Search NASA⌕ Search

SEARCH · Search NASA

Results for “deployable entry system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Advanced Supersonic Parachute Inflation Research and Experiment-2 (ASPIRE2) Flight Mechanics Modeling and Simulation

Introduction: The Advanced Supersonic Para-chute Inflation Research Experiment-2 (ASPIRE2) program is a sounding rocket flight test to be conducted at Wallops Island, VA in early 2025. This program is a risk mitigation exercise for the Mars Sample Retrieval Lander (MSRL) program and builds upon the success of the 2017 & 2018 ASPIRE program, [1,2]. While the ASPIRE program certified the strengthened 21.5 m diameter disk-gap-band (DGB) deployed at Mach 1.7, ASPIRE2 will certify a 24 m diameter DGB deployed at Mach 2.1. The need to certify this increased parachute performance is driven the increased lander mass for MSRL; over 50% increase in comparison to M2020. Modeling: Like its predecessor, ASPIRE2 is developing a multi-body flight dynamics simulation to predict parachute dynamics and aide in designing the flight test that will target Mars-relevant flight conditions, as shown in Figure 1. This work de-scribes the parachute modeling, flight mechanics simulations (from payload separation to splash-down), and design trades used to prepare for the 2025 ASPIRE2 flight. Discussed herein are comparisons between ASPIRE and ASPIRE2, noting key differences in the parachute modeling and vehicle configuration. A study on the attitude control system performance impacts with respect to payload section design will also be presented. This work will quantify the pre-flight parachute performance in the presence of uncertainties, such as those associated with the separation from the sounding rocket, atmosphere, the parachute system, and vehicle mass. The pre-flight predictions will include Monte Carlo analyses, powered by the flight mechanics simulations to show the ASPIRE2 vehicle performance in meeting program requirements on parachute deployment conditions (Mach & dynamic pressure), parachute loads, vehicle attitude at key milestones, and the vehicle splashdown conditions.

Entry Descent and Landing↗

IRVE-3 Post-Flight Reconstruction

The Inflatable Re-entry Vehicle Experiment 3 (IRVE-3) was conducted from the NASA Wallops Flight Facility on July 23, 2012. Launched on a Black Brant XI sounding rocket, the IRVE-3 research vehicle achieved an apogee of 469 km, deployed and inflated a Hypersonic Inflatable Aerodynamic Decelerator (HIAD), re-entered the Earth's atmosphere at Mach 10 and achieved a peak deceleration of 20 g's before descending to splashdown roughly 20 minutes after launch. This paper presents the filtering methodology and results associated with the development of the Best Estimated Trajectory of the IRVE-3 flight test. The reconstructed trajectory is compared against project requirements and pre-flight predictions of entry state, aerodynamics, HIAD flexibility, and attitude control system performance.

Olds, Aaron D.↗

AERACEPT (Aerosol Rapid Analysis Combined Entry Probe/sonde Technology): Enabling Technology for Planetary Atmospheric Science Probes

Aerosols –clouds, hazes, and dusts –are a key part of planetary mass and energy balance, but difficult to study remotely. Current technology limits in situ measurements to once-in-a-lifetime flagship missions, which is not enough to characterize such highly dynamic systems. AERACEPT (AErosol Rapid Analysis Combined Entry Probe/sonde Technology) is an early-stage technology allowing asingle aeroshell body toact as both anentry vehicle and aerosol-samplingpassivedescent sonde, using the aeroshell’sown velocityto drive aerosol capture and separationthrough a series of embedded inlets.It takes advantage ofrecently developed thermal protection materials (3D-CC and 3MDCP)in combination withheritage aerosol sampling technologies fromboth planetary and airborne science (high-speed inlets and particle separation). By eliminating the need for heat shield separation, deployable parachutes, ordescent control, AERACEPT reducesthe mass, volume, and complexity ofplanetary aerosol sampling. Verifying AERACEPT’s performance involves modeling interdependencies between the size and geometry of the sampling inlets, the material response of the hypersonic phase of entry, the thermal conditions throughout the probe’s descent, the subsonic flow and particle sampling efficiency, the needed amount of sample, andthe cadence at which the sample can be analyzed. AERACEPT’s current predictions, using the Nephele Venus cloud mission concept (sampling between 63km to 39km, all subsonic) indicates AERACEPT can obtain >20 μL of particle material (roughly 10x the limit of detection) from droplets larger than 0.2 μm, with sample heating limited to <15 K above ambient. Validation testing for the thermal material response model has recently been performed at the UIUC Plasmatron facility, and for the flow and particle capture models is planned for this fall at the Ames Fluid Mechanics Laboratory.

AERACEPT↗

High Performance, Web-Based, Real-Time Telemetry Visualization for Deep Space Mission Support and Operations

The Jet Propulsion Laboratory’s Mission ControlSystems Section and Mobility and Robotic Systems Section havepartnered to developed a high-performance telemetry visualizationsystem, based on our mature, web-based, 3D visualizationsoftware technology, that provides mission trajectory designers,operations personnel and reconstruction analysts with a highlyaccurate, re-usable, multi-mission solution to interactively visualizeresults from Entry, Descent and Landing (EDL) simulations,real-time mission test beds, live telemetry streams during criticalmission events, such as landing, as well as post-event reconstructionanalysis. This work builds on previous mission visualizationsystems that we have deployed for a variety of flight missions andJPL organizations including NASA’s Mars Science Laboratory(MSL), NASA’S Low Density Supersonic Decelerator (LDSD),NASA’s Soil Moisture Active Passive (SMAP), JPL’s MoonRiseLunar sample return proposal. JPL’s mission design teams, JPL’sOffice of Naval Research tasks, and JPL’s Education and PublicOutreach Office.

Wenzel, Sean↗

An Overview of NASA's Current Materials Development Efforts for Mars EDL

Current roadmaps point to landing heavy masses (cargo, followed by manned vehicles) on Mars in the 2030's and the existing entry, descent and landing (EDL) technology will not be sufficient to facilitate such missions. In 2009 the Exploration Technology Development Program (ETDP) established the Entry, Descent and Landing Technology Development Project (EDL TDP), to be managed programmatically at Langley Research Center (LaRC) and technically a Ames Research Center (ARC). The purpose of the project is to further the technologies required to land heavy (approximately 40 metric ton) masses on Mars to facilitate exploration. The EDL TDP contains three technical elements. They are: 1) Thermal Protection Systems (TPS) development 2) Modeling and Tools (MAT) development 3) Supersonic Retropropulsion (SRP) development The primary goals of the EDL TDP TPS element is to design and develop TPS materials capable of withstanding the severe aerothermal loads associated with aerocapture and entry into the Martian atmosphere while significantly decreasing the TPS mass fraction contribution to the entry system. Significant advancements in TPS materials technology are needed in order to enable heavy mass payloads to be successfully landed on the Martian surface for robotic precursors and subsequent human exploration missions. The EDL TDP TPS element is further divided into two different TPS concepts for Mars EDL those being: 1) Rigid TPS for a mid L/D aeroshell with the capability to withstand dual pulsed heating environments as high as 500 W/square cm for aerocapture and 130 W/square cm for entry 2) Flexible TPS for a deployable aerodynamic decelerator with the capability to withstand dual pulsed heating environments as high as 120 W/square cm for aerocapture and 30 W/square cm for entry NASA, along with its vendors, has begun developing and testing materials for each of the deceleration approaches. These include multi-layer rigid ablators and flexible ablative materials. In order to model the response of these types of materials, new and improved modeling techniques will be required. This presentation will outline the types of materials that are under development and illustrate the need for advancement in modeling of ablative materials.

Beck, Robin A.↗

Experimental Hypersonic Aerodynamic Characteristics of the Space Shuttle Orbiter for a Range of Damage Scenarios

Aerodynamic tests in support of the Columbia accident investigation were conducted in two hypersonic wind tunnels at the NASA Langley Research Center, the 20-Inch Mach 6 Air Tunnel and the 20-Inch Mach 6 CF4 Tunnel. The primary purpose of these tests was to measure the forces and moments generated by a variety of outer mold line alterations (damage scenarios) using 0.0075-scale models of the Space Shuttle Orbiter (approximately 10 inches in length). Simultaneously acquired global heat transfer mappings were obtained for a majority of the configurations tested. Test parameters include angles of attack from 38 to 42 deg, unit Reynolds numbers from 0.26 to 3.0 x10^6 per foot, and normal shock density ratios of 5 (Mach 6 air) and 12 (Mach 6 CF4). The damage scenarios evaluated included asymmetric boundary layer transition, gouges in the windward surface acreage thermal protection system tiles, wing leading edge damage (partially and fully missing reinforced carbon-carbon (RCC) panels), holes through the wing from the windward surface to the leeside, deformation of the wing windward surface, and main landing gear door and/or gear deployment. The aerodynamic data were compared to the magnitudes and directions observed in flight, and the heating images were evaluated in terms of the location of the generated disturbances and how these disturbance might relate to the response of discrete gages on the Columbia Orbiter vehicle during entry. The measured aerodynamic increments were generally small in magnitude, as were the flight-derived values during most of the entry. Asymmetric boundary layer transition (ABLT) results were consistent with the flight-derived Shuttle ABLT model, but not with the observed flight trends for STS-107. The partially missing leading edge panel results best matched both the early aerodynamic and heating trends observed in flight. A progressive damage scenario is presented that qualitatively matches the flight observations for the full entry.

Brauckman, Gregory J.↗

Prototyping Operational Autonomy for Space Traffic Management

Current state of the art in Space Traffic Management (STM) relies on a handful of providers for surveillance and collision prediction, and manual coordination between operators. Neither is scalable to support the expected 10x increase in spacecraft population in less than 10 years, nor does it support automated manuever planning. We present a software prototype of an STM architecture based on open Application Programming Interfaces (APIs), drawing on previous work by NASA to develop an architecture for low-altitude Unmanned Aerial System Traffic Management. The STM architecture is designed to provide structure to the interactions between spacecraft operators, various regulatory bodies, and service suppliers, while maintaining flexibility of these interactions and the ability for new market participants to enter easily. Autonomy is an indispensable part of the proposed architecture in enabling efficient data sharing, coordination between STM participants and safe flight operations. Examples of autonomy within STM include syncing multiple non-authoritative catalogs of resident space objects, or determining which spacecraft maneuvers when preventing impending conjunctions between multiple spacecraft. The STM prototype is based on modern micro-service architecture adhering to OpenAPI standards and deployed in industry standard Docker containers, facilitating easy communication between different participants or services. The system architecture is designed to facilitate adding and replacing services with minimal disruption. We have implemented some example participant services (e.g. a space situational awareness provider/SSA, a conjunction assessment supplier/CAS, an automated maneuver advisor/AMA) within the prototype. Different services, with creative algorithms folded into then, can fulfil similar functional roles within the STM architecture by flexibly connecting to it using pre-defined APIs and data models, thereby lowering the barrier to entry of new players in the STM marketplace. We demonstrate the STM prototype on a multiple conjunction scenario with multiple maneuverable spacecraft, where an example CAS and AMA can recommend optimal maneuvers to the spacecraft operators, based on a predefined reward function. Such tools can intelligently search the space of potential collision avoidance maneuvers with varying parameters like lead time and propellant usage, optimize a customized reward function, and be implemented as a scheduling service within the STM architecture. The case study shows an example of autonomous maneuver planning is possible using the API-based framework. As satellite populations and predicted conjunctions increase, an STM architecture can facilitate seamless information exchange related to collision prediction and mitigation among various service applications on different platforms and servers. The availability of such an STM network also opens up new research topics on satellite maneuver planning, scheduling and negotiation across disjoint entities.

space traffic management↗

Nano-ADEPT Aeroloads Wind Tunnel Test

A wind tunnel test of the Adaptable Deployable Entry and Placement Technology (ADEPT) was conducted in April 2015 at the US Army's 7 by10 Foot Wind Tunnel located at NASA Ames Research Center. Key geometric features of the fabric test article were a 0.7 meter deployed base diameter, a 70 degree half-angle forebody cone angle, eight ribs, and a nose-to-base radius ratio of 0.7. The primary objective of this wind tunnel test was to obtain static deflected shape and pressure distributions while varying pretension at dynamic pressures and angles of attack relevant to entry conditions at Earth, Mars, and Venus. Other objectives included obtaining aerodynamic force and moment data and determining the presence and magnitude of any dynamic aeroelastic behavior (buzz/flutter) in the fabric trailing edge. All instrumentation systems worked as planned and a rich data set was obtained. This paper describes the test articles, instrumentation systems, data products, and test results. Four notable conclusions are drawn. First, test data support adopting a pre-tension lower bound of 10 foot pounds per inch for Nano-ADEPT mission applications in order to minimize the impact of static deflection. Second, test results indicate that the fabric conditioning process needs to be reevaluated. Third, no flutter/buzz of the fabric was observed for any test condition and should also not occur at hypersonic speeds. Fourth, translating one of the gores caused ADEPT to generate lift without the need for a center of gravity offset. At hypersonic speeds, the lift generated by actuating ADEPT gores could be used for vehicle control.

system engineering↗

Mars Solar Balloon Landed Gas Chromatograph Mass Spectrometer

A Mars surface lander Gas Chromatograph Mass Spectrometer (GCMS) is described to measure the chemical composition of abundant and trace volatile species and isotope ratios for noble gases and other elements. These measurements are relevant to the study of atmospheric evolution and past climatic conditions. A Micromission plan is under study where a surface package including a miniaturized GCMS would be delivered to the surface by a solar heated hot air balloon based system. The balloon system would be deployed about 8 km above the surface of Mars, wherein it would rapidly fill with Martian atmosphere and be heated quickly by the sun. The combined buoyancy and parachuting effects of the solar balloon result in a surface package impact of about 5 m/sec. After delivery of the package to the surface, the balloon would ascend to about 4 km altitude, with imaging and magnetometry data being taken for the remainder of the daylight hours as the balloon is blown with the Martian winds. Total atmospheric entry mass of this mission is estimated to be approximately 50 kg, and it can fit as an Ariane 5 piggyback payload. The GCMS would obtain samples directly from the atmosphere at the surface and also from gases evolved from solid phase material collected from well below the surface with a Sample Acquisition and Transport Mechanism (SATM). The experiment envisioned in the Mars Micromission described would obtain samples from a much greater depth of up to one meter below the surface, and would search for organic molecules trapped in ancient stratified layers well below the oxidized surface. Insitu instruments on upcoming NASA missions working in concert with remote sensing measurement techniques have the potential to provide a more detailed investigation of mineralogy and the extent of simple volatiles such as CO2 and H2O in surface and subsurface solid phase materials. Within the context of subsequent mission opportunities such as those provided by the Ariane 5 piggyback payload based Micromissions, it is essential to implement an even broader chemical analysis and to enable a significant extension of previous isotope measurements. Such a development would enhance the presently very active study of questions of atmospheric evolution and loss and past climatic conditions. The method selected to implement this program can be based on well-established mass spectrometry techniques. Sampled gas is chemically and physically processed to separate the gas mixture into components using gas chromatograph and related enrichment techniques. This allows trace species to be identified and reveals isotopic distributions in many cases with improved precision. Samples of interest, such as organic molecules, may lie deep below the highly oxidized surface layer and the suggested program includes enhanced sampling techniques to measure volatiles preserved in solid phase material deep below the surface as well as gas from the well mixed atmosphere.

Mahaffy, P.↗

Mars surface gas chromatograph mass spectrometer

A Mars surface lander Gas Chromatograph Mass Spectrometer (GCMS) is described to measure the chemical composition of abundant and trace volatile species and isotope ratios for noble gases and other elements. These measurements are relevant to the study of atmospheric evolution and past climatic conditions. A Micromission plan is under study where a surface package including a miniaturized GCMS would be delivered to the surface by a solar heated hot air balloon based system. The balloon system would be deployed about 8 km above the surface of Mars, wherein it would rapidly fill with Martian atmosphere and be heated quickly by the sun. The combined buoyancy and parachuting effects of the solar balloon result in a surface package impact of about 5 m/sec. After delivery of the package to the surface, the balloon would ascend to about 4 km altitude, with imaging and magnetometry data being taken for the remainder of the daylight hours as the balloon is blown with the Martian winds. Total atmospheric entry mass of this mission is estimated to be approximately 50 kg, and it can fit as an Ariane 5 piggyback payload.

Mahaffy, P.↗

The MARS pathfinder end-to-end information system: A pathfinder for the development of future NASA planetary missions

The development of the Mars pathfinder is considered with emphasis on the End-to-End Information System (EEIS) development approach. The primary mission objective is to successfully develop and deliver a single flight system to the Martian surface, demonstrating entry, descent and landing. The EEIS is a set of functions distributed throughout the flight, ground and Mission Operation Systems (MOS) that inter-operate in order to control, collect, transport, process, store and analyze the uplink and downlink information flows of the mission. Coherence between the mission systems is achieved though the EEIS architecture. The key characteristics of the system are: a concurrent engineering approach for the development of flight, ground and mission operation systems; the fundamental EEIS architectural heuristics; a phased incremental EEIS development and test approach, and an EEIS design deploying flight, ground and MOS operability features, including integrated ground and flight based toolsets.

Cook, Richard A.↗

Sharp Hypervelocity Aerodynamic Research Probe

The objective of this flight demonstration is to deploy a slender-body hypervelocity aerodynamic research probe (SHARP) from an orbiting platform using a tether, deorbit and fly it along its aerothermal performance constraint, and recover it intact in mid-air. To accomplish this objective, two flight demonstrations are proposed. The first flight uses a blunt-body, tethered reentry experiment vehicle (TREV) to prove out tethered deployment technology for accurate entries, a complete SHARP electronics suite, and a new soft mid-air helicopter recovery technique. The second flight takes advantage of this launch and recovery capability to demonstrate revolutionary sharp body concepts for hypervelocity vehicles, enabled by new Ultra-High Temperature Ceramics (UHTCs) recently developed by Ames Research Center. Successful demonstration of sharp body hypersonic vehicle technologies could have radical impact on space flight capabilities, including: enabling global reentry cross range capability from Station, eliminating reentry communications blackout, and allowing new highly efficient launch systems incorporating air breathing propulsion and zeroth staging.

Bull, Jeffrey↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

NASA-ESA Mars Sample Return Program

NASA's Perseverance mission arrived at Jezero Crater on Mars in February 2021 and began scientific studies and acquisition of Martian samples for return to Earth by future missions, consistent with the recommendations of the U.S. science community in the previous Planetary Science Decadal Survey. NASA and ESA have established a joint Mars Sample Return (MSR) program to safely deliver these samples back to Earth, allowing researchers to use advanced scientific instrumentation that cannot be transported on robotic spacecraft and enable future studies of carefully curated samples using capabilities that have not yet been developed. The MSR architecture consists of two flight elements to follow Perseverance, the NASA-led Sample Retrieval Lander (SRL) and the ESA-led Earth Return Orbiter (ERO). The ERO is designed to orbit Mars and provide relay services for the SRL, including its ESA Sample Fetch Rover (SFR) and the NASA Mars Ascent Vehicle (MAV). The SRL deploys the SFR to retrieve Martian samples cached by the Perseverance rover and then returns the samples to the Orbiting Sample container (OS) on board the MAV using the ESA Sample Transfer Arm (STA). Independently, Perseverance could also deliver samples retained onboard to the OS. The MAV would launch and release the OS into low Mars orbit for rendezvous with the ERO. Upon successful capture of the OS in the ERO’s primary payload, the NASA Capture/Containment Return System (CCRS), the OS would be safely contained and loaded into the Earth Entry System (EES). The ERO will leave Mars orbit and release the EES on Earth approach on a ballistic reentry trajectory through the Earth's atmosphere for landing in the United States. Following return of the samples to Earth, the samples would be protected, preserved, assessed, curated, and made available to the international science community for scientific research and analysis. The NASA SRL and ESA ERO missions are expected to launch as early as 2026, with the return of Martian samples to Earth as early as 2031. MSR’s primary objective is the return of scientifically selected Mars samples for detailed investigation in terrestrial laboratories. The mission would also further inform the design of future human missions. The Mars Sample Return campaign is underway with the successful collection of several scientifically selected samples in Jezero Crater. The MSR Program is working towards a confirmation review in 2023 for the remaining flight elements.

Mars↗

The Assembly, Test, and Integration of LOFTID (Low-Earth Orbit Flight Test of an Inflatable Decelera-tor)

R.J. Bodkin Biography Mr. Bodkin worked in industry for a rapid prototype company focusing on UAVs and manned experimental aircraft. Later he served as the Inflation System Lead on IRVE-II and 3 and the Re-Entry Vehicle Lead for LOFTID at NASA Langley Research Center. Introduction: The Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID), developed in partnership with United Launch Alliance (ULA) and flown in conjunction with the National Oceanic and Atmospheric Administration (NOAA) Joint Polar Satellite System-2 (JPSS-2) satellite, demonstrated Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology has progressed and is ready for mission infusion. LOFTID’s success demonstrates that aeroshells are not limited to the internal diame-ter of the launch vehicle payload fairing, allowing larger payloads to be deployed to the surfaces of planetary bodies with atmospheres. The challenges of assembling, integrating, and testing this revolutionary spacecraft will be dis-cussed as well as issues associated with doing this with a fixed launch date the project did not control. Assembly: Because LOFTID flew as a rideshare partner with JPSS-2, it was constrained with addi-tional schedule, milestone, and technical require-ments that were beyond the project’s control. As-sembly of the LOFTID hardware was challenged with the normal mechanical fit issues while also having to navigate the SARS-COVID-II pandemic. Challenges ranged from availability of team per-sonnel required on-site for vehicle assembly to dif-ficulties associated with team collaboration while working remotely and increased costs and lead times of components due to supply chain con-straints. Numerous additional challenges cascaded from the additional time required. Integration: LOFTID flew as a secondary pay-load to JPSS-2 in a mission-unique configuration, directly under JPSS-2 primary payload, inside the Payload Adapter that integrated JPSS-2 to the Atlas V launch vehicle. A mission unique Payload Adapt-er Separation System (PASS) was required to sepa-rate the Payload Adapter from the Launch Vehicle prior to the start of the LOFTID flight demonstra-tion. Development of this system was challenging due to a shortened development schedule resulting from the iterative nature of Payload Adapter devel-opment with the partners at ULA. Preparations to integrate the main segments of the LOFTID vehicle posed unique challenges of having to accommodate issues with a fixed launch date that led to some cre-ative solutions to the integration. The partnership agreement with ULA and JPSS-2 resulted in a mass simulator designed to be installed late in the inte-gration in the event the LOFTID vehicle was not ready in time.. Test: LOFTID testing was carried out in several phases. Some components were tested at the com-ponent level, others at the sub-system levels and then finally the integrated vehicle level. This culmi-nated with the Complete Systems Test (CST) per-formed in a vacuum chamber as one of the final checkouts prior to disassembly for re-packing of the aeroshell. CST challenges will be discussed as well as obstacles encountered post-CST. After CST, the vehicle was disassembled so the HIAD could be repacked, and the vehicle was reassembled for ac-ceptance vibration testing. Testing concluded with the fully assembled vehicle being shipped to the launch site for final testing and integrations with the Payload Adapter to JPSS-2 for launch and opera-tions. Conclusion: The challenges posed by the AI&T for LOFTID could inform the planetary community of some of the opportunities and challenges of de-veloping technologies on a rideshare with a rela-tively small budget.

R.J. Bodkin↗

Lightweight Multifunctional Planetary Probe for Extreme Environment Exploration and Locomotion

The demand to explore new worlds requires the development of advanced technologies that enable landed science on uncertain terrains or in hard to reach locations. As a result, contemporary Entry, Descent, Landing, (EDL) and additional locomotion (EDLL) profiles are becoming increasingly more complex, with the introduction of lifting/guided entries, hazard avoidance on descent, and a plethora of landing techniques including airbags and the skycrane maneuver. The inclusion of each of these subsystems into a mission profile is associated with a substantial mass penalty. This report explores the new all-in-one entry vehicle concept, TANDEM, a new combined EDLL concept, and compares it to the current state of the art EDL systems. The explored system is lightweight and collapsible and provides the capacity for lifting/guided entry, guided descent, hazard avoidance, omnidirectional impact protection and surface locomotion without the aid of any additional subsystems. This Phase I study explored: 1. The capabilities and feasibility of the TANDEM concept as an EDLL vehicle. 2. Extensive impact analysis to ensure mission success in unfavorable landing conditions, and safe landing in Tessera regions. 3. Development of a detailed design for a conceptual mission to Venus. As a result of our work it was shown that: 1. TANDEM provides additional benefits over the Adaptive, Deployable Entry Placement Technology (ADEPT) including guided descent and surface locomotion, while reducing the mass by 38% compared to the ADEPT-VITaL mission. 2. Demonstrated that the design of tensegrity structures, and TANDEM specifically, grows linearly with an increase in velocity, which was previously unknown. 3. Investigation of surface impact revealed a promising results that suggest a properly configured TANDEM vehicle can safely land and preform science in the Tessera regions, which was previously labeled by the Decadal Survey as, largely inaccessible despite its high scientific interest. This work has already resulted in a NASA TM and will be submitted to the Journal of Spacecraft and Rockets.

landing techniques↗

Guidance Performance of Bank-Angle and Alpha-Beta Steering for A Large Robotic Mars Entry Vehicle

Entry performance using Apollo-based entry guidance is assessed with a future entry system for a large robotic payload. Both a traditional bank-angle steering system and an innovative alpha-beta steering concept are considered to compare flight performance. Results indicate alpha-beta steering provides an order of magnitude improvement in crossrange error and mean altitudes up to 1 km higher than bank-angle steering. Results also show alpha-beta steering provides downrange errors with a spread half of that of bank-angle steering. Lastly, alpha-beta steering is found to provide a narrower spread of terminal altitude, Mach number, and dynamic pressure, indicating safer parachute deploy conditions.

Daniel L Engel↗

Entry Dispersion Analysis for the Genesis Sample Return Capsule

Genesis will be the first mission to return samples from beyond the Earth-Moon system. The spacecraft will be inserted into a halo orbit about the L1 (Sun- Earth) libration point where it will remain for two years collecting solar wind particles. Upon Earth return, the sample return capsule, which is passively controlled, will descend under parachute to Utah. The present study describes the analysis of the entry, descent, and landing scenario of the returning sample capsule. The robustness of the entry sequence is assessed through a Monte Carlo dispersion analysis where the impact of off-nominal conditions is ascertained. The dispersion results indicate that the capsule attitude excursions near peak heating and drogue chute deployment are within Genesis mission limits. Additionally, the size of the resulting 3-sigma landing ellipse is 47.8 km in downrange by 15.2 km in crossrange, which is within the Utah Test and Training Range boundaries.

Desai, Prasun N.↗