Search NASA⌕ Search

SEARCH · Search NASA

Results for “Staging Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Affordable Development and Demonstration of a Small Nuclear Thermal Rocket (NTR) Engine and Stage: How Small Is Big Enough?

The Nuclear Thermal Rocket (NTR) derives its energy from fission of uranium-235 atoms contained within fuel elements that comprise the engine's reactor core. It generates high thrust and has a specific impulse potential of approximately 900 specific impulse - a 100 percent increase over today's best chemical rockets. The Nuclear Thermal Propulsion (NTP) project, funded by NASA's Advanced Exploration Systems (AES) program, includes five key task activities: (1) Recapture, demonstration, and validation of heritage graphite composite (GC) fuel (selected as the Lead Fuel option); (2) Engine Conceptual Design; (3) Operating Requirements Definition; (4) Identification of Affordable Options for Ground Testing; and (5) Formulation of an Affordable Development Strategy. During fiscal year (FY) 2014, a preliminary Design Development Test and Evaluation (DDT&E) plan and schedule for NTP development was outlined by the NASA Glenn Research Center (GRC), Department of Energy (DOE) and industry that involved significant system-level demonstration projects that included Ground Technology Demonstration (GTD) tests at the Nevada National Security Site (NNSS), followed by a Flight Technology Demonstration (FTD) mission. To reduce cost for the GTD tests and FTD mission, small NTR engines, in either the 7.5 or 16.5 kilopound-force thrust class, were considered. Both engine options used GC fuel and a common fuel element (FE) design. The small approximately 7.5 kilopound-force criticality-limited engine produces approximately157 thermal megawatts and its core is configured with parallel rows of hexagonal-shaped FEs and tie tubes (TTs) with a FE to TT ratio of approximately 1:1. The larger approximately 16.5 kilopound-force Small Nuclear Rocket Engine (SNRE), developed by Los Alamos National Laboratory (LANL) at the end of the Rover program, produces approximately 367 thermal megawatts and has a FE to TT ratio of approximately 2:1. Although both engines use a common 35-inch (approximately 89-centimeters) -long FE, the SNRE's larger diameter core contains approximately 300 more FEs needed to produce an additional 210 thermal megawatts of power. To reduce the cost of the FTD mission, a simple one-burn lunar flyby mission was considered to reduce the liquid hydrogen (LH2) propellant loading, the stage size and complexity. Use of existing and flight proven liquid rocket and stage hardware (e.g., from the RL10B-2 engine and Delta Cryogenic Second Stage) was also maximized to further aid affordability. This paper examines the pros and cons of using these two small engine options, including their potential to support future human exploration missions to the Moon, near Earth asteroids (NEA), and Mars, and recommends a preferred size. It also provides a preliminary assessment of the key activities, development options, and schedule required to affordably build, ground test and fly a small NTR engine and stage within a 10-year timeframe.

Spacecraft design↗

LCC-based framework for building envelope and structure co-design considering energy efficiency and natural hazard performance

Herein, this paper presents a life-cycle cost (LCC) informed co-design framework for building structures and envelope systems, holistically considering the influences of energy and natural hazard performance. The proposed method is consisted of a two-stage design and decision-making process, aiming to provide a quantitative guideline for building's structural and envelope co-design based on the its geographic locations. First, the building's structural configuration and envelope type are selected based on the life cycle cost. Then, the long-term cost effectiveness of various energy-saving building envelope options (e.g., high-performance glazing and insulation) is evaluated to refine the envelope design. The proposed co-design framework was demonstrated through the case study of a medium-size office building archetype in three locations with distinct climate conditions and seismic activities (i.e., Los Angeles, Memphis, and Boston). The results highlighted the interplay between building's structural (seismic) performance and the cost-effectiveness of energy-saving design options – e.g., for buildings located in high-seismic regions, seismic enhancing designs greatly reduce the paybak period of high performance building envelope by reducing the seismic loss; whereas for buildings located in regions with cold climate and low seismic risk such as Boston, spatial frame with high insulation building envelope shows the lowest LCC.

42 ENGINEERING↗

PROTOPLASMA - Proton-driven plasma-wakefield experiment at Fermilab: Stages and approach

Generation of TeV-scale electron beams using conventional RF technology appears expensive for building the next generation of colliders. Proton-driven plasma-wakefield acceleration of electrons promises an alternative route to generate TeV-scale electron beams using existing proton machines. PROTOPLASMA is the proposed R and D project at Fermilab that plans to use a proton beam driven plasma-wakefield to accelerate electrons. The project is planned in stages with the project's path guided by simulations. First, a 60-120 GeV proton beam will be injected into 1-2 meters of plasma to observe selfmodulation instability in the proton beam. Next, an injected 5 MeV electron beam will be accelerated by the plasma. In this paper, we report on the basic project plan and outline our staged approach. We report on first simulation results that show self-modulation of a proton bunch and discuss beam optics requirements and other limits.

43 PARTICLE ACCELERATORS↗

Building a Diverse and Inclusive STEM Workforce: The JUMP into STEM Program: Preprint

The JUMP into STEM program is a DOE-funded initiative jointly run by the National Renewable Energy Laboratory and Oak Ridge National La-boratory. Through this program, students from historically underrepresented backgrounds are engaged in the science of building energy-efficient infrastruc-ture. Through program stages, students have opportunity to compete in chal-lenges, competitions, and internship opportunities. We have conducted a study of past participants in the program. We find that 1) the program has been effec-tive at engaging a diverse array of participants from a variety of backgrounds, including historically underrepresented backgrounds, and 2) the program has been effective at promoting career paths in STEM, and more specifically, in en-ergy efficiency.

DEI↗

Formation and Assembly-Disassembly Processes of ZnO Hexagonal Pyramids Driven by Dipolar and Excluded Volume Interactions

ZnO hexagonal pyramids were obtained in hydrophilic media without any traditional stabilizers (capping agents). The absence of a thick organic shell reducing the anisotropy of nanoparticle (NP) interactions, oxide nature of the materials, and new geometry of the nanocrystals makes possible the observation of new self-organization phenomena. Several new features not present in the previous cases of NP self-organization were identified and discussed. The formation of ZnO pyramids involved recrystallization of larger amorphous NPs followed by the multistage disassembly of intermediate aggregates into individual virtually perfectly shaped nanocrystals. The evolution of NPs begins with crystallization of clustered plates within the original amorphous spherical colloids, and then agglomerated truncated pyramids are formed. These agglomerates further transform into chained pyramids, which eventually separate from each other. The crystallization and disassembly processes can be associated with the decrease of potential and anisotropy of the attractive force field around the crystallites represented in part by dipole moments. The reassembly of the pyramids can still be attained via engaging excluded volume interaction after adding similarly charged polymer. Overall, in this system, we see the first examples of (1) coupled crystallization and disassembly process; (2) induced assembly of nanoscale particles using excluded volume interactions, which were previously used only for aggregation of microscale colloids; and (3) nanoparticle assemblies with variable and experimentally verifiable relative orientation of dipoles including head-to-tail, tail-to-tail pairs, and antiparallel chains. Described assemblies of ZnO pyramids with collective behavior of individual building blocks as well as distinct and experimentally controlled stages of assembly and disassembly present a fundamentally interesting nanoparticle system with rich dynamic behavior.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Energy efficient engine pin fin and ceramic composite segmented liner combustor sector rig test report

Under the NASA-sponsored Energy Efficient Engine program, Pratt and Whitney has successfully completed a comprehensive test program using a 90-degree sector combustor rig that featured an advanced two-stage combustor with a succession of advanced segmented liners. Building on the successful characteristics of the first generation counter-parallel Finwall cooled segmented liner, design features of an improved performance metallic segmented liner were substantiated through representative high pressure and temperature testing in a combustor atmosphere. This second generation liner was substantially lighter and lower in cost than the predecessor configuration. The final test in this series provided an evaluation of ceramic composite liner segments in a representative combustor environment. It was demonstrated that the unique properties of ceramic composites, low density, high fracture toughness, and thermal fatigue resistance can be advantageously exploited in high temperature components. Overall, this Combustor Section Rig Test program has provided a firm basis for the design of advanced combustor liners.

Dubiel, D. J.↗

Concept of Operations Visualization in Support of Ares I Production

Boeing was selected in 2007 to manufacture Ares I Upper Stage and Instrument Unit according to NASA's design which would require the use of the latest manufacturing and integration processes to meet NASA budget and schedule targets. Past production experience has established that the majority of the life cycle cost is established during the initial design process. Concept of Operations (CONOPs) visualizations/simulations help to reduce life cycle cost during the early design stage. Production and operation visualizations can reduce tooling, factory capacity, safety, and build process risks while spreading program support across government, academic, media and public constituencies. The NASA/Boeing production visualization (DELMIA; Digital Enterprise Lean Manufacturing Interactive Application) promotes timely, concurrent and collaborative producibility analysis (Boeing)while supporting Upper Stage Design Cycles (NASA). The DELMIA CONOPs visualization reduced overall Upper Stage production flow time at the manufacturing facility by over 100 man-days to 312.5 man-days and helped to identify technical access issues. The NASA/Boeing Interactive Concept of Operations (ICON) provides interactive access to Ares using real mission parameters, allows users to configure the mission which encourages ownership and identifies areas for improvement, allows mission operations or spacecraft detail to be added as needed, and provides an effective, low coast advocacy, outreach and education tool.

Chilton, James H.↗

In-Cell Thermal Creep Frame Capability: Out-of-Cell Construction and Subsized Sample Testing

This report describes the activities related to the construction of an in-cell thermal creep test facility for small-scale specimens in the irradiation-assisted stress-corrosion cracking (IASCC) hotcell located at the Fuels and Applied Science Building (FASB) at INL. The whole project includes three stages: (i) conceptual design; (ii) out-of-cell demonstration tests; and (iii) in-cell demonstration testing. During the current fiscal year (FY)-2022, materials and equipment required to construct the conceptual design outlined in a previous report were procured. Frames for conducting out-of-cell testing have been constructed, and testing plans have been developed to assess the operation of the newly constructed frames. Preliminary testing of flat subsized tensile specimens on ASTM creep frames has also been completed for two sample thicknesses: 0.75 mm and 1.0 mm.

36 MATERIALS SCIENCE↗

Progress in Decommissioning the Humboldt Bay Power Plant - 13604

Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) to Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Global-Local Policy Search and its Application in Grid-Interactive Building Control

As the buildings sector represents over 70% of the total U.S. electricity consumption, it offers a great amount of untapped demand-side resources to tackle many critical grid-side problems and improve the overall energy system's efficiency. To help make buildings grid-interactive, this paper proposes a global-local policy search method to train a reinforcement learning (RL) based controller which optimizes building operation during both normal hours and demand response (DR) events. Experiments on a simulated five-zone commercial building demonstrate that by adding a local fine-tuning stage to the evolution strategy policy training process, the control costs can be further reduced by 7.55% in unseen testing scenarios. Baseline comparison also indicates that the learned RL controller outperforms a pragmatic linear model predictive controller (MPC), while not requiring intensive online computation.

demand response↗

K-311-1/K-310-3 Purge Cascade Process Description, Oak Ridge Environmental Management Accelerated Cleanup Project, Oak Ridge, Tennessee

K-311-1 was constructed along with the rest of the K-25 Building in the 1943-1945 timeframe. K-311-1 was equipped with Size 3 converters and Size 38 Allis Chalmers{trademark} single-stage centrifugal compressors driven by 3600 rpm electric motors, and the unit operated as the 'bottom' unit flow-wise in K-25. The depleted flow from the bottom stage in K-311-1 passed through booster compressors and flowed to the K-601 Building where the depleted or 'tails' material was removed. In 1948, after the K-27 Building was completed, the decision was made to operate K-27 and K-25 in series rather than operate the two buildings as separate entities. To facilitate this operation, concrete bases were poured and two sets of booster compressors were installed in the extreme West end of the K-311-1 cell floor. These compressors were enclosed in heated housings and consisted of Size 38 compressors. One pair was to boost the 'B' flow between K-25 and K-27, and one pair was to boost the 'A' flow between the buildings. Each station operated with one compressor on-stream and the other in standby. (Reference 9) Each station also was equipped with a Size 2 after-cooler located in the discharge stream downstream of the junction of the onstream and standby compressors. Additional gaseous diffusion capacity was added at Oak Ridge as K-29, K-31, and K-33 were constructed and placed in service in the early 1950s. As a result of the additional process equipment added by these buildings, in-leakage of light gases to the cascade including light gases introduced into the cascade as a result of purging operations threatened to exceed the capacity of the existing K-312 Purge Cascade facilities in the K-25 Building. As a result, in 1954 K-311-1 was converted to a side purge cascade to remove light gases from the process gas stream as the stream entered K-25 from K-27. Low molecular weight gas in-leakage in K-33, K-31, K-29, and K-27 was removed by the K-311-1 Side Purge Facility and a relatively pure stream of UF6 then passed from K-311-1 into the upstream cells in K-25. In-leakage of light gases in the K-25 Building continued to be removed by the K-312 Purge Facilities. K-311-1 operated as a Side Purge Cascade from 1954 until the K-25 Building was shut down in 1964; at that time K-311-1 became the Oak Ridge Gaseous Diffusion Plant (ORGDP) Top (and only) Purge Cascade. The adjacent K-310-3 Unit was operated along with K-311-1 as the top purge cascade and K-310-2 was also operated at times to supplement cells in the K311-1/K-310-3 Purge Cascade. K-311-1 was shut down on February 14, 1977, after the newer, larger capacity K-402-9 Purge Cascade was placed in operation. K-310-3 continued to operate until the K-402-8 Coolant Removal Unit was placed in service, and K-310-3 was shut down on March 14, 1978. Since the K-311-1 and K-310-3 units continued to operate after K-25 shutdown, removal of equipment such as valves and piping for other projects did not occur in this area. As a result, these two units have not been exposed to atmospheric wet air over the years as much of the remainder of K-25 has been exposed. Any deposits or residual gases contained in K-311-1 or K-310-3 are not likely to be fully hydrolyzed.

54 ENVIRONMENTAL SCIENCES↗

Thermal characterization of the build chamber in electron beam melting

Electron beam powder bed fusion, commonly termed electron beam melting (EBM), offers great versatility in multiple-part processes and can produce high quality as-built components due to low residual stresses. The EBM process is complex and requires careful thermal management, including uniform and consistent preheating of the powder bed, in order to ensure quality and consistency of the product. However, most of the simulations in the literature focus on the selective melting stage of the process. As of today, optimal conditions for initial pre-heating temperatures are only available for specific materials. Thus, in order to extend the EBM technology to other desired build materials, a much better understanding of the pre-heating stages is required. In this work, numerical and experimental approaches are combined in order to investigate the effects and sensitivities of heat removal from the build plate during EBM pre-heating stages. For this purpose, a carefully reconstructed numerical model of the build chamber of an ARCAM Q20 + machine is developed. It includes all main parts of the chamber and all relevant heat transfer mechanisms, whereas special attention is paid to radiation heat exchange between various bodies. In order to validate the model, dedicated experiments are performed, in which a system of thermocouples is installed in the build chamber, allowing direct measurement of the local temperatures of the start-plate and heat shields. A good agreement between the simulation and experimental findings is achieved, leading to a better understanding of the thermal processes characteristic to the pre-heating stages. This basic analysis is followed by a representative pre-heating case, where a powder bed is also considered. The energy required to obtain the desired pre-heating temperatures is evaluated, and the role of the powder bed in heat transfer within the chamber is assessed. The pre-heating stage, simulated in the present work, is supposed to create proper conditions for sintering and consequent melting of the powder, which are highly dependent on the local temperatures and heat transfer features. Thus, the findings of the reported work present a step towards a better understanding of the thermal processes that characterize EBM. The reported model can be further used to provide realistic boundary condition inputs for other meso- or macro-scale models as a function of time and geometry. The model can serve also for verification of machine settings, i.e., jump-safe and melt-safe ones which actually provide desired preheat, and for development of settings for new powders.

36 MATERIALS SCIENCE↗

Influence of construction and demolition waste management on the environmental impact of buildings

Highlights: Black-Right-Pointing-Pointer Environmental impacts of different demolition practices. Black-Right-Pointing-Pointer 'Top-down' approach to the Life Cycle Analysis methodology. Black-Right-Pointing-Pointer Results based on real buildings measurements and demolition contractor activities. Black-Right-Pointing-Pointer Not every type of selective demolition brings about environmental benefits. - Abstract: The purpose of this study is to quantify comparable environmental impacts within a Life Cycle Analysis (LCA) perspective, for buildings in which the first (Materials) and last (End of Life) life cycle stages are adjusted to several waste/material management options. Unlike most LCAs, the approach is 'top-down' rather than 'bottom-up', which usually involves large amounts of data and the use of specific software applications. This approach is considered appropriate for a limited but expedient LCA designed to compare the environmental impacts of different life cycle options. Present results, based on real buildings measurements and demolition contractor activities, show that shallow, superficial, selective demolition may not result in reduced environmental impacts. Calculations actually show an increase (generally less than 5%) in most impact categories for the Materials and End of Life stages because of extra transportation needs. However, core material separation in demolition operations and its recycling and/or reuse does bring environmental benefits. A reduction of around 77% has been estimated in the climate change impact category, 57% in acidification potential and 81% in the summer smog impact (for the life cycle stages referred).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cyber-Informed Engineering Guidance—Implementing CIE in Early Systems Engineering Lifecycle Stages

Traditionally, cybersecurity is not considered in the design process. Design engineers typically focus on building safety and reliability into their products and applications. Security against malicious cyber incidents is often an afterthought, resulting in deployment of security solutions during installation or operation. Unfortunately, waiting to consider cybersecurity until later in the systems engineering lifecycle often results in less effective and more expense security. Idaho National Laboratory (INL) developed the concept of Cyber-Informed Engineering (CIE) in 2015 to provide a framework that enables cybersecurity to be built into systems beginning at the conceptual design stage. In addition to ongoing research by INL, the U.S. Department of Energy (DOE) Office of Cybersecurity, Energy Security, and Emergency Response has recently developed a National CIE Strategy document for incorporating CIE into the design and operation of infrastructure systems reliant on digital monitoring or controls. This paper provides a brief review of this National CIE Strategy as well as a roadmap to historical, current, and future CIE research by INL through the U.S. DOE Office of Nuclear Energy (NE) Cybersecurity Crosscutting Technology Development Program. A near-term focus of the DOE-NE’s research and development is to extend the foundational CIE work into detailed guidance for implementation during initial systems engineering stages in nuclear digital instrumentation and control projects and to demonstrate use of the guidance in an integrated energy systems project.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Lessons Learned in Launching Ares I-X

The Ares I-X flight test, scheduled for 2009, is the first opportunity for the Constellation Program and Ares Projects to obtain important data on the in-flight loads, first stage recovery, and ground-handling characteristics of the Ares I crew launch vehicle. The flight test vehicle will incorporate a mix of flight and mockup hardware, reflecting an acceptable representation of the mass and outer mold line characteristics of the operational Ares I vehicle. It will be powered by a four-segment solid rocket motor from the Space Shuttle inventory and will include a fifth, inert spacer segment and new forward structures to make it the same shape as the Ares I first stage. The vehicle also includes mass simulators for the upper stage, Orion crew module, and launch abort system to match the outer mold line of Ares I; an active roll control system; and avionics derived from Shuttle and Atlas hardware. This suborbital mission will take the flight test vehicle from stacking in the Vehicle Assembly Building (VAB) at Kennedy Space Center (KSC) through liftoff, maximum dynamic pressure, first stage separation, and recovery. Ares I-X presented NASA with unique project management challenges. This presentation will address those unique challenges, including managing a virtual nationwide team under a constrained timeline; designing and building the launch vehicle and ground systems; working concurrently with Space Shuttle activities; and integrating technical and management functions. It also will identify key data collected and lessons learned from the flight that will be applied to future exploration missions.

Davis, Stephan R.↗

The IRIS-GUS Shuttle Borne Upper Stage System

This paper describes the Italian Research Interim Stage - Gyroscopic Upper Stage (IRIS-GUS) upper stage system that will be used to launch NASA's Triana Observatory from the Space Shuttle. Triana is a pathfinder earth science mission being executed on rapid schedule and small budget, therefore the mission's upper stage solution had to be a system that could be fielded quickly at relatively low cost and risk. The building of the IRIS-GUS system wa necessary because NASA lost the capability to launch moderately sized upper stage missions fro the Space Shuttle when the PAM-D system was retired. The IRIS-GUS system restores this capability. The resulting system is a hybrid which mates the existing, flight proven IRIS (Italian Research Interim Stage) airborne support equipment to a new upper stage, the Gyroscopic Upper Stage (GUS) built by the GSFC for Triana. Although a new system, the GUS exploits flight proven hardware and design approaches in most subsystems, in some cases implementing proven design approaches with state-of-the-art electronics. This paper describes the IRIS-GUS upper stage system elements, performance capabilities, and payload interfaces.

Tooley, Craig↗

Energy Savings Potential and Research, Development, & Demonstration Opportunities for Residential Building Heating, Ventilation, and Air Conditioning Systems

This report is an assessment of 135 different heating, ventilation, and air-conditioning (HVAC) technologies for U.S. residential buildings to identify and provide analysis on 19 priority technology options in various stages of development. The analyses include an estimation of technical energy-savings potential, descriptions of technical maturity, descriptions of non-energy benefits, descriptions of current barriers for market adoption, and descriptions of the technology's applicability to different building or HVAC equipment types. From these technology descriptions, are suggestions for potential research, development and demonstration (RD&D) initiatives that would support further development of the priority technology options.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Savings Potential and Research, Development, & Demonstration Opportunities for Commercial Building Heating, Ventilation, and Air Conditioning Systems

This report covers an assessment of 182 different heating, ventilation, and air-conditioning (HVAC) technologies for U.S. commercial buildings to identify and provide analysis on 17 priority technology options in various stages of development. The analyses include an estimation of technical energy-savings potential, description of technical maturity, description of non-energy benefits, description of current barriers for market adoption, and description of the technology’s applicability to different building or HVAC equipment types. From these technology descriptions, are suggestions for potential research, development and demonstration (RD&D) initiatives that would support further development of the priority technology options.

aerosol duct sealing↗