Search NASA⌕ Search

SEARCH · Search NASA

Results for “complexity management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Cassini Information Management System in Distributed Operations Collaboration and Cassini Science Planning

Launched on October 15, 1997, the Cassini-Huygens spacecraft began its ambitious journey to the Saturnian system with a complex suite of 12 scientific instruments, and another 6 instruments aboard the European Space Agencies Huygens Probe. Over the next 6 1/2 years, Cassini would continue its relatively simplistic cruise phase operations, flying past Venus, Earth, and Jupiter. However, following Saturn Orbit Insertion (SOI), Cassini would become involved in a complex series of tasks that required detailed resource management, distributed operations collaboration, and a data base for capturing science objectives. Collectively, these needs were met through a web-based software tool designed to help with the Cassini uplink process and ultimately used to generate more robust sequences for spacecraft operations. In 2001, in conjunction with the Southwest Research Institute (SwRI) and later Venustar Software and Engineering Inc., the Cassini Information Management System (CIMS) was released which enabled the Cassini spacecraft and science planning teams to perform complex information management and team collaboration between scientists and engineers in 17 countries. Originally tailored to help manage the science planning uplink process, CIMS has been actively evolving since its inception to meet the changing and growing needs of the Cassini uplink team and effectively reduce mission risk through a series of resource management validation algorithms. These algorithms have been implemented in the web-based software tool to identify potential sequence conflicts early in the science planning process. CIMS mitigates these sequence conflicts through identification of timing incongruities, pointing inconsistencies, flight rule violations, data volume issues, and by assisting in Deep Space Network (DSN) coverage analysis. In preparation for extended mission operations, CIMS has also evolved further to assist in the planning and coordination of the dual playback redundancy of highvalue data from targets such as Titan and Enceladus. This paper will outline the critical role that CIMS has played for Cassini in the distributed ops paradigm throughout operations. This paper will also examine the evolution that CIMS has undergone in the face of new science discoveries and fluctuating operational needs. And finally, this paper will conclude with theoretical adaptation of CIMS for other projects and the potential savings in cost and risk reduction that could potentially be tapped into by future missions.

Equils, Douglas J.↗

The Design of Large-Scale Complex Engineered Systems: Present Challenges and Future Promise

Model-Based Systems Engineering techniques are used in the SE community to address the need for managing the development of complex systems. A key feature of the MBSE approach is the use of a model to capture the requirements, architecture, behavior, operating environment and other key aspects of the system. The focus on the model differentiates MBSE from traditional SE techniques that may have a document centric approach. In an effort to assess the benefit of utilizing MBSE on its flight projects, NASA Langley has implemented a pilot program to apply MBSE techniques during the early phase of the Materials International Space Station Experiment-X (MISSE-X). MISSE-X is a Technology Demonstration Mission being developed by the NASA Office of the Chief Technologist i . Designed to be installed on the exterior of the International Space Station (ISS), MISSE-X will host experiments that advance the technology readiness of materials and devices needed for future space exploration. As a follow-on to the highly successful series of previous MISSE experiments on ISS, MISSE-X benefits from a significant interest by the

Bloebaum, Christina L.↗

Automation technology for aerospace power management

The growing size and complexity of spacecraft power systems coupled with limited space/ground communications necessitate increasingly automated onboard control systems. Research in computer science, particularly artificial intelligence has developed methods and techniques for constructing man-machine systems with problem-solving expertise in limited domains which may contribute to the automation of power systems. Since these systems perform tasks which are typically performed by human experts they have become known as Expert Systems. A review of the current state of the art in expert systems technology is presented, and potential applications in power systems management are considered. It is concluded that expert systems appear to have significant potential for improving the productivity of operations personnel in aerospace applications, and in automating the control of many aerospace systems.

Larsen, R. L.↗

A Model-Driven Architecture Approach for Modeling, Specifying and Deploying Policies in Autonomous and Autonomic Systems

Autonomic Computing (AC), self-management based on high level guidance from humans, is increasingly gaining momentum as the way forward in designing reliable systems that hide complexity and conquer IT management costs. Effectively, AC may be viewed as Policy-Based Self-Management. The Model Driven Architecture (MDA) approach focuses on building models that can be transformed into code in an automatic manner. In this paper, we look at ways to implement Policy-Based Self-Management by means of models that can be converted to code using transformations that follow the MDA philosophy. We propose a set of UML-based models to specify autonomic and autonomous features along with the necessary procedures, based on modification and composition of models, to deploy a policy as an executing system.

Pena, Joaquin↗

Real-time automated failure identification in the Control Center Complex (CCC)

A system which will provide real-time failure management support to the Space Station Freedom program is described. The system's use of a simplified form of model based reasoning qualifies it as an advanced automation system. However, it differs from most such systems in that it was designed from the outset to meet two sets of requirements. First, it must provide a useful increment to the fault management capabilities of the Johnson Space Center (JSC) Control Center Complex (CCC) Fault Detection Management system. Second, it must satisfy CCC operational environment constraints such as cost, computer resource requirements, verification, and validation, etc. The need to meet both requirement sets presents a much greater design challenge than would have been the case had functionality been the sole design consideration. The choice of technology, discussing aspects of that choice and the process for migrating it into the control center is overviewed.

Kirby, Sarah↗

Configuration Management at NASA

NASA programs are characterized by complexity, harsh environments and the fact that we usually have one chance to get it right. Programs last decades and need to accept new hardware and technology as it is developed. We have multiple suppliers and international partners Our challenges are many, our costs are high and our failures are highly visible. CM systems need to be scalable, adaptable to new technology and span the life cycle of the program (30+ years). Multiple Systems, Contractors and Countries added major levels of complexity to the ISS program and CM/DM and Requirements management systems center dot CM Systems need to be designed for long design life center dot Space Station Design started in 1984 center dot Assembly Complete in 2012 center dot Systems were developed on a task basis without an overall system perspective center dot Technology moves faster than a large project office, try to make sure you have a system that can adapt

Doreswamy, Rajiv↗

Trajectory-Based Complexity (TBX): A Modified Aircraft Count to Predict Sector Complexity During Trajectory-Based Operations

In this paper we introduce a new complexity metric to predict -in real-time- sector complexity for trajectory-based operations (TBO). TBO will be implemented in the Next Generation Air Transportation System (NextGen). Trajectory-Based Complexity (TBX) is a modified aircraft count that can easily be computed and communicated in a TBO environment based upon predictions of aircraft and weather trajectories. TBX is scaled to aircraft count and represents an alternate and additional means to manage air traffic demand and capacity with more consideration of dynamic factors such as weather, aircraft equipage or predicted separation violations, as well as static factors such as sector size. We have developed and evaluated TBX in the Airspace Operations Laboratory (AOL) at the NASA Ames Research Center during human-in-the-loop studies of trajectory-based concepts since 2009. In this paper we will describe the TBX computation in detail and present the underlying algorithm. Next, we will describe the specific TBX used in an experiment at NASA's AOL. We will evaluate the performance of this metric using data collected during a controller-inthe- loop study on trajectory-based operations at different equipage levels. In this study controllers were prompted at regular intervals to rate their current workload on a numeric scale. When comparing this real-time workload rating to the TBX values predicted for these time periods we demonstrate that TBX is a better predictor of workload than aircraft count. Furthermore we demonstrate that TBX is well suited to be used for complexity management in TBO and can easily be adjusted to future operational concepts.

trajectories↗

Program Helps Decompose Complex Design Systems

DeMAID (Design Manager's Aid for Intelligent Decomposition) computer program is knowledge-based software system for ordering sequence of modules and identifying possible multilevel structure for design problems such as large platforms in outer space. Groups modular subsystems on basis of interactions among them. Saves considerable amount of money and time in total design process, particularly in new design problem in which order of modules has not been defined. Originally written for design problems, also applicable to problems containing modules (processes) that take inputs and generate outputs. Available in three machine versions: Macintosh written in Symantec's Think C 3.01, Sun, and SGI IRIS in C language.

Rogers, James L., Jr.↗

A Ground-Delay-Based Approach to Reduce Impedance-Based Airspace Complexity

This paper introduces a ground delay based traffic management approach to reduce the impedance based airspace complexity for a given scenario. The preliminary work presented here extends our prior research on developing an impedance based complexity metric for unmanned aircraft system traffic scenario classification. Impedance based metric was evaluated for 1045 randomly-generated scenarios. Scenarios with overall impedance above a certain threshold were declared as no-go. A ground delay approach was developed to be applied to the rest of the scenarios so as to remediate any scenarios with small areas of high impedance on their impedance maps. A sample application is shown for a scenario with sixty flights. The final paper will include detailed trade-offs between overall accrued system delay and the delay tolerance for each aircraft. A sample application to a potential Urban Air Mobility traffic scenario will also be included in the final paper.

Vishwanath Bulusu↗

Creating a GIS-Based Decision-Support System

Tilting the Balance: Climate Variability and Water Resource Management in the Southwest, a regional conference hosted by the Pan American Center for Environmental Studies, will be held at The University of Texas at El Paso on March 2-4, 1998. The conference is supported through the US Global Change Research Program (USGCRP) established by the President in 1989, and codified by Congress in the Global Change Research Act of 1990. The NASA Mission to Planet Earth program is one of the workshops sponsors. The purpose of the regional workshops is to improve understanding of the consequences of global change. This workshop will be focused on issues along the border and the Rio Grande River and thus will bring together stakeholders from Mexico, California, Texas, New Mexico, Arizona and Colorado representing federal, state, and local governments; universities and laboratories; industry, agricultural and natural resource managers; and non-governmental organizations. This paper discusses the efforts of the NASA PACES center create a GIS-based decision-support system that can be used to facilitate discussion of the complex issues of resource management within the targeted international region.

Alvarado, Lori↗

Safety and Mission Assurance Performance Metric

The safety and mission assurance (S&MA) performance metric is a method that provides a process through which the managers of a large, complex program can readily understand and assess the accepted risk, the problems, and the associated reliability of the program. Conceived for original use in helping to assure the safety and success of the International Space Station (ISS) program, the S&MA performance metric also can be applied to other large and complex programs and projects. The S&MA-performance-metric data products comprise one or more tables (possibly also one or more graphs) that succinctly display all of the information relevant (and no information that is irrelevant) to management decisions that must be made to assure the safety and success of a program or project, thereby facilitating such decisions.

Holsomback, Jerry↗

The Impact of Delayed Communication on NASA’s Human-Systems Operations: Preliminary Results of a Systematic Review

Throughout the history of human spaceflight, NASA has relied on a team of ground-based experts on Earth to manage its missions, vehicles, and crews to ensure crew safety and mission success. However, as missions progress beyond low-Earth orbit (LEO), this paradigm of dependence on ground must evolve. Beyond LEO, in missions to the moon and Mars, crews will confront new challenges: limited evacuation options, reduced resupply capabilities, and significant communication delays that impede real-time support from experts on the ground. This reduction in ground support amplifies the likelihood that crews will be unable to adequately respond to unanticipated, safety-critical events. Understanding the scope of these risks and identifying effective countermeasures hinges on understanding the impact of communication delays on complex operations, especially in urgent, unforeseen events. Real-time communication currently provides the crew with continuous access to a large, extensively resourced ground team skilled in anomaly resolution. However, as communication delays grow, the need to transfer some responsibilities from ground experts to onboard crew becomes evident. NASA has been exploring this shift in operational responsibilities and its effectiveness in managing complex operations for decades. Nevertheless, a comprehensive understanding of the specific challenges posed by communication delays and the necessary countermeasures to mitigate them remains a gap. In this paper, we present an update on our systematic review of the literature on communication delays, the first in-depth review since 2013 (Rader et al.). We introduce a coding taxonomy to capture key constructs from papers of interest and discuss preliminary findings. These preliminary results suggest two significant research gaps: limited studies have been conducted 1) with lunar-like latencies and 2) on problem-solving strategies for the maximum latencies expected in Mars missions. We outline plans and propose recommendations to address these gaps through ongoing and future research.

human-systems integration↗

The Impact of Delayed Communications on NASA's Human-Systems Operations: Preliminary Results of a Systematic Review

Throughout the history of human spaceflight, NASA has relied on a team of ground-based experts on Earth to manage its missions, vehicles, and crews to ensure crew safety and mission success. However, as missions progress beyond low-Earth orbit (LEO), this paradigm of dependence on ground must evolve. Beyond LEO, in missions to the moon and Mars, crews will confront new challenges: limited evacuation options, reduced resupply capabilities, and significant communication delays that impede real-time support from experts on the ground. This reduction in ground support amplifies the likelihood that crews will be unable to adequately respond to unanticipated, safety-critical events. Understanding the scope of these risks and identifying effective countermeasures hinges on understanding the impact of communication delays on complex operations, especially in urgent, unforeseen events. Real-time communication currently provides the crew with continuous access to a large, extensively resourced ground team skilled in anomaly resolution. However, as communication delays grow, the need to transfer some responsibilities from ground experts to onboard crew becomes evident. NASA has been exploring this shift in operational responsibilities and its effectiveness in managing complex operations for decades. Nevertheless, a comprehensive understanding of the specific challenges posed by communication delays and the necessary countermeasures to mitigate them remains a gap. In this paper, we present an update on our systematic review of the literature on communication delays, the first in-depth review since 2013 (Rader et al.). We introduce a coding taxonomy to capture key constructs from papers of interest and discuss preliminary findings. These preliminary results suggest two significant research gaps: limited studies have been conducted 1) with lunar-like latencies and 2) on problem-solving strategies for the maximum latencies expected in Mars missions. We outline plans and propose recommendations to address these gaps through ongoing and future research.

earth-independence↗

Intelligent Sensors: An Integrated Systems Approach

The need for intelligent sensors as a critical component for Integrated System Health Management (ISHM) is fairly well recognized by now. Even the definition of what constitutes an intelligent sensor (or smart sensor) is well documented and stems from an intuitive desire to get the best quality measurement data that forms the basis of any complex health monitoring and/or management system. If the sensors, i.e. the elements closest to the measurand, are unreliable then the whole system works with a tremendous handicap. Hence, there has always been a desire to distribute intelligence down to the sensor level, and give it the ability to assess its own health thereby improving the confidence in the quality of the data at all times. This paper proposes the development of intelligent sensors as an integrated systems approach, i.e. one treats the sensors as a complete system with its own sensing hardware (the traditional sensor), A/D converters, processing and storage capabilities, software drivers, self-assessment algorithms, communication protocols and evolutionary methodologies that allow them to get better with time. Under a project being undertaken at the NASA Stennis Space Center, an integrated framework is being developed for the intelligent monitoring of smart elements. These smart elements can be sensors, actuators or other devices. The immediate application is the monitoring of the rocket test stands, but the technology should be generally applicable to the Intelligent Systems Health Monitoring (ISHM) vision. This paper outlines some fundamental issues in the development of intelligent sensors under the following two categories: Physical Intelligent Sensors (PIS) and Virtual Intelligent Sensors (VIS).

Mahajan, Ajay↗

Managing geometric information with a data base management system

The strategies for managing computer based geometry are described. The computer model of geometry is the basis for communication, manipulation, and analysis of shape information. The research on integrated programs for aerospace-vehicle design (IPAD) focuses on the use of data base management system (DBMS) technology to manage engineering/manufacturing data. The objectives of IPAD is to develop a computer based engineering complex which automates the storage, management, protection, and retrieval of engineering data. In particular, this facility must manage geometry information as well as associated data. The approach taken on the IPAD project to achieve this objective is discussed. Geometry management in current systems and the approach taken in the early IPAD prototypes are examined.

Dube, R. P.↗

Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.

Jacobs, Derya, A.↗

Improving Aquatic Plant Management in the California Sacramento-San Joaquin Delta

Management of aquatic weeds in complex watersheds and river systems present many challenges to assessment, planning and implementation of management practices for floating and submerged aquatic invasive plants. The Delta Region Areawide Aquatic Weed Project (DRAAWP), a USDA sponsored area-wide project, is working to enhance planning, decision-making and operational efficiency in the California Sacramento-San Joaquin Delta. Satellite and airborne remote sensing are used map (area coverage and biomass), direct operations, and assess management impacts on plant communities. Archived satellite records going are used to review results from previous climate and management events and aide in developing long-term strategies. Modeling at local and watershed scales provides insight into land-use effects on water quality. Plant growth models informed by remote sensing are being applied spatially across the Delta to balance location and type of aquatic plant, growth response to altered environments, phenology, environmental regulations, and economics in selection of management practices. Initial utilization of remote sensing tools developed for mapping of aquatic invasive weeds improved operational efficiency by focusing limited chemical use to strategic areas with high plant-control impact and incorporating mechanical harvesting when chemical use is restricted. These assessment methods provide a comprehensive and quantitative view of aquatic invasive plants communities in the California Delta, both spatial and temporal, informed by ecological understanding with the objective of improving management and assessment effectiveness.

Aquatic↗