Search NASA⌕ Search

SEARCH · Search NASA

Results for “Technical Update”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Progress on the Development of the UAS C2 Link and Supporting Spectrum - from LOS to BLOS

In order to provide for the safe integration of unmanned aircraft systems (UAS) into the National Airspace System, the control and non-payload communications (CNPC) link connecting the ground-based pilot with the unmanned aircraft must be highly reliable and robust, based upon standards that enable certification. Both line-of-sight (LOS) links using terrestrial-based communications and beyond-line-of-sight (BLOS) links using satellite communications are required to support UAS operations. The development of standards has been undertaken by RTCA Special Committee 228 (SC-228), with supporting technical data developed by NASA under the UAS in the National Airspace (NAS) Project. As a result of this work minimum operational performance standards (MOPS) have been completed and published for the LOS CNPC system. The second phase of work, for both NASA and RTCA involves the BLOS CNPC systems. The development of technical data to support MOPS development for UAS BLOS satellite-based CNPC links has now been initiated by NASA, and RTCA SC-228 has organized itself to begin the MOPS development process. This paper will provide an overview of the work that has been completed to date by the Communications Subproject in support of LOS C2 communications for UAS followed by an update of plans and progress for the BLOS phase of the project, with the focus on the UAS C2 spectrum aspects.

Pilotless aircraft↗

Agency Agreements Process Champion Support Intern

This document will provide information on the 2018 Spring semester NIFS Intern who represented the Office of Chief Financial Officer (OCFO) as a Reimbursable Accountant at Kennedy Space Center (KSC). This intern supported the Agency Agreements Process Champions and Team Lead, Susan Kroskey, Sandy Massey and Mecca Murphy, with major initiatives to advance the KSC OCFO's vision of creating and innovating healthy financial management practices that maximize the value of resources entrusted to NASA. These initiatives include, but are not limited to: updating the Agency Guidance and NASA Procedural Guidance 9090.1 Agreements, implementing a new budget structure to be utilized across all centers, submitting a Call Request (CRQ) to enhance non-federal customer reporting, initiating a discussion to incorporate a 3-year funding program for NASA agreements, and undertaking the Office of Inspector General (OIG) Audit. In support of these initiatives, this intern identified technical methods to enhance and reduce the workload of financial processes for reimbursable and non-reimbursable agreements, prepared reports in support of accounting functions, and performed administrative work and miscellaneous technical tasks in support of the OCFO as requested. In conclusion of the internship, the intern will become knowledgeable on reimbursable accounting, reimbursable policy, types of reimbursable agreements, the agreements process, estimated pricing reports, and the roles and responsibilities of the Financial Accounting and Financial Services offices.

Process Champion↗

Final Report Document: Microgravity Medical Eyewash B

Senior Capstone Design Team 15 has been commissioned by the National Aeronautics and Space Administration (NASA) to redesign the current microgravity eye wash station. The current design exhibits four primary limitations: single-use operation, excessive mass and volume, operational complexity requiring coordination with external systems, and dependence on frequent Earth resupply missions. Our updated eyewash design will be deployed on long-range space missions that could last multiple years. Based on these and other requirements from our customer, we have developed our updated eyewash design. Our compact, single-eye system uses capillary-driven flow and a free-floating water ball. This design allows us to eliminate pumps and bulky tubing, decreasing the mass and volume of the overall system. The containment eyecup is held to the astronaut's face with a strap, and a silicone seal prevents leakage while improving user comfort. Contaminated water is contained within a disposal bag containing wicking material to pull it back out of the eyecup after washing the eye. This system is reusable, efficient, and easy to activate quickly. We evaluated our design through calculations, microfluidic testing, and user try-on testing to verify our requirements. Our work demonstrated that steady-state flow was capable with our capillary framework, achieving 1.31 L/min. The prototype construction confirmed mass and volume reductions, and try-on-testing evaluated the ability to put on the system quickly. Almost all major design requirements were achieved, and water loss could be validated by testing in microgravity. Our design went through a number of iterations to reach the final solution presented in this report. These changes were driven by our testing and collaboration from each member of the team. Updated models optimized tube placement and geometry of the eyecup to better direct flow as it pools across the eye. Changes to our tubing bends improved capillary efficiency and increased the flow rate we were capable of achieving. And improved bracket placements adjusted the fit, comfort, and seal of the eyecup to the astronaut's face. Our capillary-based eyewash system is technically feasible and has been theoretically validated to operate effectively in microgravity conditions. Testing and analysis indicate that it can meet or exceed the required performance metrics, including flow rate and safety constraints. Overall, the design represents a viable alternative to current ISS-dependent eyewash systems for future space missions.

Jeffrey Allen↗

Evaluating Process Effectiveness to Reduce Risk

It is well documented that government agencies do not have the same incentive as the private sector to focus on process effectiveness and continual improvement of those processes. It is also well documented whenever government agencies fail to deliver efficient, effective, consistent, and fair services to the citizens. In spite of the various "reinventing government" and "effectiveness initiatives" of the past decades, and in spite of the efforts on the part of many agencies to improve, government in general still lags behind industry in creating a culture of effective processes and systems. While the tragic events that unfolded recently in Flint, Michigan, teach us that running government "like a business" does not always take the needs of the citizenry into account, there are many lessons and techniques from the private sector that government agencies can use to improve. The incentive to improve, while mandated by various administrations1, needs to come from within the workforce, in order to effectively take root. The best, most effective incentive is to reduce, control or eliminate risk. Government agencies face some of the same risks as the private sector, while some are unique. While ISO 310002 has been around since 2009, risk has taken on increased visibility within the private sector with the advent of the emphasis on risk-based thinking in ISO 9001:20153. The relationship between risk-based thinking and effective processes is simple and direct. Those processes that are well thought out and standardized (i.e. Plan-Do-Check-Act), will have taken into account the applicable policy, statutory, regulatory, safety, quality and technical parameters, which may not occur to someone performing the process with minimal experience or training; and thus protect the employees, the public and the agency from statutory and regulatory violations; delay in providing services; non-delivery of services; harm to public or employee safety and health; cost overruns; breaches in security; loss of confidence in government; failure of publicly funded projects; damage to the environment; ethics violations, and the list goes on; with local, national and even international consequences. The Plan-Do-Check-Act process, also known as the "process approach" can be used at any time to establish and standardize a process, and it can also be used to check periodically for "process creep" (i.e., informal, unauthorized changes that have occurred over time), any necessary updates and improvements. While ISO 9001 compliance is not mandated for all government agencies, if interpreted correctly, it can be useful in establishing a framework and implementing effective management systems and processes.4 Another method that can be used to evaluate effectiveness is the scorecard definitions in Mallory's Process Management Standard5 as a basis for evaluating work on the process level on effective, and continuously improved and improving processes. With processes on the lower end of the scale, agencies are vulnerable to a great many risks, with employees and managers making up many of the rules as they go, leading to the above listed negative results. Without clear guidance for nominal operations, off-nominal situations can, and do, increase the likelihood of chaos. In an increasingly technical environment, with inter-agency communication and collaboration becoming the norm, agencies need to come to grips with the fact that processes can become rapidly outdated, and that the technical community should take on an increased role in the maturation of the agency's processes. Industry has long known that effective processes are also efficient, and process improvement methods such as Kaizen, Lean, Six Sigma, 5S, and mistake proofing lead to increased productivity, improved quality, and decreased cost. Again, government agencies have different concerns, but inefficiencies and mistakes can have dire and wide reaching consequences for the public that they serve. While no one goes to work planning to cause harm, it is up to agencies to establish upper level systems, which make establishment and compliance with processes possible. Again, Mallory provides us with a Systems Management Standard6, similar to the Process Management Standard, with a scale of 0-5 for systems effectiveness and maturity. Deming determined that "eighty-five percent of the reasons for failure are deficiencies in the systems and process rather than the employee. The role of management is to change the process rather than badgering individual employees to do better." 7 It is not just the working level employees who need effective processes, but the mid-and upper level managers as well. A disciplined management culture sets the tone for the employees, aids both routine and off-nominal decision-making, and incorporates risk -based thinking into the systems and processes as a matter of normal activity. Figure 1, illustrates the relationship between ineffective and effective processes and risk, through the use of the "stoplight" colors that are commonly used to show serious situations (red), situations which may be improving or deteriorating depending on trends (yellow), and situations that are under control and continuously improved (green).

Shepherd, Christena C.↗

Coordinating Council. Sixth Meeting: Who Are Our Key Users?

This NASA Scientific and Technical Information Program Coordinating Council meeting deals with the topic 'Who are our key users?' Presentations were made on the following subtopics: Key users: Who uses the system the most, Who orders the most documents, Users: What do we know about them?, NASA/DOD Aerospace Knowledge Diffusion research project on 'Potential key users', How we meet the user's needs, and STI Council user requirements update. Summaries of discussions after the presentations are included along with visuals for the presentations.

Source record↗

Airborne Wind Shear Detection and Warning Systems: Fourth Combined Manufacturers' and Technologists' Conference, part 1

The purpose of the meeting was to transfer significant ongoing results of the NASA/FAA joint Airborne Wind Shear Program to the technical industry and to pose problems of current concern to the combined group. It also provided a forum for manufacturers to review forward-look technology concepts and for technologists to gain an understanding of the problems encountered by the manufacturers during the development of airborne equipment and the FAA certification requirements. The present document was compiled to record the essence of the technology updates and discussions which follow each.

Vicroy, Dan D.↗

Astrobee: Improving Capabilities for Free Flying Robotic Technology Demonstrations

The Astrobee Project has completed three years operating inside the ISS. Three Astrobee Free Flyers reached the ISS in April 2019 and are currently hosting a variety of users. During this time, Astrobee has advanced the state of the art in free-flying robots on ISS, operated over 100 sessions, logged over 750 hours of free-flyer operation, and made several capability improvements. Astrobee’s primary objective is to provide a highly flexible and capable free-flying robotic research platform to enable future guest scientist investigations. However, Astrobee is also demonstrating the feasibility of intra-vehicular robots (IVR) for performing key caretaking functions within exploration vehicles as part of NASA’s Moon-to-Mars exploration strategy. IVR capabilities will be especially vital during uncrewed mission phases. For example, current plans call for the lunar Gateway to be uncrewed >85% of the time. Astrobee’s baseline implementation supports free-flying camera and sensor survey use cases. Astrobee guest scientists can deploy software updates and hardware payloads to extend its capabilities. Astrobee is continuously improving its navigation robustness, general flight software maturity, and ISS interior maps, both through the baseline Astrobee operations and with the help of the ISAAC project. Astrobee began with mapping, localization, and operations in the Japanese Experiment Module (JEM), and has expanded to mapping in Node 2 and the US Lab. Astrobee has improved localization and operational robustness through improved mapping processes, algorithm updates (Soussan 2022) that reduce the occurrences of lost localization as well as developed recovery techniques to return to a good localization fix when loss of localization does occur. Future guest science experiments currently in development could demonstrate cargo transfer, fault isolation, free flyer and stationary robot collaboration, microgravity fluid transfer, and new docking mechanisms, among others. This presentation will focus on 1) Astrobee technical capabilities 2) What Astrobee can provide to a guest science experiment 3) Astrobee’s recent improvements 4) Possibilities for using Astrobee for future investigations. Soussan, R., Kumar, V., Coltin, B. and Smith, T. (2022) AstroLoc: An Efficient and Robust Localizer for a Free-flying Robot, Proc. Int. Conf. Rob. Autom. (ICRA) [to appear]

Astrobee↗

Airborne Wind Shear Detection and Warning Systems. Fourth Combined Manufacturers' and Technologists' Conference, part 2

The Fourth Combined Manufacturers' and Technologists' Conference was hosted jointly by NASA Langley Research Center (LaRC) and the Federal Aviation Administration (FAA) in Williamsburg, Virginia, on April 14-16, 1992. The meeting was co-chaired by Dr. Roland Bowles of LaRC and Bob Passman of the FAA. The purpose of the meeting was to transfer significant ongoing results of the NASA/FAA Joint Airborne Wind Shear Program to the technical industry and to pose problems of current concern to the combined group. It also provided a forum for manufacturers to review forward-look technology concepts and for technologists to gain an understanding of the problems encountered by the manufacturers during the development of airborne equipment and the FAA certification requirements. The present document has been compiled to record the essence of the technology updates and discussions which follow each.

Vicroy, Dan D.↗

Advanced Technology Composite Fuselage: Program Overview

The Advanced Technology Composite Aircraft Structures (ATCAS) program has studied transport fuselage structure with a large potential reduction in the total direct operating costs for wide-body commercial transports. The baseline fuselage section was divided into four 'quadrants', crown, keel, and sides, gaining the manufacturing cost advantage possible with larger panels. Key processes found to have savings potential include (1) skins laminated by automatic fiber placement, (2) braided frames using resin transfer molding, and (3) panel bond technology that minimized mechanical fastening. The cost and weight of the baseline fuselage barrel was updated to complete Phase B of the program. An assessment of the former, which included labor, material, and tooling costs, was performed with the help of design cost models. Crown, keel, and side quadrant cost distributions illustrate the importance of panel design configuration, area, and other structural details. Composite sandwich panel designs were found to have the greatest cost savings potential for most quadrants. Key technical findings are summarized as an introduction to the other contractor reports documenting Phase A and B work completed in functional areas. The current program status in resolving critical technical issues is also highlighted.

Ilcewicz, L. B.↗

Observations on the State of NASA's GN&C Engineering Discipline: Results of an Independent Non-Advocate Study

The NASA Technical Fellows periodically conduct State-of-the-Discipline assessments. The GN&C Technical Fellow contracted Harlan Brown & Company in 2007 and 2009 to conduct independent, third party studies to gain unbiased insight and understanding into the attitudes and beliefs of NASA's GN&C Community of Practice (CoP). The paper first outlines the background, objectives and methodology of the studies. The paper then summarizes key study results of the 2007 baseline study, as well as the 2009 update. The update was then used to track and monitor perceptions, identify performance trends, identify areas where further improvement needs to be made in NASA's GN&C discipline. It also generated feedback on the recently developed GN&C CoP online knowledge capture and learning site.

Pawlikowski, Gerald J.↗

Status of NASA's Space Launch System

NASA's Space Launch System (SLS) continued to make significant progress in 2015, completing hardware and testing that brings NASA closer to a new era of deep space exploration. The most significant program milestone of the year was completion of Critical Design Review (CDR). A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just four years after program start, every major element has amassed development and flight hardware and completed key tests that will set the stage for a growing schedule of manufacturing and testing in 2016. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The space shuttle-heritage RS-25 engine is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with an additional propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100t and, ultimately, to 130t. Among the program's major accomplishments in 2015 were the first booster qualification hotfire test, a series of seven RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the second booster qualification motor hotfire, flight and additional development RS-25 engine tests, and completion of core stage test articles and test stands and several flight article sections. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Lyles, Garry↗

Status of NASA's Space Launch System

NASA's Space Launch System (SLS) continued to make significant progress in 2015, completing hardware and testing that brings NASA closer to a new era of deep space exploration. The most significant program milestone of the year was completion of Critical Design Review (CDR). A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just four years after program start, every major element has amassed development and flight hardware and completed key tests that will set the stage for a growing schedule of manufacturing and testing in 2016. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The space shuttle-heritage RS-25 engine is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with an additional propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100 metric tons and, ultimately, to 130 metric tons. Among the program's major accomplishments in 2015 were the first booster qualification hotfire test, a series of seven RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the second booster qualification motor hotfire, flight and additional development RS-25 engine tests, and completion of core stage test articles and test stands and several flight article sections. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Honeycutt, John↗

Exploration Medical Capability Systems Engineering Overview and Update

Long duration Lunar and Martian missions will change the way NASA currently practices medicine. The missions will require more autonomous capability compared to current low Earth orbit operations. For the medical system, lack of consumable resupply, evacuation opportunities, and real-time ground support are key drivers toward greater autonomy. Recognition of the limited mission and vehicle resources available to carry out exploration missions motivates the Exploration Medical Capability (ExMC) Element’s approach to enabling the necessary autonomy. The ExMC Systems Engineering (SE) team’s mission is to “Define, develop, validate, and manage the technical system design needed to implement exploration medical capabilities for Mars and test the design in a progression of proving grounds.” The Element’s work must integrate with the overall exploration mission and vehicle design efforts to successfully provide exploration medical capabilities. ExMC is using Model-Based System Engineering (MBSE) to accomplish its integrative goals. The MBSE approach to medical system design offers a paradigm shift toward greater integration between the vehicle and the medical system, and directly supports the transition of Earth-reliant ISS operations to the Earth-independent operations envisioned for Mars. This talk will provide a high-level overview of what the ExMC SE team has accomplished since the last IWS and what they are focusing on for the upcoming year.

Kerry McGuire↗

Status of NASA's Space Launch System

NASA's Space Launch System (SLS) continued to make significant progress in 2015 and 2016, completing hardware and testing that brings NASA closer to a new era of deep space exploration. Programmatically, SLS completed Critical Design Review (CDR) in 2015. A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just five years after program start, every major element has amassed development and flight hardware and completed key tests that will lead to an accelerated pace of manufacturing and testing in 2016 and 2017. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The existing fleet of RS-25 engines is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with a fifth propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100t and, ultimately, to 130t. Among the program's major 2015-2016 accomplishments were two booster qualification hotfire tests, a series of RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the completion of welding for all qualification and flight EM-1 core stage components and testing of flight avionics, completion of core stage structural test stands, casting of the EM-1 solid rocket motors, additional testing of RS-25 engines and flight engine controllers This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Honeycutt, John↗

NASA Tech Briefs, October 2008

Topics covered include: Control Architecture for Robotic Agent Command and Sensing; Algorithm for Wavefront Sensing Using an Extended Scene; CO2 Sensors Based on Nanocrystalline SnO2 Doped with CuO; Improved Airborne System for Sensing Wildfires; VHF Wide-Band, Dual-Polarization Microstrip-Patch Antenna; Onboard Data Processor for Change-Detection Radar Imaging; Using LDPC Code Constraints to Aid Recovery of Symbol Timing; System for Measuring Flexing of a Large Spaceborne Structure; Integrated Formation Optical Communication and Estimation System; Making Superconducting Welds between Superconducting Wires; Method for Thermal Spraying of Coatings Using Resonant-Pulsed Combustion; Coating Reduces Ice Adhesion; Hybrid Multifoil Aerogel Thermal Insulation; SHINE Virtual Machine Model for In-flight Updates of Critical Mission Software; Mars Image Collection Mosaic Builder; Providing Internet Access to High-Resolution Mars Images; Providing Internet Access to High-Resolution Lunar Images; Expressions Module for the Satellite Orbit Analysis Program Virtual Satellite; Small-Body Extensions for the Satellite Orbit Analysis Program (SOAP); Scripting Module for the Satellite Orbit Analysis Program (SOAP); XML-Based SHINE Knowledge Base Interchange Language; Core Technical Capability Laboratory Management System; MRO SOW Daily Script; Tool for Inspecting Alignment of Twinaxial Connectors; An ATP System for Deep-Space Optical Communication; Polar Traverse Rover Instrument; Expert System Control of Plant Growth in an Enclosed Space; Detecting Phycocyanin-Pigmented Microbes in Reflected Light; DMAC and NMP as Electrolyte Additives for Li-Ion Cells; Mass Spectrometer Containing Multiple Fixed Collectors; Waveguide Harmonic Generator for the SIM; Whispering Gallery Mode Resonator with Orthogonally Reconfigurable Filter Function; Stable Calibration of Raman Lidar Water-Vapor Measurements; Bimaterial Thermal Compensators for WGM Resonators; Root Source Analysis/ValuStream[Trade Mark] - A Methodology for Identifying and Managing Risks; Ensemble: an Architecture for Mission-Operations Software; Object Recognition Using Feature-and Color-Based Methods; On-Orbit Multi-Field Wavefront Control with a Kalman Filter; and The Interplanetary Overlay Networking Protocol Accelerator.

Source record↗

T-Rex: The NASA Technology Taxonomy Recommender System

NASA tracks over 16,000 technology projects across the Agency, from propulsion systems to software. These projects are classified according to NASA’s Technology Taxonomy to facilitate data search, extraction, and application. In 2020, the Taxonomy was revised to better align strategic goals with project technical disciplines. Manual re-classification of cur-rent and historical projects was estimated to take thousands of technologist labor hours. Instead of manual classification, our team developed T-Rex, a recommender engine, trained on just a small set of manually classified projects. T-Rex was used to classify the projects and then integrate the data into TechPort to recommend classes to users when updating projects. The system and methodology are used in other NASA projects, and T-Rex has achieved 95% accepted accuracy overall.

Space Technology↗

Technical Report Series on Global Modeling and Data Assimilation: Interannual Variability and Potential Predictability in Reanalysis Products - Volume 13

The Data Assimilation Office (DAO) at Goddard Space Flight Center and the National Center for Environmental Prediction and National Center for Atmospheric Research (NCEP/NCAR) have produced multi-year global assimilations of historical data employing fixed analysis systems. These "reanalysis" products are ideally suited for studying short-term climatic variations. The availability of multiple reanalysis products also provides the opportunity to examine the uncertainty in the reanalysis data. The purpose of this document is to provide an updated estimate of seasonal and interannual variability based on the DAO and NCEP/NCAR reanalyses for the 15-year period 1980-1995. Intercomparisons of the seasonal means and their interannual variations are presented for a variety of prognostic and diagnostic fields. In addition, atmospheric potential predictability is re-examined employing selected DAO reanalysis variables.

Min, Wei↗

An Update on the Role of Systems Modeling in the Design and Verification of the James Webb Space Telescope

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2014. System-level verification of critical performance requirements will rely on integrated observatory models that predict the wavefront error accurately enough to verify that allocated top-level wavefront error of 150 nm root-mean-squared (rms) through to the wave-front sensor focal plane is met. The assembled models themselves are complex and require the insight of technical experts to assess their ability to meet their objectives. This paper describes the systems engineering and modeling approach used on the JWST through the detailed design phase.

Muheim, Danniella↗