Search NASA⌕ Search

SEARCH · Search NASA

Results for “TECHNICAL DETAILS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Towards a Public Event Display for DUNE

The Deep Underground Neutrino Experiment (DUNE) is a next generation long baseline neutrino experiment based at Fermilab, with a near detector near the beam target and a Far Detector (FD) in South Dakota. As the experiment prepares for its first data runs, creating pathways for public engagement and data transparency is essential. We present the first-ever DUNE event display designed for public outreach and education. Developed using data from the ProtoDUNE detectors at the CERN Neutrino Platform, this tool provides an intuitive and interactive interface that allows non-experts to visualise and explore particle interactions in a Liquid Argon Time Projection Chamber (LArTPC). By translating raw experimental data into a browser-accessible format, we establish the essential infrastructure for DUNE’s pathway to open data. This talk will detail the technical development of the display, its current implementation with ProtoDUNE data, and the strategic roadmap for integrating it into DUNE’s long-term open-access framework.

Sabater, Eva [U. Sussex (main)] (ORCID:00090001748↗

REMOVAL OF LEGACY PLUTONIUM MATERIALS FROM SWEDEN

U.S. Department of Energy’s National Nuclear Security Administration (NNSA) Office of Global Threat Reduction (GTRI) recently removed legacy plutonium materials from Sweden in collaboration with AB SVAFO, Sweden. This paper details the activities undertaken through the U.S. receiving site (Savannah River Site (SRS)) to support the characterization, stabilization, packaging and removal of legacy plutonium materials from Sweden in 2012. This effort was undertaken as part of GTRI’s Gap Materials Program and culminated with the successful removal of plutonium from Sweden as announced at the 2012 Nuclear Security Summit. The removal and shipment of plutonium materials to the United States was the first of its kind under NNSA’s Global Threat Reduction Initiative. The Environmental Assessment for the U.S. receipt of gap plutonium material was approved in May 2010. Since then, the multi-year process yielded many first time accomplishments associated with plutonium packaging and transport activities including the application of the of DOE-STD-3013 stabilization requirements to treat plutonium materials outside the U.S., the development of an acceptance criteria for receipt of plutonium from a foreign country, the development and application of a versatile process flow sheet for the packaging of legacy plutonium materials, the identification of a plutonium container configuration, the first international certificate validation of the 9975 shipping package and the first intercontinental shipment using the 9975 shipping package. This paper will detail the technical considerations in developing the packaging process flow sheet, defining the key elements of the flow sheet and its implementation, determining the criteria used in the selection of the transport package, developing the technical basis for the package certificate amendment and the reviews with multiple licensing authorities and most importantly integrating the technical activities with the Swedish partners.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

A Detailed Wind Turbine Blade Cost Model

This technical report describes a detailed blade cost model for wind turbine blades in the range of 30 to 100 meters in length. The model estimates the bill of materials, the number of labor hours and the cycle time, and the costs related to direct labor, overhead, buildings, tooling, equipment, maintenance, and capital. The model applies to multimegawatt wind turbine blades manufactured via vacuum-assisted resin transfer molding, which is the most commonly adopted manufacturing method for modern wind turbine blades. The model is implemented both in a large Excel file and in Python. The latter is freely available in the repository of the Wind-Plant Integrated System Design and Engineering Model (WISDEM[R]) github.com/WISDEM. WISDEM is a multidisciplinary analysis and optimization design framework developed at the National Renewable Energy Laboratory. This blade cost model represents a valuable tool to run design optimization studies for wind turbines. In this report, the model is first presented with its approach and assumptions and then computes the costs of three blades, namely the 33-meter-long Wind Partnership for Advanced Component Technologies (WindPACT) study blade, the 63-meter-long International Energy Agency (IEA) Wind Task 37 land-based reference wind turbine blade, and the 100-meter-long SNL-100-03 blade developed at Sandia National Laboratories.

17 WIND ENERGY↗

Wabash CarbonSAFE: Detailed Site Characterization Plan, Task 11.0, Technical Report

Wabash CarbonSAFE established that commercial-scale CO 2 storage in the Potosi Dolomite –Maquoketa Group storage complex associated with the Wabash Valley Resources (WVR) plant site near Terre Haute, IN is highly feasible. The CarbonSAFE project team performed this evaluation through extensive data acquisition and analysis including 2D seismic reflection data, wireline logs, well testing, and core/cuttings from the Wabash #1 stratigraphic test well (now plugged and abandoned). This document summarizes work detailed in separate Wabash CarbonSAFE reports and consolidates the geologic characterization, well testing, and storage complex modeling results for the Mt. Simon Sandstone and Potosi Dolomite, two distinct reservoirs characterized at the Wabash CarbonSAFE project site. The report then presents recommendations for the next steps for site characterization, identifies data gaps for future activities, and provides an overall assessment of site potential.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Systematic Technology Evaluation Program for SiC-based BWR Channel Box

Silicon carbide (SiC) –based accident-tolerant fuel (ATF) cladding of light water reactors (LWRs) has become a topic of great interest in nuclear material development since the Fukushima Dai-ichi Nuclear Power Plant accident. Extensive development of SiC cladding has identified benefits of the concept, including its inherent accident resistance and neutronic performance. Advancements achieved during the development of SiC-based ATF cladding have made it attractive for use in accident-tolerant cores of LWRs. In this document, we consider the use of SiC-based materials to replace the zirconium alloy used for the channel boxes of boiling water reactors. Both accident resistance and prevention of the bowing observed in current grades of channel boxes are needs driving the exploration of a new channel box system. To provide a pathway for channel box development, this document lays out (1) a current technology overview, (2) the technology gap, and (3) a systematic technology evaluation plan. The objectives of the technology evaluation plan are to address key feasibility issues revealed by the knowledge gap analysis and to contribute to advancing the technology readiness level. Further development will be required in the technology implementation phase. The technology evaluations include understanding the behavior of channel boxes under both normal and off-normal conditions, identifying potential mitigation strategies for the issues if necessary, and improving channel box performance based on the knowledge obtained. The structure of the technology evaluation plan and each task are shown in Figure S.1. The knowledge gap analysis identified key research areas, including irradiation effects, hydrothermal corrosion, accident behavior, and design and manufacture. These are common issues between SiC-based channel boxes and SiC-based fuel cladding, although technical evaluations specific for the channel box components are required. This document also describes details of the technical feasibility evaluation methods and plans.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Results for the September Bimonthly Calendar Year 2022 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the 2022 September bimonthly sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the Tank 50 sample was obtained. The chemical and radionuclide contaminant results from the characterization of the 2022 September bimonthly sampling of Tank 50 were requested by SRMC personnel via a Task Technical Request (TTR). Details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is the TTR deliverable relating Salt Solution Analysis from the SRMC request. The following facts pertaining to the WAC are drawn from the analytical results, including analytical uncertainty, provided in this report. 1) WAC LIMITS and TARGETS were met for all analyzed chemical and radioactive contaminants for which the detection limits are below the WAC LIMITS and TARGETS; 2) Measured average concentrations of nitrate, nitrite and total mercury are approximately 24%, 9% and 12% of the WAC LIMITS, respectively; 3) Measured average concentrations of Tc-99 and I-129 are approximately 19% and 20% of the WAC LIMITS, respectively; 4) All other radionuclide average concentrations are at 4% or less of the WAC LIMITS and TARGETS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Science Case for a Wide Field-of-View Very-High-Energy Gamma-ray Observatory in the Southern Hemisphere

This white paper outlines the wide science program that would be enabled by the construction of a next-generation gamma-ray observatory using ground-level particle detectors in the Southern Hemisphere: the Southern Gamma-ray Survey Observatory (SGSO). This science case rests on four main pillars: unveiling galactic and extragalactic particle accelerators, monitoring the transient sky at very high energies, probing particle physics beyond the Standard Model, and the characterization of the cosmic ray flux. Several currently ongoing efforts to advance the technical performance of such an observatory will briefly be discussed in Section 8. However, the focus of this document will be on the broad spectrum of astrophysical questions SGSO will address, rather than the details of the technical implementation of a detector. To assess the potential to specific astrophysical applications, a “straw man” detector design is used. This design provides an increase in effective area, number of channels, and a lower energy threshold compared to existing observatories such as the HAWC gamma-ray observatory. Intrinsic figures of merit that quantify the potential performance of SGSO (like angular resolution and background rates) are based on the demonstrated performance of HAWC. Details on this design and its performance are given in Section 3. This approach is chosen as a balance to obtain both an ambitious and feasible performance, suitable to a wide range of applications, while keeping the assumptions about the technical implementation to a minimum. It is foreseen that some applications could benefit from enhanced performance over the straw man design in certain energy ranges; the feasibility and need of reaching enhanced performance will be discussed case by case. The outcome of the studies presented in this document will give an overview of the scientific potential of a next-generation gamma-ray observatory in the southern hemisphere and provide guidance to the finalization of the design of such an observatory.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Rooftop Solar Photovoltaic Technical Potential in the United States. A Detailed Assessment

How much energy could be generated if PV modules were installed on all of the suitable roof area in the nation? To answer this question, we first use GIS methods to process a lidar dataset and determine the amount of roof area that is suitable for PV deployment in 128 cities nationwide, containing 23% of U.S. buildings, and provide PV-generation results for a subset of those cities. We then extend the insights from that analysis to the entire continental United States. We develop two statistical models--one for small buildings and one for medium and large buildings--and populate them with geographic variables that correlate with rooftop's suitability for PV. We simulate the productivity of PV installed on the suitable roof area, and present the technical potential of PV on both small buildings and medium/large buildings for every state in the continental US. Within the 128 cities covered by lidar data, 83% of small buildings have a location suitable for a PV installation, but only 26% of the total rooftop area of small buildings is suitable for development. The sheer number of buildings in this class, however, gives small buildings the greatest technical potential. Small building rooftops could accommodate 731 GW of PV capacity and generate 926 TWh/year of PV energy, approximately 65% of rooftop PV's total technical potential. We conclude by summing the PV-generation results for all building sizes and therefore answering our original question, estimating that the total national technical potential of rooftop PV is 1,118 GW of installed capacity and 1,432 TWh of annual energy generation. This equates to 39% of total national electric-sector sales.

14 SOLAR ENERGY↗

2017 Publications Demonstrate Advancements in Wind Energy Research

In 2017, wind energy experts at the National Renewable Energy Laboratory (NREL) made significant strides to advance wind energy. Many of these achievements were presented in articles published in scientific and engineering journals and technical reports that detailed research accomplishments in new and progressing wind energy technologies. During fiscal year 2017, NREL wind energy thought leaders shared knowledge and insights through 45 journal articles and 25 technical reports, benefiting academic and national-lab research communities; industry stakeholders; and local, state, and federal decision makers. Such publications serve as important outreach, informing the public of how NREL wind research, analysis, and deployment activities complement advanced energy growth in the United States and around the world. The publications also illustrate some of the noteworthy outcomes of U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) and Laboratory Directed Research and Development funding, as well as funding and facilities leveraged through strategic partnerships and other collaborations.

17 WIND ENERGY↗

Fusion Energy Sciences Exascale Requirements Review. An Office of Science review sponsored jointly by Advanced Scientific Computing Research and Fusion Energy Sciences, January 27-29, 2016, Gaithersburg, Maryland

The additional computing power offered by the planned exascale facilities could be transformational across the spectrum of plasma and fusion research — provided that the new architectures can be efficiently applied to our problem space. The collaboration that will be required to succeed should be viewed as an opportunity to identify and exploit cross-disciplinary synergies. To assess the opportunities and requirements as part of the development of an overall strategy for computing in the exascale era, the Exascale Requirements Review meeting of the Fusion Energy Sciences (FES) community was convened January 27–29, 2016, with participation from a broad range of fusion and plasma scientists, specialists in applied mathematics and computer science, and representatives from the U.S. Department of Energy (DOE) and its major computing facilities. This report is a summary of that meeting and the preparatory activities for it and includes a wealth of detail to support the findings. Technical opportunities, requirements, and challenges are detailed in this report (and in the recent report on the Workshop on Integrated Simulation). Science applications are described, along with mathematical and computational enabling technologies. Also see http://exascaleage.org/fes/ for more information.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The 2014 Sandia Nonlinear Mechanics and Dynamics Summer Research Institute

A collaborative research institute was organized and held at Sandia Albuquerque for a period of six weeks. This research institute brought together researchers from around the world to work collaboratively on a set of research projects. These research projects included: developing experimental guidelines for studying variability and repeatability of nonlinear structures; decoupling aleatoric and epistemic uncertainty in measurements to improve dynamic predictions; a numerical round robin to assess the performance of five different numerical codes for modeling systems with strong nonlinearities; and an assessment of experimentally derived and numerically derived reduced order models. In addition to the technical collaborations, the institute also included a series of seminars given by both Sandians and external experts, as well as a series of tours and field trips to local places of scientific and engineering importance. This report details both the technical research and the programmatic organization of the 2014 Sandia Nonlinear Mechanics and Dynamics Summer Research Institute.

36 MATERIALS SCIENCE↗

Captain Electronics Technical Report

This report details the current layout of the electronics for the mini-CAPTAIN detector system, as well as the lessons learned during commissioning. We will present some electronics suggestions for future LArTPC systems. Mini-CAPTAIN is one of three detectors used in the Cryogenic Apparatus for Precision Tests of Argon Interactions with Neutrino (CAPTAIN) project at Los Alamos National Lab (LANL). The detector uses many of the same electronic components as current and developing LArTPC experiments. This includes the motherboards, service cards, amplifiers and ADC made by Brookhaven National Laboratory (BNL) and the front-end modules (FEM) made by Nevis Labs. The cold electronics performed well in both vacuum and cryogenic environments after months of exposure. Mini-CAPTAIN was tested with two liquid nitrogen and three liquid argon run cycles. The final testing was performed at the Weapons Neutron Research (WNR) facility at LANSCE. Mini-CAPTAIN was able to maintain a clean electrical signal through most of the test cycles. Most noise reduction was achieved with power source filtering and careful attention to the ground configuration. Direct oscilloscope probing on the front-end output provided the fastest analysis and correction of noise sources. Ground path assumptions and integrity were verified with frequent impedance checks. A high voltage break down event damaged some of the channels on the motherboards and a number of the wire decoupling capacitors. This temporarily introduced significant noise on the wire planes due to current leakage. The detector was taken apart and reassembled three times, with successful noise reduction after each activity. The current raw signal-to-noise ratio is 9 to 1.

42 ENGINEERING↗

Interactions Between Microturbulence and Magnetohydrodynamic Instabilities in Magnetized Plasmas (Final Technical Report)

This document details the work accomplished during the period 04/15/2012-01/31/2020 for the collaborative project “Interactions Between Microturbulence and Magnetohydrodynamic Instabilities in Magnetized Plasmas,” and serves as the final report on the University of California, San Diego part of this collaborative project for Department of Energy Office of Science - Fusion Energy Sciences Grant No. DE- SC0007783. This project focused on the development of analytic and computational tools, seeking to better understand the mutual interactions between small-scale temperature-gradient driven microturbulence and macroscopic magnetohydrodynamic (MHD) instabilities, particularly tearing modes, in magnetically confined plasmas relevant for the generation of fusion energy. This project advanced understanding through numerical simulations of different sets of model equations, corresponding to different microturbulence instabilities. Questions addressed included how the magnitudes, spatial structures, and scaling's of turbulent forcing's and drags impact magnetic island dynamics, as well as quantifying the “region of influence” of an island on the microturbulence dynamics. A key finding of the project is that the microturbulence fluctuations and associated cross-field particle and energy fluxes exhibit spatial asymmetries for sufficiently large islands. The results have improved our fundamental understanding of plasma dynamics, motivated new experimental investigations, and will help inform future fusion predictive modeling efforts.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Energy Exchange in Dynamic DNA-Metal Hybrid Materials (Final Technical Report)

This report details research results from the 1 year renewal of DE-SC0017270, Energy Exchange in Dynamic DNA-Metal Hybrid Materials, including the primary findings associated with this research. This work investigated interactions between dynamic DNA origami energy harvesting materials and inorganic materials responsive to electromagnetic fields with two primary areas of inquiry: cyclic energy conversion and mechanical energy storage and transfer. This work resulted in 5 publications, including 1 in revision, and 1 issued patent.

36 MATERIALS SCIENCE↗

AMS / BARC Joint Survey Addendum Technical Report

This report details the data analysis results from data collected during the September-October 2019 joint survey series between the Department of Energy (DOE) National Nuclear Security Administration (NNSA) Aerial Measuring System (AMS) asset, and the Government of India’s Department of Atomic Energy (DAE) Bhabha Atomic Research Centre (BARC). This joint survey series took place at the Nevada National Security Site (NNSS), areas of public land in Southern Nevada, and at the DOE Office of Legacy Management (LM) Large Area Calibration Pads (LACP) at the Grand Junction Regional Airport in Grand Junction, CO. The data detailed in this report were gathered at the LACP. More details regarding the setup of these surveys and personnel involvement can be found in the AMS / BARC Joint Survey Summary Report. The data from the LACP collected by AMS are consistent with past data collection campaigns at the LACP. The AMS Bell 412 (B412) helicopter, equipped with both the standard AMS thallium-doped sodium iodide (NaI(Tl)) 2"x4"x16" 12-detector system and a subset of the BARC Aerial Gamma Spectroscopy System (AGSS) consisting of two independent 3"x3"cylindrical NaI(Tl) detectors, measured each of the five calibration pads for a minimum of 10 minutes. After the helicopter measurements, a pressurized ion chamber (PIC) was used to directly measure radiation exposure rates on each of the pads for a period 5 minutes. The geophysical calibration procedure published by the International Atomic Energy Agency (IAEA) (Erdi-Krausz et al. 2003) was used to determine the spectral stripping sensitivity matrix for naturally occurring radiological material (NORM). The sensitivity matrix is consistent with the AMS long term average. Additionally, the PIC data was used to calibrate the AMS system for exposure rate. The results of the exposure rate analysis are also consistent with AMS long-term averages.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

LAMP Technical Readiness Evaluation Report (Rev. 1)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed. Corresponding Technical Readiness Levels (TRLs) were also determined for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Only two subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗