only supports the User Datagram Protocol (UDP) which is connectionless and unreliable. This nature of UDP and by extension the low priority treatment of UDP packets by some network hardware creates a difficult environment for distribution of high rate telemetry to a number of recipients over IP networks. NACK (Negative ACKnowledgment) Oriented Reliable Multicast (NORM) is defined by IETF (Internet Engineering Task Force) RFC (Request for Comments) 5740 in 2009 by B. Adamson et al. NORM provides a mechanism of retransmission and or forward error correction for UDP packets, potentially overcoming the limits of UDP for the transmission of spacecraft telemetry. Marshall Space Flight Center’s (MSFC) Huntsville Operations Support Center (HOSC) manages the delivery of the International Space Station (ISS) payload science and health data. The ISS IP Ground Routed (IIGoR) network provides the delivery of the data from the ground stations to the control centers. HOSC personnel have been experimenting with the use of NORM on the link between the ground stations and the front end processor equipment in Huntsville, AL.

Baldwin, Patrick A.↗

Transient Science with LEAP

The LargE Area burst Polarimeter (LEAP) will investigate the nature of gamma-ray burst jets by making via the first high-fidelity polarization and spectroscopy measurements of the prompt gamma-ray emission from a large sample of gamma-ray bursts (GRBs). LEAP is a proposed International Space Station (ISS) payload with a three-year mission designed to answer the following science questions. Are the jet magnetic fields randomly oriented or are their directions ordered? Are the jets dominated by matter or magnetic fields? Is the energy dissipated within the jet by internal shocks or by magnetic reconnection? Is the non-thermal emission mechanism synchrotron radiation, and what portion of the signal is of thermal photospheric origin? LEAP's baseline mission requires observation of at least 65 GRBs with a sensitivity defined by a minimum detectable polarization (MDP) of 30%. The current LEAP design is expected to trigger on approximately 400 GRBs, with about 86 of those having an MDP <30%. LEAP will enable rapid community follow-up to better understand GRBs and their environments. The LEAP design enables a broad range of secondary science while achieving its baseline mission. During overlap between LIGO's A+ configuration, approximately 3 joint GW/GRB detections per year are expected with LEAP. LEAP will also be sensitive to magnetar bursts, which have recently been associated with Fast Radio Bursts and will potentially measure polarization for bright individual bursts or stacked collections of bursts. LEAP will extend pulse flux and spin frequency histories for accreting pulsars with a sensitivity similar to Fermi GBM, and will potentially measure polarization for their brightest outbursts. The LEAP mission is scheduled during the declining phase of Solar Cycle 25, during which many intense flares are likely to occur; LEAP will make the most sensitive measurements to date of solar flare polarization. LEAP will open a new window into the nature of the most energetic phenomena in the universe with gamma-ray polarization.

N/A↗

Tether applications for space station

A wide variety of space station applications for tethers were reviewed. Many will affect the operation of the station itself while others are in the category of research or scientific platforms. One of the most expensive aspects of operating the space station will be the continuing shuttle traffic to transport logistic supplies and payloads to the space station. If a means can be found to use tethers to improve the efficiency of that transportation operation, it will increase the operating efficiency of the system and reduce the overall cost of the space station. The concept studied consists of using a tether to lower the shuttle from the space station. This results in a transfer of angular momentum and energy from the orbiter to the space station. The consequences of this transfer is studied and how beneficial use can be made of it.

Nobles, W.↗

Low Temperature Microgravity Physics Facility Payload for the ISS

The LTMPF Payload is a 182-liter superfluid-helium dewar that will be attached to the JEM-EF facility of the International Space Station after launch in the cargo bay of the Space Shuttle. The LTMPF Payload will provide a major low-temperature research laboratory for Fundamental Physics experiments on the International Space Station. The LTMPF payload will provide instrument temperatures below superfluid helium temperatures and the ISS will provide microgravity to allow the experiments to study condensed matter and gravitational physics. Each flight will be allocated to one condensed matter instrument and one gravitation instrument.

Langford, Don↗

Space station Simulation Computer System (SCS) study for NASA/MSFC. Volume 6: Study issues report

The Simulation Computer System (SCS) is the computer hardware, software, and workstations that will support the Payload Training Complex (PTC) at the Marshall Space Flight Center (MSFC). The PTC will train the space station payload specialists and mission specialists to operate the wide variety of experiments that will be on-board the Freedom Space Station. This simulation Computer System (SCS) study issues report summarizes the analysis and study done as task 1-identify and analyze the CSC study issues- of the SCS study contract.This work was performed over the first three months of the SCS study which began in August of 1988. First issues were identified from all sources. These included the NASA SOW, the TRW proposal, and working groups which focused the experience of NASA and the contractor team performing the study-TRW, Essex, and Grumman. The final list is organized into training related issues, and SCS associated development issues. To begin the analysis of the issues, a list of all the functions for which the SCS could be used was created, i.e., when the computer is turned on, what will it be doing. Analysis was continued by creating an operational functions matrix of SCS users vs. SCS functions to insure all the functions considered were valid, and to aid in identification of users as the analysis progressed. The functions will form the basis for the requirements, which are currently being developed under task 3 of the SCS study.

Source record↗

Flight payloads environmental approach

The Earth Observing System (EOS) and Space Station (SS) attached payload instruments to be developed by JPL will have a consistent implied level of reliability confidence based on the application of product assurance requirements. An important subset of these requirements is a set of detailed environmental design and test requirements. These requirements have a sound technical defense, are unambiguous in their level of detail, provide rational risk management as a function of payload classification, and are rigorously enforced with a comprehensive waiver process imposed on planned deviations.

Schlue, John W.↗

Space station Simulation Computer System (SCS) study for NASA/MSFC. Volume 4: Conceptual design report

The Simulation Computer System (SCS) is the computer hardware, software, and workstations that will support the Payload Training Complex (PTC) at Marshall Space Flight Center (MSFC). The PTC will train the space station payload scientists, station scientists, and ground controllers to operate the wide variety of experiments that will be onboard the Space Station Freedom. In the first step of this task, a methodology was developed to ensure that all relevant design dimensions were addressed, and that all feasible designs could be considered. The development effort yielded the following method for generating and comparing designs in task 4: (1) Extract SCS system requirements (functions) from the system specification; (2) Develop design evaluation criteria; (3) Identify system architectural dimensions relevant to SCS system designs; (4) Develop conceptual designs based on the system requirements and architectural dimensions identified in step 1 and step 3 above; (5) Evaluate the designs with respect to the design evaluation criteria developed in step 2 above. The results of the method detailed in the above 5 steps are discussed. The results of the task 4 work provide the set of designs which two or three candidate designs are to be selected by MSFC as input to task 5-refine SCS conceptual designs. The designs selected for refinement will be developed to a lower level of detail, and further analyses will be done to begin to determine the size and speed of the components required to implement these designs.

Source record↗

Space Station needs, attributes and architectural options. Volume 2, book 1, part 4: Payload element mission data sheets

Data sheets are presented for 11 internal payloads, 30 externally mounted payloads, and 46 free flyers. The importance of the space station to each payload element is rated on a scale of 1 to 10. The type of experiment noncommercial science and applications, commercial, technological, and operational is indicated and the payload and its objectives are described. Space is provided for noting requirements for power; data/communication; thermal environment; equipment physical characteristics; crew size; and service and maintenance.

Source record↗