Search NASA⌕ Search

SEARCH · Search NASA

Results for “Subsystems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Triple redundant computer system/display and keyboard subsystem interface

Interfacing of the redundant display and keyboard subsystem with the triple redundant computer system is defined according to space shuttle design. The study is performed in three phases: (1) TRCS configuration and characteristics identification; (2) display and keyboard subsystem configuration and characteristics identification, and (3) interface approach definition.

Gulde, F. J.↗

Apollo experience report: Command and service module electrical power distribution on subsystem

A review of the design philosophy and development of the Apollo command and service modules electrical power distribution subsystem, a brief history of the evolution of the total system, and some of the more significant components within the system are discussed. The electrical power distribution primarily consisted of individual control units, interconnecting units, and associated protective devices. Because each unit within the system operated more or less independently of other units, the discussion of the subsystem proceeds generally in descending order of complexity; the discussion begins with the total system, progresses to the individual units of the system, and concludes with the components within the units.

Munford, R. E.↗

System design of the Pioneer Venus spacecraft. Volume 7: Communication subsystem studies

Communications subsystem tradeoffs were undertaken to establish a low cost and low weight design consistent with the mission requirements. Because of the weight constraint of the Thor/Delta launched configuration, minimum weight was emphasized in determining the Thor/Delta design. In contrast, because of the greatly relaxed weight constraint of the Atlas/Centaur launched configuration, minimum cost and off the shelf hardware were emphasized and the attendant weight penalities accepted. Communication subsystem hardware elements identified for study included probe and bus antennas (CM-6, CM-17), power amplifiers (CM-10), and the large probe transponder and small probe stable oscillator required for doppler tracking (CM-11, CM-16). In addition, particular hardware problems associated with the probe high temperature and high-g environment were investigated (CM-7).

Newlands, D. M.↗

The Atmosphere Explorer power subsystem

The design and operation of the power subsystem for the Atmospheric Explorer spacecraft are discussed. The additional functional redundancy which was added in several component areas to improve the overall subsystem reliability is analyzed. The battery charging technique has been modified to include third electrode overcharge control. The automatic removal of all battery charge is provided to correct abnormally high battery voltages. An undervoltage detector has been added which removes all nonessential spacecraft loads when the battery voltage falls below a given level. All automatic functions can be over-ridden by ground command.

Obenschain, A.↗

Design, fabrication, assembly, and test of a liquid hydrogen acquisition subsystem

The development of a cryogenic fluid system to supply liquid hydrogen to a turbopump at flowrates up to 7.5 pounds per second for a period of approximately 5 seconds before refill, is discussed. Refill is accomplished in less than 10 seconds, during which a constant flowrate can be maintained to the pumps. Diagrams are provided to show the configuration of the system. Subsystem acceptance and functional tests, including acquisition subsystem expulsion, pressurization, and refill were performed. The tests included: (1) thermodynamic vent system operation, (2) warm-gas pressurization effects, (3) hydraulic pressure surge effects, (4) screen device operational limitations, (5) feedline vapor control, and (6) two-phase refill.

Blackman, J. B.↗

Optimizing subsystem test programs

The goal of reduction of space system costs is pursued in the areas of standardization of subsystem test requirements as well as overall subsystem test program resource requirements. A number of standard components are being developed by NASA. The rationale for the various environmental tests applicable to future missions and launch vehicles is discussed. The need for and approach to developing standard component specifications is presented. In addition, a method for reduction of test expenditures utilizing indexes of mission effect and hardware history as indicators of test requirements is proposed.

Meyer, W. H.↗

Pulse-modulated dual-gas control subsystem for space cabin atmosphere

An atmosphere control subsystem (ACS) was developed for use in a closed manned cabin, such as the Space Shuttle Orbiter. This subsystem uses the Perkin Elmer mass spectrometer for continuous measurement of major atmospheric constituents (H2, H2O, N2, O2, and CO2). The O2 and N2 analog signals are used as inputs to the controller, which produces a pulse-frequency-modulated output to operate the N2 gas admission solenoid valve and an on-off signal to operate the O2 valve. The proportional controller characteristic results in improved control accuracy as compared with previously used on-off controllers having significant dead-band. A 60-day evaluation test was performed on the ACS during which operation was measured at various values of control setpoint and simulated cabin leakage.

Jackson, J. K.↗

Life support subsystem monitoring instrumentation

The recognition of the need for instrumentation in manned spacecraft life-support subsystems has increased significantly over the past several years. Of the required control and monitoring instrumentation, this paper will focus on the monitoring instrumentation as applied to life-support subsystems. The initial approach used independent sensors, independent sensor signal conditioning circuitry, and independent logic circuitry to provide shutdown protection only. This monitoring system was replaced with a coordinated series of printed circuit cards, each of which contains all the electronics to service one sensor and provide performance trend information, fault detection and isolation information, and shutdown protection. Finally, a review of sensor and instrumentation problems is presented, and the requirement for sensors with built-in signal conditioning and provisions for in situ calibration is discussed.

Powell, J. D.↗

An assessment of the Instrument Pointing Subsystems (IPS) requirements for spacelab missions

Instrument Pointing Subsystem requirements for Spacelab missions in solar physics, stellar astronomy, and earth observation are analyzed and design guidelines for fine pointing instrument platforms are presented. The requirements for the platforms are time-phased based on NASA projections of flight mission models and payload scheduling. The experiments used for these projections are to be viewed as representative payloads. Other experiments or experiment groupings within any one discipline may be accommodated by an Instrument Pointing Subsystem that meets these requirements.

Nein, M. E.↗

Apollo experience report: Guidance and control systems: Command and service module entry monitor subsystem

The conceptual aspects of the command and service module entry monitor subsystem, together with an interpretation of the displays and their associated relationship to entry trajectory control, are presented. The entry monitor subsystem is described, and the problems encountered during the developmental phase and the first five manned Apollo flights are discussed in conjunction with the design improvements implemented.

Reina, B., Jr.↗

Apollo experience report: Command and service module sequential events control subsystem

The Apollo command and service module sequential events control subsystem is described, with particular emphasis on the major systems and component problems and solutions. The subsystem requirements, design, and development and the test and flight history of the hardware are discussed. Recommendations to avoid similar problems on future programs are outlined.

Johnson, G. W.↗

Opto-mechanical subsystem of a 10 micrometer wavelength receiver terminal. Waveguide laser local oscillator. Servo system

An engineering model opto-mechanical subsystem for a 10.6-micrometer laser heterodyne receiver is developed, and a CO2 waveguide local oscillator and servo electronics are provided for the receiver. Design goals are presented for the subsystems and overall package design is described. Thermal and mechanical distortion loading tests were performed and the results are included.

Source record↗

Electrical power generation subsystem for Space Shuttle Orbiter

The requirements, capabilities, and design of the Space Shuttle Orbiter electrical power generation (EPG) subsystem are presented. The Orbiter EPG subsystem is designed to have the flexibility to supply the basic Orbiter electrical loads and the power requirements of the payloads which, in some cases, are completely dependent on the Orbiter for both power and heat rejection. These needs are supplied by three hydrogen/oxygen fuel cell powerplants (FCPs), having the capability of providing a total of 14 kW average and up to 24 kW peak in the basic Orbiter configuration. Kits permit dedication of one FCP to the payload by providing an additional reactant tank pair for a seven-day mission and additional heat rejection capability.

Blaski, M. F.↗

Design considerations for the Shuttle/Orbiter closed-circuit television subsystem

The Shuttle/Orbiter Program requirements relative to operational and performance parameters of the CCTV (closed circuit television) subsystem and their influence upon design considerations are presented. The anticipated use of the CCTV for rendezvous, docking, manipulator arm operation, satellite inspection and general orbiter operations is outlined to establish the performance requirements of each subsystem element. Typical physical characteristics, interface parameters, and remote-control design philosophy are briefly described.

Perry, W. E.↗

Multilevel control optimization using subsystem relative performance index sensitivity

A method is presented for the design of optimal feedback controllers for large multivariable systems with subsystem sensitivity constraints. The weighted sum of subsystem and/or operational mode relative performance index sensitivities is defined as the overall performance index. The method is developed for linear systems with quadratic performance criteria and either full or partial state feedback. An example concerning the design of a stability augmentation system for a VTOL aircraft in the transition mode demonstrates the effectiveness of the design method.

Leininger, G. G.↗

Primary electric propulsion thrust subsystem definition

A review is presented of the current status of primary propulsion thrust subsystem (TSS) performance, packaging considerations, and certain operational characteristics. Thrust subsystem related work from recent studies by Jet Propulsion Laboratories (JPL), Rockwell and Boeing is discussed. Existing performance for 30-cm thrusters, power processors and TSS is present along with projections for future improvements. Results of analyses to determine (1) magnetic field distributions resulting from an array of thrusters, (2) thruster emitted particle flux distributions from an array of thrusters, and (3) TSS element failure rates are described to indicate the availability of analytical tools for evaluation of TSS designs.

Masek, T. D.↗

Development of components for an S-band phased array antenna subsystem

The system requirements, module test data, and S-band phased array subsystem test data are discussed. Of the two approaches to achieving antenna gain (mechanically steered reflector or electronically steered phased array), the phased array approach offers the greatest simplicity and lowest cost (size, weight, power, and dollars) for this medium gain. A competitive system design is described as well as hardware evaluation which will lead to timely availability of this technology for implementing such a system. The objectives of the study were: to fabricate and test six engineering model transmit/receive microelectronics modules; to design, fabricate, and test one dc and logic multilayer manifold; and to integrate and test an S-band phased array antenna subsystem composed of antenna elements, seven T/R modules, RF manifolds and dc manifold.

Source record↗

Mission payloads subsystem description, revision 2

The Mission Payloads Subsystem (MPLS) which utilizes a simplified trajectory model to generate a list of missions for the Scheduling Algorithm for Mission Planning and Logistics Evaluation (SAMPLE) program is described. The MPLS is the mechanism that forms the basis of input for the other subsystems of SAMPLE and various post processors.

Williams, J. M.↗