Search NASA⌕ Search

SEARCH · Search NASA

Results for “electrolysis systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment, and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of June 2012, and describes the technical challenges encountered and lessons learned over the past year.

Carter, Layne↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment, and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of May 2011, and describes the technical challenges encountered and lessons learned over the past year.

Carter, Layne↗

Investigation of DMSD Trend in the ISS Water Processor Assembly

The ISS Water Recovery System (WRS) is responsible for providing potable water to the crew, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. The WRS includes the Water Processor Assembly (WPA) and the Urine Processor Assembly (UPA). The WPA processes condensate from the cabin air and distillate produced by the UPA. In 2010, an increasing trend in the Total Organic Carbon (TOC) in the potable water was ultimately identified as dimethylsilanediol (DMSD). The increasing trend was ultimately reversed after replacing the WPA's two multifiltration beds. However, the reason for the TOC trend and the subsequent recovery was not understood. A subsequent trend occurred in 2012. This paper summarizes the current understanding of the fate of DMSD in the WPA, how the increasing TOC trend occurred, and the plan for modifying the WPA to prevent recurrence.

Carter, Layne↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment, and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of June 2013, and describes the technical challenges encountered and lessons learned over the past year.

Carter, Layne↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment, and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of May 2015 and describes the technical challenges encountered and lessons learned over the past two years.

Carter, Layne↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of May 2016 and describes the technical challenges encountered and lessons learned over the past year.

Carter, Layne↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of June 2017 and describes the technical challenges encountered and lessons learned over the past year.

Carter, Layne↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment as of May 2018 and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA).

Carter, Layne↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment as of March 2022 and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA).

Water Recovery↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment as of March 2022 and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA).

Water Recovery↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment as of March 2023 and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA), Urine Processor Assembly (UPA), and Brine Processor Assembly (BPA).

Jill Williamson↗

Multi-scale Modeling Using IDAES

This presentation was delivered at the 2023 FECM / NETL Spring R&D Project Review Meeting. It demonstrated how the IDAES platform is enabling unique analyses across multiple scales. Focus areas included solid oxide fuel cell/solid oxide electrolysis cell-based integrated energy systems with the flexibility to produce both hydrogen and electricity as well as long term expansion planning of future decarbonized electricity grids.

Burgard, Anthony↗

TEDS-SOEC Non-Fired Boiler Repurpose

A brief presentation of the project to re-purpose the non-fired boiler that was previously installed in the TEDS-SOEC connection—the slides outline the project timeline and technical steps required to finish this project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Flexible Nuclear-Based Integrated Energy System

Presentation on a conceptual study of combining a small modular nuclear reactor (SMR) with a solid oxide fuel cell, solid oxide electrolysis cell, and a gas turbine as an integrated energy system with high operational flexibility and rapid load following. Virtually presented at the MILLENNIUM CLEAN and SUSTAINABLE POWER workshop 2025, University of Genoa, Italy.

flexibility↗

A real-time distributed solid oxide electrolysis cell (SOEC) model for cyber-physical simulation

System integration and dynamic operability between SOEC and balance-of-plant (BoP) components are major technical challenges before realizing rapid load following of SOEC systems. Cyber-physical simulation (CPS) is a leading-edge digital engineering approach and is regarded as the next step beyond Digital Twins. CPS approach can be used to research SOEC system integration and develop dynamic controls prior to actual pilot testing without using a real SOEC. To seamlessly couple with BoP hardware and access non-observable operational parameters (e.g., local temperature gradient) during transients, a distributed one-dimensional (1D) real-time SOEC model was developed. Its real-time execution was demonstrated for 20 to 640 nodes at the fixed time step of 5 ms. A higher excess air ratio enabled smaller local temperature gradients on SOEC solid materials and faster transients upon current density step change from 0.15 to 0.55 A cm -2 . During the transients, the magnitude of the peak temperature gradient nearly doubled in 10 s from -3.5 to -5.9 °C cm -1 . This represents a significant operating risk that can impact the dynamic operability of SOEC systems. In addition, the local temperature gradient was found to change directions on all nodes in SOEC solid materials, with the greatest impact on the upstream nodes. The SOEC model was also tested at the thermal neutral voltage using actual process air flow parameters as variable model inputs. Variable process air temperatures were found to induce alternating local temperature gradients on SOEC solid materials. These are new operational mechanisms for SOEC degradation relevant for load following operational modes yet distinct from previous reports. To mitigate these unfavorable features, the SOEC can be operated at voltages that are slightly (±20 mV) deviated from the thermal neutral voltage. Here, the corresponding net thermal energy change was less than 1.6% of the electric power consumption. This 1D real-time SOEC model established the basis of cyber-physical simulation of SOEC hybrid systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Alkaline regenerative fuel cell systems for energy storage

A description is presented of the results of a preliminary design study of a regenerative fuel cell energy storage system for application to future low-earth orbit space missions. The high energy density storage system is based on state-of-the-art alkaline electrolyte cell technology and incorporates dedicated fuel cell and electrolysis cell modules. In addition to providing energy storage, the system can provide hydrogen and oxygen for attitude control of the satellite and for life support. During the daylight portion of the orbit the electrolysis module uses power provided by the solar array to generate H2 and O2 from the product water produced by the fuel cell module. The fuel cell module supplies electrical power during the dark period of the orbit.

Schubert, F. H.↗

Advancements in Development and Testing of Thermal Power Dispatch Simulators

Flexible plant operations and generation (FPOG) offer nuclear power plants (NPPs) the chance to leverage alternative, non-electric revenue streams while ensuring their continued role as reliable, clean, and constant sources of baseload electrical power. The excess thermal energy generated from NPPs during periods of low electricity demand can be channeled as raw materials to numerous industrial processes via a thermal power dispatch (TPD) system. Hydrogen production via high-temperature steam electrolysis (HTSE) is an optimal use case based on technical and economic feasibility. Researchers at Idaho National Laboratory (INL) have conducted previous works that developed and implemented TPD system models within the GSE Solutions Generic Pressurized Water Reactor (GPWR) simulator to support human-in-the-loop (HITL) scenario-based evaluations. The first part of this report documents modifications made to the GPWR TPD model and HMI from the previous iteration in line with a new Sargent and Lundy (S&L) TPD design with an automatic control system. The was done in collaboration with Westinghouse using their three-loop pressurizer water reactor (W3LPWR) simulator which contains an industrial grade automatic control system for the TPD. This was installed in the Human Systems Simulation Laboratory (HSSL) at INL. The second part of the report documents findings from an all-hands-on-deck integration and verification workshop that was conducted in the HSSL over several days. The research team comprised INL human factors and TPD experts, a nuclear engineer from GSE Solutions who implemented the revised TPD model for GPWR, the human-machine interface (HMI) prototyping and human factors team from the University of Idaho, and personnel with operations experience with pressurized water reactors. The workshop provided time and expertise to conduct the final activities to bring the operations, HMI, and simulator into a functional state. The goals of the integration and verification workshop were: 1. to install the revised GPWR TPD model into the HSSL 2. verify the TPD HMI prototype was functional 3. integrate the HTSE Simulink model to GPWR. 3. Issues were identified for resolution, but overall the workshop accomplished its goal to integrated and verify the majority of the intended functional. Future work will resolve the identified issues and use the integrated simulation to support an evaluation and demonstration in the next fiscal year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗