Search NASA⌕ Search

SEARCH · Search NASA

Results for “Work Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Interim Measure Report Revision 0: Un-Numbered Operational Areas PRL 229

This report documents the Interim Measure (IM) completed at Un-Numbered Operational Areas (UNOA) potential release location (PRL) 229, at Kennedy Space Center (KSC), Florida. This document has been prepared for the National Aeronautics and Space Administration (NASA), in accordance with HydroGeoLogic, Inc.’s (HGL) Contract 80KSC019D0012, Task Order 80KSC019F0224. The purpose of this IM report is to document the field results of the 2022 IM conducted between December 13, 2021, and February 11, 2022, and to present the recommendations based on the IM findings. IM activities were completed at the UNOA PRL 229 to remove railroad ties and benzo(a)pyrene equivalent (BAPE)/total recoverable petroleum hydrocarbons (TRPH)-affected soil in accordance with the IM Work Plan (IMWP) (Jacobs/CORE, 2019a). The objectives of the IM were to mitigate human health risks by reducing site contaminants to the residential soil cleanup target level (SCTL) based on the 95 percent upper confidence limit on the mean. A second objective was to reduce low molecular weight and high molecular weight polynuclear aromatic hydrocarbon (PAH) concentrations below ecological screening values for terrestrial receptors. Prior to excavation operations, railroad ties from all areas were consolidated. In total, 50.67 tons of railroad ties were transported from the site to JED Landfill in St. Cloud, Florida. The cumulative excavation footprint spanned an area of 9,710 square ft. In total, 908.54 tons of soil was transported from the site to JED Landfill. To backfill the excavation area, 880 cubic yards of clean fill was trucked to the site from S&LMaterials, Inc. borrow pit in Christmas, Florida. Following completion of backfill, the site restoration activities included grading the disturbed areas to match the existing elevations and vegetation planting by the site restoration subcontractor. The IM implementation activities were presented to the KSC Remediation Team during its meeting on May 3, 2022. The Remediation Team reached consensus on the completion of the IM reducing the area affected by BAPE/TRPH above the State of Florida residential soil cleanup target levels.

PAHs↗

KSC Headquarters Building Area SWMU 104 Soil Interim Measure Report for LOC 2D and LOC 2E Kennedy Space Center, Florida

This Interim Measure (IM) Report for Location of Concern (LOC) 2D and LOC 2E summarizes the activities associated with implementation of an IM to address soil and concrete contamination at the Kennedy Space Center (KSC) Headquarters Building Area (KHQA) located at KSC, Florida. KHQA has been designated Solid Waste Management Unit (SWMU) 104 under KSC’s Resource Conservation and Recovery Act Corrective Action Program. The IM consisted of excavating/removing residual polychlorinated biphenyl (PCB) contamination in soil and concrete from two separate areas, LOC 2D and LOC 2E, which were associated with electrical transformer locations. IM activities were conducted in accordance with the Interim Measure Work Plan (IMWP), Revision 1, for KHQA dated June 2018, which was approved by the Florida Department of Environmental Protection in a correspondence letter dated April 2016 and the United States Environmental Protection Agency in a correspondence letter dated August 2018. The objective of the IM was to remove all remaining contaminated media with total PCB concentrations greater than the State of Florida Residential Soil Cleanup Target Level (RSCTL) (0.5 milligrams per kilogram [mg/kg]). This cleanup goal meets unrestrictive re-use conditions in Florida, and is below federal regulations for PCB Bulk Remediation Waste Cleanup of 1 mg/kg for high occupancy, unrestricted use areas, as outlined in 40 Code of Federal Regulations (CFR) 761.61(a). The timeline of the IM was coordinated with demolition of the former KSC Headquarters Building (demolished in 2021) in order to safely remove contaminated media after electrical equipment was de-energized and removed from the site. Excavation activities were conducted between January 10, 2022, and February 8, 2022, and included two waste streams for off-site disposal: (1) PCB-remediation waste greater than or equal to 50 mg/kg, and (2) PCB-remediation waste less than 50 mg/kg. A total of approximately 347 cubic yards (478 tons) of PCB-contaminated soil and concrete was initially removed from the LOC 2D and LOC 2E areas, as defined in the IMWP. An additional 4.35 tons of soil and concrete were removed based on verification sampling, which was conducted until the cleanup goal was achieved. The total area of excavation from both LOC 2D and LOC 2E was approximately 5,186 square feet (0.12 acres), and excavation depths ranged from 0.5 to 4.0 feet below land surface Excavated soils and concrete were stockpiled based on waste stream and subsequently transported and disposed of at Waste Connections of Osceola County, LLC – JED Landfill in St. Cloud, Florida (PCBs less than 50 mg/kg) or the Chemical Waste Management Landfill in Emelle, Alabama (PCBs greater than or equal to 50 mg/kg). Following excavation, clean backfill was brought to the site and provided to the Demolition Contractor to complete backfill and grading in conjunction with their final site restoration activities from building demolition. Post-IM groundwater sampling was conducted in May 2022 at three monitoring wells installed in April 2022 to confirm that PCBs did not leach into groundwater. These wells were installed where the highest PCB concentrations were detected at LOC 2D, LOC 2E, and from the Building Perimeter IM (previously completed in 2020). All PCB results in groundwater were non-detect. Volatile organic compounds were also analyzed based on potential past use of solvents in transformers with PCB-dielectric fluids and the potential release of dielectric fluids containing volatile organic compounds, and all results were non-detect. Based on completion of a successful IM at LOC 2D and LOC 2E, as well as previous remedial actions that have addressed other contamination at KHQA (SWMU 104), No Further Action without controls will be recommended for SWMU 104. NASA will submit separate Site Rehabilitation Completion Order request documentation for SWMU 104 to support an NFA without controls recommendation.

PCB↗

Technology Maturation Report for Damage Arresting Composites under the Environmentally Responsible Aviation Project

The goal of the NASA Environmentally Responsible Aviation (ERA) Project was to develop technologies that will lead to commercial aircraft that will burn less fuel and produce fewer emissions than the 2010 state of the art. The purpose of this Technology Maturation Report (TMR) is to summarize both the development and lessons learned for the Damage Arresting Composites (DAC) Demonstration and to summarize how the test results were used to predict the impact the Pultruded Rod Stitched Efficient Unitized Structure (PRSEUS) technology would have on future transport aircraft weights. The TMR includes the technical work plans for the DAC Demonstration for the six-year effort of the NASA ERA Project. System studies indicated that DAC would reduce structural weight by 20% for both hybrid wing body and tube and wing aircraft. A lighter vehicle requires less energy to fly so weight savings becomes reduced fuel burn. Additionally, the hybrid wing body configuration has improved lift-to-drag ratios compared to the tube and wing aircraft, further reducing fuel burn.

carbon-epoxy↗

Size Effects on Laser Powder Bed Fusion and Laser Powder Directed Energy Deposition GRCop-42 Alloy

Additive manufacturing (AM) plays a significant role in the fabrication of regeneratively cooled rocket engine combustion chambers, where internal channels are used to transport high pressure propellants to keep the engine from overheating. Cooling channels are designed with thin walls between the cooling and combustion sides, experiencing high thermal and mechanical stresses from large temperature gradients and internal pressures. Hence, selecting materials suited for this environment and maintaining a high-quality processing for this critical application is of utmost importance. GRCop-alloys (Cu-Cr-Nb) were developed as an ideal material for combustion chambers due to its high conductivity and high strength at temperature, being employed as a structural member for the hotwall with excellent heat transfer capabilities. GRCop-42 (Cu, 4 at% Cr, 2 at% Nb) has significantly matured using the Laser Powder Bed Fusion (L-PBF) process through microstructure, mechanical and thermophysical properties and evaluations using hot-fire testing. Additionally, Laser Powder Directed Energy Deposition (LP-DED) has demonstrated successful deposition and geometry samples using GRCop-42. While the maturation in properties has focused on bulk material properties from standard test specimens, these cannot be extrapolated to be used in thin walls, as different features (i.e., microstructure, porosity, and surface texture) have a greater effect on thin walls, especially on AM structures built using L-PBF and LP-DED. This presentation provides an overview of the effects introduced by reducing the thickness on the fabrication, microstructure, surface metrology and subsequent mechanical properties of GRCop-42 using L-PBF and LP-DED as well as future work planned for this research.

Gabriel Demeneghi↗

Coordinated NASA Development of Medical Capabilities and Technologies for Deep Space Exploration

Building upon the success of the last two decades of human spaceflight medical operations onboard the International Space Station (ISS), NASA now must start to evolve to a deep space medical operations paradigm. This new paradigm will include myriad challenges including communication delays and blackouts, infrequent or unavailable resupply, potentially significant vehicle resource constraints, and delayed or non-existent evacuation options. To overcome these challenges, two separate but highly coordinated NASA groups are working together to develop and test solutions to these problems: the Exploration Medical Capability (ExMC) Element of the NASA Human Research Program and the Exploration Medical Integrated Product Team (XMIPT) of the Environmental Control and Life Support System – Crew Health and Performance Systems Capability Leadership Team. Although the work of these two groups is very complementary, ExMC generally focuses more on research and early technology development work while the XMIPT works on maturing and integrating new medical capabilities for exploration. During this panel, these two groups together will present details on how medical capability gaps are defined and addressed, a new work plan in development to increase medical autonomy in spaceflight, a technology maturation effort to generate intravenous fluids from potable water onboard a spacecraft, multiple new technology demonstrations of in-situ laboratory analysis capabilities, and new onboard tools to advance medical care for deep space missions.

Kris Lehnhardt↗

Wilson Corners Solid Waste Management Unit (SWMU) 001: 2021 Annual Long-Term Monitoring Report, Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.

long-term monitoring (LTM)↗

Earth Observations into Action: Systemic Integration of Earth Observation Applications into National Risk Reduction Decision Structures

As stated in the United Nations Global Assessment Report 2022 Concept Note, decision makers everywhere need data and statistics that are accurate, timely, sufficiently disaggregated, relevant, accessible, and easy to use. The purpose of this paper is to demonstrate scalable and replicable methods to advance and integrate the use of Earth observation, specifically ongoing efforts within the Group on Earth Observations Work Programme and the Committee on Earth Observation Satellites Work Plan, to support risk-informed decision making, based on documented national and subnational needs and requirements.

earth observations↗

Stand Alone Electrical Equipment PRL 227a (Formerly PRL 227 LOC3) Confirmatory Sampling Report Addendum

HydroGeoLogic, Inc. (HGL) prepared this Confirmatory Sampling Report Addendum (CSRA) for the National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC), Florida. PRL 227a Location of Concern (LOC) 3 is located on 10th Street, west of the former Vertical Processing Facility (M7-1469), SWMU 077. The Load Break Switches (LBS) were installed in 1986 and are suspected to have formerly contained dielectric fluid that contained polychlorinated biphenyls (PCBs). The LBS were replaced in 1993 with new LBSs that do not contain PCBs. The LBS are located on a concrete pad surrounded by grass that is mowed and maintained. A total of 330 soil samples were collected between June 2020 and December 2022 from 88 locations at depths ranging from 0-0.5 to 19-20 ft bls. In general, soil samples collected from depths less than 5 ft were collected via hand auger and samples collected beyond 5 ft bls were collected using a direct-push technology drill rig. Soil samples collected from greater than 5 ft bls to 20 ft bls were collected to confirm PCBs were not present at depth in the aquifer matrix. Delineation samples were collected using an approximately 20 ft horizontal spacing. PCB impacted soil has been completely delineated to the State of Florida residential soil cleanup target level (SCTL) at PRL 227a horizontally and vertically. PCB concentrations have been identified above the residential and industrial SCTL as well as concentrations greater than or equal to 50 ppm requiring coordination with EPA and disposal at a facility authorized under TSCA. Based upon the CSRA sampling, an interim measure is recommended to remove PCB impacted soil above the residential SCTL. The total volume of PCB impacted soil to be removed is 591.6 cubic yards. This includes approximately 9.3 cubic yards of soil with PCB concentrations greater than or equal to 50 ppm. An interim measure work plan is included as an attachment to this report.

electrical equipment↗

Interim Measure Report South Water Pump Station Potential Release Location 213 – Location of Concern 2 Kennedy Space Center, Florida

This report presents a summary of the polychlorinated biphenyl (PCB) interim measure (IM) activities that occurred in December 2022 and March 2023 at Location of Concern (LOC) 2 – Electrical Equipment Area associated with the South Water Pump Station (SWPS) Potential Release Location (PRL) 213, located at the John F. Kennedy Space Center (KSC), Florida. The SWPS site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at six SWPS LOCs identified during a Solid Waste Management Unit assessment in 2013. Based on the data collected during these assessments, it was determined that IM activities would be completed at one of the LOCs, LOC 2 – Electrical Equipment Area, and an IM Work Plan was prepared and approved. In 2019, demolition of the SWPS buildings and structures was completed, allowing for additional assessment at LOC 2, and it was determined that soil excavation to remove PCB-impacted soils was no longer required for LOC 2. The IM activities conducted following demolition are presented in this report and include shallow soil sample collection, conducted in December 2022, and monitoring well installation and groundwater sampling, both conducted in March 2023. AECOM Technical Services, Inc. (AECOM) personnel collected two soil samples from two boring locations, SWPS-SB0005 and SWPS-SB0018. The samples were collected at 0 to 0.5 feet below land surface (bls). AECOM also conducted oversight of one monitoring well installation, SWPS-MW0001 screened from 4 to 14 feet bls, and then subsequently collected one groundwater sample from SWPS-MW0001. The samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. There were no detections of PCBs in soil or groundwater during the reporting period.

Chadwick Sloan Lee↗

Per- and Polyfluoroalkyl Substances Confirmatory Sampling Report, South Repeater Building (SWMU 121), Kennedy Space Center, Florida

This Per- and Polyfluoroalkyl Substances (PFAS) Confirmatory Sampling (CS) Report was prepared by AECOM Technical Services, Inc. (AECOM) for the National Aeronautics and Space Administration (NASA) under Contract 80KSC019D0010, Task Order 80KSC021F0096. The purpose of this report is to document CS activities at the South Repeater Building, Solid Waste Management Unit (SWMU) 121, formerly known as the Area 3 Repeater Building (A3RB). A Phase I SWMU Assessment and Confirmatory Sampling Report (NASA 2019) and a Phase II and III SWMU Assessment and Confirmatory Sampling Report (NASA 2022b) were previously submitted detailing Center-Wide assessment activities performed at the John F. Kennedy Space Center (KSC) in Florida that identified 33 locations of concern and 19 areas of potential concern at KSC associated with the storage, use, or release of materials containing PFAS. A review of the analytical results from investigation derived waste samples collected in 2020 from the South Repeater Building area indicated concentrations of perfluorooctanesulfonic acid (PFOS) were above Florida Department of Environmental Protection (FDEP) provisional Groundwater Cleanup Target Levels of 70 nanograms per liter (ng/L) at a concentration of 1,750 ng/L. Following this review, the KSC Fire Chief was contacted; the Chief recalled fighting a brush fire in 1998 in the area, during which an unknown volume of aqueous film-forming foam was used to extinguish the fire. The Phase II and Phase III SWMU Assessment Report recommended this area proceed to CS. Historical results in this area are provided in Appendix A . PFAS CS activities were contracted at the South Repeater Building. Initial CS activities were conducted in accordance with the PFAS Assessment and Mitigation Work Plan (AECOM 2022), which was submitted to the NASA Remediation Project Management team and accepted by the team on November 1 and 8, 2021. The objectives of the PFAS CS were to: - - Confirm and begin to assess the extent of PFAS affected media in the South Repeater Building area. - - Identify locations for groundwater, soil, surface water, and soil core sampling. - - Qualitatively characterize the migration potential of released PFAS to environmental media (soil, groundwater, and surface water). The following activities were completed to meet the PFAS CS objectives: - - Installation of monitoring wells via direct push technology (DPT) and rotosonic techniques - - Groundwater, soil, and surface water sampling - - Collection of soil cores to evaluate site lithology - - Development of initial PFAS plume characterization

PFAS↗

Interim Measures Pilot Study Completion Report, South Repeater Building, Solid Waste Management Unit 121, Hydraulic Containment and Groundwater Treatment System for Per- and Polyfluoroalkyl Substances

This Per- and Polyfluoroalkyl Substances (PFAS) Interim Measures Pilot Study Completion Report was prepared for the National Aeronautics and Space Administration by AECOM Technical Services, Inc. under Contract 80KSC019D0010, Task Order 80KSC021F0096. The purpose of this report is to document the pilot study activities at the South Repeater Building, Solid Waste Management Unit (SWMU) 121. This report details the additional assessment activities completed from June 2023 through November 2023 and the subsequent pilot study completed at the South Repeater Building conducted in December 2023 through February 2024. Initial activities were conducted in accordance with the Pilot Study Work Plan (NASA 2023), submitted to the KSC Remediation Team and accepted by the team on October 26, 2023. The objectives of the pilot study were to: • Provide information on aquifer characteristics and to aid in future modeling and remedial design activities to mitigate off-KSC migration of PFAS compounds. • Develop information on characteristics of the surficial aquifer system, specifically transmissivity, storage coefficient, hydraulic conductivity, and vertical hydraulic conductivity. • Obtain data to support construction and calibration of a groundwater flow model. • Acquire design parameters necessary for future remedial design activities, specifically radius of influence, drawdown, flow rates, and pump settings. The following activities were completed to meet the pilot study objectives: • Groundwater and surface water sampling • Geophysical investigation via Hydraulic Profiling Tool (HPT) and soil sampling • Installation of observation and extraction wells via rotosonic techniques • Slug, step, and pump testing activities • Initial modeling efforts for a groundwater hydraulic containment system. Results of the pilot study and modeling activities are being used in the development of a groundwater containment and treatment system for the site.

PFAS↗

Use of novel refractory design and installation techniques for improved energy efficiency in iron and steel and other energy intensive industries

This paper describes the planned work to be performed under a United States Department of Energy funded project to bring together the key players necessary to develop and deploy new technology which could increase the thermal efficiency of the steel industry as well as other energy intensive industries. It is hoped that such improvements in energy efficiency will reduce the overall energy and environmental footprint of domestic industry, as well as provide economic benefit to the individual companies. The described project brings together a vertically integrated collaborative team consisting of the end user (U.S. Steel), material producers/suppliers (Allied Mineral Products and Reno Refractories), raw material suppliers (American Metallurgical Services, Minerals Manufacturing), and research organizations (Oak Ridge National Laboratory, National Energy Technology Laboratory and University of Alabama-Birmingham) with the objective of designing and producing new refractory materials based on novel aggregates, improved particle packing, and engineered surface texture. In addition, the recycling and use of spent refractory materials will be investigated and a novel installation technique will be developed taking advantage of new additive manufacturing technology and existing refractory shotcrete technology. It is hoped that the combination of these new technologies will allow for the improvement of the energy, environmental, and economic efficiency of the steel industry while also reducing the environmental footprint of the refractory and steel industries. Additionally, the developed technology is expected to be applicable to other energy intensive industries such as cement, glass, pulp and paper, and non-ferrous metals processing.

Hemrick, James↗

Panel Session 2: Hot Topics in US DOE Environmental Management

The well-attended Panel Session was chaired by Martin Schneider. The four panelists did not provide presentations. Rather the session was a discussion focusing on pressing issues facing US DOE Environmental Management (EM) sites and how the program is moving forward. The session began by momentarily reflecting on a success: the three Tank Waste Treatment Facilities will soon be coming online. These three facilities will treat as much waste in two years as was treated in the past 30 years. That is a significant milestone in progress. Also, safety enhancements at WIPP are a big success. The panelists noted that there will be challenges with the victories of the startup of the Waste Treatment Facilities. Treating tank waste is the last EM mission and will help with the relationships with the stakeholders, regulators and Congress. One of the biggest challenges will be moving back to full operation mode. Although the operation will increase productivity of reducing/managing the tank waste, it will decrease life cycle cost and lessen years of cleanup. The challenge will be having people understand that EM will be operating 24/7 and that maintenance will be key in keeping the operations. EM will be working together with the regulators to show tangible progress that will be effective and efficient. By working together, they can find opportunities/technologies for streamlining and accelerating cleanup. Recent changes to the regulatory framework between DOE-EM Los Alamos Field Office and New Mexico Environmental Department have helped cleanup in Los Alamos. Every year EM and the agencies review progress and come to agreements on the next work priorities. At Savannah River Site, the Federal Facility Agreement among EM, South Carolina Department of Health and Environmental Control, and Environmental Protection Agency (EPA) has developed a small core team that work are shared by together in resolving issues that come up. The discussion moved on to how progress can be made by sharing lessons learned among the contractors. An example of how these learned lessons can be shared is that key representatives from projects across the EM sites participate in various forums to review/contribute to the work planned. Other opportunities can be by temporary assignments of DOE staff to gain experience and by monthly EM Headquarters report that provide the lessons learned across the EM sites. The panelists discussed how skyline changes are the best examples of tangible progress. Decontamination and Demolition (D and D) of structures are the easiest tangible progress that can be seen. Whereas tank waste cleanup is the hardest to see. Disposal of waste onsite versus offsite is another challenge, and timely discussions are necessary to get to the best value to the government.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing Commercial Submersible Mixer Pumps for Sludge Removal in Savannah River Site's Tank 26 - 20289

The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving Cyber Situational Understanding

Effective cybersecurity operations require the ability to analyze large amounts of information to assess security risks and formulate defensive strategies against adversaries. This has become more complex in recent years as the sprawl and interconnectivity of devices grows through implementation of virtualization, cloud computing, and Internet of Things (IoT). The amount of data and analysis required for effective cybersecurity command and control decisions far exceeds humans’ capacity to perform manually. We characterize the analysis problem as cyber situational understanding. The research presented to improve cyber situational understanding focuses on vulnerability analysis and threat intelligence. Regarding vulnerabilities, entities must analyze and plan work for between thousands and tens of thousands of software vulnerabilities annually. Entities heavily use network firewalls to limit vulnerability exposure. As a result, some of these vulnerabilities permit exposure to adversarial exploitation, whereas others are inaccessible and therefore present negligible risk of exploitation. Distinguishing between high and low risk software vulnerabilities requires a deep understanding of the vulnerability, network firewall protection, and characteristics of the targeted device. This problem is solved by extracting network service features from vulnerability data features using both machine-learning and natural language processing. Then, the network firewall topology is parsed to determine which vulnerabilities are reachable by adversaries. Ultimately, a state-based safety analysis ascertains which vulnerabilities are unsafe. A related vulnerability analysis problem occurs in cybersecurity operations when associating an entity’s hardware and software assets to public vulnerability databases. Assets often reveal hardware and software through installation artifacts and network service identification, and entities store these artifacts in inventory databases. However, software and hardware vendors apply a standard Common Platform Enumeration (CPE) naming convention when publicly reporting vulnerabilities. Associating these two datasets often requires many hours to days of manual inspection. The proposed solution automates the mapping approach of human analysts using fuzzy matching techniques, natural language processing, and, ultimately, machine learning to present a small set of recommendations for mapping the two datasets. The result significantly reduces human analysis time and reduces the occurrence of false positives in vulnerability notifications. Finally, cyber threat intelligence (CTI) requires associating cyber observable artifacts, such as IP addresses, URIs, and file hashes, with cyber threat tactics, techniques, and procedures. Unfortunately, most CTI data is compartmentalized across multiple organizations and cannot be shared due to the legal and reputational risk with cyber threat being associated with the entity. The approach to solving this problem inovlves using a distributed ledger with anonymous token spending and authentication. This allows a consortium of semi-trusted entities to share the workload of curating CTI for a threat sharing community’s cooperative benefit.

Huff, Philip↗

Repository-Based Software Engineering Program: Working Program Management Plan

Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

Source record↗