Search NASA⌕ Search

SEARCH · Search NASA

Results for “decommissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Assessment of San Onofre Concrete Susceptibility Against Irradiation Damage

The work performed under this contract covers the characterization of unirradiated concrete specimens cored from the walls of the steam generator room of the SONGS Unit 2, currently under decommission. This report documents the extensive set of characterization conducted at the Oak Ridge National Laboratory, at the University of Tennessee, Knoxville, at the Ohio State University, and at ALG Global. The susceptibility of irradiation-induced damage in concrete is governed by the exposure level (fast neutron fluence > 10 19 n.cm -2 at E > 0.1 MeV) and the mineralogy of the aggregates (high quartz content and chemical heterogeneity of the assemblage). Both conditions are met for the SONGS concrete biological shield. Hence, harvesting in-service irradiated concrete from the SONGS Unit 2 or 3 biological shield is currently an unparalleled opportunity to study the flux effects of neutron irradiation.

36 MATERIALS SCIENCE↗

2021 Site Environmental Report

The cover for this year’s 2021 Site Environmental Report recounts the removal of the High Flux Beam Reactor (HFBR) Stack. The Stack served as an exhaust for the Brookhaven Research Reactor (BGRR), from 1950 to 1968 and for the HFBR from 1965 to 1999. Historical operations from both facilities resulted in radiological contamination of the interior of the Stack. Under the direction of the Department of Energy (DOE), the U.S. Army Corps of Engineers oversaw the demolition and decommissioning of the HFBR Stack at BNL. Olgoonik-FPM Joint Venture was contracted to plan the work, safely dismantle the HFBR Stack, and properly dispose of all waste.

54 ENVIRONMENTAL SCIENCES↗

From Protection and Prevention to Research and Discovery: Eligibility Assessment of the Health Research Laboratory (TA-43) and Historic Documentation for TA-43-0001 - Volume 1

The U.S. Department of Energy National Nuclear Security Administration Los Alamos Field Office (NA-LA) requests the New Mexico State Historic Preservation Officer (SHPO) to concur with the National Register of Historic Places (NRHP)–eligibility determinations detailed in this report for the Health Research Laboratory (HRL) complex in Technical Area 43 (TA-43) at the Los Alamos National Laboratory (LANL). As part of the LANL Footprint Reduction Program’s Decommissioning and Demolition (D&D) process, all facilities of the HRL complex are scheduled for characterization and future demolition.

99 GENERAL AND MISCELLANEOUS↗

Development of a Cloud-based Application to Enable a Scalable Risk-informed Predictive Maintenance Strategy at Nuclear Power Plants

Light-water reactor operations and maintenance (O&M) costs are prohibitively high, thus contributing to the premature decommissioning of nuclear power plants (NPPs). This is partly due to how the equipment is monitored. In recent years, cloud computing has emerged as a dominant technology by virtue of its low costs, computing and storage adaptability, and ability to host applications over numerous types of virtual infrastructures. Cloud computing can be a cost-effective alternative to onsite storage and diagnostics. This paper conducts a techno-economic assessment of a provisional cloud deployment architecture for a NPP predictive monitoring (PdM) system. The cloud-based monitoring system would enable maintenance and diagnostics (M&D) analysts and other authorized plant users to remotely monitor equipment functionality so as to enable PdM practices and early detection of faults. The Microsoft Azure cloud platform is included in the proposed cloud architecture to provide data processing and storage, sensor device networking, and database management; however, this analysis could be extended to other cloud computing service providers as well. For the techno-economic assessment, technical feasibility is measured in terms of network performance metrics such as response time, latency, and throughput, whereas economic feasibility is measured in terms of operational costs and capital expenditures. Finally, this report covers certain regulatory and security aspects that may concern licensees looking to implement cloud computing. The report focuses on the integration of sensor database storage, the application of cloud resources to PdM, and the identification of technological and economic hurdles associated with moving to a cloud-computing-based architecture.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Technology Maturation of Wireless Harsh Environment Sensors For Improved Condition Based Monitoring Of Coal Fired Power Generation

The overall goal of this project was to demonstrate and develop the usage of high-temperature (HT) harsh-environment (HE) wireless surface acoustic wave resonator (SAWR) sensor technology to promote reliable maintenance through condition-based maintenance (CBM) for field applications in harsh service conditions associated with power plant environments. The project aimed to advance the HT HE wireless SAWR sensor technology from TRL 5 to TRL 7. In addition to HT HE wireless temperature sensing, efforts were dedicated during this project to investigate, develop and increase the TRL from 3 to 5 for the following technologies: (a) HT HE strain sensors to address additional CBM monitoring needs, such as boiler tube mechanical / thermal stresses, which can provide early indications for boiler tube cracking and failure; and (b) HT aluminum nitride (AlN) and scandium aluminum nitride (ScAlN) based piezoelectric thin film fabrication and implementation of SAW sensors, with the goal of releasing the need to use single crystal piezoelectric materials for SAWRs and thus broaden possible technology applications to non-planar and harder to modify surfaces. To achieve the goals mentioned above, UMaine and its partner, Environetix Technologies Corporation, established partnerships with the following power plants: Longview Power (Maidsville, WV), a coal-fired power plant; Penobscot Energy Recovery Corp (PERC, Orrington, ME), a waste-to-energy power plant; and the UMaine Steam Plant (Orono, ME), an oil / natural gas power plant. To realize wireless HT HE SAWR sensor systems in these harsh service conditions, the University of Maine research team worked with Environetix and these power plants to define, design, fabricate, test and validate a mature prototype wireless temperature SAWR sensor system for boiler tube applications within the HT HE of the reheater pass damper chamber to directly and wirelessly monitor the temperature at eighteen independent boiler tube locations. The system included three levels, or “tiers”, of wireless communication to enable remote monitoring: Tier 1, the wireless link in the reheater pass damper chamber directly accessing the sensors on the boilers; Tier 2, the wireless local area network link, transmitting processed sensor information within the power plant to the Tier 3, a commercial wireless signal carrier company for secure remote data monitoring outside of the power plant. Regarding the wireless sensor system installed at Longview Power, temperature information from the boilers was continuously transmitted from the Longview boilers at Maidsville, WV, to Environetix headquarters, Orono, ME, over a 34 month period, when the system was finally decommissioned. Strain sensors and piezoelectric ScAlN thin film sensors were successfully installed on the exhaust duct at the UMaine Steam Power plant. The advances in wireless strain sensors and thin film piezoelectric film fabrication and testing were performed mostly in UMaine laboratories and field tested at the UMaine Steam Plant, due to its close proximity to UMaine/Environetix, access to the plant facility, and due to difficulties in accessing the other power plants during the COVID shut-down period. The project accomplished the TRL level increase of the targeted CBM technologies through the successful fabrication, installation, test, and validation of dedicated and commercial wireless sensor systems, utilizing the three different power plants. The outcomes of this project, including the wireless sensor data capability, are expected to yield an advance for CBM in harsh power plant environments. The reduction of maintenance costs, improved safety during plant operation, and increased power plant efficiency will lead to increased revenues (i.e., fewer forced outages) due to better process monitoring enabled by the wireless HT HE SAWR temperature sensor technology.

20 FOSSIL-FUELED POWER PLANTS↗

U.S. Efforts in Support of Examinations at Fukushima Daiichi - November 2022 Meeting Notes and Information Request Status

Information obtained from Fukushima Daiichi Nuclear Power Station (Daiichi) is required to inform future Decontamination and Decommissioning (D&D) activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This information also has important implications for the safety and operation of U.S. commercial nuclear power plants. This document summarizes results from the Fiscal Year 2023 (FY2023) U.S. effort to review Daiichi information and extract insights to enhance the safety of existing and future nuclear power plant designs. This U.S. effort, which was initiated in 2014 by the Department of Energy Office of Nuclear Energy, is completed by a group of experts in reactor safety and plant operations that identify examination needs and evaluate recent Daiichi examination data to address these needs. Fukushima-related information and associated discussions during these meetings benefit operating, new, and advanced reactors. Significant safety insights have been and are continuing to be obtained in several areas: system and component performance, radionuclide surveys and sampling, debris end-state location, combustible gas effects, and plant operations and maintenance. In addition to reducing uncertainties related to severe accident modeling progression, these insights have and continue to be used to update guidance for severe accident prevention, mitigation, and emergency planning. Furthermore, Daiichi-related activities, such as code modeling improvements and analysis, testing, and new technology deployment efforts, have the potential to offer additional benefits to the operating fleet and new LWR and non-LWR designs. U.S. evaluations of obtained examination information and input regarding future Daiichi examinations are of interest to several organizations within Japan. Since its inception, the U.S. has provided consensus input for high priority time-sequenced examination tasks and supporting research activities. In their Mid-to-Long-term Examination Plan for 1F investigations, TEPCO included all remaining U.S. consensus information requests and additional information requests they identified. TEPCO periodically provides reports on the status of these requests (reflecting D&D priorities, new insights from investigations, and new technologies that become available). Hence, U.S. experts agreed that it was appropriate for TEPCO to track and prioritize these information requests as D&D progresses. U.S. experts will continue to review and comment on the information obtained from examinations and, as needed, provide additional details and relevant background material to support future examinations. As documented in this report, several other items, such as additional details on information requests pertaining to ex-vessel examinations, relevant references from prior research, additional documents to provide insights regarding recent investigation findings, and reviews of recently released documents, were agreed to during the FY2023 meeting.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cultural Resource Management Plan for Brookhaven National Laboratory

The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references the facets and interrelationships of cultural resources at BNL. Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a “living document.” Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation. The current (2023) update incorporates new findings and/or updated text based on completed or ongoing projects related to cultural resources at BNL since inception of the last updated CRMP in 2013. Historically, Brookhaven National Laboratory had little need for cultural resource management because many of its buildings were less than 50 years old. Most of the features that are potentially eligible for inclusion in the National Register of Historic Places were protected simply by avoiding the features. Compliance with cultural resource laws and regulations has included archeological surveys, such as those associated with the 1977 Final Environmental Impact Statement for Brookhaven National Laboratory and the 1978 Final Environmental Impact Statement for the Proton-Proton Storage Accelerator Facility (ISABELLE). In 1979, World War I trenches associated with the former Camp Upton and located near ISABELLE were determined to be eligible for inclusion in the National Register of Historic Places; however, many of these trenches had been destroyed by construction work. In 1991, the NYSHPO provided BNL with a letter indicating that only three structures and features were likely to be eligible for inclusion in the National Register of Historic Places. Between 1991 and 1999, little work associated with cultural resource management was accomplished. Beginning in 1999, awareness for the need of a program to manage cultural resources grew out of the realization that over half of the buildings at BNL were either 50 years old or were reaching that age and were, therefore, subject to the requirements in Section 106 of the National Historic Preservation Act. This fact, concomitant with the decontamination and decommissioning of the Brookhaven Graphite Research Reactor (BGRR) and the subsequent determination of BGRR’s eligibility for listing as an historical site, fueled the need for developing and implementing a more structured program for managing cultural resources at BNL.

54 ENVIRONMENTAL SCIENCES↗

Standard Operating Procedure for Optimal Deployment of Meteorological Instrumentation Within the Solar Radiation Research Laboratory (BMS and RMS SOP)

The objective of the National Renewable Energy Laboratory's (NREL's) Solar Radiation Research Laboratory (SRRL) is to collect and use high-quality solar radiation data sets for research leading to the widespread adoption of solar technologies. To appropriately populate and track the diverse array of instruments at the NREL-SRRL, NREL has established a Standard Operating Procedure (SOP) for optimal instrument deployment within the SRRL for both the Baseline Measurement System (BMS) and the Research Measurement System (RMS). Using best practices methodologies, the NREL-SRRL maintains a varied and extensive array of solar monitoring equipment to test, evaluate, and characterize the solar sensors used by federal and international agencies as well as the solar industry to determine the solar resource. The SOP provides the industry with guidance for solar resource assessment and is used for procedures in the long-term continuous monitoring of legacy instruments alongside state-of-the-art instruments. Based on the SOP, instruments are annually evaluated for continued deployment. Instruments that do not meet the SOP criteria are decommissioned, and new instruments that meet the criteria are deployed. Streamlining and optimizing the use of this facility ensures that the lab continues to be a world-leading solar calibration and measurement facility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FFTF Acceptance and Startup Testing for GAIN

The Fast Flux Test Facility (FFTF) is the most recent liquid metal reactor (LMR) to be designed, constructed, and operated by the U.S. Department of Energy (DOE). The 400-MWt sodium-cooled, fast-neutron flux reactor plant was designed for irradiation testing of nuclear reactor fuels and materials for liquid metal fast breeder reactors. Following the demise of the breeder reactor program in the United States, FFTF continued to play a key role in providing a test bed for demonstrating performance of advanced fuel designs and demonstrating operation, maintenance, and safety of advanced liquid metal reactors. FFTF operations ceased in April 1992 after a determination by DOE that no combination of proposed missions was financially feasible over a ten-year period. The reactor is currently deactivated and in a long-term surveillance and maintenance (S&M) mode. This report provides information on the extensive and rigorous process that was used to conduct turnover from construction followed by acceptance and startup testing of the FFTF. This paper is in support of the Gateway for Accelerated Innovation in Nuclear (GAIN), which provides the nuclear energy community with access to the technical, regulatory, and financial support necessary to move new or advanced nuclear reactor designs toward commercialization while ensuring the continued safe, reliable, and economic operation of the existing nuclear fleet. The information obtained from the design, startup, and operation of the FFTF provides valuable insight for follow-on reactor projects, such as the Versatile Test Reactor (VTR), in the areas of plant system and component design, component fabrication, fuel design and performance, prototype testing, site construction, reactor startup and operations, and reactor deactivation and decommissioning (D&D). The focus of this report is on the process used to startup the FFTF and to ensure that operations could be conducted efficiently and safely. A reference section is provided of documents detailing the successful turnover and testing process implemented for startup of the reactor and its supporting systems. The documents listed can be retrieved upon request and are believed useful for future reactor startup endeavors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Secure Storage: Historical Documentation of TA-08-0032, TA-11-0036, TA-22-0016, TA-22-0023, TA-22-0025, TA-22-0035, TA-37-0006, TA-37-0009, and TA-37-0020

The U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office (NA-LA), is pursuing the decommissioning and demolition (D&D) of facilities contaminated with high-explosives residues at the Los Alamos National Laboratory (Laboratory or LANL). This effort affects nine facilities associated with high-explosives and detonator research, development, and storage: Technical Area (TA) 8 Facility 32 (TA-08-0032), TA-11-0036, TA-22-0016, TA-22-0023, TA-22-0025, TA-22-0035, TA-37-0006, TA-37-0009, and TA-37-0020. All nine facilities proposed for D&D have been evaluated for listing in the National Register of Historic Places (NRHP) and determined eligible. NA-LA previously requested the State Historic Preservation Officer (SHPO) to concur with the NRHP-eligibility determinations of these nine properties presented in four reports: (1) TA-08-0032 was determined eligible for listing in the NRHP in the report, From Ranching to Radiography: An Assessment of Historic Buildings at Anchor West Site (TA-8), Vol. 1 (McGehee et al. 2008a). The SHPO concurred with this eligibility determination on November 26, 2008. (2) TA-11-0036 was determined eligible for listing in the NRHP in the report, ESA Division’s Five-Year Plan: Consolidation and Revitalization at Technical Areas 3, 8, 11, and 16, Vol. 1) (McGehee et al. 2003). The SHPO concurred with this eligibility assessment on June 22, 2003. (3) TA-22-0016, TA-22-0023, TA-22-0025, and TA-22-0035 were determined eligible for listing in the NRHP in the report, DX Division’s Facility Strategic Plan: Consolidation and Revitalization at Technical Areas 6, 8, 9, 14, 15, 22, 36, 39, 40, 60, and 69, Vol. 1 (McGehee et al. 2005a). The SHPO concurred with these eligibility determinations on April 18, 2006. (4) TA-37-0006, TA-37-0009, and TA-37-0020 were determined eligible for listing in the NRHP in the report, High Explosives and the Nuclear Stockpile: An Assessment of Historic Buildings at Magazine Area C (TA-37), Vol. 1 (McGehee et al. 2008b). The SHPO concurred with these eligibility determinations on April 17, 2008. In a letter dated January 24, 2020, NA-LA acknowledged that the D&D of these nine NRHP-eligible facilities was an adverse effect that requires resolution through mitigation. NA-LA proposed the use of standard mitigation practices as defined in the Programmatic Agreement (PA) among the U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office, the New Mexico State Historic Preservation Office, and the Advisory Council on Historic Preservation Concerning Management of the Historic Properties at Los Alamos National Laboratory, Los Alamos, New Mexico. The PA states that adverse effects to NRHP-eligible buildings and structures will be resolved according to the standard practices defined in Part II, Section 10, of the Laboratory’s Cultural Resources Management Plan, A Plan for the Management of the Cultural Heritage at Los Alamos National Laboratory, New Mexico (Purtzer et al. 2019), and Section 2.B of Appendix D of the PA itself. The standard practice documentation package includes the following components: (1) Interior and exterior photography and production of archival-quality digital photographs; (2) Documentation and curation of historically significant equipment and artifacts; (3) A list of all known drawings for the property; (4) Reduced-scale reproductions of selected drawings for the property; (5) A location map that shows the location of the property relative to the entire Laboratory property; (6) Reproduction of historical TA maps; (7) A TA map that depicts the footprint of each eligible and non-eligible facility; and (8) An expanded historic context that uses oral-history interviews, if available. On March 3, 2020, the SHPO concurred with the adverse effect determination and the mitigation plan. The documentation package, as previously described, is provided in Volumes 1 and 2 of this report.

99 GENERAL AND MISCELLANEOUS↗

Technology Strategy Assessment: Findings from Storage Innovations 2030 Thermal Energy Storage

The concept of thermal energy storage (TES) can be traced back to early 19th century, with the invention of the ice box to prevent butter from melting. Modern TES development began with building heating and cooling and concentrated solar thermal technologies for power generation in the early 1900s and late 1970s, respectively. TES systems provide many advantages compared with other long-duration energy storage (LDES) technologies, which include low costs, long operational lives, high energy density, synchronous power generation capability with inertia that inherently stabilizes the grid, and the ability to output both heat and electricity. TES Use Cases TES technologies can couple with most renewable energy systems, including wind, photovoltaic, and concentrated solar thermal energy, and can be used for heat-to-heat, heat-to-electricity, electricity-to-heat, and electricity-to-electricity (bidirectional electricity) applications. The three types of TES that have heat as an input or output are grouped together for the purposes of this report. Retrofitting retired thermal power plants can be a potential cost-effective option for TES with electricity output because they both use a similar thermal-to-electricity type of conversion. Additionally, TES can directly serve heat demand for buildings and industrial processes, displacing fossil fuels to achieve broad decarbonization. Bidirectional Electricity Figure 1 shows a bidirectional electricity TES (ETES) architecture that is emerging as a prime technology for LDES at a grid scale. The ETES technology can utilize existing TES technology infrastructures, has no geological limitations (such as mountains and water for pumped storage hydro, underground natural caverns for compressed-air energy storage, etc.), and is capable of deployment anywhere in the United States and the world for broad uses. Particularly, ETES technology can be placed at retired fossil-fueled thermal power plants to reuse decommissioned assets, protect job security in associated communities, and provide resilient and high-inertia (i.e., spinning) power to the grid. Heat Input and Output There also are many ways to integrate TES within heat-to-electricity, heat-to-heat, and electricity-to-heat applications, such as those used in concentrating solar power (CSP), buildings, district heating, and industry process heat applications. These categories can be further classified for low- and high-temperature applications. High-temperature thermal energy storage (HTTES) heat-to-electricity TES applications are currently associated with CSP deployments for power generation. TES with CSP has been deployed in the Southwestern United States with rich solar resources and has proved its value to the electric grid. Electricity-to-heat and heat-to-heat HTTES applications present great potential for decarbonizing energy-intensive industrial process heat applications [8, 9], such as iron ore processing, iron smelting, cement production, glass manufacturing, mineral processing, and chemical production. Some industrial processes require process heat at temperatures > 1,400°C, so HTTES can be utilized to reduce fuel consumption in those processes through fuel, oxidizer, and process material pre-heating. Thermal energy storage for augmenting existing industrial process heat applications makes a much more attractive economic case because the energy penalty due to thermal-to-electric conversion is eliminated. Co-located applications of power production and heat also can add to the value stacking of integrating utility-scale TES; however, these scenarios are very case specific and not practically possible in many cases. These constraints are primarily attributed to the existing infrastructure being designed, developed, and constructed for many decades around the most economically feasible technologies, such as electricity and a selection of fossil fuels for heat input. Low-temperature TES can be utilized for building and district heating and cooling, as well as some process heat applications in electricity-to-heat and heat-to-heat configurations. Lower temperature TES (LTTES) can be added to heat pump equipment (electric input), either directly interacting with the refrigerant in the condenser or evaporator, or through a secondary heat transfer fluid. It also can be integrated in the building envelope or within the ducts of the heating, ventilation, and air conditioning (HVAC) system. Cost-effective integration of TES into buildings adds significant cost, and it is one of the key barriers preventing the commercialization and deployment of TES. The optimal strategy for integrating TES with buildings has yet to be determined for various applications of TES. Nevertheless, thermal storage materials are far less costly per unit of energy stored than electricity storage materials. This means that thermal storage has the potential to reduce the cost to society of energy storage.

25 ENERGY STORAGE↗

SPC-70646 Specification for Reactor Supplemental Shielding for Use in DOME

NRIC is developing the Demonstration of Microreactor Experiments (DOME) test bed at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC): to allow for testing of advanced reactors in support of future licensing and commercial operations. One such need is a neutron and photon radiation shielding system to protect personnel and equipment from harsh neutron and photon fluxes during reactor operations and post shut down operations, disassembly, and decommissioning.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Phase I Summary of Management Activities - Advanced Construction Technology Initiative Project

As the end of the year is approached, it is essential to review the National Reactor Innovation Center (NRIC) management activities undertaken during the Advanced Construction Technology Initiative (ACTI) project. The ACTI project was launched to support a transformation in nuclear energy construction, management, and deployment costs, enabling nuclear energy to make important contributions to the energy systems of the future. This transformation will increase the confidence of investors, energy system planners, policymakers, and ultimately consumers in the capability of nuclear energy to meet future needs; thus, it represents a critical element of advanced nuclear energy system demonstration. Development and/or demonstration project(s) will consider regulatory requirements for commercial nuclear implementation and will incorporate strategies to develop regulator experience and review of the technology. GE Hitachi (GEH), a leading player in the nuclear industry that offers a range of products and services including nuclear reactor design, fuel supply, and decommissioning solutions, submitted a proposal for the ACTI project. GEH was awarded the contract for the first phase of the project.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Status Report on Regulatory Criteria Applicable to the Use of Artificial Intelligence (AI) and Machine Learning (ML)

Although the interest in the use of artificial intelligence (AI) and machine learning (ML) in nuclear energy is increasing rapidly, at present their implementation is limited. This rapid increase in interest is not surprising considering that implementing AI and ML technology would allow for continuous monitoring, facilitate the implementation of predictive maintenance with optimized staffing plans, enable automation and autonomy opportunities that could drastically reduce fixed operation and maintenance costs, and provide training for operations and maintenance. Other industries are using AI for construction, and in the nuclear arena AI could provide great benefit in decommissioning activities. The ability of AI and ML to operate in real time vastly increases their potential impact. Before AI can be used in design, operations, or as a regulatory tool, the specifics on the regulations applicable to the use of AI for nuclear power applications need to be established. The difficulty is that the specific use cases will dictate the applicability of regulations. For example, even within the application domain associated with operations, the regulations might vary if the AI is used to create a virtual reference for plant operations or is used for training, optimization of maintenance intervals, prioritization of maintenance activities, etc. Different still is if the AI is to be used for design or setting technical specifications, which will introduce additional requirements. US Nuclear Regulatory Commission (NRC) licensing reviews are based on an applicant’s design meeting its performance assessment based on (1) safety goals and objectives, (2) deterministic and/or probabilistic analysis of accident scenarios, and (3) quantitative assessment of design alternatives against the safety goals and objectives using accepted engineering tools, methodologies, and performance criteria. The current regulatory framework does not explicitly address AI or autonomous control. However, as implementing AI technology will require the use of a digital platform, it must meet the requirements of an instrumentation and control (I&C) system. The regulatory requirements for AI, which will be incorporated into the I&C system, will be very dependent on how it is used (i.e., its functionality, safety classification, etc.). The licensing process is primarily risk-based with the identification of components and systems as nonsafety, important to safety, or safety related. A risk-informed approach allows further gradation of components and systems based on risk metrics such as core damage frequency or large early release fractions. Thus, the use cases and the risk categorization of impacted systems and components will determine the regulatory requirements. Regardless of how AI is used it presents new opportunities for risk-informing operating, maintenance, and regulatory decisions. Trustworthiness, transparency, and the ability to validate and verify the results will be paramount in showing that the systems and plant still meet their performance requirements. This report describes the results of research to identify regulatory implications of AI technologies and their uses. Specifically, this report reviews current regulatory guidance relevant to the application of AI for design (including design changes or new designs including advanced reactors), construction, operations, training, maintenance, research, testing, and as a regulatory tool. AI can be automated at different levels from purely informative purposes to autonomous controls. The focus of this review included determination of constraints on the application of AI technology, identification of any regulatory gaps or uncertainties, and clarification of anticipated technical basis information likely to be important for regulatory acceptance of these technologies. Currently, any use of AI at nuclear power plants is focused on nonsafety-related applications. The NRC and other regulatory bodies are evaluating providing guidance to address gaps rather than create new regulations to address the use of AI and ML. This approach seems to be the best to encourage AI development without adding regulatory uncertainty.

97 MATHEMATICS AND COMPUTING↗

Inspection Status Report of Site A/Plot M Report for 2023

The Site A/Plot M Decommissioned Reactor Site was inspected on June 6, 2023. Site A/Plot M is in the Palos Area Preserves, operated by the Forest Preserve District of Cook County. The site was found to be in good condition with negligible erosional concerns across the grass covered mound at Plot M. Landscaping timbers installed along the footpath of Plot M have been effective in reducing erosion down the eastern slope, thus, no additional timber steps are needed at this time. The bike trail, installed by Cook County Forest Preserve, located to the south and east of Plot M has helped to significantly reduce traffic at the site. The Site A and Plot M monuments were both replaced on May 1, 2021, and remain in good condition, despite a small amount of graffiti observed on both monuments at the time of the inspection. The 19 groundwater monitoring wells at Site A/Plot M were found to be secure and in good condition.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using National-Scale Data to Inform Coal Power Plant Redevelopment and Coal Community Revitalization Planning

In the United States, individual coal plants have high variation in their construction and operation. Coal plants commonly have multiple units, with different commissioning ages, operational position, and maintenance conditions – even multiple fuels. These units may be in changing states of utilization, with variation in productivity depending on economic contexts. Coal plants themselves may be temporarily offline, mothballed, retired, or decommissioned due to owner/operator portfolios or market conditions, and the current posture of the plant may be difficult to ascertain without local news sources (Tarekegne et al. 2021). Anticipated dates of plant closures are prospectively represented to regulators and to the Energy Information Administration (EIA), but may also experience uncertainty due to the engineering, environmental, economic and social complexity of closing a very large power plant. As noted in this report, closure of the first unit to the last within a single plant may span more than 20 years. Yet tracking and predicting the position of our nation’s coal fleets on a national scale is deeply important. In developing a case for federal datasets and an approach to building and curating these data, this report identified that data must have high fidelity at the plant-level to be meaningful in aggregate. Plant-scale detail is also a match for its application: national priorities in federal investment range from economic revitalization for coal plant communities to maintaining reliable electric grid operations. This document is organized into a statistical review of coal plant retirements, past and prospective, in the United States; trends in the relationship between closures and existing federal investment programs for community revitalization; and potential methods for accelerating site redevelopment through advanced geospatial analysis based on federal data.

01 COAL, LIGNITE, AND PEAT↗

Modelling the Liquid Waste Operation at the Savannah River Site

Modeling Successes Dounreay – Site Closure Optimization and Risk Reduction Re-structuring and streamlining a complex project plan to achieve site decommissioning in reduced time and at reduced cost, through automated task prioritization. Idaho AMWTP – Multi-stream Optimization Speeding up a complex facility with many process lines, by utilizing all of the process lines more efficiently and reducing overall plant downtime, by coordinating repairs and shutdowns. AWE –Waste Repackaging and Relocation Relocating schedule for waste material from an old storage facility to a new purpose-built one, safely, and in a timely fashion that removed the need to reassure the safety of the old facility. Sellafield – Effluent, Sludge and HAW Treatment Improving a wide range of chemical engineered processes including aqueous effluent treatment, chemically-reactive sludge management and waste vitrification processing. Strategic Petroleum Reserve – Cavern Management Linking chemistry models of petroleum prediction, through engineering cavern management to financial modeling of gasoline sales to benefit US government

Jung, Andrew W.↗

Experimental Testing of Personal Dosimetry Interference from a Portable X-ray Generator

The determination of the disposition route for a legacy drum in a nuclear facility at the Y-12 National Security Complex is supported by non-destructive testing of the drum and its contents. An advanced radiation measurements organization at the Y-12 National Security Complex proposed a series of active measurements using a portable x-ray generator, imaging the drum and its contents with 360-degree visualization. In rooms near the current storage location for the drum, Criticality Accident Alarm System (CAAS) annunciation is degraded, and Personal Radiation Dosimetry Instruments (PRDI’s) are routinely worn by personnel. The Y-12 Development Organization has procured advanced radiation detection devices and a variety of radiation sources for use in active measurements. These devices are being used to support Y-12 operations and safety engineering disciplines to safely address complex challenges throughout the complex. This paper presents the results of experimental testing of the PRDI’s used at Y-12 with the x-ray generator [1], and notes the unique utilization of a decommissioned facility for this work.

61 RADIATION PROTECTION AND DOSIMETRY↗