Electrification 2021 Annual Progress Report

During fiscal year 2021 (FY 2021), the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO) funded early-stage research, development, demonstration, & deployment (RDD&D) projects that address Batteries and Electrification of the U.S. transportation sector. The VTO Electrification Sub-Program is composed of Electric Drive Technologies, and Grid Integration activities. The Electric Drive Technologies group conducts R&D projects that advance electric motors and power electronics technologies. The Grid and Charging Infrastructure group conducts R&D projects that advance grid modernization and electric vehicle charging technologies. This document presents a brief overview of the Electrification Sub-Program and progress reports for its R&D projects. Each of the progress reports provide a project overview and highlights of the technical results that were accomplished in fiscal year (FY) 2021.

33 ADVANCED PROPULSION SYSTEMS↗

Explained: Reliability of the Current Power Grid

Maintaining reliability of the bulk power system, which supplies and transmits electricity, is a constant focus of electric grid planners, operators, and regulators. Based on the standards set by power system reliability entities, the U.S. grid has been and continues to be very reliable. Over the past decade the average U.S. customer has only experienced about 15 minutes of outages per year due to supply limitations, with most of those outages occurring due to failures on the distribution system. However, there have been a few notable incidents in recent years tied to extreme weather events. The fact sheet provides and introduction to reliability of the bulk power system in the U.S.

power grid↗

Leveraging Existing Assets for Long Duration Energy Storage

Increased renewables penetration to electrical grid is necessary to reduce overall emissions from the electrical power generation sector. Nonetheless, its integration creates challenges to grid operators who must match the power being generated by intermittent renewables and other traditional energy sources with the demand from consumers, while ensuring the reliability and power quality for the entire system. Energy storage has been proposed as an alternative to natural gas peaking plants and a form to deliver excess renewable energy generation at times of peak demand. For energy storage to provide benefits to end customers (energy consumers), it must be reliable, efficient, and cost effective. The Illinois Sustainable Technology Center (ISTC), one of the surveys that integrate the Prairie Research Institute (PRI), aims to develop a Center for Energy Storage at Existing Assets (CESEA) at UIUC with the participation of Waste Pressure Corp and Ecotek Engineering USA LLC. CESEA will focus on LDES systems that can integrate to existing infrastructure in a manner that reduces the initial capital expenditure and demonstrates the ability to repurpose fossil assets that would otherwise become stranded, to serve the energy transition. CESEA aims to leverage UIUC’s unique facilities to validate LDES systems performance at a relevant operating environment. UIUC’s facilities include a 85-MW combined heat and power (CHP) power plant, two (2) solar PV plants totaling over 18 MWdc of installed capacity, an electrical grid along with a substation at transmission and distribution voltages, a 22-mile gas pipeline network operating at two pressure levels, along with steam and chilled water distribution networks. The new LDES systems will connect to the existing UIUC grid through a new test electrical station, which will have the capacity to accommodate additional connections to test new devices and technologies as part of future CESEA R&D activities. The test electrical station will contain meters, instrumentation, and controls to accurately capture data and allow optimization of control algorithms. CESEA will initially focus on technologies that: i) utilize existing equipment or facilities to perform at least one of the process steps in LDES (charging, storage, or discharging), ii) leverage mature or commercially available components or controls, iii) show potential for cost-leadership in 10+ hour storage at a commercial scale. Initial technologies that were identified to meet these criteria include Compressed Gas Energy Storage (CGES), and TES. CGES stores electricity by raising the pressure of a compressible gas inside a control volume and converting the stored energy to electricity via expansion-generation. CGES is a generalization of CAES that covers any working gas (not just air). A successful CGES demo will help to circumvent many challenges faced by CAES (long development times due to site prospecting, high cost of compression and storage, heat recovery management, etc.) by: 1) utilizing existing infrastructure (compressors, pipelines, underground storage or pressure vessels) used in the transportation and storage of industrial gases for LDES charging and storage; 2) deploying over sites already-developed for industrial applications with minor additional work; 3) leveraging the price structure of commercial industrial gas to cover the costs of electricity used during charging. A previous DOE-sponsored conceptual study (DE-FE-0032018) estimated the levelized cost of energy of a 1.1 MW / 17 MWh CGES system at $0.08/kWh, with a commercial 10x scale system cost estimated at <$0.04/kWh (Giardinella, 2022). The pilot-sized system was estimated to avoid up to 2693 tons of CO2/year.

25 ENERGY STORAGE↗

Applied Mathematics Challenge: Simulation of Power Electronics in Future Power Grid

There has been a buzz around increased grid modernization for more than a decade. Grid modernization includes, but is not limited to, upgrades to the grid to enhance reliability, resilience, security, and access to clean energy sources. One significant change that has been happening in this context is the increased penetration of computing power and controlled devices like power electronics in the power grid. As this change happens, the operation and characteristics of the power grid are set to undergo a significant change. The power grid moves from an older electric machine dominated grid that used analog electronics for controls to a power electronics dominated grid that uses digital computing for controls. As this transition happens, there are significant problems of applied mathematics that will need to be resolved in power electronics and power grid. The problems include the ability to simulate in different timescales, while also leveraging the significantly improved computing capabilities available today. In this paper, the challenges related to simulation of power electronics are discussed and the challenge problems laid down that applied mathematics may help resolve in future.

Debnath, Suman↗

Outdoor Test Bed Performance of a Power Line Sensor Using a Real-Time Event Simulator

This report summarizes the design and application of an outdoor power line sensor testbed (OPLST) with a real-time simulator and power meter to compare a potential transformer (PT) and current transformer (CT) versus an advanced line-post sensor. The OPLST was created to validate advanced medium-voltage (20/34.5 kV) outdoor power line sensors used in electrical distribution systems. Electrical utilities have installed metering and relay-protection transformers like PTs and CTs for several decades. The PTs/CTs are iron core measurement transformers based on the electromagnetic induction principle and provide reliable data in normal grid operation. However, new outdoor power line sensors (OPLS) using other technologies like voltage divider, Rogowski coil and optical principles have become available and may have favorable performance and costs compared to PTs/CTs. Therefore, the importance of testing these technologies with the PT/CT, to compare the measured phase voltage/current at different power grid scenarios is crucial to understand the performance of these new OPLS. For this study a G&W Electric Model CVS-36-O power line sensor was chosen as the OPLS to test with voltage/current signals. An OPAL-RT Technologies Model OP4510 real-time simulator and Schweitzer Engineering Laboratories Model SEL-735 power meter were installed with the 20/34.5 kV OPLST to compare the measured transient events collected from an advanced OPLS and the PT/CT. This system is installed at the Distributed Energy Communications and Control (DECC) lab, Oak Ridge National Laboratory (ORNL). The simulator generated different power grid scenarios (electrical faults, capacitor bank operation, service restoration, etc.), and its analog-output signals were connected to the voltage/current amplifiers that feed the 20/34.5 kV aerial cable loop through the PT/CT devices. Additional PT/CT devices were also wired with the medium voltage aerial cable loop to measure the phase current/voltage signals and server as references. After each test, common format for transient data exchange (COMTRADE) files were collected from the SEL-735 power meter and used to compare the performance of the OPLS with the PT/CT. The behavior of analog signals, harmonic components, total harmonic distortion and crest factors were assessed and found favorable for the G&W sensor as compared to the reference PT/CT.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid regulation services for energy storage devices based on grid frequency

Disclosed herein are representative embodiments of methods, apparatus, and systems for charging and discharging an energy storage device connected to an electrical power distribution system. In one exemplary embodiment, a controller monitors electrical characteristics of an electrical power distribution system and provides an output to a bi-directional charger causing the charger to charge or discharge an energy storage device (e.g., a battery in a plug-in hybrid electric vehicle (PHEV)). The controller can help stabilize the electrical power distribution system by increasing the charging rate when there is excess power in the electrical power distribution system (e.g., when the frequency of an AC power grid exceeds an average value), or by discharging power from the energy storage device to stabilize the grid when there is a shortage of power in the electrical power distribution system (e.g., when the frequency of an AC power grid is below an average value).

24 POWER TRANSMISSION AND DISTRIBUTION↗

LLGOMAX: Enhancing Industry-Standard Tools for AC Optimal Unit Commitment (CRADA Final Report)

This was a collaborative effort between Lawrence Livermore National Security, LLC ("LLNS"), as manager and operator of Lawrence Livermore National Laboratory ("LLNL") and ECCO International Inc. ("Participant"). The team designed and implemented a new approach for the Security-Constrained Alternating-Current Unit Commitment (SCACUC) problem. The SCACUC problem is a mathematical optimization problem that decides which generating units should be online and how much power should be produced (and consumed) at each point of the power grid. The decisions are made so as to minimize the total cost of supplying electricity while respecting technical constraints of the power grid, both under normal and emergency conditions. The team developed a solution for SCACUC as specified in the ARPA-E Grid Optimization Competition (GOC) Challenge 3, which put forth a forward-looking version of the problem, which many features not present in today’s electricity market specifications for SCACUC.

24 POWER TRANSMISSION AND DISTRIBUTION↗

On the Impact of High-Order Harmonic Generation in Electrical Distribution Systems

The modern power grid has seen a rise in the integration of non-linear loads, presenting a significant concern for operators. These loads introduce unwanted harmonics, leading to potential issues such as overheating and improper functioning of circuit breakers. In pursuing a more sustainable grid, the adoption of electric vehicles (EVs) and photovoltaic (PV) systems in residential networks has increased. Understanding and examining the effects of high-order harmonic frequencies beyond $1.5$ kHz is crucial to understanding their impact on the operation and planning of electrical distribution systems under varying nonlinear loading conditions. This study investigates a diverse set of critical power electronic loads within a household modeled using PSCAD/EMTdc, analyzing their unique harmonic spectra. This information is utilized to run the time-series harmonic analysis program in OpenDSS on a modified IEEE 34 bus test system model. The impact of high-order harmonics is quantified using metrics that evaluate total harmonic distortion (THD), transformer harmonic-driven eddy current loss component, and propagation of harmonics from the source to the substation transformer.

Peerzada, Aaqib A. [BATTELLE (PACIFIC NW LAB)]↗

All Hazards Approach to Grid Modernization

Resilience hazards for electric power systems are on the rise, exacerbated by both a rise in extreme weather events and manmade physical and cyber attacks. At the same time, grid modernization challenges plague the United States, covering everything from increased electrification and ambitious renewable energy targets to aging infrastructure and regulation that lags behind today’s challenges. This talk will cover an all-hazards risk based approach that addresses both rising resilience and grid modernization challenges. Examples of this approach taken for national laboratory research projects will be discussed, including a deep dive into a project that addressed black start, resynchronization, distributed control, and cybersecurity challenges for an operational microgrid up to sub-transmission voltages. As takeaways from this project are translated from demonstration scale to real-world exercises, key lessons are noted on the translation from research into practice and how this can inform risk-based research moving forward

17 WIND ENERGY↗

Power Grid Reliability Estimation via Adaptive Importance Sampling

Electricity production currently generates approximately 25% of greenhouse gas emissions in the USA. Thus, increasing the amount of renewable energy is a key step to carbon neutrality. However, integrating a large amount of fluctuating renewable generation is a significant challenge for power grid operating and planning. Grid reliability, i.e., an ability to meet operational constraints under power fluctuations, is probably the most important of them. In this letter, we propose computationally efficient and accurate methods to estimate the probability of line overflow, i.e., reliability constraints violation, under a known distribution of renewable energy generation. To this end, we investigate an importance sampling approach, a flexible extension of Monte-Carlo methods, which adaptively changes the sampling distribution to generate more samples near the reliability boundary. The approach allows to estimate overload probability in real-time based only on a few dozens of random samples, compared to thousands required by the plain Monte-Carlo. Our study focuses on high voltage direct current power transmission grids with linear reliability constraints on power injections and line currents. Herein, we propose a novel theoretically justified physics-informed adaptive importance sampling algorithm and compare its performance to state-of-the-art methods on multiple IEEE power grid test cases.

power system faults↗

Policy and Regulatory Environment for Utility-Scale Energy Storage: Bangladesh

Bangladesh has experienced significant economic growth and poverty reduction over the past several decades. Recognizing the central role electricity plays in economic development, the Government of Bangladesh (GOB) has established policies to accelerate the growth of the electric power sector. The Bangladesh power grid is transforming into one marked by declining reliance on domestic natural gas reserves and oil-based rental power plants, increasing renewable energy contribution, and shifting demand patterns. The GOB is now reconsidering its prior plans to increase the share of coal capacity in the generation mix to meet demand, shifting its focus instead to electricity imports from neighboring countries, nuclear generation, liquified natural gas imports, and domestic renewable resources such as wind and solar. However, investments in the transmission and distribution system, as well as ancillary services, have not kept pace with investments in generation resources over the past decade. Thus, Bangladesh electricity consumers still experience outages and poor power quality despite adequate installed capacity. On the demand side, population growth and industrialization have fueled steady growth in electricity consumption as efforts to expand access to electricity enabled near-universal electricity access by mid-2020. The combined changes in the mix of generation resources and patterns of electricity demand present new challenges and opportunities in operating and maintaining a reliable power system. Energy storage has the potential to help meet these challenges and accelerate Bangladesh’s energy transition. Declining costs for some energy storage technologies make them increasingly cost-effective solutions to provide a wide range of grid services. Previous analyses of energy storage in the region have identified several potential applications for storage at the bulk system level, including energy arbitrage, ancillary services, and transmission network support. The potential for storage to meet these needs depends on many factors, including physical characteristics of the power system and the policy and regulatory environments in which these energy storage assets would operate. This report applies an Energy Storage Readiness Assessment the National Renewable Energy Laboratory developed for policy makers and regulators to identify priority areas of focus as they continue to develop the appropriate suite of policies, programs, and regulations to enable storage deployment. This assessment uses a simple evaluation scheme to identify the barriers and opportunities for utility-scale energy storage within Bangladesh’s policy and regulatory environment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A grid-scale study of demand bidding by large industrial users

A demand bidding mechanism for engaging large industrial electricity users in the operation of the power grid is presented. Demand bidding is formulated as an optimization problem based on a modified version of the alternating current optimal power flow problem, and can be interpreted as a tâtonnement process between the grid operator and electricity users. Here, the work provides the first – to the authors’ knowledge – grid-scale case study of demand bidding, using a synthetic grid structure in the footprint of the grid of Texas. Results reveal that the demand bidding lowers overall power generation costs, but economic benefits plateau as the number of participants increases. Transmission line and transformer capacity constraints become the limiting factors, revealing that expanding and fortifying the transmission infrastructure is key to expanding demand-side participation. Demand bidding does not substantially alter the optimal operation of existing bidding entities when the number of bidders increases, thereby supporting existing bidders to stay in the system and encouraging new ones to join.

Chlor-alkali plant↗

Extracting maximal frequency response potential in controllable loads

Methods and apparatus are disclosed for extracting maximal frequency response potential in controllable loads. In one example, a method includes assigning a fitness metric to at least one electrical device coupled to a power grid, assigning a frequency threshold based on the fitness metric, and transmitting the assigned frequency threshold to the at least one electrical device. The fitness metric can be based at least in part on an availability component and a quality component associated with the at least one device and the frequency threshold can cause the at least one electrical device to activate autonomously based on a frequency of the power grid.

Lian, Jianming↗

Predicting Power Outage During Extreme Weather with EAGLE-I and NWS Datasets

Extreme weather events, such as hurricanes, severe thunderstorms, and floods can significantly disrupt power grid systems, leading to electrical outages that result in inconvenience, economic losses, and life-threatening situations. There is a growing need for a robust and precise predictive model to forecast power outages, which will help prioritize emergency response before, during, and after extreme weather events. In this paper, we introduce machine-learning models that predict power outage risk at the state level during and after extreme weather events. We jointly utilized two publicly available datasets: the U.S. historical power outage data collected by the Environment for Analysis of Geo-Located Energy Information (EAGLE-I™) system, and the National Weather Service historical weather alert data sets. We highlight our initial result and discuss future work aimed at enhancing the model's robustness and accuracy for real-world applications.

Lee, Sangkeun (Matt)↗

Explained: Causes of Three Recent Major Blackouts and What Is Being Done in Response

While the power grid is designed to have an adequate supply of electricity generating capacity under hot and cold conditions well above or below average, weather in recent years has approached the bounds of anticipated conditions, in both magnitude and duration. Extreme weather can result in unanticipated levels of electricity demand and correlated power plant outages driven by extreme temperatures. How power system planners account for the changing role of wind and solar also plays an important role in the power grid's ability to supply enough electricity during extreme weather. In response to recent significant outages, power system planners have been focusing on ensuring methods to evaluate reliability during periods of "net peak demand" consider availability of renewable resources and capture the impact of extreme weather on power plants of all types. In particular, there is significant emphasis on the ability of natural gas-fueled power plants to operate during periods of extreme cold temperatures. The impact of extreme weather on the need to change planning processes is demonstrated in this fact sheet that discusses three significant outages that occurred in recent years.

power grid↗

Evaluating grid stress and reliability in future electricity grids across a range of demand, generation mix, and weather trends

The reliability of power grids in the future will depend on how system planners account for the integration of new technologies, extreme weather events, and uncertainties in demand growth from increased electrification and data centers. This study introduces an open-source, multisectoral, multiscale modeling framework that projects grid stress and reliability trends between 2020 and 2055 in the Western Interconnection of the United States. The framework integrates global to national energy-water-land dynamics with power plant siting and hourly grid operations modeling. We analyze future wholesale electricity price shocks and unserved energy events across eight scenarios spanning a range of population growth and economic change, generation mixes, and weather conditions. Our results show future grids with high percentage of non-renewable generation and strong economic growth are characterized by higher reliability and lower wholesale electricity prices than lower growth scenarios because of larger reliance on dispatchable generators and lower fossil fuel extraction costs. Scenarios with high percentage of renewable resources have lower median but more volatile wholesale electricity prices as well as more frequent and severe unserved energy events compared to scenarios relying more on dispatchable generators. These events occur because higher proportion of solar and wind energy causes net demand curves to deepen during midday (duck curves get progressively severe), exacerbating the challenge of meeting demand during summer evening peaks. This study suggests that robust and co-optimized transmission and energy storage planning could help maintain low wholesale electricity prices and high reliability levels in future electricity grids across uncertainties in generation mixes.

Electric grid reliability↗

Total Power Factor Smart Contract with Cyber Grid Guard Using Distributed Ledger Technology for Electrical Utility Grid with Customer-Owned Wind Farm

In modern electrical grids, the numbers of customer-owned distributed energy resources (DERs) have increased, and consequently, so have the numbers of points of common coupling (PCC) between the electrical grid and customer-owned DERs. The disruptive operation of and out-of-tolerance outputs from DERs, especially owned DERs, present a risk to power system operations. A common protective measure is to use relays located at the PCC to isolate poorly behaving or out-of-tolerance DERs from the grid. Ensuring the integrity of the data from these relays at the PCC is vital, and blockchain technology could enhance the security of modern electrical grids by providing an accurate means to translate operational constraints into actions/commands for relays. This study demonstrates an advanced power system application solution using distributed ledger technology (DLT) with smart contracts to manage the relay operation at the PCC. The smart contract defines the allowable total power factor (TPF) of the DER output, and the terms of the smart contract are implemented using DLT with a Cyber Grid Guard (CGG) system for a customer-owned DER (wind farm). This article presents flowcharts for the TPF smart contract implemented by the CGG using DLT. The test scenarios were implemented using a real-time simulator containing a CGG system and relay in-the-loop. The data collected from the CGG system were used to execute the TPF smart contract. The desired TPF limits on the grid-side were between +0.9 and +1.0, and the operation of the breakers in the electrical grid and DER sides was controlled by the relay consistent with the provisions of the smart contract. The events from the real-time simulator, CGG, and relay showed a successful implementation of the TPF smart contract with CGG using DLT, proving the efficacy of this approach in general for implementing electrical grid applications for utilities with connections to customer-owned DERs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Plug-in Electric Vehicle Charging Response Characterization for Grid Integration: Implications for Smart Charge Management

The rapid expansion of plug-in electric vehicles (PEVs) has created a unique challenge for electrical grids due to their significant power demand. At the same time, PEVs also create a unique opportunity to ease their own burden on the power grid, as they create a growing fleet of distributed energy resources capable of providing grid services such as demand response, frequency regulation, and renewable balancing. For aggregators and grid operators to effectively integrate PEVs into grid management, it is essential to first understand and characterize how they would respond in such situations. This study examines 25 models of PEVs across 25 makes, spanning model years from 2013 to 2025, to characterize their responses to the basic controls used in vehicle-grid integration (VGI): stopping, starting, and modulating the charge rate. Each vehicle was tested in a controlled laboratory setting to evaluate its performance in response to varying the maximum allowable current via the SAE J1772 control pilot signal, as well as its response to wake-up commands outlined in SAE J1772. Results show measurable differences across vehicle makes in the accuracy, latency, and precision with which PEVs respond to changes in ampacity, as well as varying sleep and wake-up behavior. The test results show that all vehicles respond to changes in ampacity, though with varying accuracy, precision, latency, and resolution. Wake-up behavior also differs across makes and models. These findings indicate that effective grid integration strategies must account for these differences. The results provide a foundation for understanding current vehicle behavior and advancing smart-charging methods while also highlighting the need for further testing, broader standardization, and manufacturer collaboration to ensure the successful integration of PEVs into the electrical grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗