Search NASA⌕ Search

SEARCH · Search NASA

Results for “Test Effect Payload”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Flight Test of a 40-Foot Nominal Diameter Disk-Gap-Band Parachute Deployed at a Mach Number of 2.72 and a Dynamic Pressure of 9.7 Pounds per Square Foot

A 40-foot-nominal-diameter (12.2 meter) disk-gap-band parachute was flight tested as part of the NASA Supersonic Planetary Entry Decelerator (SPED-I) Program. The test parachute was deployed from an instrumented payload by means of a deployment mortar when the payload was at an altitude of 158,500 feet (48.2 kilometers), a Mach number of 2.72, and a free-stream dynamic pressure of 9.7 pounds per foot(exp 2) (465 newtons per meter(exp 2)). Suspension line stretch occurred 0.46 second after mortar firing and the resulting snatch force loading was -8.lg. The maximum acceleration experienced by the payload due to parachute opening was -27.2g at 0.50 second after the snatch force peak for a total elapsed time from mortar firing of 0.96 second. Canopy-shape variations occurred during the higher Mach number portion of the flight test (M greater than 1.4) and the payload was subjected to large amplitude oscillatory loads. A calculated average nominal axial-force coefficient ranged from about 0.25 immediately after the first canopy opening to about 0.50 as the canopy attained a steady inflated shape. One gore of the test parachute was damaged when the deployment bag with mortar lid passed through it from behind approximately 2 seconds after deployment was initiated. Although the canopy damage caused by the deployment bag penetration had no apparent effect on the functional capability of the test parachute, it may have affected parachute performance since the average effective drag coefficient of 0.48 was 9 percent less than that of a previously tested parachute of the same configuration.

EXPERIMENTS↗

Semi-Autonomous Transportation of Emergency Supplies via sUAS

Over the past several decades, the extent and severity of wildfires in the United States has increased dramatically. This, accordingly, has put ever-increasing pressure on wildland firefighters to mitigate the effects of fire damage. Wildland firefighters have exceptionally dangerous and strenuous jobs. The United States Forest Service has an interest to develop an autonomous sUAS logistics payload delivery system to transport supplies to crews on the fireline. A design reference mission which includes the transportation of portable drinking water from a helicopter drop site closer to crews on the fire line was developed. Two delivery methods were designed and prototyped within this project, with one of them tested in flight.

Wildfire UAS Logistics↗

Experimental investigations of thrust vectoring systems for VTOL aircraft

This paper presents a summary of two technology programs sponsored by NASA to investigate the characteristics of two thrust vectoring schemes for V/STOL aircraft. The operational capability of the VTOL aircraft is dependent on maximum utilization of the installed thrust in both the cruise and powered lift modes of flight. An effective thrust vectoring system on the cruise propulsion unit is therefore essential to provide maximum payload in hover and STOL plus minimum specific fuel consumption in loiter and cruise. Introducing a high by-pass ratio fan system, augmenting the gas generator thrust, as the propulsion system for VTOL aircraft places increased significance on the performance of the relatively short coupled thrust vectoring systems. The two programs discussed herein include both large-scale and small-scale tests of a vectoring hood system with a vented, internal-lip and swivel nozzle systems. These tests indicated that a satisfactory thrust vectoring system can be developed.

Rolls, L. S.↗

Unmanned Aerial Systems (UAS) Integration into the National Airspace System (NAS)

NASA's Unmanned Aerial Systems (UAS) integration into the National Air Space (NAS) project has been working closely with the FAA and RTCA Special Committee 228 to identify and break down barriers to UAS integration. A focus of this work is on detect and avoid (DAA) technologies. A pilot has responsibility to see and avoid other aircraft and to remain "well clear," using their best judgment (Federal Aviation Regulations (FAR) Sec. 91.113). For UAS to perform this function, the see function is replaced by sensors to detect the other aircraft. Secondly, the pilot judgment of well clear has to be replaced by a mathematical expression. For Phase 1 of this effort, a well clear violation was defined if all three of these conditions are true: a) the horizontal clearance is less than 4000 ft., and b) the vertical clearance is less than 450 ft., and c) the time to loss of well clear is less than 35 seconds. This definition was developed with a great deal of community input and testing to ensure interoperability with Air Traffic Control (ATC) and pilots of manned aircraft. Appropriate guidance, alerting and displays were developed to allow UAS, with the appropriate sensors, to effectively maintain well clear. This work contributed to FAA Technical Standard Orders: TSO-C211, Detect and Avoid and TSO-C212, ATAR for Traffic Surveillance. Phase 2 of this work extends the operational environment to include the terminal area and lesser capable aircraft that might not have the payload capability to carry the RADAR defined in Phase 1. This session reports on work from Phase 1 and initial work in Phase 2.

UAS↗

Detect and Avoid: Efforts from NASA's UAS Integration into the NAS Project

NASA's Unmanned Aerial Systems (UAS) integration into the National Air Space (NAS) project has been working closely with the FAA and RTCA Special Committee 228 to identify and break down barriers to UAS integration. A focus of this work is on detect and avoid (DAA) technologies. A pilot has responsibility to see and avoid other aircraft and to remain "well clear," using their best judgment (Federal Aviation Regulations (FAR) Sec. 91.113). For UAS to perform this function, the see function is replaced by sensors to detect the other aircraft. Secondly, the pilot judgment of well clear has to be replaced by a mathematical expression. For Phase 1 of this effort, a well clear violation was defined if all three of these conditions are true: a) the horizontal clearance is less than 4000 ft., and b) the vertical clearance is less than 450 ft., and c) the time to loss of well clear is less than 35 seconds. This definition was developed with a great deal of community input and testing to ensure interoperability with Air Traffic Control (ATC) and pilots of manned aircraft. Appropriate guidance, alerting and displays were developed to allow UAS, with the appropriate sensors, to effectively maintain well clear. This work contributed to FAA Technical Standard Orders: TSO-C211, Detect and Avoid and TSO-C212, ATAR for Traffic Surveillance. Phase 2 of this work extends the operational environment to include the terminal area and lesser capable aircraft that might not have the payload capability to carry the RADAR defined in Phase 1. This session reports on work from Phase 1 and initial work in Phase 2.

Detect and Avoid (DAA)↗

Supersonic Retropropulsion Technology Development in NASA's Entry, Descent, and Landing Project

NASA's Entry, Descent, and Landing (EDL) space technology roadmap calls for new technologies to achieve human exploration of Mars in the coming decades [1]. One of those technologies, termed Supersonic Retropropulsion (SRP), involves initiation of propulsive deceleration at supersonic Mach numbers. The potential benefits afforded by SRP to improve payload mass and landing precision make the technology attractive for future EDL missions. NASA's EDL project spent two years advancing the technological maturity of SRP for Mars exploration [2-15]. This paper summarizes the technical accomplishments from the project and highlights challenges and recommendations for future SRP technology development programs. These challenges include: developing sufficiently large SRP engines for use on human-scale entry systems; testing and computationally modelling complex and unsteady SRP fluid dynamics; understanding the effects of SRP on entry vehicle stability and controllability; and demonstrating sub-scale SRP entry systems in Earth's atmosphere.

Edquist, Karl T.↗

Modeling and Testing of Non-Nuclear, Highpower Simulated Nuclear Thermal Rocket Reactor Elements

When the President offered his new vision for space exploration in January of 2004, he said, "Our third goal is to return to the moon by 2020, as the launching point for missions beyond," and, "With the experience and knowledge gained on the moon, we will then be ready to take the next steps of space exploration: human missions to Mars and to worlds beyond." A human mission to Mars implies the need to move large payloads as rapidly as possible, in an efficient and cost-effective manner. Furthermore, with the scientific advancements possible with Project Prometheus and its Jupiter Icy Moons Orbiter (JIMO), (these use electric propulsion), there is a renewed interest in deep space exploration propulsion systems. According to many mission analyses, nuclear thermal propulsion (NTP), with its relatively high thrust and high specific impulse, is a serious candidate for such missions. Nuclear rockets utilize fission energy to heat a reactor core to very high temperatures. Hydrogen gas flowing through the core then becomes superheated and exits the engine at very high exhaust velocities. The combination of temperature and low molecular weight results in an engine with specific impulses above 900 seconds. This is almost twice the performance of the LOX/LH2 space shuttle engines, and the impact of this performance would be to reduce the trip time of a manned Mars mission from the 2.5 years, possible with chemical engines, to about 12-14 months.

Kirk, Daniel R.↗

Risetime distortion of Shuttle Ku-band payload 50 MBPS data due to coaxial cable skin effects

This paper discusses distortion of digital signals generated in the Space Shuttle Ku-band communications systems. Specifically, the degradation considered is due to coaxial cables which interface data and clock from a source located in the payload bay to the KuSPA (Ku-Band Signal Processor Assembly) located in the avionics bay of the Shuttle. Due to the length (nearly 100 feet) and relatively narrow bandwidth of the cable, the clock and data waveforms are significantly affected by this transmission medium. This paper presents a closed form model that closely approximates the distortion of the waveforms measured in laboratory tests.

Schadelbauer, S.↗

Space platforms - A cost effective evolution of Spacelab operation

The capabilities added to the Shuttle/Spacelab configuration by the addition of the Power Extension Package (PEP), the Power System (PS), and the Science and Applications Space Platforms (SASP) are reviewed with an emphasis on SASP. SASP are intended for placement in orbit by the Shuttle to test new instruments and systems, for clustering of instrumentation, and for servicing, refurbishment, repair, or augmentation by the Shuttle. The PEP permits extended stays in orbit (30 days), and the PS is an orbital solar array and energy storage system acting as a free flying spacecraft. The Shuttle can deliver payloads to the PS or attach to it for extension of the Spacelab operations. Applications of SASP for long term space-based biological experiments are outlined, and the fact that SASP do not increase the required Shuttle in-orbit time is stressed.

Stofan, A. J.↗

An Evaluation of the Additional Acoustic Power Needed to Overcome the Effects of a Test-Articles Absorption During Reverberant Chamber Acoustic Testing of Spaceflight Hardware

It is important to realize that some test-articles may have significant sound absorption that may challenge the acoustic power capabilities of a test facility. Therefore, to mitigate this risk of not being able to meet the customers target spectrum, it is prudent to demonstrate early-on an increased acoustic power capability which compensates for this test-article absorption. This paper describes a concise method to reduce this risk when testing aerospace test-articles which have significant absorption. This method was successfully applied during the SpaceX Falcon 9 Payload Fairing acoustic test program at the NASA Glenn Research Center Plum Brook Stations RATF.

sound power↗

A new approach to performance optimization of the 1975 Mars Viking lander.

The design of the 1975 Viking lander is based, in part, upon performance optimization analyses and a requirement to maximize operational flexibility. The analysis technique is characterized by a graphical tradeoff approach found to be the most effective for evaluating lifting-entry trajectory performance. The analysis eliminates the constraint of a level flight trajectory and allows the lander to reach positive flight-path angles before parachute deployment. Updated Mars environmental knowledge and recent test results and design decisions are analysis factors. The entry-phase analysis indicates that a hypersonic lift-to-drag ratio of 0.18 and an entry flight-path-angle corridor of -15 to -19 deg satisfy the requirements of optimum performance (maximum payload and sufficient terrain height capability).

Zeiner, H. N.↗

Interactions measurement payload for Shuttle

The Interactions Measurement Payload for Shuttle (IMPS) consisted of engineering experiments to determine the effects of the space environment on projected Air Force space systems. Measurements by IMPS on a polar-orbit Shuttle flight will lead to detailed knowledge of the interaction of the low-altitude polar-auroral environment on materials, equipment and technologies to be used in future large, high-power space systems. The results from the IMPS measurements will provide direct input to MIL-STD design guidelines and test standards that properly account for space-environment effects.

Guidice, D. A.↗

Vibration damping of the Cassini spacecraft structure

Cassini is a large robotic spacecraft currently under development at the Jet Propulsion Laboratory (JPL) whose interplanetary scientific mission is to explore Saturn, its ring, and its moons. Cassini is scheduled to launch on a Titan IV rocket with a Centaur upper stage booster, and will be protected during ascent through the atmosphere by a lightweight aluminum payload fairing (PLF). As a result of the extreme noise levels generated by the powerful Titan IV at liftoff, and the acoustic transparency of the PLF, Cassini is predicted to experience sever acoustic levels. Furthermore, the high acoustic levels, coupled with the size and configuration of the spacecraft, will induce unacceptable random vibration levels on the structure and critical spacecraft components. Studies showed that the use of Tuned Vibration Absorbers (TVAs) would be effective in reducing vibration. A series of reverberant acoustic tests were performed on a partial development test model (DTM) of Cassini to evaluate the effectiveness of TVAs in reducing the structural vibration. The test results showed that significant vibration attenuation was achieved.

vibration damping↗

Analysis of legged landers for the survivable soft landing of instrument payloads.

Two methods of analysis have been developed for legged planetary landers. The first of these, the Large Displacement Gear Analysis, is a design tool for statically determining the large displacement stroking behavior, energy absorption characteristics, and internal load distributions in a single gear. The second, the Landing Dynamics Analysis, predicts the spatial landing dynamics of a legged lander. Effects of structural flexibility, elastic-plastic gear load characteristics, and soil properties on the loads, motions, and stability of the lander may be determined. Validation of the analytical techniques is accomplished through comparison of predicted results and experimental data obtained during a model test program.

Laurenson, R. M.↗

The gravity probe B relativity gyroscope program

The idea of testing general relativity through observations on Earth orbiting gyroscopes was suggested in 1959 to 1960. The direction, it was noted, of spin of a suitably oriented gyroscope should change with respect to the line of sight to a guide star for two reasons: a geodetic effect from the motion of the gyroscope through the curved space-time around the Earth, and a frame-dragging effect from the Earth's rotation. NASA began supporting laboratory research on the experiment, now called Gravity Probe B, in 1964. Technologies for it were progressively established, and an error analysis demonstrated the potential of measuring frame-dragging to 1 to 2 percent and the geodetic effect to 1 part in 10(exp 4). Later analyses, discussed herein, suggest possibilities for further improving those precisions each by a further factor of 10. In 1984, after technical and scientific reviews by the Space Science Board and other bodies, and completion by NASA Marshall Center of a Phase B Study, the NASA Administrator approved the start of a program known as STORE (Shuttle Test Of the Relativity Experiment). The purpose of STORE is to verify the final Gravity Probe B science payload, perform on the Shuttle a 7-day experiment rehearsal (including sophisticated gyro tests in low gravity), and then return the payload to Earth for refurbishment and integration into the Science Mission spacecraft. The payload comprises four gyroscopes, a telescope, and a drag-free proof mass, all mounted in a quartz block assembly within an evacuated magnetically shielded probe, which in turn is inserted into a 10-ft long, 6-ft diameter liquid helium dewar, operating at 1.8 K and maintaining low temperature for 2 years. STORE is manifested on Shuttle OV-105, for launch MSSN 69 in February 1993. The Science Mission is set tentatively for June 1995.

Everitt, C. W. Francis↗

Scale Model Experiments on Sound Propagation From a Mach 2.5 Cold Nitrogen Jet Flowing Through a Rigid-Walled Duct With a J-Deflector

The Launch Systems Testbed (LST) represents the evolution of vibroacoustics research and development work performed at NASA John F. Kennedy Space Center (KSC) over the last 15 years. The LST is located at the Launch Equipment Test Facility (LETF) in the KSC industrial complex. The LETF is operated by Sierra Lobo, Inc., as a member of University-Affiliated Technology Development Contract (USTDC) to KSC Spaceport and Engineering and Technology Directorate (YA), with ASRC Aerospace Corporation as a the prime contractor. Trajectory Simulation Mechanism (TSM) is a major component of the LST, developed specifically to simulate nonstationary acoustic loads on launch pad structures, vehicles, and payloads. TSM enhances the capabilities within LST for simulating launch environments of future vehicles. The scaled launch environments will be used to predict the full-scale launch environment via an appropriate scaling procedure. Air Force Research Laboratory (AFRL) has tasked NASA KSC to perform a basic technology test program in support of developing a low-cost clean pad (incorporating passive mitigation techniques) for future launch vehicles. The overall goal of the program is to develop innovative launch exhaust management systems, which effectively reduce launch acoustic environment with innovative duct designs, while eliminating traditional sound suppression water systems. Passive techniques, such as nontraditional duct geometries, resonators, and diffusers, etc., will be investigated. The overall goals are to advance innovative concepts for a clean pad while developing ideas to reduce transmitted sound via investigation and modeling of jet exhaust acoustic and flow field characteristics. The series of tests outlined in this report represent baseline tests and are geared towards defining the acoustic load environment on the TSM pad for open and closed duct configurations. This report summarizes the cold jet acoustic testing for Mach 2.5 supersonic nitrogen jet issuing from a nozzle with 1-inch exit diameter. Acoustic data, including spectral sound power and Overall Sound Pressure Level (OASPL), are obtained both for a free jet and with the jet flowing through a rigid-walled duct with a J-deflector. The relative performance of closed duct and open duct is evaluated. The results show that the closed duct is superior to the partially open duct, and results in about 3-decibel (dB) noise reduction (near the duct axis) relative to the free jet. The location of the nozzle exit plane (NEP) relative to the duct inlet plane (DIP) has a significant effect on the acoustic field. The results suggest that the location of NEP at 10 inches above the DIP results in reduced acoustic loads relative to 5 inches above the duct inlet and 1 inch into the duct inlet.

Kandula, Max↗

Integrated Simulation Design Challenges to Support TPS Repair Operations

During the Orbiter Repair Maneuver (ORM) operations planned for Return to Flight (RTF), the Shuttle Remote Manipulator System (SRMS) must grapple the International Space Station (ISS), undock the Orbiter, maneuver it through a long duration trajectory, and orient it to an EVA crewman poised at the end of the Space Station Remote Manipulator System (SSRMS) to facilitate the repair of the Thermal Protection System (TPS). Once repair has been completed and confirmed, then the SRMS proceeds back through the trajectory to dock the Orbiter to the Orbiter Docking System. In order to support analysis of the complex dynamic interactions of the integrated system formed by the Orbiter, ISS, SRMS, and SSMS during the ORM, simulation tools used for previous ‘nominal’ mission support required substantial enhancements. These upgrades were necessary to provide analysts with the capabilities needed to study integrated system performance. Prevalent throughout this ORM operation is a dynamically varying topology. In other words, the ORM starts with the SRMS grappled to the mated Shuttle/ISS stack (closed loop topology), moves to an open loop chain topology consisting of the Shuttle, SRMS, and ISS, and then, at the repair configuration, extends the chain topology to one consisting of the Shuttle, SMS, ISS, and SSRMS/EVA crewman. The resulting long dynamic chain of vehicles and manipulators may exhibit significant motion between the Shuttle worksite and the EVA crewman due to the system flexibility throughout the topology (particularly within the SRMS/SSRMS joints and links). Since the attachment points of both manipulators span the flexible structure of the ISS, simulation analysis may also need to take that into consideration. Moreover, due to the lengthy time duration associated with the maneuver and repair, orbital effects become a factor and require the ISS vehicle control system to maintain active attitude control. Several facets of the ORM operation make the associated analytical efforts different from previous mission support, including: (1) the magnitude of the SRMS handled payload (Le., Orbiter class), (2) the orbital effects induced on the integrated system consisting of the large Shuttle and ISS masses connected by a light flexible SRMS, (3) long duration environmental consequences due to the lengthy operational times associated with the maneuver and repair of the TPS, (4) active attitude control (as opposed to free drift) interacting with the SRMS and SSRMS manipulators (also due to the length of the maneuver and repair), (5) relative dynamics between the EVA crewman and thc worksite influenced by the extended flexible topology. In order to meet these analysis challenges, an ORM simulation architecture was developed leveraging upon numerous pre-existing simulation elements to analyze the various subsystems individually. For example, core manipulator subsystem simulations for both the SRMS and SSRMS were originally combined to provide the dual-arm dynamics topology simulation (in the absence of orbital dynamics and vehicle control). This capability was later merged with the simulation used to analyze SRMS loading with a heavy payload in the orbital environment with an active payload control system (in this case, the ISS Attitude Control System (ACS)), configured for the ORM. The resulting worksite dynamics simulation, based off of the modified ORM simulation, provided the extended topological chain of vehicles and manipulators, while taking into account the orbital effects of both the Shuttle and ISS (as well as its ACS). Verification and validation (V&V) of these integrated simulations became a challenge in itself. A systematic approach needed to be developed such that integration simulation results could be tested against previous constituent simulations upon which these simulations were built. General V&V categories included: (1) core orbital state propagation, (2), stand-alone SRMS, (3) stand-alone SSRMS, (4) stand-alone ISS ACS, (5) integrated Shuttle, SRMS, ISS (with active ACS) in the orbital environment, and (5) dual-arm SRMS/SSRMS dynamics topology. Integrated simulation V&V run suites were created and correlated to verification runs from subsystem simulations, in order to establish the validity of the results. This paper discusses the simulation design challenges encountered while developing simulation capabilities to mirror the ORM operations. The paper also describes the incremental build approach that was utilized, starting with the subsystem simulation elements and integration into increasing more complex simulations until the resulting ORM worksite dynamics simulation had been assembled. Furthermore, the paper presents an overall integrated simulation V&V methodology based upon a subsystem level testing, integrated comparisons, and phased checkout.

Thermal Protection System↗

Adaptive microwave reflector

As an interim step in going to the 100-meter reflector that was evaluated, a 5-meter reflector is proposed to test the electrostatic concept under space conditions. Some of the issues which require the space environment for evaluation are the following questions: Can deployment of a box ring structure with a thin film reflector attached be manually deployed? In the absence of humidity, can a 0.3-mil aluminized Kapton film reflector be formed by the electrostatic process suitable for antenna applications? Can the photogrammetric process be used to evaluate the reflector surface with pictures taken from the payload handling station? Can the space charging effect be evaluated with the 5-meter reflector attached to the Shuttle? Does the outgassing of moisture from 0.3-mil Kapton film affect its reflector capability? A box ring truss support structure and an automatic sequence deployment system are discussed.

Goslee, J. W.↗