Search NASA⌕ Search

SEARCH · Search NASA

Results for “departures”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Performance Evaluation of Conflict-Free Trajectory Taxiing in Airport Ramp Area Using Fast-Time Simulations

The German Aerospace Center (DLR) and the National Aeronautics and Space Administration (NASA) have been collaborating to conduct joint research addressing future surface traffic management challenges. The surface management tool from DLR, called Taxi Routing for Aircraft: Creation and Controlling (TRACC), was adapted to be integrated in NASA's fast-time simulation environment called Surface Operations Simulator and Scheduler (SOSS). The research described in this paper 1) applied TRACC to trajectory-based ramp traffic management, where TRACC generates conflict-free aircraft trajectories in a congested ramp area, 2) investigated the feasibility of the concept through the integrated TRACC-SOSS fast-time simulation, and 3) evaluated the performance of the integrated system. For this activity, TRACC was adapted for ramp operations at Charlotte Douglas International Airport, called TRACC_PB (TRACC for pushback optimization). TRACC_PB provides four-dimensional taxi trajectories with a command speed profile for each aircraft following standard taxi routes within the ramp area. In this study, departures are given the Target Movement Area entry Times (TMATs) provided by the baseline surface metering scheduler based on NASA's Spot and Runway Departure Advisor (SARDA). TRACC_PB also calculates optimal pushback times for departures, as well as the times when arrivals shall enter the ramp, the Target Movement area Exit Times (TMETs). The initial results showed that the TRACC_PB successfully generated conflict-free trajectories for the ramp area taxi operations and improved taxiing efficiency compared to the baseline results. TRACC_PB aimed to provide conflict-free taxi routes avoiding any stops while taxiing. This resulted in longer gate hold times for departures and postponed throughput values compared to the baseline simulation without trajectory optimization. Having conflict-free routes without stoppage also created shorter taxi times but required renegotiation of the given TMATs. TRACC_PB also achieved reductions in both fuel consumption and engine emissions (17% for departures and 10% for arrivals), which correlate with the ramp taxi time reduction.

trajectory-based taxi operations↗

Exploring Management of Arrival Spacing Using Route Extensions with Terminal Spacing Tools

Airports with shared runway operations between arrivals and departures can experience severe departure gridlock and delays during a heavy arrival push due to insufficient gaps in the arrival stream for aircraft to depart. The problem is accentuated in situations when a large gap in the arrival spacing has to be created at the last minute due to wake vortex separation requirements. At LaGuardia airport, wake vortex separation problems arise when a heavy jet, such as a B757, departing on Runway 31 needs additional spacing between arrivals on Runway 22. A standard solution for controllers in many airports in situations such as this is to extend the downwind leg of arrival aircraft to create extra space between the arrivals. The question addressed in this paper is how such route extensions would work with terminal scheduling operations, namely (1) the automated Terminal Sequencing and Spacing (TSS) tools and (2) a new scheduling tool which increases the availability of gaps for departure aircraft (Departure Sensitive Arrival Spacing or DSAS). In a simulated LaGuardia airport (LGA) Terminal Radar Approach Control (TRACON) airspace, two new RNAV arrival routes were created along with extensions to these routes. The arrival route from the south had a downwind leg extension near the airport in the final sector. The arrival route from the north had an extension in a feeder sector further from the airport. An exploratory one-hour run with the route extensions was compared to an hour run without the extensions. Topics included in the paper are 1) how the route extensions were developed, 2) a procedure outlining how the aircraft could be scheduled to the extensions and who would do it, and 3) the results of the exploratory run compared to the original run without the extensions. The results indicated that the extended downwind leg route helped to create a B757 departure gap in the middle of a packed arrival stream, resulting in a reduction of 11 minutes in average wait time for the B757s, but at a cost of increased controller self-reported workload from low to moderate.

time based flow management↗

Analyzing Double Delays at Newark Liberty International Airport (EWR)

When weather or congestion impacts the National Airspace System, multiple different Traffic Management Initiatives can be implemented, sometimes with unintended consequences. One particular perceived inequity that is commonly identified is in the interaction between Ground Delay Programs (GDPs) and time based scheduling of internal departures by the Traffic Management Advisor (TMA) (now operationally superseded by the FAA's the Time-Based Flow Management system). Internal departures under TMA scheduling can take large GDP delays, followed by large TMA scheduling delays, because they cannot easily fit into the arrival flow at the runway. In this paper we examine the causes of these double delays through an analysis of arrival operations at Newark Liberty International Airport (EWR) from June to August 2010. TMA scheduling delays are found to be generally higher than TMA airborne metering delays, regardless of prior GDP delays. Depending on how the double delay is defined, between 42 and 62 of all internal departures in GDP and TMA scheduling experienced double delays in this period. A deep dive into the data reveals that contributors to double delays include upstream flights departing before their Expect Departure Clearance Times (EDCTs); differences in the rates used for setting EDCTs and TMA Scheduled Times of Arrival; differences in the arrival demand expected based on EDCTs and the arrival demand entering TMA; and shorter en route times between takeoff and entry into TMA than assumed in the calculation of flight EDCTs, all of which undermine the sequencing and spacing underlying flight EDCTs. Double delays are also found to coincide with periods in which the virtual runway arrival queue being served by a TMA is large, there are periods of high demand relative to capacity, and there are high airborne metering delays. Data mining techniques are used to confirm that each of these factors contribute to the occurrence of double delay andor high internal departure scheduling delay across three months of data from June to August 2010. Predictors of the occurrence of double delay and high TMA scheduling delay are built using logistic regression, providing prediction accuracies of 69 and 73, respectively.

traffic flow management↗

ATD-2 TFDM Terminal Publication Service (TTP)

Learn the many benefits of the newest SWIM feed from the surface system. This will discuss current options to onboard with this feed, allow participants to ask questions and provide some examples of how the data can be used. Service Includes Flight Data Individual flight updates containing flight identifiers, targeted times, actual times, runway, parking gate, spot, departure fix (predicted, assigned, actual as appropriate), flight states, and more. Airport Information Airport configurations, airport and runway rates, ramp closures, runway closures, taxiway closures. Traffic Management Restrictions Call for Release programs departure MIT/MINIT restrictions, departure stop/ground stop programs. Along with list of impacted flights for each. Flight Delay Airport and runway delay by arrival, departure, and total. Operational Metrics Metrics on airport throughput and individual flight metrics. Surface Metering Program SMP start / end times, metering constraint type / details, updates to existing programs, TMAT compliance window, departure queue length, and more.

Gorman, Shawn M.↗

Airspace Technology Demonstration 2 (ATD-2) Phase 2 Technology Description Document (TDD)

This Technology Description Document (TDD) provides an overview of the technology for the Phase 1 Baseline and Phase 2 Fused demonstrations of the Integrated Arrival, Departure, and Surface (IADS) prototype system of the National Aeronautics and Space Administration’s (NASA) Airspace Technology Demonstration 2 (ATD-2) project, which has been demonstrated since October of 2017 at Charlotte Douglas International Airport (CLT). Development, integration, and field demonstration of relevant technologies of the IADS system directly address recommendations made by the Next Generation Air Transportation System (NextGen) Integration Working Group (NIWG) on Surface and Data Sharing and the Surface Collaborative Decision Making (Surface CDM) concept of operations developed jointly by the Federal Aviation Administration (FAA) and aviation industry partners. NASA has been developing the IADS traffic management system under the ATD-2 project in coordination with the FAA, flight operators, CLT airport operators, and the National Air Traffic Controllers Association (NATCA). The primary goal of ATD-2 is to improve the predictability and operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation’s most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 project is a 5-year research activity beginning in 2015 and extending through 2020. The Phase 1 Baseline IADS capability resulting from the ATD-2 research has been demonstrated at the CLT airport since the beginning of October 2017. Phase 1 provided data exchange and integration with the initial demonstration of the integrated system of strategic and tactical scheduling, collaborative tactical surface metering, tactical departure scheduling to an en route meter point and overhead stream insertion, initial integration of a TFDM SWIM prototype feed, and an early implementation prototype of a Terminal Flight Data Manager (TFDM) Electronic Flight Data (EFD) system. The strategic surface scheduling element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 The Phase 2 Fused IADS system provided substantial updates to baseline IADS Demonstration capability. Improvements were made to the IADS modeler; tactical surface scheduling, and metering; tactical departure scheduling for overhead stream insertion; Electronic Flight Data (EFD) and the integration with the FAA Advanced Electronic Flight Strip (AEFS); RTC/RMTC, and departure trajectories. New capabilities included a TFDM SWIM prototype feed and delivery of IADS data via the TFDM Terminal Publication (TTP) service of the FAA’s SWIM system; strategic surface scheduling and metering as well as fusion with tactical surface metering; integration and ingestion of data from TTP-connected Mobile App and texting industry for General Aviation (GA) flights; and expansion of airspace deployments to include adjacent Center automation, in particular interface with the Atlanta Center (ZTL) arrival metering TBFM system to evaluate pre-scheduling of flights. Improvements in Data Analysis and System Health (DASH) monitoring and updates were completed as well.

Talebi, Ehsan↗

Performance Evaluation of Individual Aircraft Based Advisory Concept for Surface Management

Surface operations at airports in the US are based on tactical operations, where departure aircraft primarily queue up and wait at the departure runways. NASA's Spot And Runway Departure Advisor (SARDA) tool was developed to address these inefficiencies through Air Traffic Control Tower advisories. The SARDA system is being updated to include collaborative gate hold, either tactically or strategically. This paper presents the results of the human-in-the-loop evaluation of the tactical gate hold version of SARDA in a 360 degree simulated tower setting. The simulations were conducted for the east side of the Dallas/Fort Worth airport. The new system provides gate hold, ground controller and local controller advisories based on a single scheduler. Simulations were conducted with SARDA on and off, the off case reflecting current day operations with no gate hold. Scenarios based on medium (1.2x current levels) and heavy (1.5x current levels) traffic were explored. Data collected from the simulation was analyzed for runway usage, delay for departures and arrivals, and fuel consumption. Further, Traffic Management Initiatives were introduced for a subset of the aircraft. Results indicated that runway usage did not change with the use of SARDA, i.e., there was no loss in runway throughput as compared to baseline. Taxiing delay was significantly reduced with the use of advisory by 45% in medium scenarios and 60% in heavy. Arrival delay was unaffected by the use of advisory. Total fuel consumption was also reduced by 23% in medium traffic and 33% in heavy. TMI compliance appeared unaffected by the advisory

departure metering↗

Charlotte - EDC Evaluation and Demonstration (CEED) Human-in-the-Loop Results Briefing to ATD-2 FAA Partners

The Charlotte EDC Evaluation and Demonstration (CEED) was the first Human-In-The-Loop experiment under the Air Traffic Management Technology Demonstration-2 (ATD-2) project. The purpose of the study was fourfold: 1) to establish a simulation environment (Charlotte) for airspace operations for ATD-2 technology, 2) to simulate current-day departures and arrival operations, 3) to assess the impact of current Traffic Management Initiatives (TMI) on Charlotte (CLT) departure flows and en route operations in Washington (ZDC) and Atlanta Centers (ZTL), and 4) to assess the impact of departure takeoff time compliance on airspace operations. The experimental design compared 3 TMIs and 2 compliance levels. Fourteen FAA retired controllers participated in the simulation. In addition, two Traffic Management Coordinators from ZTL and ZDC managed traffic flows. Surface and airborne delays, control efficiency, throughput, realism, workload, and acceptability were assessed and will be compared across the experimental conditions. Participants rated the simulation as very realistic. Results indicate that different TMIs have different impacts on surface and airspace delay. Departure compliance indicates partial benefits to sector complexity and controller workload. This simulation will provide an initial assessment of the tactical scheduling problems that the ATD-2 technology will address in the near term.

airspace technology demonstration 2↗

Transient Pressure Interference During CO2 Injection in Saline Aquifers

Abstract CO2 injection in subsurface geological formations (e.g. deep saline aquifers) causes pressure perturbations over a large area surrounding the injection well. Observation wells are widely considered in geologic CO2 storage (GCS) projects where the pressure perturbation induced by CO2 injection is measured. In this work, we use analytical and numerical modeling tools along with field data to examine the pressure behavior in GCS projects before and after CO2 arrival at an observation well. Prior to CO2 arrival, a baseline pressure trend is established which corresponds to single-phase brine flow across the observation well (approximated by Theis solution). Therefore, analysis of early-time pressure data is straightforward, provides the single-phase flow characteristics (mobility and storativity), and helps establishing a baseline pressure change that can be extended beyond the single-phase flow period at the observation well. Upon CO2 arrival, a departure from this baseline trend is expected. For the pressure to detect the CO2 arrival at an observation well, the departure from baseline pressure behavior must be significant and well above the background noise levels. We use existing analytical models to determine the strength of the expected pressure departure signal from the baseline trend upon CO2 arrival. The strength of the expected pressure departure is found to be directly proportional to the mobility ratio. Accordingly, we establish a criterion to determine whether the pressure at an observation well can detect the CO2 arrival. We present an analysis approach through application to synthetic and field data and show the characteristic pressure behavior before and after CO2 arrival. We show that while generally the pressure can be either above or below the expected baseline pressure trend, it would be likely above the baseline upon CO2 arrival. This is because the mobility ratio becomes less than unity after CO2 arrival. We show that depending on the reservoir characteristics, changes in the pressure trend may or may not be sufficient to detect the CO2 arrival.

Engineering↗

Elliptic Capture Orbits for Missions to the Near Planets

Elliptic capture orbits around Mars and Venus have often been considered as means for reducing arrival and departure energy requirements for two-way missions. It had also generally been feared that the energy savings obtained by capturing a spacecraft into a highly elliptical orbit (rather than a near circular orbit of the same periapsis) would largely be offset by the penalties incurred in aligning the semi-major axis of the ellipse in such a way as to obtain the proper orientation of the departure hyperbola. This paper, presents the results of an analysis which takes into consideration the penalties arising from the requirement to match the orientation of the elliptical orbit with the asymptote of the departure hyperbola. The scientific aspects of elliptical orbits around the target planet are discussed, and it is shown that such orbits exhibit characteristics which may be considered advantageous or disadvantageous depending on the purpose of the mission. Alignment of ' the semi-major axis of the capture, ellipse relative to the, asymptote of the escape hyperbola was found not to be a critical requirement since the kinetic energy remains high over a substantial portion of the elliptical capture orbit. This 'means that the escape stage can operate efficiently even when ignited at some angle from the true periapsis point. Considerable freedom in choosing this angle is available at little propulsive cost. The resulting latitude in the choice of angles between arrival and escape asymptotes makes it possible to consider a wide variety of interplanetary transfers and planetary staytimes without the need for separate propulsive maneuvers to realign the capture ellipse before departure., Special consideration has also been g1ven to plane change maneuvers around the planet. These may be required for reasons of orbit dynamics or scientific experimentation and are not uniquely tied to elliptical captures. The sensitivity of the mass of the excursion module to the eccentricity of the capture orbit is discussed and mass-penalty diagrams are presented. It is shown that these penalties do not materially offset the large gains obtained through the use of the elliptical capture mode.

Casal, Federico G.↗

A high resolution spatial and temporal multiple Doppler analysis of a microburst and its application to aircraft flight simulation

Multiple Doppler radar data collected during the Joint Airport Weather Studies (JAWS) Project is used to synthesize the three-dimensional wind in the region of a microburst. The particular microburst used in this study is the strongest one to date for which three-dimensional winds have been recovered. As a diagnostic tool, a six-DOF numerical aircraft model having characteristics similar to 727 series aircraft is used to investigate jet transport aircraft response to observed microburst winds during simulated approaches and departures. Simple pilot control laws are used to adjust thrust, pitch, roll, and yaw so as to maintain given approach or departure parameters. Generally, when horizontal wind shear along the approach or departure path is 0.01/s or greater, the model is unable to maintain the desired approach path and suffers a significant reduction in climb performance during a go-around or departure. Although the mean wind shear along a path gives a good qualitative measure of the wind shear threat to a jet transport, different paths with similar mean shears can yield markedly different results, as do the same paths through the microburst at different times. These findings are a direct consequence of the fine temporal and spatial scale of microburst winds. During any given modeled aircraft traverse through the region of highest horizontal shear, time variations in the microburst wind field are shown to have an insignificant effect on the modeled flight path. This is because the traverse period is short (30 s) compared to the lifetime of a microburst (300-600 s).

Elmore, K. L.↗

Model flight tests of a spin-resistant trainer configuration

Powered, radio-controlled flight tests were conducted on a 1/4-scale model of a spin-resistant trainer configuration to determine the stall departure and spin resistance characteristics provided by an outboard wing leading-edge droop modification. The model was instrumented to provide quantitative as well as qualitative information on flight characteristics. Flight test results indicated that the unmodified configuration (wing leading-edge droop off) exhibited an abrupt, uncontrollable roll departure at the stall. With the outboard wing leading-edge droop installed, the modified configuration exhibited flight characteristics that were resistant to stall departure and spin entry. The stall departure and spin resistance characteristics of the modified configuration were demonstrated in flight maneuvers that included idle-power stalls, full-power stalls, sideslip stalls, and accelerated stalls.

Yip, Long P.↗

Preliminary Findings: Issues in Surface Movement

The final report for the grant is presented. The recent goals for this project have been: (1) To identify common surface movement challenges which affect the airlines and Air Traffic Control; (2) To map out possible solutions to these challenges; (3) To start generalizing about the information we are receiving so that major, abstract categories of challenges and potential solutions will begin to emerge. In particular, there are several areas of opportunity which are beginning to emerge from the data, dealing with the need for: (1) Tools to support information exchange regarding priorities (both within an individual airline and between the ATC tower and airlines). Such priorities include both concerns affecting departure throughput as well as the ordering of departures to accommodate other airline considerations; (2) Planning tools to help ATC and airline Ramp staff deal with information about priorities; (3) Implementation of strategies to enable greater flexibility in queueing flights for departures; (4) Tools to provide better coordination and situation awareness during taxiing (within an airline as well as between airlines and between the airlines); (5) Tools to support planning and to deal with the interactions between departures and arrivals. Thus far, the initial interviews and observations at three airlines and two ATC facilities have been completed.

Smith, Philip J.↗

Anchorage Arrival Scheduling Under Off-Nominal Weather Conditions

Weather can cause flight diversions, passenger delays, additional fuel consumption and schedule disruptions at any high volume airport. The impacts are particularly acute at the Ted Stevens Anchorage International Airport in Anchorage, Alaska due to its importance as a major international portal. To minimize the impacts due to weather, a multi-stage scheduling process is employed that is iteratively executed, as updated aircraft demand and/or airport capacity data become available. The strategic scheduling algorithm assigns speed adjustments for flights that originate outside of Anchorage Center to achieve the proper demand and capacity balance. Similarly, an internal departure-scheduling algorithm assigns ground holds for pre-departure flights that originate from within Anchorage Center. Tactical flight controls in the form of airborne holding are employed to reactively account for system uncertainties. Real-world scenarios that were derived from the January 16, 2012 Anchorage visibility observations and the January 12, 2012 Anchorage arrival schedule were used to test the initial implementation of the scheduling algorithm in fast-time simulation experiments. Although over 90% of the flights in the scenarios arrived at Anchorage without requiring any delay, pre-departure scheduling was the dominant form of control for Anchorage arrivals. Additionally, tactical scheduling was used extensively in conjunction with the pre-departure scheduling to reactively compensate for uncertainties in the arrival demand. For long-haul flights, the strategic scheduling algorithm performed best when the scheduling horizon was greater than 1,000 nmi. With these long scheduling horizons, it was possible to absorb between ten and 12 minutes of delay through speed control alone. Unfortunately, the use of tactical scheduling, which resulted in airborne holding, was found to increase as the strategic scheduling horizon increased because of the additional uncertainty in the arrival times of the aircraft. Findings from these initial experiments indicate that it is possible to schedule arrivals into Anchorage with minimal delays under low-visibility conditions with less disruption to high-cost, international flights.

Grabbe, Shon↗

NextGen Operational Improvements: Will they Improve Human Performance

Modernization of the National Airspace System depends critically on the development of advanced technology, including cutting-edge automation, controller decision-support tools and integrated on-demand information. The Next Generation Air Transportation System national plan envisions air traffic control tower automation that proposes solutions for seven problems: 1) departure metering, 2) taxi routing, 3) taxi and runway scheduling, 4) departure runway assignments, 5) departure flow management, 6) integrated arrival and departure scheduling and 7) runway configuration management. Government, academia and industry are simultaneously pursuing the development of these tools. For each tool, the development process typically begins by assessing its potential benefits, and then progresses to designing preliminary versions of the tool, followed by testing the tool's strengths and weaknesses using computational modeling, human-in-the-loop simulation and/or field tests. We compiled the literature, evaluated the methodological rigor of the studies and served as referee for partisan conclusions that were sometimes overly optimistic. Here we provide the results of this review.

Beard, Bettina L.↗

A Concept and Implementation of Optimized Operations of Airport Surface Traffic

This paper presents a new concept of optimized surface operations at busy airports to improve the efficiency of taxi operations, as well as reduce environmental impacts. The suggested system architecture consists of the integration of two decoupled optimization algorithms. The Spot Release Planner provides sequence and timing advisories to tower controllers for releasing departure aircraft into the movement area to reduce taxi delay while achieving maximum throughput. The Runway Scheduler provides take-off sequence and arrival runway crossing sequence to the controllers to maximize the runway usage. The description of a prototype implementation of this integrated decision support tool for the airport control tower controllers is also provided. The prototype decision support tool was evaluated through a human-in-the-loop experiment, where both the Spot Release Planner and Runway Scheduler provided advisories to the Ground and Local Controllers. Initial results indicate the average number of stops made by each departure aircraft in the departure runway queue was reduced by more than half when the controllers were using the advisories, which resulted in reduced taxi times in the departure queue.

Jung, Yoon C.↗

Space Launch System Upper Stage Technology Assessment

The Space Launch System (SLS) is envisioned as a heavy-lift vehicle that will provide the foundation for future beyond low-Earth orbit (LEO) exploration missions. Previous studies have been performed to determine the optimal configuration for the SLS and the applicability of commercial off-the-shelf in-space stages for Earth departure. Currently NASA is analyzing the concept of a Dual Use Upper Stage (DUUS) that will provide LEO insertion and Earth departure burns. This paper will explore candidate in-space stages based on the DUUS design for a wide range of beyond LEO missions. Mission payloads will range from small robotic systems up to human systems with deep space habitats and landers. Mission destinations will include cislunar space, Mars, Jupiter, and Saturn. Given these wide-ranging mission objectives, a vehicle-sizing tool has been developed to determine the size of an Earth departure stage based on the mission objectives. The tool calculates masses for all the major subsystems of the vehicle including propellant loads, avionics, power, engines, main propulsion system components, tanks, pressurization system and gases, primary structural elements, and secondary structural elements. The tool uses an iterative sizing algorithm to determine the resulting mass of the stage. Any input into one of the subsystem sizing routines or the mission parameters can be treated as a parametric sweep or as a distribution for use in Monte Carlo analysis. Taking these factors together allows for multi-variable, coupled analysis runs. To increase confidence in the tool, the results have been verified against two point-of-departure designs of the DUUS. The tool has also been verified against Apollo moon mission elements and other manned space systems. This paper will focus on trading key propulsion technologies including chemical, Nuclear Thermal Propulsion (NTP), and Solar Electric Propulsion (SEP). All of the key performance inputs and relationships will be presented and discussed in light of the various missions. For each mission there are several trajectory options and each will be discussed in terms of delta-v required and transit duration. Each propulsion system will be modeled, sized, and judged based on their applicability to the whole range of beyond LEO missions. Criteria for scoring will include the resulting dry mass of the stage, resulting propellant required, time to destination, and an assessment of key enabling technologies. In addition to the larger metrics, this paper will present the results of several coupled sensitivity studies. The ultimate goals of these tools and studies are to provide NASA with the most mass-, technology-, and cost-effective in-space stage for its future exploration missions.

Holladay, Jon↗

Throughput Benefit Assessment for Tactical Runway Configuration Management (TRCM)

The System-Oriented Runway Management (SORM) concept is a collection of needed capabilities focused on a more efficient use of runways while considering all of the factors that affect runway use. Tactical Runway Configuration Management (TRCM), one of the SORM capabilities, provides runway configuration and runway usage recommendations, monitoring the active runway configuration for suitability given existing factors, based on a 90 minute planning horizon. This study evaluates the throughput benefits using a representative sample of today's traffic volumes at three airports: Memphis International Airport (MEM), Dallas-Fort Worth International Airport (DFW), and John F. Kennedy International Airport (JFK). Based on this initial assessment, there are statistical throughput benefits for both arrivals and departures at MEM with an average of 4% for arrivals, and 6% for departures. For DFW, there is a statistical benefit for arrivals with an average of 3%. Although there is an average of 1% benefit observed for departures, it is not statistically significant. For JFK, there is a 12% benefit for arrivals, but a 2% penalty for departures. The results obtained are for current traffic volumes and should show greater benefit for increased future demand. This paper also proposes some potential TRCM algorithm improvements for future research. A continued research plan is being worked to implement these improvements and to re-assess the throughput benefit for today and future projected traffic volumes.

Phojanamongkolkij, Nipa↗

Orbital Transfer Techniques for Round-Trip Mars Missions

The human exploration of Phobos and Deimos or the retrieval of a surface sample launched to low-Mars orbit presents a highly constrained orbital transfer problem. In general, the plane of the target orbit will not be accessible from the arrival or departure interplanetary trajectories with an (energetically optimal) tangential burn at periapsis. The orbital design is further complicated by the addition of a high-energy parking orbit for the relatively massive Deep Space Vehicle to reduce propellant expenditure, while the crew transfers to and from the target orbit in a smaller Space Exploration Vehicle. The proposed strategy shifts the arrival and departure maneuvers away from periapsis so that the apsidal line of the parking orbit lies in the plane of the target orbit, permitting highly efficient plane change maneuvers at apoapsis of the elliptical parking orbit. An apsidal shift during the arrival or departure maneuver is approximately five times as efficient as maneuvering while in Mars orbit, thus significantly reducing the propellant necessary to transfer between the arrival, target, and departure orbits.

human missions↗