Search NASA⌕ Search

SEARCH · Search NASA

Results for “fission power”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Testing of Liquid Metal Components for Nuclear Surface Power Systems

The Early Flight Fission Test Facility (EFF-TF) was established by the Marshall Space Flight Center (MSFC) to provide a capability for performing hardware-directed activities to support multiple in-space nuclear reactor concepts by using a non-nuclear test methodology. This includes fabrication and testing at both the module/component level and near prototypic reactor configurations. The EFF-TF is currently supporting an effort to develop an affordable fission surface power (AFSP) system that could be deployed on the Lunar surface. The AFSP system is presently based on a pumped liquid metal-cooled (Sodium-Potassium eutectic, NaK-78) reactor design. This design was derived from the only fission system that the United States has deployed for space operation, the Systems for Nuclear Auxiliary Power (SNAP) 10A reactor, which was launched in 1965. Two prototypical components recently tested at MSFC were a pair of Stirling power conversion units that would be used in a reactor system to convert heat to electricity, and an annular linear induction pump (ALIP) that uses travelling electromagnetic fields to pump the liquid metal coolant through the reactor loop. First ever tests were conducted at MSFC to determine baseline performance of a pair of 1 kW Stirling convertors using NaK as the hot side working fluid. A special test rig was designed and constructed and testing was conducted inside a vacuum chamber at MSFC. This test rig delivered pumped NaK for the hot end temperature to the Stirlings and water as the working fluid on the cold end temperature. These test were conducted through a hot end temperature range between 400 to 550C in increments of 50 C and a cold end temperature range from 30 to 70 C in 20 C increments. Piston amplitudes were varied from 6 to 1 1mm in .5 mm increments. A maximum of 2240 Watts electric was produced at the design point of 550 hot end, 40 C cold end with a piston amplitude of 10.5mm. This power level was reached at a gross thermal efficiency of 28%. A baseline performance map was established for the pair of 1kW Stirling convertors. The performance data will then be used for design modification to the Stirling convertors. The ALIP tested at MSFC has no moving parts and no direct electrical connections to the liquid metal containing components. Pressure is developed by the interaction of the magnetic field produced by the stator and the current which flows as a result of the voltage induced in the liquid metal contained in the pump duct. Flow is controlled by variation of the voltage supplied to the pump windings. Under steady-state conditions, pump performance is measured for flow rates from 0.5-4.3 kg/s. The pressure rise developed by the pump to support these flow rates is roughly 5-65 kPa. The RMS input voltage (phase-to-phase voltage) ranges from 5-120 V, while the frequency can be varied arbitrarily up to 60 Hz. Performance is quantified at different loop temperature levels from 50 C up to 650 C, which is the peak operating temperature of the proposed AFSP reactor. The transient response of the pump is also evaluated to determine its behavior during startup and shut-down procedures.

Polzin, Kurt A.↗

Nuclear Energy for Space Exploration

Nuclear power and propulsion systems can enable exciting space exploration missions. These include bases on the moon and Mars; and the exploration, development, and utilization of the solar system. In the near-term, fission surface power systems could provide abundant, constant, cost-effective power anywhere on the surface of the Moon or Mars, independent of available sunlight. Affordable access to Mars, the asteroid belt, or other destinations could be provided by nuclear thermal rockets. In the further term, high performance fission power supplies could enable both extremely high power levels on planetary surfaces and fission electric propulsion vehicles for rapid, efficient cargo and crew transfer. Advanced fission propulsion systems could eventually allow routine access to the entire solar system. Fission systems could also enable the utilization of resources within the solar system. Fusion and antimatter systems may also be viable in the future

Houts, Michael G.↗

End-to-End Demonstrator of the Safe Affordable Fission Engine (SAFE) 30: Power Conversion and Ion Engine Operation

The Safe Affordable Fission Engine (SAFE) test series addresses Phase 1 Space Fission Systems issues in particular non-nuclear testing and system integration issues leading to the testing and non-nuclear demonstration of a 400-kW fully integrated flight unit. The first part of the SAFE 30 test series demonstrated operation of the simulated nuclear core and heat pipe system. Experimental data acquired in a number of different test scenarios will validate existing computational models, demonstrated system flexibility (fast start-ups, multiple start-ups/shut downs), simulate predictable failure modes and operating environments. The objective of the second part is to demonstrate an integrated propulsion system consisting of a core, conversion system and a thruster where the system converts thermal heat into jet power. This end-to-end system demonstration sets a precedent for ground testing of nuclear electric propulsion systems. The paper describes the SAFE 30 end-to-end system demonstration and its subsystems.

Hrbud, Ivana↗

Radiation and Nuclear Technology in Planetary Cave Environments

Many technological and environmental challenges must be resolved to enable successful lunar habitation and exploration, and to maximize scientific return. This presentation is intended as a preliminary discussion on three such areas of interest with the intent to identify likely areas of mutual benefit for collaboration and data sharing between the space nuclear and radiological disciplines with the planetary cave community. First is the previously identified and studied possible application of lunar lava tubes or pits to reduce the solar and cosmic radiation environment burden on crew health and hardware reliability. This is an area of continued interest, and should be kept in the forefront of discussion during the selection of sites for potential exploration or long-term habitation. In theory, the prospect of using existing morphology presents an enticing opportunity to reduce the requirements on landed mass or construction while also reducing dose or fluence of harmful natural radiation. However, such discussions should also include the practical implications of relocating habitation hardware and personnel from a landing site to a subsurface location. Inherent risks associated with landing in proximity to the relevant terrain must also be considered and weighed against those imposed by the natural radiation environment. Second is a discussion on the means by which a long-term habitation module or base of operations may be powered throughout the lunar day-night cycle. Fission surface power presents an opportunity to establish round-the-clock power in any lunar surface environment, including permanently shadowed regions where solar panels cannot operate, or in any other non-polar region where solar radiation is available for no more than two weeks per four-week cycle. Among the drawbacks of fission surface power is the need to either land and co-locate a heavy shield to minimize radiological consequences to personnel or equipment, land and operate construction equipment capable of restructuring the in-situ regolith to provide appropriate shielding, or to make use of existing topology features (e.g. craters or pits) to serve as pre-formed radiation barriers. A realistic assessment of the practicality of this third option should involve the selection of candidate features from existing surveys, and assess the effectiveness of the approach using modern radiation transport methodologies. Consideration must be made for the needs to reject waste heat in the thermal power conversion process, which typically requires the use of large area radiators. Energy must be exchanged from the reactor and power conversion system to such radiators, and the impacts on thermal efficiency and secondary scatter of nuclear radiation must be considered. Further consideration should be made for the implications of placement of a power source such that it does not sacrifice valuable scientific opportunity. Placement of a reactor is likely to thereafter prevent personnel access within that feature. Third is a discussion on the use of portable radioisotope power systems (RPS) within confined spaces, both with respect to the dose effects of emitted nuclear radiation and also performance associated with emitted thermal radiation. Radioisotope power systems provide a unique capability to power objects with no reliance upon solar radiance. However, their useable power production relies upon the flow of heat from ‘hot side’ (decaying radioisotope) to ‘cold side’ (radiators emitting heat to space). In the case of a confined volume in vacuum such as a lunar lava tube, that radiated energy will absorb into the wall, which is already above the ‘cold background’ temperature of dark space, and then gradually rises in temperature. That temperature rise, and its implications on availability of useable electrical power, will depend upon factors such as enclosure volume, thermal emissivity/absorptivity, and thermal conductivity through the depth of absorbing media. The advantages of nuclear technology may prove to enable unique scientific exploration opportunities, both above the lunar surface and below. In turn, the unique advantages of lunar lava tubes or pits may present unique opportunities to enhance the application of these technologies and to mitigate the effects of radiation from both natural and technological sources. A discussion on these pairings may prove to be valuable to all, in our endeavor to explore our neighboring worlds.

Radiation↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Power deposition in volumetric /U-235/F6-He fission-pumped nuclear lasers

The power deposition in (U-235)F6-He fission-pumped nuclear lasers is studied. Specifically, means to maximize the energy density in the He gas are assessed. Primary loss mechanisms are identified as the fission-fragment transport to the laser-cell wall and UF6 gas excitation. The losses are thus strongly dependent on UF6 concentration. It is found that maximum power will be deposited in a laser tube when the tube radius is as large as the range of fission fragments. Experimental results indicate that when the tube radius equals the fission-fragment range, the ratio of a UF6 partial pressure to total pressure is 0.15, and the UF6-He mixing ratio is 1:6, maximum power will be deposited.

Wilson, J. W.↗

Space Nuclear Propulsion 101

The Fission Surface Power (FSP) project is a NASA effort to demonstrate a tens of kilowatt class nuclear fission reactor power system on the Moon in next decade. Fission technology promises a class of long-duration Sun-independent scalable power systems with applications across the Solar System. The FSP project is just the beginning of the journey for this technology. This presentation will showcase the current state of the project, technical goals and accomplishments, future plans, and how this technology may find exciting future applications.

fission↗

Powering Moon, Mars, and Beyond

A panel discussion on Fission Surface Power program outlining the progress made at NASA and national labs over time and the path forward. This panel will outline the technical achievements made for materials, power conversion, experiments and deployment. Panelists will cover a broad range of topics during their presentation and will be followed by an audience based Q&A afterwards.

fission surface power↗

Space Nuclear Power and Propulsion: Materials Challenges for the 21st Century

The current focus of NASA s space fission effort is Fission Surface Power (FSP). FSP systems could be used to provide power anytime, anywhere on the surface of the Moon or Mars. FSP systems could be used at locations away from the lunar poles or in permanently shaded regions, with no performance penalty. A potential reference 40 kWe option has been devised that is cost-competitive with alternatives while providing more power for less mass. The potential reference system is readily extensible for use on Mars. At Mars the system could be capable of operating through global dust storms and providing year-round power at any Martian latitude. To ensure affordability, the potential near-term, 40 kWe reference concept is designed to use only well established materials and fuels. However, if various materials challenges could be overcome, extremely high performance fission systems could be devised. These include high power, low mass fission surface power systems; in-space systems with high specific power; and high performance nuclear thermal propulsion systems. This tutorial will provide a brief overview of space fission systems and will focus on materials challenges that, if overcome, could help enable advanced exploration and utilization of the solar system.

Houts, Mike↗

Design and Test of Advanced Thermal Simulators for an Alkali Metal-Cooled Reactor Simulator

The Early Flight Fission Test Facility (EFF-TF) at NASA Marshall Space Flight Center (MSFC) has as one of its primary missions the development and testing of fission reactor simulators for space applications. A key component in these simulated reactors is the thermal simulator, designed to closely mimic the form and function of a nuclear fuel pin using electric heating. Continuing effort has been made to design simple, robust, inexpensive thermal simulators that closely match the steady-state and transient performance of a nuclear fuel pin. A series of these simulators have been designed, developed, fabricated and tested individually and in a number of simulated reactor systems at the EFF-TF. The purpose of the thermal simulators developed under the Fission Surface Power (FSP) task is to ensure that non-nuclear testing can be performed at sufficiently high fidelity to allow a cost-effective qualification and acceptance strategy to be used. Prototype thermal simulator design is founded on the baseline Fission Surface Power reactor design. Recent efforts have been focused on the design, fabrication and test of a prototype thermal simulator appropriate for use in the Technology Demonstration Unit (TDU). While designing the thermal simulators described in this paper, effort were made to improve the axial power profile matching of the thermal simulators. Simultaneously, a search was conducted for graphite materials with higher resistivities than had been employed in the past. The combination of these two efforts resulted in the creation of thermal simulators with power capacities of 2300-3300 W per unit. Six of these elements were installed in a simulated core and tested in the alkali metal-cooled Fission Surface Power Primary Test Circuit (FSP-PTC) at a variety of liquid metal flow rates and temperatures. This paper documents the design of the thermal simulators, test program, and test results.

Garber, Anne E.↗

Physics and potentials of fissioning plasmas for space power and propulsion

A brief description of two gas core reactor concepts devised for propulsion applications is presented and recent research on the emission of radiation from nonequilibrium fissioning gases is considered. The principles of UF6 and plasma core reactor experiments are discussed. It is expected that the program of nuclear gas core reactor experiments can lead in several years to reactor operation at pressures, temperatures, and power levels of technological significance to terrestrial applications.

Thom, K.↗

Overview of Multi-Kilowatt Free-Piston Stirling Power Conversion Research at Glenn Research Center

As a step towards development of Stirling power conversion for potential use in Fission Surface Power (FSP) systems, a pair of commercially available 1 kW class free-piston Stirling convertors and a pair of commercially available pressure wave generators (which will be plumbed together to create a high power Stirling linear alternator test rig) have been procured for in-house testing at Glenn Research Center (GRC). Delivery of both the Stirling convertors and the linear alternator test rig is expected by October 2007. The 1 kW class free-piston Stirling convertors will be tested at GRC to map and verify performance. The convertors will later be modified to operate with a NaK liquid metal pumped loop for thermal energy input. The high power linear alternator test rig will be used to map and verify high power Stirling linear alternator performance and to develop power management and distribution (PMAD) methods and techniques. This paper provides an overview of the multi-kilowatt free-piston Stirling power conversion work being performed at GRC.

Geng, Steven M.↗

Overview of Multi-kilowatt Free-Piston Stirling Power Conversion Research at GRC

As a step towards development of Stirling power conversion for potential use in Fission Surface Power (FSP) systems, a pair of commercially available 1 kW class free-piston Stirling convertors and a pair of commercially available pressure wave generators (which will be plumbed together to create a high power Stirling linear alternator test rig) have been procured for in-house testing at Glenn Research Center. Delivery of both the Stirling convertors and the linear alternator test rig is expected by October, 2007. The 1 kW class free-piston Stirling convertors will be tested at GRC to map and verify performance. The convertors will later be modified to operate with a NaK liquid metal pumped loop for thermal energy input. The high power linear alternator test rig will be used to map and verify high power Stirling linear alternator performance and to develop power management and distribution (PMAD) methods and techniques. This paper provides an overview of the multi-kilowatt free-piston Stirling power conversion work being performed at GRC.

Geng, Steven M.↗

Summary of Test Results From a 1 kW(sub e)-Class Free-Piston Stirling Power Convertor Integrated With a Pumped NaK Loop

As a step towards development of Stirling power conversion for potential use in Fission Surface Power (FSP) systems, a pair of commercially available 1 kW class free-piston Stirling convertors was modified to operate with a NaK liquid metal pumped loop for thermal energy input. This was the first-ever attempt at powering a free-piston Stirling engine with a pumped liquid metal heat source and is a major FSP project milestone towards demonstrating technical feasibility. The tests included performance mapping the convertors over various hot and cold-end temperatures, piston amplitudes and NaK flow rates; and transient test conditions to simulate various start-up and fault scenarios. Performance maps of the convertors generated using the pumped NaK loop for thermal input show increases in power output over those measured during baseline testing using electric heating. Transient testing showed that the Stirling convertors can be successfully started in a variety of different scenarios and that the convertors can recover from a variety of fault scenarios.

Briggs, Maxwell H.↗

Summary of Test Results From a 1 kWe-Class Free-Piston Stirling Power Convertor Integrated With a Pumped NaK Loop

As a step towards development of Stirling power conversion for potential use in Fission Surface Power (FSP) systems, a pair of commercially available 1 kW class free-piston Stirling convertors was modified to operate with a NaK liquid metal pumped loop for thermal energy input. This was the first-ever attempt at powering a free-piston Stirling engine with a pumped liquid metal heat source and is a major FSP project milestone towards demonstrating technical feasibility. The tests included performance mapping the convertors over various hot and cold-end temperatures, piston amplitudes and NaK flow rates; and transient test conditions to simulate various start-up and fault scenarios. Performance maps of the convertors generated using the pumped NaK loop for thermal input show increases in power output over those measured during baseline testing using electric heating. Transient testing showed that the Stirling convertors can be successfully started in a variety of different scenarios and that the convertors can recover from a variety of fault scenarios.

Briggs, Maxwell H.↗

Test Results From a Pair of 1-kWe Dual-Opposed Free-Piston Stirling Power Convertors Integrated With a Pumped NaK Loop

As a step towards development of Stirling power conversion for potential use in Fission Surface Power (FSP) systems, a pair of commercially available 1-kW-class free-piston Stirling convertors were modified to operate with a NaK (sodium (Na) and potassium (K)) liquid metal pumped loop for thermal energy input. This was the first-ever attempt at powering a free-piston Stirling engine with a pumped liquid metal heat source and is a major FSP project milestone towards demonstrating technical feasibility. The convertors were successfully tested at the Marshall Space Flight Center (MSFC) from June 6 through July 14, 2009. The convertors were operated for a total test time of 66 hr and 16 min. The tests included (a) performance mapping the convertors over various hot- and cold-end temperatures, piston amplitudes, and NaK flow rates and (b) transient test conditions to simulate various startup (i.e., low-, medium-, and high-temperature startups) and fault scenarios (i.e., loss of heat source, loss of NaK pump, convertor stall, etc.). This report documents the results of this testing

Geng, Steven M.↗

NASA Utilization of Space Nuclear Systems for Robotic and Human Exploration Missions: Response to EO 13972: Promoting Small Nuclear Reactors for National Defense and Space Exploration

Space Nuclear Systems (SNS) technology development offers a wide range of capabilities to support NASA’s current and future missions. Executive Order (EO) 13972, “Promoting Small Modular Reactors for National Defense and Space Exploration” [1], issued 5 January 2021, directs NASA to define requirements for NASA utilization of nuclear energy systems for human and robotic exploration missions through 2040 and analyze the costs and benefits of such requirements.” Although it is premature to define requirements and cost for future exploration missions that have not yet been formulated, this report describes planned objectives and missions by 2040 that are enabled or enhanced by nuclear systems while taking into account a number of unique considerations for nuclear energy in the space environment. Nuclear energy systems are enabling for space missions and critical capabilities where conventional forms of energy production are impractical or impossible due to mass constraints, mission duration, or distance from the Sun. Space nuclear technologies available or in development for use by 2040 utilize radioisotope decay or nuclear fission and fall into three categories: heat, power, and propulsion. Current applications utilize radioisotope power systems that provide consistent and reliable performance in the sub-kilowatt power range. More advanced SNS can enable new mission objectives where high energy density solutions are critical, or where access to solar solutions is prohibitive. Higher power radioisotope and fission systems are under development within NASA for a wide variety of human exploration and science mission applications. Planned missions designed to use radioisotope systems include Dragonfly, a rotorcraft that will explore the surface of Titan, and Persephone, a mission concept for a Pluto orbiter. Nuclear fission systems have the key advantage of providing significantly higher power, lower mass solutions from tens to even thousands of kilowatts. Fission power is enabling to a sustained human presence on the Moon and developing a robust lunar economy. Fission propulsion is enabling for missions within and beyond cis-lunar space. This report examines NASA-envisioned mission applications and associated performance needs for SNS over the next twenty years leading to 2040 along with the unique technical considerations posed by space nuclear technology development. This includes engineering and operational logistics for ground handling, thermal management, survival of the space environment, operational safety, power requirements, and service longevity. Safety to the public, the NASA work force, and agency assets remains a top priority for NASA and particular attention is given to this aspect in the design, hardware assembly, ground operation, launch, and mission operation of an SNS. NASA relies on the Department of Energy as nuclear authority and its legacy of rigorous safety procedures as standards for ground development, test, transportation, and launch site operation. The principal concern is preventing unintended radiological release to the public or environment. Radioisotope system experience has established processes, including ground operation, transportation, and launch, that are considered directly applicable to emerging fission systems; however, fission systems have unique design needs that impact the safety and performance requirements. High efficiency power conversion from both fission and radioisotope systems requires high operating temperatures necessitating both passive and active thermal management to maintain safe and nominal operating conditions. Effective cooling and waste heat rejection have special considerations for space applications, whether in zero-g or reduced gravity. Fluid and heat transfer within the reactor system is not anticipated to be impacted by reduced or zero-g environments. Cryogenic working fluids and propellant supplies utilized in some space nuclear applications will need low mass, high capacity cryocoolers to meet the long-term storage and near zero-boiloff needs. Integrated, high power density SNS capable of being packaged in a single vehicle is a key consideration for NASA. Due to concerns for complexity and reliability, in space reactor assembly and reactor refueling are not current design considerations. Expanding into a new era for space exploration depends on mass-efficient, high-energy solutions to power deep-space vehicles, operate in harsh environments, and increase mission flexibility. NASA nuclear technology investments are targeting power for surface operations and propulsion for fast-transit, deep-space missions, all with the ability to reliably operate without the need for repair or refueling. NASA’s goals, enabled by nuclear technologies, provide for exciting advances in scientific objectives and human exploration, ushering in a new space age that enables a human presence on bodies beyond our Earth.

nuclear↗