Search NASA⌕ Search

SEARCH · Search NASA

Results for “TEST FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

The Fuel Motion Monitoring System at TREAT - Current Status and Future Plans

An important component of the United States Nuclear Fuel Safety Transient Testing Program, the Fuel Motion Monitoring System (FMMS) at Idaho National Laboratory's Transient Reactor Test Facility (TREAT) is fast-neutron hodoscope capable of imaging the location, movement, and relocation of nuclear fuel experiments under simulated transient accident conditions. The FMMS was refurbished in parallel with the TREAT restart program starting in 2014, restoring 96-channels of fast-neutron detection. Since returning to operation in 2017 the FMMS has supported many fuel safety experiments supporting accident tolerant fuel development, light-water reactor safety, space thermal nuclear propulsion fuel development, and advanced reactor research and development. In Phase 2 of the FMMS restoration. work is now under way to expand the FMMS' field-of-view by adding an additional 96 channels of fast neutron detectors to the system's hodoscope, along with an expanded data acquisition system and associated transient timing electronics. An overview of the FMSS system and its fast-neutron detectors will be presented along with examples of current FMMS imaging performance and associated information.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Advanced Electron Microscopy Characterization of the Fuel-Cladding Chemical Interaction Region in a High Burnup U-10Zr Fuel

To support the development of U-10Zr metallic fuel, advanced characterization techniques have been applied to the fuel-cladding chemical interaction (FCCI) region in a Na-bonded solid U-10Zr fuel cross-section that was irradiated to a burnup of ~13.1 at.% at the Fast Flux Test Facility. 17 phases were identified in the FCCI region through a combination of high-resolution scanning transmission electron microscopy (STEM), STEM based energy dispersive X-ray spectroscopy (STEM-EDS), and TEM based selective area electron diffraction (TEM-SAED) analysis. In this talk, we will also discuss the implications of results on metallic fuel FCCI by focusing on the formation of Zr rind, fission product migration, and HT-9 cladding integrality under the investigated thermal irradiation conditions. This work complements our previous study on the TEM characterization of the fuel region of this high burnup fuel sample and serves as scientific basis to support metallic fuel development and qualification.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Controls Status of Fermilab's PIP-II Project

The Fermilab Proton Improvement Project II (PIP-II) is building a new Super Conducting Linear Accelerator (SCL) accelerating protons to 800 MeV for injection into the rest of the FNAL beam complex. Key progress since the last status report given at ICALEPCS includes the adoption of modern DevOps practices with continuous integration and GitOps-based deployments, commissioning of EPICS-based systems at the Cryomodule Test Facility, and integration of a Virtual Accelerator framework for application development ahead of installation. In parallel, web-based applications using Dart and Flutter have matured, providing secure, unified access to both EPICS and legacy ACNET data. Data acquisition and timing systems have also evolved. This paper presents the current state of controls, emphasizing these recent developments and outlining upcoming milestones as PIP-II approaches commissioning of its cryoplant in 2026 and the Warm Front End in 2027.

Crisp, D. B. [Fermilab]↗

The Automatic Reactor Control System (ARCS) Upgrade, version 2.0 for TREAT

The Transient REActor Test Facility (TREAT) recently underwent an upgraded to the Automatic Reactor Control System (ARCS). The purpose of the upgrade was to institute a new software architecture that is better suited for the programming environment, patched software bugs and applied two new segments for reactor control. This paper will focus on the new segments for reactor control. The two new control segments added to ARCS are called Generic Power and Generic Rods. The original version of ARCS provided only two power related functions, namely periods and ramps, that had to be spliced together to generate any power shape. The Generic Power segment allows the user to input data points to define the function and then the algorithm does its best to create the desired shape. The original ARCS program utilized two direct rod commands (i.e. open loop control), these were a rod stop and clip. A Generic Rod segment extends the ability of the computer to directly command any rod position. The functionality of these new segments was proven during the TREAT outage in 2024.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Accelerating Nuclear-Integrated Data Centers in the USA: SWOT Analysis, Power-Thermal Management Strategies, and Industrial-Scale Demonstration and Potential Deployment

Driven by the growth in digital services, cloud computing, AI, and manufacturing, data centers face rising energy demands that challenge traditional power sources and cooling efficiency. This study explores using nuclear power to meet these demands, focusing on accelerated reactor technology deployment and highlighting needs such as N+1/N+2 power supplies and integrated power-thermal management. A SWOT analysis addresses grid connectivity, reactors, and site selection, particularly DOE sites. Reactor technology demonstration and deployment could be accelerated by leveraging test facilities such as MARVEL, MAGNET, TED, FAS, DOME, LOTUS, ATR, Energy System Proving Grounds, and upcoming Energy Launch Pads, along with modeling and simulation tools such as RELAP5, MOOSE, VERA, RAVEN, and FORCE. The potential power and thermal management options, including various cooling technologies, waste-heat utilization, and an industrial-scale demonstration plan, aim to accelerate the integration of nuclear power and data centers in the USA, while emphasizing community and stakeholder engagement and synergistic efforts.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Calibration and Performance of Germanium High Voltage Detectors for SuperCDMS SNOLAB

As SuperCDMS SNOLAB is getting ready to search for low mass dark matter particles, using cryogenic Ge and Si detectors, a set of six of the new SuperCDMS High Voltage (HV) detectors (four Ge and two Si) were tested in the Cryogenic Underground TEst facility (CUTE) at SNOLAB. This provided the first opportunity to gain experience with this new detector type and assess their performance thoroughly under low background conditions. Here we describe the SuperCDMS HV detector concept and discuss some of the newly developed analysis methods and approaches. Focusing on the Ge detectors, we investigate the detector performance under voltage bias (up to 90 V), exercise the low energy (keV to sub-keV range) calibration based on the electron capture peaks generated by the decay of $^{71}$Ge, assess the detector resolution, and demonstrate the unexpected (and encouraging) ability of these detectors to also measure high energy interactions in the hundreds of keV range with good resolution (better than 3% at 356 keV).

Albakry, M. F. [British Columbia U.; TRIUMF]↗

Closure Report for Corrective Action Unit 116: Area 25 Test Cell C Facility, Nevada National Security Site, Nevada with ROTC-1

CR loaded to this OSTI record. Just adding new file which includes CR plus new ROTC 1 and update the metadata to the following: This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 116, Area 25 Test Cell C Facility. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 [as amended March 2010]). CAU 116 consists of the following two Corrective Action Sites (CASs), located in Area 25 of the Nevada National Security Site: (1) CAS 25-23-20, Nuclear Furnace Piping and (2) CAS 25-41-05, Test Cell C Facility. CAS 25-41-05 consisted of Building 3210 and the attached concrete shield wall. CAS 25-23-20 consisted of the nuclear furnace piping and tanks. Closure activities began in January 2007 and were completed in August 2011. Activities were conducted according to Revision 1 of the Streamlined Approach for Environmental Restoration Plan for CAU 116 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2008). This CR provides documentation supporting the completed corrective actions and provides data confirming that closure objectives for CAU 116 were met. Site characterization data and process knowledge indicated that surface areas were radiologically contaminated above release limits and that regulated and/or hazardous wastes were present in the facility. The Record of Technical Change 1 updated the use restriction information.

54 ENVIRONMENTAL SCIENCES↗

Results of South-East Flux Trap Dosimetry Measurements for the Advanced Test Reactor Critical Facility in support of Advanced Sensors and Instrumentation Development

Reactor dosimetry measurements are commonly used to validate simulation and modeling in nuclear reactor tests. Numerous standard dosimeter materials exist which are commonly utilized with sensitivities to different energy ranges of neutrons. At the Advanced Test Reactor (ATR), cobalt alloy and pure nickel wires are installed every cycle to monitor thermal- and fast-neutron fluence rates. However, there is growing interest in exploring less commonly used materials which are either more sensitive to different parts of the neutron energy spectrum or which can incorporate multiple activation paths in a single material. Epithermal and fast-neutron energies beyond the typical 1-MeV threshold are of particular interest. Two ATR-C Flux Runs took place during 2024; each flux run included supplemental dosimetry packages in the South-East Flux Trap (SEFT) Filler. The focus of the dosimetry package for flux run 23-4 was to test two novel dosimetry methods that can provide simultaneous thermal and threshold (fast) sensitivity in a single dosimeter wire. A selection of 3% Au in Cu alloyed wires were available that provided sensitivity to fast and thermal neutrons through 5 different reactions. Likewise, Fe offers multiple interaction pathways with sensitivity to both thermal and fast neutrons. The main question to be answered by these irradiations was if sufficient radioactivation would take place in the ATR-C SEFT during a nominal 20-minute irradiation at typical power levels (near 600Wth) to observe the threshold reactions that have smaller activation cross-sections than the thermal reactions without being saturated by interfering interactions and Compton continuum during the High-Purity Germanium (HPGe) measurements. The results from comparing the measurement results to anticipated activity levels provide confidence in our ability to activate both traditional and novel dosimetry materials in ATR-C, however not all the measured values matched with the predicted activities. This leaves further room for investigation both on the experimental and computational approaches for future irradiation experiments.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Findings on subtask 3.3 – applicability of automated brine chemistry determinations for treatment and recovery processes through facility automation/modularization: engineering design study

Under the Energy & Environmental Research Center’s (EERC’s) ~$\$$22 million Phase II Brine Extraction and Storage Test (BEST) Program, a multimillion-dollar brine treatment technology test bed facility was established in western North Dakota to provide a platform for evaluating developing technologies and approaches for brine treatment and volume reduction. The initial facility, and associated research effort, was funded by the U.S. Department of Energy (DOE), with in-kind contributions provided by several industry participants and the state of North Dakota. Since its opening, the Brine Technology Test Facility (BTTF) has supported performance evaluations of desalination technologies capable of treating high-salinity produced water (PW) and enabled data collection for multiple approaches of PW management and critical material recovery. As part of the decommissioning process for the original project, facility ownership and liability were transferred to Select Water, which is providing the EERC with a continuing site access option for state or federal research and/or commercial technology development. This report documents the findings from a design study conducted by the EERC and the engineering firm that was originally contracted to design and construct the facility (Advanced Engineering and Environmental Services, LLC [AE2S]) that evaluated the current status of BTTF and its systems and developed a retrofit design to increase the facility’s capabilities through automation and modularization of its PW treatment infrastructure. The proposed retrofit will provide DOE and industry with an expanded range of conditioned PW that can be produced at the facility for evaluating fit-for-purpose water treatment technologies, online instrumentation for brine chemistry determination, and systems that recover critical materials like lithium and magnesium. The current facility consists of an 9600-square-foot facility that includes a 40-foot by 65-foot Class 1, Division 2-rated demonstration area and associated control rooms and lab-ready space capable of sourcing oil and gas PW and wastewater from industrial sources or tailoring brine compositions up to 300,000 mg/L total dissolved solids (TDS) and supplying them at rates up to 25 gpm for extended-duration technology demonstrations. The colocation of the facility with Select Water’s water management facilities allows for access and unloading of more than 10,000 bbl/day of trucked water delivered to site and associated access to on-site Class I and Class II brine disposal wells and nearby hazardous waste landfills operated and/or contracted by Select Water to dispose of concentrate and/or effluents associated with the testing.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

FUEL PERFORMANCE SIMULATION OF HIGH BURNUP FUELS IN PLANNED INTEGRAL DESIGN BASIS ACCIDENT EXPERIMENTS

High burnup (HBu) fuel rods from the Byron Nuclear Generating Station (BNGS) were recently received at Idaho National Laboratory (INL) to support a variety of planned Nuclear Energy fuel cycle R&D objectives ranging from fuel performance, fuel recycle, and spent fuel research topics. Among these R&D activities, these fuel rods will be the subjects of multiple in-pile experiment programs at the Transient Reactor Test (TREAT) facility as well as detailed characterization and testing in the hot cells at INL and Oak Ridge National Laboratory (ORNL). TREAT RIA experiments are planned for the Nuclear Energy Agency Framework for Irradiation Experiments (FIDES) Joint Experimental Program called High burnup Experiments in Reactivity Initiated Accident (HERA) program. TREAT and ORNL-furnace LOCA experiments are part of the Department of Energy (DOE) Advanced Fuels Campaign (AFC) program U.S. consensus LOCA test plan, and the in-pile experiments have also been proposed in a FIDES project called Loss of Coolant-High Burnup (LOC-HBu). The results of these test programs will provide crucial data about safety performance enabling extended licensable burnup limits for these fuels. The purpose of this paper is to document fuel performance computational simulations of the BNGS fuel using the Bison code. The detailed assessments include (1) the irradiation history of the fuel to provide prediction of as-run fuel conditions and (2) extending the irradiated fuel conditions into the as-designed experiment conditions for the HERA-HBu RIA experiments and for the LOC-HBu LOCA experiments. The results of these assessments will inform post-irradiation examinations (PIE) of the BNGS parent rods and detailed final design of the planned experiments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FUEL PERFORMANCE SIMULATION OF HIGH BURNUP FUELS IN PLANNED INTEGRAL DESIGN BASIS ACCIDENT EXPERIMENTS

High burnup (HBu) fuel rods from the Byron Nuclear Generating Station (BNGS) were recently received at Idaho National Laboratory (INL) to support a variety of planned Nuclear Energy fuel cycle R&D objectives ranging from fuel performance, fuel recycle, and spent fuel research topics. Among these R&D activities, these fuel rods will be the subjects of multiple in-pile experiment programs at the Transient Reactor Test (TREAT) facility as well as detailed characterization and testing in the hot cells at INL and Oak Ridge National Laboratory (ORNL). TREAT RIA experiments are planned for the Nuclear Energy Agency Framework for Irradiation Experiments (FIDES) Joint Experimental Program called High burnup Experiments in Reactivity Initiated Accident (HERA) program. TREAT and ORNL-furnace LOCA experiments are part of the Department of Energy (DOE) Advanced Fuels Campaign (AFC) program U.S. consensus LOCA test plan, and the in-pile experiments have also been proposed in a FIDES project called Loss of Coolant-High Burnup (LOC-HBu). The results of these test programs will provide crucial data about safety performance enabling extended licensable burnup limits for these fuels. The purpose of this paper is to document fuel performance computational simulations of the BNGS fuel using the Bison code. The detailed assessments include (1) the irradiation history of the fuel to provide prediction of as-run fuel conditions and (2) extending the irradiated fuel conditions into the as-designed experiment conditions for the HERA-HBu RIA experiments and for the LOC-HBu LOCA experiments. The results of these assessments will inform post-irradiation examinations (PIE) of the BNGS parent rods and detailed final design of the planned experiments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Modernizing the Legacy Fission Wire Measurement System for the Advanced Test Reactor-Critical Facility

Operational lifetime extensions of existing research reactors have emphasized the need for refurbishment, replacements, and upgrades to supporting equipment and instrumentation. The Advanced Test Reactor (ATR) at Idaho National Laboratory (INL), which entered service in 1967, has recently completed the sixth core internals change-out and has scheduled operations until at least 2040. Reactor maintenance and operational risk management is critically important in the research reactor community, however supporting measurement systems sometimes get overlooked when maintenance is planned. The Fission Wire Measurement System (FWMS) is a custom measurement system designed in the 1960s to measure the beta-particle activity of irradiated uranium-aluminum fission wires. This measurement is conducted to determine the fission rate profile of the Advanced Reactor Test Critical (ATR-C) facility. The ATR-C is an open-pool, low-power test reactor that was purpose driven to resemble ATR and is used to qualify experiment configurations and verify core models prior to full-power experiment irradiations in ATR. A power distribution measurement in ATR-C uses uranium-aluminum wires that are distributed throughout the ATR-C core to validate simulation and modeling results. These measurements require 340 to 1500 wires to be irradiated and measured within a 12-hour window. The activity of the wires is measured in the required time with the FWMS, which was put into service in 1965 at the Radiation Measurements Laboratory (RML). The system consists of 4 measurement channels and one reference channel, each with a 2-pi proportional gas flow detector and the measurement channels each have an automated sample changer. This legacy system is crucial to the continued operations of ATR and has undergone some minor hardware upgrades since 1965, however the system presently relies on custom control boards, custom gas ion chambers, analog amplifiers/discriminators, and a user interface (UI) for the system written in outdated code. Much of the equipment and software is custom with no commercial replacements or support and limited documentation. The existing control software requires an operating system that is no longer supported, creating more vulnerabilities to continued operations. A project is underway with a third-party vendor to design, build, and document a new control and data acquisition system (CDAS) for the FWMS. The new upgrade will replace the control system, computer, UI, sample changer motors, and main power supply while maintaining the interface with existing detector hardware. The upgraded system will be operated in parallel with the current hardware and software to conduct validation testing. This equipment upgrade demonstrates the commitment at ATR to ensuring successful operations and potential future research reactors at INL.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

ATR Gamma Facility User Guide

Advanced Test Reactor Gamma Facility User Guide provides guidance to assist Test Sponsors in meeting the administrative requirements associated with ATR Gamma Facility irradiations. The sections in the guide provide a brief discussion of each step, including purpose, party responsible for execution, typical order of events, general methodology, and location at which each step takes place. The length of time to complete an experiment will vary depending on the complexity of the irradiation test (i.e., experiment design) and irradiation duration.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

First observation of antiproton annihilation at rest on argon in the LArIAT experiment

We report the first observation and measurement of antiproton annihilation at rest on argon track and shower multiplicities and particle identification conducted with the LArIAT experiment. Stopping antiprotons from the Fermilab Test Beam Facility’s charged particle test beam are identified using beamline instrumentation and LArIAT’s liquid argon time projection chamber (LArTPC). The charged particle multiplicity from the annihilation vertex is manually evaluated via hand scanning, yielding a mean of 3.2 ± 0.4 tracks and a standard deviation of 1.3 tracks, consistent with a semiautomated reconstruction resulting in 2.8 ± 0.4 tracks and a standard deviation of 1.2 tracks. Both methods are consistent with Monte Carlo simulations within statistical uncertainty. The shower multiplicities and particle identification for outgoing tracks are also consistent with eant4 model predictions. These results, obtained from a low-statistics sample, provide a foundation for higher-statistics studies in larger LArTPCs, which could refine modeling of intranuclear annihilation on argon and inform scenarios such as neutron-antineutron oscillations. Published by the American Physical Society 2025

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Beam Test Characterization of an Irradiated Pixel-Strip Module for HL_LHC CMS Tracker Upgrade

A new tracker, for the CMS detector at The Large Hadron Collider, will be built to address the demands of the High Luminosity upgrade which aims to achieve peak instantaneous luminosities from 5 up to 7.5 10^34 cm^-2 s^-1 and an integrated luminosity of 3000 4000 fb^-1 at a center of mass energy of 14 TeV. To meet the resulting challenges, the CMS experiment is changing its outer tracker silicon modules to include tracking capabilities at the Level-1 trigger. As part of this upgrade effort, a prototype module, combining both pixel and strip sensors (PS-module), was irradiated and subsequently tested at the Fermilab Test Beam and Irradiation facilities. These tests evaluated the module's ability to maintain precise tracking, effective particle momentum discrimination, and consistent performance when exposed to the radiation levels expected in the High Luminosity LHC environment. Results from these studies are presented with a focus on comparing the module's performance before and after irradiation.

43 PARTICLE ACCELERATORS↗

ANS Winter 2024 Summary: Optimizing the ATF-2Ramp Power Profile

When the Halden Boiling Water Reactor closed down in 2018, a need to restore the capability for in-reactor power ramp testing arose. Such testing is valuable for studying pellet-clad interaction phenomena in nuclear fuels. The data from these studies is of great interest to a number of research programs, including the accident-tolerant fuel (ATF) program at Idaho National Laboratory (INL). In 2022, Woolstenhulme et al. proposed several power ramp testing ideas using facilities at INL, including irradiation in the Transient Reactor Test Facility (better known as TREAT) and the Advanced Test Reactor (ATR) [1]. Worrall et al. [2] and Labossiere-Hickman et al. [3] subsequently performed feasibility studies for the ATR testing options in 2023. This summary further investigates the three-pin trefoil design (Fig. 1) for the proposed ATF-2Ramp Experiment discussed in Labossiere-Hickman et al. [3]. ATF-2Ramp is designed to operate in the center flux trap (CFT) of the ATR during a powered axial locator mechanism (PALM) cycle: a short, variable-powered cycle with an asymmetric power distribution. Previously, it was shown that tailoring the thickness of the hafnium (Hf) neutron shields (“mini-shrouds”) surrounding each pin offered a degree of control sufficient to achieve the programmatic linear heat generation rate (LHGR) targets for ATF-2Ramp during the high-power period of a PALM cycle. New work involves shortening the experiment test train for consistency with the fuel pins in ATF-2D [4] and then shaping the axial power profile of the three test pins.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗