Search NASA⌕ Search

SEARCH · Search NASA

Results for “coordinated scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Coordinated observations of X-ray bright BL Lacertae objects

No new International Ultraviolet Explorer (IUE) observations were scheduled. The work on the spectral extraction routine was continued. The computer code was adapted from the RDAF PDP 11/44 computer to a VAX 11/750, in order that it run more quickly. A chapter on ultraviolet observations of blazars for a book celebrating the scientific accomplishment of IUE was written in colloboration. A copy of the final draft is attached.

Urry, C. M.↗

Design and Evaluation of the Terminal Area Precision Scheduling and Spacing System

This paper describes the design, development and results from a high fidelity human-in-the-loop simulation of an integrated set of trajectory-based automation tools providing precision scheduling, sequencing and controller merging and spacing functions. These integrated functions are combined into a system called the Terminal Area Precision Scheduling and Spacing (TAPSS) system. It is a strategic and tactical planning tool that provides Traffic Management Coordinators, En Route and Terminal Radar Approach Control air traffic controllers the ability to efficiently optimize the arrival capacity of a demand-impacted airport while simultaneously enabling fuel-efficient descent procedures. The TAPSS system consists of four-dimensional trajectory prediction, arrival runway balancing, aircraft separation constraint-based scheduling, traffic flow visualization and trajectory-based advisories to assist controllers in efficient metering, sequencing and spacing. The TAPSS system was evaluated and compared to today's ATC operation through extensive series of human-in-the-loop simulations for arrival flows into the Los Angeles International Airport. The test conditions included the variation of aircraft demand from a baseline of today's capacity constrained periods through 5%, 10% and 20% increases. Performance data were collected for engineering and human factor analysis and compared with similar operations both with and without the TAPSS system. The engineering data indicate operations with the TAPSS show up to a 10% increase in airport throughput during capacity constrained periods while maintaining fuel-efficient aircraft descent profiles from cruise to landing.

Swenson, Harry N.↗

Effects of restricted feeding schedules on circadian organization in squirrel monkeys

Free running circadian rhythms of motor activity, food-motivated lever-pressing, and either drinking (N = 7) or body temperature (N = 3) were recorded from 10 squirrel monkeys maintained in constant illumination with unlimited access to food. Food availability was then restricted to a single unsignaled 3-hour interval each day. The feeding schedule failed to entrain the activity rhythms of 8 monkeys, which continued to free-run. Drinking was almost completely synchronized by the schedule, while body temperature showed a feeding-induced rise superimposed on a free-running rhythm. Nonreinforced lever-pressing showed both a free-running component and a 24-hour component that anticipated the time of feeding. At the termination of the schedule, all recorded variables showed free-running rhythms, but in 3 animals the initial phase of the postschedule rhythms was advanced by several hours, suggesting relative coordination. Of the remaining 2 animals, one exhibited stable entrainment of all 3 recorded rhythms, while the other appeared to entrain temporarily to the feeding schedule. These results indicate that restricted feeding schedules are only a weak zeitgeber for the circadian pacemaker generating free-running rhythms in the squirrel monkey. Such schedules, however, may entrain a separate circadian system responsible for the timing of food-anticipatory changes in behavior and physiology.

Non-NASA Center↗

Assembly, Test and Launch Operations for a Nuclear-enabled NASA Mission: Considerations that are Specific to Use of a Nuclear Payload

For more than five decades, Radioisotope Power Systems (RPS) have played a critical role in the exploration of space, enabling missions of scientific discovery to destinations across the solar system by providing electrical power to explore remote, challenging and extreme environments. In particular, RPS enable deep space missions where increased heliocentric distances reduce the ability of solar power to adequately meet spacecraft and instruments power requirements. Some previous notable missions that were enabled by RPS include Nimbus III, the Apollo Surface Experiments, the Pioneers 10 and 11, the Viking Mars Landers, Galileo, Ulysses, Cassini, New Horizons and Curiosity. The current operating set of missions that are enabled by RPS are Voyagers 1 and 2, Cassini, New Horizons, and Curiosity. The Multi-Mission Radioisotope Thermal Generator (MMRTG) is the current RPS used for missions. An enhanced version of this generator outfitted with higher efficiency thermoelectrics is under development for potential use in the future. Other previously deployed power systems include the Multi-hundred Watt Radisotope Thermo-electric Generator (MHW RTG) and the General Purpose Heat Source Radisotope Thermo-electric Generator (GPHS RTG). The common thread for all of these power systems is that they are fueled with Pu-238. The use of this unique isotope involves additional planning activities and requires specific actions when the devices are delivered to Kennedy Space Center (KSC), launch site, and incorporated into the assembly, test and launch operations (ATLO) process to ensure mission success, met safety and security challenges. It has been forecasted that the use of a nuclear reactor system is on the horizon. This system could be used for either specifically powering S/C propulsion system or for surface power use once the mission arrived at its destina-tion. Since a nuclear-fission-based system has never been handled or integrated into a spacecraft at KSC, this nuclear reactor system would potentially require further challenges that must be accounted for in the ATLO process. This paper will explain ATLO considerations for the recent RTG-enabled launches that have occurred and planned in the near future (Mars 2020 NASA mission). It will also describe where further challenges that need to be met for the placement of a nuclear reactor (either for propulsion or transportation for surface power use) onto a space mission. Specifically, the following topics will be addressed: • Approach for nuclear safety planning for nuclear material use and its transportation to launch site • Planning for security posture for nuclear materials at launch site • Preparation for transportation of the nuclear power system from the fueling/testing location to the launch site • Preparation of documentation and procedures for nuclear material use at launch site • Planning for coordination between power system and space mission groups • Planning for appropriate staffing and scheduling of operations

07 ISOTOPE AND RADIATION SOURCES↗

A Method for Integrating Thrust-Vectoring and Actuated Forebody Strakes with Conventional Aerodynamic Controls on a High-Performance Fighter Airplane

A method, called pseudo controls, of integrating several airplane controls to achieve cooperative operation is presented. The method eliminates conflicting control motions, minimizes the number of feedback control gains, and reduces the complication of feedback gain schedules. The method is applied to the lateral/directional controls of a modified high-performance airplane. The airplane has a conventional set of aerodynamic controls, an experimental set of thrust-vectoring controls, and an experimental set of actuated forebody strakes. The experimental controls give the airplane additional control power for enhanced stability and maneuvering capabilities while flying over an expanded envelope, especially at high angles of attack. The flight controls are scheduled to generate independent body-axis control moments. These control moments are coordinated to produce stability-axis angular accelerations. Inertial coupling moments are compensated. Thrust-vectoring controls are engaged according to their effectiveness relative to that of the aerodynamic controls. Vane-relief logic removes steady and slowly varying commands from the thrust-vectoring controls to alleviate heating of the thrust turning devices. The actuated forebody strakes are engaged at high angles of attack. This report presents the forward-loop elements of a flight control system that positions the flight controls according to the desired stability-axis accelerations. This report does not include the generation of the required angular acceleration commands by means of pilot controls or the feedback of sensed airplane motions.

Lallman, Frederick J.↗

Reasoning abstractly about resources

r describes a way to schedule high level activities before distributing them across multiple rovers in order to coordinate the resultant use of shared resources regardless of how each rover decides how to perform its activities. We present an algorithm for summarizing the metric resource requirements of an abstract activity based n the resource usages of its potential refinements.

abstraction planning rovers multiple agents↗

Airspace Technology Demonstration 2 (ATD-2) Phase 1 Concept of Use (ConUse)

This document presents an operational Concept of Use (ConUse) for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, which began demonstration in 2017 at Charlotte Douglas International Airport (CLT). NASA is developing the IADS system under the ATD-2 sub-project in coordination with the Federal Aviation Administration (FAA) and aviation industry partners. The primary goal of ATD-2 sub-project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 effort is a five-year research activity through 2020. The initial phase of the ATD-2 sub-project, which is the focus of this document, will demonstrate the Phase 1 Baseline IADS capability at CLT in 2017. The Phase 1 Baseline IADS capabilities of the ATD-2 sub-project consists of: (a) Strategic and tactical surface scheduling to improve efficiency and predictability of airport surface operations, (b) Tactical departure scheduling to enhance merging of departures into overhead traffic streams via accurate predictions of takeoff times and automated coordination between the Airport Traffic Control Tower (ATCT, or Tower) and the Air Route Traffic Control Center (ARTCC, or Center), (c) Improvements in departure surface demand predictions in Time Based Flow Management (TBFM), (d) A prototype Electronic Flight Data (EFD) system provided by the FAA via the Terminal Flight Data Manager (TFDM) early implementation effort, and (e) Improved situational awareness and demand predictions through integration with the Traffic Flow Management System (TFMS), TBFM, and TFDM (3Ts) for electronic data integration and exchange, and an on-screen dashboard displaying pertinent analytics in real-time. The surface scheduling and metering element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 Upon successful demonstration of the Phase 1 Baseline IADS capability, follow-on demonstrations of the matured IADS traffic management capabilities will be conducted in the 2018-2020 timeframe. At the end of each phase of the demonstrations, NASA will transfer the ATD-2 sub-project technology to the FAA and industry partners.

integrated arrival↗

Design implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗

Design, implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗

Adapting Project Management Practices to Research-Based Projects

From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

Bahr, P.↗

Future foundries: A convergent manufacturing platform

This article introduces the Future Foundries platform developed at Oak Ridge National Laboratory, a first-generation research system designed to demonstrate convergent manufacturing. Convergent manufacturing brings together additive, subtractive, and transformative processes in a digitally interconnected environment to enable end-to-end production workflows. By linking traditionally discrete steps, convergent platforms accelerate production, improve repeatability, and support high-mix, low-volume manufacturing. The Future Foundries platform exemplifies this vision in practice by combining four modular, vendor-agnostic process cells that include robotic WAAM, induction heating, optical metrology, and machining, coordinated through an automated pallet handler and a ROS 2-based digital thread. This architecture provides the flexibility and scalability needed for agile production in small and medium-sized manufacturing enterprises and for field deployable manufacturing. Two case studies illustrate the platform’s capabilities. The first presents an integrated workflow for fabricating, transforming, and repairing critical replacement components, showing how consolidated thermal, additive, inspection, and machining operations reduce manual part handling and streamline process flow. The second case study highlights coordinated multi-part production enabled by automated pallet logistics and multi-cell scheduling. Together, these examples showcase convergent manufacturing as a practical and scalable strategy for strengthening domestic casting and forging capacity, improving supply-chain resilience, and enabling rapid, adaptable production of mission-critical components.

Convergent manufacturing↗

Urban-Scale Control of School Bus Fleet Charging and Discharging Strategies Using Single and Multi-Stage Optimization

This paper presents a dual-strategy approach to optimizing charging and discharging schedules for school bus fleets, using the limited charging infrastructure effectively. We aim to ensure that each bus is fully charged for daily operations and aids in grid stability during peak demand. The first strategy utilizes linear programming to schedule overnight charging at available station sockets and strategic discharging during peak periods, efficiently coordinating limited resources. The second strategy employs metaheuristic techniques for continuous optimization, focusing on precise power requirements and offering greater flexibility than the linear model.

Selim, Alaa↗

Lateral distribution of pulse height in a parallel-plate avalanche counter

The nuclear γ-ray spectroscopy enters a new era when the first engineering run of GRETINA [1], a new generation of γ-ray tracking arrays, was successfully carried out at LBNL in early April, 2011. A parallel effort has been setup to develop the auxiliary charged-particle detector arrays with a matching position resolution to fully exploit the potential of GRETINA. Improving the position resolution of the existing charged-particle detector array, CHICO [2], is a part of this coordinated effort. The proposal to upgrade CHICO was approved by DOE/SC at the end of FY10. The goal is to redesign the cathode board and amplifier to improve the resolution for both and coordinates to better than one degree to match that of GRETINA. This project is scheduled to complete by the summer of 2012.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Gasoline Engine and Fuels Offering Reduced fuel Consumption and Emissions (GEFORCE)

The GEFORCE project resulted from a collaborative proposal submitted to a U.S. DOE funding opportunity announcement. The CRADA reported herein was put in place to support the GEFORCE project. The project objective was to establish key engine technologies and fuel characteristics that enable very high fuel efficiency with very low emissions in future vehicles. A matrix of study fuels was designed and produced to support engine experiments in an advanced engine. The advanced engine was constructed and prepared for operation in an engine test cell at a 3rd party laboratory. ORNL conducted engine experiments using a 2.0 LTG engine and used the resulting data to estimatefuel economy values for a mid-size sedan using a vehicle model established in Autonomie. The projected fuel economy trends versus driving schedule were consistent with those identified in a previous projectconducted in partnership with the Coordinating Research Council (CRC), AVFL-20. Additional vehicle modeling is anticipated when data are available from the advanced engine.

33 ADVANCED PROPULSION SYSTEMS↗

HDU Pressurized Excursion Module (PEM) Prototype Systems Integration

The Habitat Demonstration Unit (HDU) project team constructed an analog prototype lunar surface laboratory called the Pressurized Excursion Module (PEM). The prototype unit subsystems were integrated in a short amount of time, utilizing a skunk-works approach that brought together over 20 habitation-related technologies from a variety of NASA centers. This paper describes the system integration strategies and lessons learned, that allowed the PEM to be brought from paper design to working field prototype using a multi-center team. The system integration process included establishment of design standards, negotiation of interfaces between subsystems, and scheduling fit checks and installation activities. A major tool used in integration was a coordinated effort to accurately model all the subsystems using CAD, so that conflicts were identified before physical components came together. Some of the major conclusions showed that up-front modularity that emerged as an artifact of construction, such as the eight 45 degree "pie slices" making up the module whose steel rib edges defined structural mounting and loading points, dictated much of the configurational interfaces between the major subsystems and workstations. Therefore, 'one of the lessons learned included the need to use modularity as a tool for organization in advance, and to work harder to prevent non-critical aspects of the platform from dictating the modularity that may eventually inform the fight system.

Gill, Tracy R.↗

MSL relay coordination and tactical planning in the era of InSight, MAVEN, and TGO

This study examines an approach for optimizing the scheduling of regular relay communications between the Mars Science Laboratory (MSL) rover and the non-sun-synchronous Mars orbiters MAVEN and TGO as well as the impacts of the approaching InSight landing on MSL relay and tactical planning. Rover operations require knowledge of recently executed activities, termed decisional data, in order to inform tactical activity planning. As a result, timely and routine data return is critical for nominal rover operations. Mars orbiters are used as relay assets to achieve such timeliness.

Thomas, Steven↗

Analysis of the Current and Future Impacts of the AECOM Early Career Technical Exchange - 18497

As the average age of the engineering workforce approaches retirement, early career professionals are hired to supplement the decreasing workforce. Their transition is challenging to implement because new hires typically lack the experience that DOE's nuclear waste facilities have come to rely on. AECOM-partnered corporations have developed the Early Career Professionals Technology Exchange (ECPTE) program to facilitate new hire transitions. This program includes semi-annual workshops that develop both soft and technical skills through extensive networking opportunities, technical presentations, facility tours, and workshop preparation. Early career participants develop reliable peer networks that support their technical collaboration. AECOM's Facility Area Coordination Team (FACT) supports the program by participating during their workshops, which are been scheduled to coincide with ECPTE workshops, allowing early career professionals the opportunity to network with management and technical experts in addition to peers. Early career professionals conduct technical presentations on topics associated with their facilities and projects, developing technical communication skills utilized in professional settings. Early career leadership at the hosting facility prepares tours of local projects for interested attendees. By attending these presentations and tours, attendees gain an understanding of facilities and projects in the U. S. Department of Energy nuclear complex. Since the initiation of the ECPTE, an increasing number of AECOM-partnered corporations have begun to participate in the program. Based on participant interviews and program reviews, this paper discusses the expanding ECPTE program and its impacts on the participants, the facility, and the AECOM-partnered corporations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing a U.S. High Performance Research Reactor Transportation Road-map - 19674

The U.S. National Nuclear Security Administration Office of Reactor Conversion through the U.S. High Performance Research Reactor (USHPRR) Project is developing and qualifying a new Low Enriched Uranium (LEU) fuel to convert USHPRRs from the use of highly enriched uranium fuel to LEU fuel. The USHPRR Project is forecast to complete in 2030's. During the Project's life cycle, it will make hundreds of radiological shipments. These shipments will include material of different sizes and radiological characteristics and involve many facilities. These shipments must be integrated with the Project's detailed schedule to ensure success of the Project. The USHPRR Project has the complex challenge to develop a Packaging and Transportation (P and T) Road-map to coordinate the multitude of packaging and shipment activities. A comprehensive packaging and shipping matrix is being developed to assist in meeting this challenge and ensure the USHPRR shipments can be made on schedule. The vision for the matrix is for it to be a bridge between the schedule and the P and T Road-map, and for it to be the one stop place for USHPRR shipment information. An interactive approach to the P and T Road-map and the comprehensive shipping matrix provides an effective strategy to execute the USHPPR Project today and through its life cycle. This paper provides an overview of the development of the USHPRR P and T Road-map and the comprehensive shipping matrix and their benefits to the USHPRR Project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗