Search NASA⌕ Search

SEARCH · Search NASA

Results for “electric utility programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

SPC-71188 Rev 0 MARVEL Control Drum Rotary Shaft Seal Procurement Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL Control Drum Rotary Shaft Seal.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-3186 Rev 8 Reactor Support Frame and Outer Shield Build to Print Fabrication Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the Reactor Support Frame (RSF) and Outer Shield.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-71250 Rev 0 MARVEL Upper Shield Build to Print Fabrication Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the Upper Shield Assembly.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70796 Rev 2 MetCar M-312 Bearings Procurement Specification

A. Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL MetCar M-312 bearings. B. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70525 Rev 2 Beryllium Metal Procurement Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. Key to this design are neutron reflector components constructed of Beryllium Metal (S-65) which is a structural grade of hot-pressed beryllium block. MARVEL will be located at the Transient Reactor Test (TREAT) facility. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-71123 Rev 1 MARVEL Control Drum Actuator Torsional Spring

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This specification defines the requirements for the procurement and factory acceptance testing of the MARVEL control drum actuator torsional spring. The purpose of this specification is to define the requirements to procure the MARVEL control drum actuator torsional spring component and witness a torsional spring rate Factory Acceptance Test (FAT) at the subcontractor’s facility with the contractor present. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Seasonal Thermal Energy Storage Program

The Seasonal Thermal Energy Storage (STES) Program designed to demonstrate the storage and retrieval of energy on a seasonal basis using heat or cold available from waste or other sources during a surplus period is described. Factors considered include reduction of peak period demand and electric utility load problems and establishment of favorable economics for district heating and cooling systems for commercialization of the technology. The initial thrust of the STES Program toward utilization of ground water systems (aquifers) for thermal energy storage is emphasized.

Minor, J. E.↗

Precursor Analysis Report: Industroyer Targeting Ukraine Electric Power Transport Utility (Ukrenergo) 2016

The Industroyer Targeting Ukraine Electric Power Transport Utility (Ukrenergo) 2016 Precursor Analysis Report leverages publicly available information about the December 2016 cyber attack against the Ukrainian Ukrenergo electric transmission utility and catalogs anomalous observables for each technique employed in the attack. This analysis is based upon the methodology of the Cybersecurity for the Operational Technology Environment (CyOTE) program. Industroyer is a modular malware framework designed to deploy several Industrial Control System (ICS) protocol-specific attack payloads to disrupt electricity distribution. Adversaries deployed Industroyer within the target network on a Microsoft Windows endpoint capable of directly manipulating or communicating with ICS. Industroyer abuses the functionality of a targeted ICS’s legitimate control system to achieve its intended impact. Adversaries likely first gained access to Ukrenergo enterprise networks in early 2016 after a successful spearphishing campaign against organizations in the electric power sector. Adversaries then began capturing credentials beginning on 1 December 2016. This allowed access to the ICS environment at the Pivnichna electric transmission substation outside Kyiv through a device dual-homed on the Information Technology (IT) and ICS networks. Adversaries conducted discovery, targeting, and access to this device using information and previously captured credentials from compromised enterprise IT machines. Finally, the adversaries deployed and launched the Industroyer malware just before midnight on 17 December. By midnight, Ukrenergo had lost control of a targeted substation, resulting in electric power outages for over an hour in the city of Kyiv and the Kyiv region. Researchers and analysts identified 31 unique techniques (used in a sequence of 33 steps) utilized during the attack with a total of 846 observables using MITRE ATT&CK® for Industrial Control Systems. The CyOTE program assesses observables accompanying techniques used prior to the triggering event to identify opportunities to detect malicious activity. If observables accompanying the attack techniques are perceived and investigated prior to the triggering event, earlier comprehension of malicious activity can take place. Twenty-nine of the identified techniques used during the Industroyer cyber attack were precursors to the triggering event. Analysis identified 548 observables associated with these precursor techniques, 353 of which were assessed to have an increased likelihood of being perceived in the 300 days preceding the triggering event. The response and comprehension time could have been reduced if the observables had been identified earlier. The information gathered in this report contributes to a library of observables tied to a repository of artifacts, data sources, and technique detection references for practitioners and developers to support the comprehension of indicators of attack. Asset owners and operators can use these products if they experience similar observables or to prepare for comparable scenarios.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Optimal Electric Vehicle Charging and Discharging Strategies Under DER Compensation Programs: Preprint

The adoption of electric vehicles (EVs) is becoming increasingly popular because of environmental concerns, the greater availability of models, and increased cost-competitiveness with gas vehicles. Because EVs have both charging and discharging capabilities, they provide great potential to help electric utilities with grid operation. When the grid demand is high, EVs can discharge to the grid to reduce the peak load, and vice versa; therefore, electric utilities have designed different policies to encourage EV charging station operators to charge or discharge at certain time periods. The New York State Public Service Commission established the Value of Distributed Energy Resources (VDER), or the Value Stack, to compensate for energy created by distributed energy resources, including EVs. This paper presents an optimization-based approach to identify the "golden hours" and "golden spots," i.e., the effective time periods and geographic locations for EV charging station operators to charge or discharge under the VDER program that can provide them the highest benefit. The proposed methodology can be applied to other compensation mechanisms and distribution systems as well. By working with industry partner NineDot Energy, realistic charging station information is used in this study, and the proposed approach is tested on a distribution feeder. The results from this study can help electric utilities and EV charging station operators determine the ideal charging/discharging time and the ideal locations for the charging station(s) in their distribution systems to achieve maximized benefit.

electric vehicle↗

Geothermal research and development program of the US Atomic Energy Commission

Within the overall federal geothermal program, the Atomic Energy Commission has chosen to concentrate on development of resource utilization and advanced research and technology as the areas most suitable to the expertise of its staff and that of the National Laboratories. The Commission's work in geothermal energy is coordinated with that of other agencies by the National Science Foundation, which has been assigned lead agency by the Office of Management and Budget. The objective of the Commission's program, consistent with the goals of the total federal program is to facilitate, through technological advancement and pilot plant operations, achievement of substantial commercial production of electrical power and utilization of geothermal heat by the year 1985. This will hopefully be accomplished by providing, in conjunction with industry, credible information on the economic operation and technological reliability of geothermal power and use of geothermal heat.

Werner, L. B.↗

Electric Vehicle Charging Implications for Utility Ratemaking in Colorado

Increasing use of electric vehicles (EVs) will affect utility costs and operations, which in turn will affect regulatory decisions on customer rates and utility programs. This presentation provides an overview of current research on the regulatory implications of EV deployment. It also includes a special analysis of EV charging as demand response specific to Colorado and its use of wind power.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Work In Progress: Using Internships as Means for Indirect Assessment of ABET Criteria 3 "1-7" Student Outcomes

PSU operates the Power Engineering Internship program with funding from two U.S. Department of Energy grants. The program is operated in partnership with the lead organizations of these grants, an investor-owned utility, Portland General Electric (PGE), and the Confederated Tribes of the Warm Springs (CTWS). One of the programmatic goals of the PEI is to create and sustain a clean energy engineering workforce pipeline on behalf of these lead organizations. Both grants support internships at PGE, which is also a partner on the CTWS grant. The PEI provides engineering students with year-long internships, spanning both the academic year and the summer. The interns work at PGE facilities located throughout the Portland metropolitan area. Interns are employed full-time during summers and part-time during the academic year. Proximity of the worksites to the PSU campus enables the interns to participate in the program while attending school full-time. During the academic year, students average fifteen hours per week, adjusting their work schedule according to their academic workload. The interns are allocated 930 hours per year, 480 in the summer and 450 during the academic year, which they can plan as they see fit. The internships provide meaningful financial support for the students, who can earn up to $21k if they use all of their allocated hours. Such funding is particularly important for the typical student who attends a minority serving institutions,

99 GENERAL AND MISCELLANEOUS↗

California Energy Systems for the 21st Century (CES-21) Program, CRADA TC02200 (Final Report)

The following report representsthe culmination of a five-year Cybersecurity Research and Development (R&D) program performed by California’s Investor-Owned Utilities (IOUs) and Lawrence Livermore National Laboratory (LLNL) and funded by the IOUs’ electricity ratepayers as authorized by California Legislation and the California Public Utilities Commission (CPUC). The cybersecurity R&D, which was intensely technical in nature, was broken into three major workstreams: 1. The development of a modeling & simulation platform, to explore the potential effects of various threat and response scenarios at grid scale; 2. The establishment of a physical testbed with separate substation instances from each of the IOUs, to evaluate threats and responses on actual substation equipment; 3. The development of a research package consisting of several capabilities to support the industry’s evolution towards automated threat response and other next-generation cybersecurity techniques Throughout the program, there was extensive collaboration between the program team and national laboratories, federal departments, academic institutions and industry organizations. Several of the tools developed through the program have been made available to the open source community, to enable faster adoption and continued development of important cybersecurity capabilities. While this program began to develop much of the foundation for automated threat response, much work remains to be done, and this report recommends a series of next steps. While the Executive Summary below has been simplified as much as possible, the very technical nature of the subject matter would make further reduction difficult without causing meaning to be lost. Due to the sensitive nature of the research, some topics are intentionally covered at a high level to protect the research and therefore the electric grid and customers of California and the Nation. For further detail, clarification or questions we suggest discussion with the program team.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2012 Market Report on U.S. Wind Technologies in Distributed Applications

At the end of 2012, U.S. wind turbines in distributed applications reached a 10-year cumulative installed capacity of more than 812 MW from more than 69,000 units across all 50 states. In 2012 alone, nearly 3,800 wind turbines totaling 175 MW of distributed wind capacity were documented in 40 states and in the U.S. Virgin Islands, with 138 MW using utility-scale turbines (i.e., greater than 1 MW in size), 19 MW using mid-size turbines (i.e., 101 kW to 1 MW in size), and 18.4 MW using small turbines (i.e., up to 100 kW in size). Distributed wind is defined in terms of technology application based on a wind project’s location relative to end-use and power-distribution infrastructure, rather than on technology size or project size. Distributed wind systems are either connected on the customer side of the meter (to meet the onsite load) or directly to distribution or micro grids (to support grid operations or offset large loads nearby). Estimated capacity-weighted average costs for 2012 U.S. distributed wind installations was $\$$2,540/kW for utility-scale wind turbines, $\$$2,810/kW for mid-sized wind turbines, and $\$$6,960/kW for newly manufactured (domestic and imported) small wind turbines. An emerging trend observed in 2012 was an increased use of refurbished turbines. The estimated capacity-weighted average cost of refurbished small wind turbines installed in 2012 was $\$$4,080/kW. As a result of multiple projects using utility-scale turbines, Iowa deployed the most new overall distributed wind capacity, 37 MW, in 2012. Nevada deployed the most small wind capacity in 2012, with nearly 8 MW of small wind turbines installed in distributed applications. In the case of mid-size turbines, Ohio led all states in 2012 with 4.9 MW installed in distributed applications. State and federal policies and incentives continued to play a substantial role in the development of distributed wind projects. In 2012, U.S. Treasury Section 1603 payments and grants and loans from the U.S. Department of Agriculture’s Rural Energy for America Program were the main sources of federal funding for distributed wind projects. State and local funding varied across the country, from rebates to loans, tax credits, and other incentives. Reducing utility bills and hedging against potentially rising electricity rates remain drivers of distributed wind installations. In 2012, other drivers included taking advantage of the expiring U.S. Treasury Section 1603 program and a prosperous year for farmers. While 2012 saw a large addition of distributed wind capacity, considerable barriers and challenges remain, such as a weak domestic economy, inconsistent state incentives, and very competitive solar photovoltaic and natural gas prices. The industry remains committed to improving the distributed wind marketplace by advancing the third-party certification process and introducing alternative financing models, such as third-party power purchase agreements and lease-to-own agreements more typical in the solar photovoltaic market. Continued growth is expected in 2013.

distributed wind↗

Demonstration Assessment of Light-Emitting Diode (LED) Parking Lot Lighting in Leavenworth, KS

This report describes the process and results of a demonstration of solid-state lighting (SSL) technology in a commercial parking lot lighting application, under the U.S. Department of Energy (DOE) Solid-State Lighting Technology GATEWAY Demonstration Program. The parking lot is for customers and employees of a Walmart Supercenter in Leavenworth, Kansas and this installation represents the first use of the LED Parking Lot Performance Specification developed by the DOE’s Commercial Building Energy Alliance. The application is a parking lot covering more than a half million square feet, lighted primarily by light-emitting diodes (LEDs). Metal halide wall packs were installed along the building facade. This site is new construction, so the installed baseline(s) were hypothetical designs. It was acknowledged early on that deviating from Walmart’s typical design would reduce the illuminance on the site. Walmart primarily uses 1000W pulse-start metal halide (PMH) lamps. In order to provide a comparison between both typical design and a design using conventional luminaires providing a lower illuminance, a 400W PMH design was also considered. As mentioned already, the illuminance would be reduced by shifting from the PMH system to the LED system. The Illuminating Engineering Society of North America (IES) provides recommended minimum illuminance values for parking lots. All designs exceeded the recommended illuminance values in IES RP-20, some by a wider margin than others. Energy savings from installing the LED system compared to the different PMH systems varied. Compared to the 1000W PMH system, the LED system would save 63 percent of the energy. However, this corresponds to a 68 percent reduction in illuminance as well. In comparison to the 400W PMH system, the LED system would save 44 percent of the energy and provide similar minimum illuminance values at the time of relamping. The LED system cost more than either of the PMH systems when comparing initial costs. However, when the life-cycle costs from energy and maintenance were factored into the scenario, the LED system had lower costs at the end of a 10-year analysis period. The LED system had a 6.1 year payback compared to the 1000W PMH system and a 7.5 year payback versus the 400W PMH system. The costs reflect high initial cost for the LED luminaire, plus more luminaires and (subsequently) more poles for the LED system. The other major issue affecting cost effectiveness was that Leavenworth, Kansas has very low electricity costs. The melded rate for this site was $0.056 per kWh for electricity. However, if the national electricity rate of $0.1022/kWh was used the payback would change to between four and five years for the LED system. This demonstration met the GATEWAY requirements of saving energy, matching or improving illumination, and being cost effective. The project also demonstrated that the Commercial Building Energy Alliance (CBEA) specification works in practice. Walmart appreciated having an entire site lighted by LEDs to gain more experience with the technology. Walmart is reviewing the results of the demonstration as they consider their entire real estate portfolio.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Achieving Cooperative Community Equitable Solar Sources (ACCESS) (Final Technical Report)

Since 2011, solar has grown from a niche technology to a widely accessible source of power for homes and businesses across the United States and has become a fundamental part of the modern grid. There are still challenges, however, in learning how to integrate and use PV most effectively and how to make PV universally available. Most low- and moderate-income (LMI) customers cannot currently afford PV; capital costs and financing costs are too high to drive significant penetration. Providing access to LMI individuals and communities is a critical and immediate priority, and the focus of this project. The overall objective of the Achieving Cooperative Community Equitable Solar Sources (ACCESS) project is to explore and amplify the use of innovative, cost-effective energy access programs to serve co-ops’ LMI members1. ACCESS will research at least three financing mechanisms and at least six LMI program designs including LMI engagement strategies to maximize participation for these hard-to-reach audiences. ACCESS evaluated the financial mechanisms and program designs from field tests sited at diverse co-ops that provide recognizable models for the broader co-op community to identify optimal solutions for small utilities. The research with these cooperatives allowed testing of concepts and development of models and tools for other utilities to adapt to their own program designs and expansions. ACCESS published results and developed an “ACCESS Solar Access Toolkit” consisting of program designs, LMI engagement strategies, how-to guidance, and other tools to facilitate replication at small utilities across the country. Through the dissemination practices of the ACCESS project team, all NRECA member co-ops (~900) were made aware of the “ACCESS Solar Access Toolkit” and all other ACCESS resources. NRECA and its partners developed innovations to expand co-ops’ solar energy offerings to provide all of a co-op’s members—especially those who struggle to pay their bills—with cost-effective options that meet their needs. ACCESS specifically explored utility financing mechanisms and program designs that, independently or used in combination, increase solar access for rural electric cooperatives’ LMI members/ratepayers and that reduce LMI member/ratepayers’ electricity costs by at least 10%. LMI engagement strategies focused on maximizing the number of members who receive benefits and on the cost savings to LMI participants.

14 SOLAR ENERGY↗

University of Florida lightning research at the Kennedy Space Center

A variety of basic and applied research programs are being conducted at the Kennedy Space Center. As an example of this research, the paper describes the University of Florida program to characterize the electric and magnetic fields of lightning and the coupling of those fields to utility power lines. Specifically, detailed consideration is given to the measurements of horizontal and vertical electric fields made during the previous three summers at KSC and the simultaneous measurements of the voltages on a 500 m test line made during the past two summers at KSC. Theory to support these measurements is also presented.

Uman, Martin A.↗

SPC-3184 Rev 7 MARVEL Reactor Structures Build to Print Fabrication Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL Primary Coolant System (PCS), Fuel and Core System (FCS), and Reactor Sub-Structure Assemblies, including the Upper Confinement Structure.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗