Continuing the Validation of CCIM Processability for Glass Ceramic HLLW Forms: Plan for Test AFY14CCIM-GC1

This test plan covers test AFY14CCIM-GC1which is the first of two scheduled FY-2014 test runs involving glass ceramic waste forms in the Idaho National Laboratory’s Cold Crucible Induction Melter Pilot Plant. The test plan is based on the successes and challenges of previous tests performed in FY-2012 and FY-2013. The purpose of this test is to continue to collect data for validating the glass ceramic High Level Liquid Waste form processability advantages using Cold Crucible Induction Melter technology. The major objective of AFYCCIM-GC1 is to complete additional proposed crucible pouring and post tapping controlled cooling experiments not completed during previous tests due to crucible drain failure. This is necessary to qualify that no heat treatments in standard waste disposal canisters are necessary for the operational scale production of glass ceramic waste forms. Other objectives include the production and post-test analysis of surrogate waste forms made from separate pours into the same graphite mold canister, testing the robustness of an upgraded crucible bottom drain and drain heater assembly, testing the effectiveness of inductive melt initiation using a resistive starter ring with a square wave configuration, and observing the tapped molten flow behavior in pans with areas identical to standard High Level Waste disposal canisters. Testing conditions, the surrogate waste composition, key testing steps, testing parameters, and sampling and analysis requirements are defined.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lagoon Seepage Testing Plan for the Specific Manufacturing Capability (SMC) Complex Sewage Lagoons at Idaho National Laboratory, Butte County, Idaho

Battelle Energy Alliance, LLC (BEA) operates the Specific Manufacturing Capability (SMC) Complex located in Butte County, Idaho at Idaho National Laboratory (INL). The SMC Complex has an existing wastewater system to collect and treat sanitary wastewater and boiler condensate water from the facility. The existing treatment facility consists of three cells: Cell #1 has a surface area of 1.6 acres, Cell #2 has a surface area of 3.2 acres, and Cell #3 has a surface area of 1.6 acres. If the three existing cells are to ever reach capacity, there is a stub out to the northeast for future expansion of the lagoons. The Lagoons were installed in 1994, and were last tested in 2009. All three cells were within the acceptable limit, which at the time was one-quarter inch per day or less. The Idaho Department of Environmental Quality (IDEQ) is requiring that the seepage tests at SMC be repeated every 10 years.

99 GENERAL AND MISCELLANEOUS↗

James Webb Space Telescope Integrated Science Instrument Module Thermal Balance/Thermal Vacuum Test Configuration and Test Planning at NASA's Goddard Space Flight Center

The James Webb Space Telescope (JWST) is the next of the great observatories , scheduled to be launched in 2014. Three of the four science instruments are passively cooled to their operational temperature range of 36K to 40K, and the fourth instrument is actively cooled to its operational temperature of approximately 6K. Thermal-vacuum testing of the flight science instruments at the Integrated Science Instrument Module (ISIM) element level will take place within a newly constructed shroud cooled by gaseous helium inside Goddard Space Flight Center s (GSFC) Space Environment Simulator (SES). The test enclosure surrounding the instruments during the integrated ISIM-level thermal balance testing is complex, and is designed to simulate as closely as possible the in-flight conductive and radiative thermal environment around the ISIM. Thermal control and measurement of parasitic sources of heat leak into the test volume is critical, as the dissipation plus known parasitics in the flight ISIM is approximately 454 mW, and additional parasitics attributed to the flight enclosure itself are nearly equal to this, resulting in the energy balance of the inflight ISIM being less than 1.0 W. Sources of test-induced parasitics must be carefully controlled and measured, and the ability to thermally control the test environment is critical to enable accurate thermal balance testing and thermal model correlation. This paper describes the test configuration and plans for the ISIM-level thermal vacuum/thermal balance testing at GSFC.

Glazer, Stuart↗

Test Plan for Solvent Extraction Data Acquisition to Support Modeling Efforts

This testing will support NEAMS SafeSep Modeling efforts related to droplet simulation in liquid-liquid extraction equipment. Physical characteristic determinations will be completed for the fluids being used in the experiment including viscosity, density, surface tension, distribution coefficients, and diffusion coefficients. Then, experiments will be carried out to provide data for comparison to the simulation’s calculation of mass transfer coefficients. Experiments will be conducted with solutions used in the TRansUranic EXtraction (TRUEX) process extraction section. The TRUEX process was chosen since it is one solvent extraction system currently proposed for the separation of actinides and lanthanides from used nuclear fuel, it is diffusion limited, testing can be performed using non radioactive lanthanides to evaluate mass transfer. The extraction section involves transfer of one or more lanthanide species from an aqueous solution to an organic solvent. Single droplets rising by buoyancy will be studied first. Droplet size and number of species transferred will be varied independently to provide mass transfer coefficients as a function of each variable. An apparatus has been designed specifically for these experiments. In order to get more accurate measurements of droplet size, contact time, time of droplet formation, and possibly droplet breakup and coalescence, a high speed camera will be utilized for these experiments. Other potential experiments include examining the effects of jetted droplets and shear flow on the mass transfer coefficients.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

PELICAN Design, Test Planning, and Commissioning Results

To support design efforts for the Versatile Test Reactor (VTR) core assemblies, an experimental facility has been designed and constructed at Argonne National Laboratory to match the hydraulic flow conditions within the VTR’s primary heat transport system (PHTS). This facility, the Pressure drop Experimental Loop for Investigations of Core Assemblies in advanced Nuclear reactors, PELICAN, provides the ability to measure pressure drop across a full-scale fuel assembly containing prototypic axial reflectors, fuel, and plena components. The PELICAN facility was designed and built to offer maximum flexibility, allowing testing from short sub-sections all the way to the full-length core fuel assemblies. The report presents the high-level program objectives, a summary of the facility design, instrumentation, and control systems, and the testing procedure. The outcomes from facility characterization efforts and first test matrix results are then presented and then, finally, the conclusion contains a summary of the future work to be performed. This test facility was designed to match the hydraulic conditions of the flowing sodium in the VTR using water as a surrogate fluid. To do so, the water is elevated to a temperature of 110°C where its viscosity matches that of sodium, and with a 50-HP centrifugal pump, is capable of generating full scale flow rates to achieve prototypic Reynolds and Euler number flow conditions. To prevent boiling, the system is maintained at elevated pressure of at least 2.7-3.0 bar (40-44 psig). A set of 15 tests have been used to perform checkout activities in order to commission the device, survey the capabilities of PELICAN, and generate experimental data at isothermal conditions and over a range of flow rates up to 44 kg/s (700 GPM) to produce datasets used in the verification and validation of VTR design and modeling efforts. Initial testing focused on facility characterization, which assessed the operational capabilities of various control systems. The thermal control system was qualified, including the thermal response of the loop to the heat added by self- and auxiliary heaters, the chiller and heat exchanger systems for removing excess heat, and their coupled ability to maintain steady-state isothermal conditions as desired. Additionally, the pressure control system was verified to ensure necessary operating environments that promote pump health and prevent boiling of loop inventory at high temperatures could be met. With these systems in place, the first set of matrix tests have been carried out using orifice plates with inner diameters of 2.25-inches and 2.5-inches. Orifice plate flow behavior is well covered in scientific literature, and the results find good agreement with the measured pressure drop vs flow rate and those of theoretical predictions. This initial testing not only helps to validate the experiment, but it also produces a high quality data set for a geometry that is easily reproducible for simulations. Finally, the report is concluded with a discussion of the work to come and provides a snapshot of the test articles in the experimental pipeline whose designs are being inspired by the current designs from the VTR.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Supplemental Immobilization Cast Stone Technology Development and Waste Form Qualification Testing Plan

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is being constructed to treat the 56 million gallons of radioactive waste stored in 177 underground tanks at the Hanford Site. The WTP includes a pretreatment facility to separate the wastes into high-level waste (HLW) and low-activity waste (LAW) fractions for vitrification and disposal. The LAW will be converted to glass for final disposal at the Integrated Disposal Facility (IDF). The pretreatment facility will have the capacity to separate all of the tank wastes into the HLW and LAW fractions, and the HLW Vitrification Facility will have the capacity to vitrify all of the HLW. However, a second immobilization facility will be needed for the expected volume of LAW requiring immobilization. A number of alternatives, including Cast Stone—a cementitious waste form—are being considered to provide the additional LAW immobilization capacity.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LCLS-II-HE Vertical Acceptance Testing Plans

LCLS-II-HE has performance requirements similar to but generally more demanding than those of LCLS-II, with an operating gradient of 21 MV/m (up from 16 MV/m in LCLS-II) and tighter restrictions on field emission and multipacting. In this paper, we outline the requirements for the 1.3 GHz cavities and the plans for qualification of these cavities by vertical test. We discuss lessons learned from LCLS-II and highlight the changes implemented in the vertical test procedure for the new project.

43 PARTICLE ACCELERATORS↗

FITT OXIDATION TEST PLAN

This plan describes the post irradiation examination (PIE) oxidation testing activities to be performed by Oak Ridge National Laboratory (ORNL) on individual particles from Compact 5 4 2 taken from the Advanced Gas Reactor (AGR) experiment, AGR 2. This work will be performed in accordance with the general objectives outlined in the AGR 2 PIE Plan1 and guidance in the ORNL PIE Statement of Work.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FITT OXIDATION TEST PLAN

This plan describes the post irradiation examination (PIE) oxidation testing activities to be performed by Oak Ridge National Laboratory (ORNL) on individual particles from Compact 5 4 2 taken from the Advanced Gas Reactor (AGR) experiment, AGR 2. This work will be performed in accordance with the general objectives outlined in the AGR 2 PIE Plan1 and guidance in the ORNL PIE Statement of Work.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Test Plan for Cyclic Heating of AGR-3/4 Compact 8-1

Post irradiation examination (PIE) and heating tests of tristructural isotropic (TRISO)-coated fuel particles, fuel compacts, and graphite from Advanced Gas Reactor (AGR) irradiation experiment AGR 3/4 are in progress. The AGR-3/4 test train consisted of twelve separate capsules irradiated in the northeast flux trap of the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) from December 14, 2011, to April 12, 2014 (Collin 2015). The plan for the reirradiation in the Neutron Radiography Reactor (NRAD) and subsequent 1200°C heating test of AGR-3/4 Compact 8-1 in the Fuel Accident Condition Simulator (FACS) furnace was described previously in (Stempien 2019). One of the main goals of that test was to assess the retention of short-lived fission products I-131 (t1/2 = 8.02 d) and Xe-133 (t1/2 = 5.2 d) in fuel kernels. Xe-133 release had ostensibly leveled off after approximately 80 hours. An issue with the condensation plate exchanges forced this test to be stopped after approximately 96 hours. The issue was resolved, and the test was restarted by heating FACS back up to 1200°C. During this reheating phase, an additional release of Xe-133, approximately equal in size to the release during the initial heating to 1200°C, was detected in the fission gas monitoring system (FGMS). To test whether this release is related to temperature transients (i.e. from heating and reheating), this new plan will describe three additional temperature cycles.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hawaiian Electric Advanced Inverter Test Plan - Result Summary

This presentation is intended to share the results of lab testing of five PV inverters with the Hawaiian Electric Companies and other stakeholders and interested parties. The tests included baseline testing of advanced inverter grid support functions, as well as distribution circuit-level tests to examine the impact of the PV inverters on simulated distribution feeders using power hardware-in-the-loop (PHIL) techniques. hardware-in-the-loop (PHIL) techniques.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Test and Evaluation for Enhanced Security: A Quantitative Method to Incorporate Expert Knowledge into Test Planning Decisions.

Complex systems are comprised of technical, social, political and environmental factors as well as the programmatic factors of cost, schedule and risk. Testing these systems for enhanced security requires expert knowledge in many different fields. It is important to test these systems to ensure effectiveness, but testing is limited to due cost, schedule, safety, feasibility and a myriad of other reasons. Without an effective decision framework for Test and Evaluation (T&E) planning that can take into consideration technical as well as programmatic factors and leverage expert knowledge, security in complex systems may not be assessed effectively. Therefore, this paper covers the identification of the current T&E planning problem and an approach to include the full variety of factors and leverage expert knowledge in T&E planning through the use of Bayesian Networks (BN).

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Pre-Launch End-to-End Testing Plans for the SPAce Readiness Coherent Lidar Experiment (SPARCLE)

The SPAce Readiness Coherent Lidar Experiment (SPARCLE) mission was proposed as a low cost technology demonstration mission, using a 2-micron, 100-mJ, 6-Hz, 25-cm, coherent lidar system based on demonstrated technology. SPARCLE was selected in late October 1997 to be NASA's New Millennium Program (NMP) second earth-observing (EO-2) mission. To maximize the success probability of SPARCLE, NASA/MSFC desired expert guidance in the areas of coherent laser radar (CLR) theory, CLR wind measurement, fielding of CLR systems, CLR alignment validation, and space lidar experience. This led to the formation of the NASA/MSFC Coherent Lidar Technology Advisory Team (CLTAT) in December 1997. A threefold purpose for the advisory team was identified as: 1) guidance to the SPARCLE mission, 2) advice regarding the roadmap of post-SPARCLE coherent Doppler wind lidar (CDWL) space missions and the desired matching technology development plan 3, and 3) general coherent lidar theory, simulation, hardware, and experiment information exchange. The current membership of the CLTAT is shown. Membership does not result in any NASA or other funding at this time. We envision the business of the CLTAT to be conducted mostly by email, teleconference, and occasional meetings. The three meetings of the CLTAT to date, in Jan. 1998, July 1998, and Jan. 1999, have all been collocated with previously scheduled meetings of the Working Group on Space-Based Lidar Winds. The meetings have been very productive. Topics discussed include the SPARCLE technology validation plan including pre-launch end-to-end testing, the space-based wind mission roadmap beyond SPARCLE and its implications on the resultant technology development, the current values and proposed future advancement in lidar system efficiency, and the difference between using single-mode fiber optical mixing vs. the traditional free space optical mixing. attitude information from lidar and non-lidar sensors, and pointing knowledge algorithms will meet this second requirement. The topic of this paper is the pre-launch demonstration of the first requirement, adequate sensitivity of the SPARCLE lidar.

Kavaya, Michael J.↗

Nimble Feedthrough Qualification - 125% High Explosive Overpressure Test Plan RevA

The primary purpose of this High Explosive (HE) Over-Pressure Test (OPT) is to qualify top cover diagnostic feedthroughs that will be used on LLNL Nimble Subcritical Experiment (SCE) Series designs per experimental design verification requirements specified in ASME Boiler and Pressure Vessel Code Case 2564, Impulsively-Loaded Pressure Vessels, Section VIII, Division 3; and to satisfy the over-test requirement of DOE-STD-1212. The diagnostic feedthroughs are part of the Vessel Confinement System (VCS), which is credited as a Safety Significant Design Feature per the U1a Facility Documented Safety Analysis (DSA). The OPT will be conducted at the LANL Area 1, R306 Firing Site (TA-15-R306) in a 3-foot diameter VCS depicted in Figure 1.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Acoustic Treatment Design Scaling Methods: Test Plans, Hardware, Results, and Evaluation - Volume 3

The ability to design, build, and test miniaturized acoustic treatment panels on scale-model fan rigs representative of the full-scale engine provides not only a cost-savings, but an opportunity to optimize the treatment by allowing tests of different designs. To be able to use scale model treatment as a full-scale design tool, it is necessary that the designer be able to reliably translate the scale model design and performance to an equivalent full-scale design. The primary objective of the study presented in this volume of the final report was to conduct laboratory tests to evaluate liner acoustic properties and validate advanced treatment impedance models. These laboratory tests include DC flow resistance measurements, normal incidence impedance measurements, DC flow and impedance measurements in the presence of grazing flow, and in-duct liner attenuation as well as modal measurements. Test panels were fabricated at three different scale factors (i.e., full-scale, half-scale, and one-fifth scale) to support laboratory acoustic testing. The panel configurations include single-degree-of-freedom (SDOF) perforated sandwich panels, SDOF linear (wire mesh) liners, and double-degree-of-freedom (DDOF) linear acoustic panels.

Yu, J.↗