Search NASA⌕ Search

SEARCH · Search NASA

Results for “human-rating”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Excavation of Exploration Toilet Fecal Canister from ISS Operations and Future Mission Impacts

Space exploration requires accommodations for crew members similar to survival on Earth including food and water, clothing, and protection from the environment. In addition, allowances for biological processes such as breathing, defecation and urination must be provided. In a micro-gravity environment, these are particularly challenging. Optimizing the consumables needed for these activities is a vital part of the spacecraft design as well as providing mass/volume for science cargo and the crew needs such as food and clothing. NASA has collected use rates for the consumables needed for defecation and urination over the decades of human-rated space travel. Most recently, the exploration toilet demonstration on International Space Station (ISS) provided data on defecation in the form of a returned canister which collected 13 days of fecal deposits, wipes, gloves and compaction plates. The canister was excavated by a dedicated team of engineers at Johnson Space Center (JSC) to provide the latest information on deposit size and weight, number of wipes and gloves used, and compaction efficiency which directly relates to the number of canisters needed. Although this is only one canister, the data found has been directly applied to manifest decisions for the Orion Artemis-2 mission. Future canisters will add to this data set. Details on what was found and how it compares to historical numbers as well as how it will be used for exploration missions will be covered in this paper.

Toilet↗

Ground Winds Experienced by the Space Launch System Rocket on the Pad before the Artemis I Launch

Over the course of the development of the Space Launch System (SLS) human-rated heavy-lift launch vehicle, the magnitude and nature of the ground winds experienced by the rocket and its Mobile Launcher (ML) on Pad 39B at the NASA Kennedy Space Center (KSC) became a more critical environment that required characterization as well as a more accurate prediction of the vehicle and ML response in the form of detailed wind loads. The numerous reasons for the sensitivity of the launch system to these ground winds and the growing importance of high fidelity rollout and launch pad wind loading estimates are discussed in this article. A description of the wind measurement instrumentation at and around the Launch Complex is provided. A methodology is developed to estimate from these raw anemometer measurements the winds experienced by the rocket and mobile launcher on the launch pad, either in real time or during post-processing. An analysis is then performed and documented on the 121 days worth of wind measurements recorded while the SLS vehicle was secured on the pad during various launch attempts and wet dress rehearsals. This included the occurrence of a tropical storm that evolved into a named hurricane by the time it arrived on Cape Canaveral and hit the vehicle while sitting on the launch pad. Plans for further developments to improve on this predictive capability in preparation for Artemis II are also presented.

Jeremy T Pinier↗

Space Launch System Base Aerothermodynamics Post-Flight Reconstruction for Artemis I

Artemis I was the first uncrewed integrated test flight of the NASA heavy-lift, human-rated, exploration-class launch vehicle, Space Launch System (SLS), and Orion spacecraft. Artemis I successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2023. The integrated test flight is composed of launch and ascent of the SLS vehicle from lift-off to RS-25 main engine cut-off (MECO), interim cryogenic propulsion stage (ICPS) in-space flight and Orion’s trajectory around the moon and landing in the Pacific Ocean which occurred on December 11th, 2023. The SLS total thrust of 8,800,000 lbf is powered by four LOX/LH2 RS-25 engines and two 5-segment solid rocket boosters. As a result, base flow environments for this vehicle are highly complex and extreme. SLS base aerothermodynamics covers rocket plume-induced convection and radiation of the vehicle’s aft region during powered flight from lift-off to MECO. This work discusses the SLS base flow physics observed during Artemis I and comparisons of post-flight reconstruction with pre-flight models and Space Shuttle data. This is the first time in-depth base heating flight reconstruction has been investigated for an exploration-class launch vehicle since the Saturn V Program.

aerothermodynamics↗

Ground Winds Experienced by the Space Launch System Rocket on the Pad before the Artemis I Launch

Over the course of the development of the Space Launch System (SLS) human-rated heavy-lift launch vehicle, the magnitude and nature of the ground winds experienced by the rocket and its Mobile Launcher (ML) on Pad 39B at the NASA Kennedy Space Center (KSC) became a more critical environment that required characterization as well as a more accurate prediction of the vehicle and ML response in the form of detailed wind loads. The numerous reasons for the sensitivity of the launch system to these ground winds and the growing importance of high fidelity rollout and launch pad wind loading estimates are discussed in this article. A description of the wind measurement instrumentation at and around the Launch Complex is provided. A methodology is developed to estimate from these raw anemometer measurements the winds experienced by the rocket and mobile launcher on the launch pad, either in real time or during post-processing. An analysis is then performed and documented on the 121 days worth of wind measurements recorded while the SLS vehicle was secured on the pad during various launch attempts and wet dress rehearsals. This included the occurrence of a tropical storm that evolved into a named hurricane by the time it arrived on Cape Canaveral and hit the vehicle while sitting on the launch pad. Plans for further developments to improve on this predictive capability in preparation for Artemis II are also presented.

Jeremy T. Pinier↗

Space Launch System Base Aerodynamics Post-Flight Reconstruction for Artemis I

Artemis I was the first uncrewed integrated test flight of the NASA heavy-lift, human-rated, exploration-class launch vehicle, Space Launch System (SLS), and Orion spacecraft. Artemis I successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2022. The integrated test flight was composed of launch and ascent of SLS vehicle from lift-off to RS-25 main engine cut-off (MECO), interim cryogenic propulsion stage (ICPS) in-space flight and Orion’s trajectory around the moon and landing in the Pacific Ocean which occurred on December 11th, 2022. The SLS total thrust of 8,800,000 lbf was powered by four LOX/LH2 RS-25 engines and two 5-segment solid rocket boosters. As a result, the base flow field had highly complex phenomena and regimes. SLS base aerodynamics covers vehicle base pressure and integrated axial force during powered flight from lift-off to MECO. This work discusses the SLS base flow physics observed during Artemis I and comparisons of post-flight reconstruction with pre-flight models and Space Shuttle data. This was the first time in-depth base aerodynamics flight reconstruction has been investigated for an exploration-class launch vehicle since the Saturn V Program.

aerothermodynamics↗

Space Launch System Base Aerothermodynamics Post-Flight Reconstruction for Artemis I

Artemis I was the first uncrewed integrated test flight of the NASA heavy-lift, human-rated, exploration-class launch vehicle, Space Launch System (SLS), and Orion spacecraft. Artemis I successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2023. The integrated test flight is composed of launch and ascent of the SLS vehicle from lift-off to RS-25 main engine cut-off (MECO), interim cryogenic propulsion stage (ICPS) in-space flight and Orion’s trajectory around the moon and landing in the Pacific Ocean which occurred on December 11th, 2023. The SLS total thrust of 8,800,000 lbf is powered by four LOX/LH2 RS-25 engines and two 5-segment solid rocket boosters. As a result, base flow environments for this vehicle are highly complex and extreme. SLS base aerothermodynamics covers rocket plume-induced convection and radiation of the vehicle’s aft region during powered flight from lift-off to MECO. This work discusses the SLS base flow physics observed during Artemis I and comparisons of post-flight reconstruction with pre-flight models and Space Shuttle data. This is the first time in-depth base heating flight reconstruction has been investigated for an exploration-class launch vehicle since the Saturn V Program.

aerothermodynamics↗

Base Aerodynamics Post-Flight Reconstruction for Artemis I

Artemis I was the first uncrewed integrated test flight of the NASA heavy-lift, human-rated, exploration-class launch vehicle, Space Launch System (SLS), and Orion spacecraft. Artemis I successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2022. The integrated test flight was composed of launch and ascent of SLS vehicle from lift-off to RS-25 main engine cut-off (MECO), interim cryogenic propulsion stage (ICPS) in-space flight and Orion’s trajectory around the moon and landing in the Pacific Ocean which occurred on December 11th, 2022. The SLS total thrust of 8,800,000 lbf was powered by four LOX/LH2 RS-25 engines and two 5-segment solid rocket boosters. As a result, the base flow field had highly complex phenomena and regimes. SLS base aerodynamics covers vehicle base pressure and integrated axial force during powered flight from lift-off to MECO. This work discusses the SLS base flow physics observed during Artemis I and comparisons of post-flight reconstruction with pre-flight models and Space Shuttle data. This was the first time in-depth base aerodynamics flight reconstruction has been investigated for an exploration-class launch vehicle since the Saturn V Program.

aerothermodynamics↗

Historical Retrospective on Orion GNC Design

On November 16, 2022, Artemis I successfully launched and began a nearly 26-day journey returning a human-rated spacecraft to the Moon for the first time in fifty years. The mission was a huge success and once again the world's attention was focused on the Moon. This paper will take a step back in time over the seventeen-plus years of design and development of the Orion Guidance Navigation and Control (GNC) system that carried the spacecraft 1.4 million miles around the Moon and landed safely back on earth off the coast of San Diego California. Key design decisions (good and not so good) and "first-ever" capabilities will be chronicled. This paper will explore such things as the most advanced on-board targeting system ever flown on a spacecraft, never-been-done-before autonomous planetary Optical Navigation, and the first-ever truly skip entry guided to the desired target within a few miles.

Guidance Navigation and Control↗

Historical Retrospective on Orion GNC Design

On November 16, 2022, Artemis I successfully launched and began a nearly 26-day journey returning a human-rated spacecraft to the Moon for the first time in fifty years. The mission was a huge success and once again the world's attention was focused on the Moon. This paper will take a step back in time over the seventeen-plus years of design and development of the Orion Guidance Navigation and Control (GNC) system that carried the spacecraft 1.4 million miles around the Moon and landed safely back on earth off the coast of San Diego California. Key design decisions (good and not so good) and "first-ever" capabilities will be chronicled. This paper will explore such things as the most advanced on-board targeting system ever flown on a spacecraft, never-been-done-before autonomous planetary Optical Navigation, and the first-ever truly skip entry guided to the desired target within a few miles.

Guidance Navigation and Control↗

Future Lunar Surface Network Study: Final Project Report-Unlimited Data Rights

Nokia of America Corporation (Nokia) powered by the research and innovation of Nokia Bell Labs, is honored to have been asked by NASA to conduct a Systems Engineering and Integration (SE&I) study to evaluate an Initial Operating Capability (IOC) for a 3rd Generation Partnership Project (3GPP)-based future lunar surface communication network for the Artemis Program. In particular, the SE&I study has focused on developing an architecture and a 3GPP-based network solution that meets the requirements of the Artemis V mission and at the same time can be evolved and expanded to meet the needs and requirements of future missions in the Moon to Mars program. Nokia strongly believes that 3GPP-based communications and networking solutions present the most effective and future-proof technological path for advanced lunar surface communications (and beyond) for the next decades. 3GPP technologies (whether 4G, 5G or 6G in the future) have revolutionized voice, video, and data transmissions on Earth in consumer, enterprise, and industrial applications, and continue to enable significant gains in productivity, efficiency, and safety. The same benefits can be harnessed for space missions and the future lunar economy including, but not limited to the Artemis program. 3GPP technologies will revolutionize lunar surface communications by increasing data-rates, reducing latency, and providing critical voice, video and data communication capabilities across large surface areas while meeting the stringent reliability requirements of human-rated space flight missions.

Nokia Bell Labs↗

Excavation of Exploration Toilet Fecal Canister From ISS Operations and Future Mission Impacts

Space exploration requires accommodations for crew members similar to survival on Earth including food and water, clothing, and protection from the environment. In addition, allowances for biological processes such as breathing, defecation and urination must be provided. In a micro-gravity environment, these are particularly challenging. Optimizing the consumables needed for these activities is a vital part of the spacecraft design as well as providing mass/volume for science cargo and the crew needs such as food and clothing. NASA has collected use rates for the consumables needed for defecation and urination over the decades of human-rated space travel. Most recently, the exploration toilet demonstration on International Space Station (ISS) provided data on defecation in the form of a returned canister which collected 13 days of fecal deposits, wipes, gloves and compaction plates. The canister was excavated by a dedicated team of engineers at Johnson Space Center (JSC) to provide the latest information on deposit size and weight, number of wipes and gloves used, and compaction efficiency which directly relates to the number of canisters needed. Although this is only one canister, the data found has been directly applied to manifest decisions for the Orion Artemis-2 mission. Future canisters will add to this data set. Details on what was found and how it compares to historical numbers as well as how it will be used for exploration missions will be covered in this paper.

Toilet↗

Modeling NASA’s Procedural Requirement Processes - Implications for Digital Future

The National Aeronautics and Space Administration (NASA) has an ongoing Digital Transformation effort and to leverage and showcase the power of Digital Transformation, an effort is underway to develop an integrated, datacentric, model representing NASA’s key process requirements. The task was divided into three phases: As Is modeling, Analysis, and To Be Planning. As part of this effort, a team has completed the first Phase I of the modeling task and is nearing completion of the second phase. This effort will capture the key elements as requirements, responsibilities, allocations, roles, products, and associated lifecycle elements. The scope of modeling included NASA’s NPR 7120.5 (Project and Program Management), NPR 7123.1 (Systems Engineering) and NPRs 8705.2 (Risk classification for Robotic Missions) and 8705.4 (Human-Rating Requirements for Space Missions). This paper will summarize the approach, scope, parsing patterns applied, metamodel, and associated workflows for the As-Is modeling. It will also summarize the results and insights gleaned during that phase, including the review process. These insights have informed the analysis and will be discussed. The analysis modeling phase will also be summarized including how the stakeholders were engaged, how the common elements were handled and dispositioned, and will also describe some of the plans for the future of NASA NPDs and NPRs.

Systems Engineering↗

Eleven Countries, an Integrated Spacecraft: the Story of International Collaboration that Built the Orion Spacecraft and Powered the Success of the Artemis I Mission

The quest to return humans to the Moon in the next step towards humanity's exploration of space is more alive than ever. After a great deal of achievements, failures, and lessons learned, the Artemis I mission set o to the Moon on November 16, 2022, with the goal of testing a new rocket, the Space Launch System, and a new spacecraft, Orion: designed, assembled, and tested across two continents, and 11 countries. Behind this mission, decades of experience with the International Space Station, Autonomous Transfer Vehicle operations, and many other program collaborations built the know-how on how to succeed together in the toughest environment | deep space. The Artemis I mission proved to be an incredible success, meeting 161 total mission objectives, including 21 developed during the flight based on outperforming spacecraft. It was also a case-study in international collaboration, given that ESA, NASA, and industry partners Airbus and Lockheed Martin for the first time had to design, build, test, and fly a fully integrated human-rated spacecraft, with most critical functions dependent and interconnected across U.S. and European systems. The U.S.-built Orion Crew Module and Crew Module Adapter and European-built European Service Module (ESM) shared critical interfaces and commodities, from propulsion, avionics, active/passive thermal, electrical power generation, storage and distribution to the software that managed it all. In this paper, we will describe relevant aspects of the integrated spacecraft design, providing context for the challenges that the team faced in all phases required to get Orion ready to fly, and provide a direct account of how the joint team formed, trained, and supported the operations of the successful Artemis I mission. We will also explore the evolution of the partnerships, given that these allow a multi-national e ort to sustain the program production, share costs, leverage a broader base of engineering expertise, and build more diverse capabilities over the long haul to support the Artemis goals and objectives. Lastly, we will cover critical lessons learned and how the Orion Program has implemented these in preparation of the next Artemis missions to repeat the success of Artemis I. The purpose of this paper is to document knowledge we gained and lessons we learned through the development of an integrated Orion spacecraft, since it is imperative we build on this now, at the dawn of the Artemis Program, an international endeavor to push human space exploration.

Deep Space Exploration↗

Excavation of Exploration Toilet Fecal Canister from ISS Operations and Future Mission Impacts

Space exploration requires accommodations for crew members similar to survival on Earth including food and water, clothing, and protection from the environment. In addition, allowances for biological processes such as breathing, defecation and urination must be provided. In a micro-gravity environment, these are particularly challenging. Optimizing the consumables needed for these activities is a vital part of the spacecraft design as well as providing mass/volume for science cargo and the crew needs such as food and clothing. NASA has collected use rates for the consumables needed for defecation and urination over the decades of human-rated space travel. Most recently, the exploration toilet demonstration on International Space Station (ISS) provided data on defecation in the form of a returned canister which collected 13 days of fecal deposits, wipes, gloves and compaction plates. The canister was excavated by a dedicated team of engineers at Johnson Space Center (JSC) to provide the latest information on deposit size and weight, number of wipes and gloves used, and compaction efficiency which directly relates to the number of canisters needed. Although this is only one canister, the data found has been directly applied to manifest decisions for the Orion Artemis-2 mission. Future canisters will add to this data set. Details on what was found and how it compares to historical numbers as well as how it will be used for exploration missions will be covered in this paper.

Toilet↗

An Eddy Current Case Study using NASA’s Transfer Function and Limited-Sample Probability of Detection Guidebooks

Probability of detection (POD) requirements for NASA fracture-critical human-rated systems can be met by (1) claiming ‘similarity’ to NASA Standard Nondestructive Evaluation (NDE) flaw sizes or (2) by inspector-specific POD demonstration, known as NASA Special NDE. Standard NDE flaw sizes are intended to represent the detection capability of most qualified inspectors, and were primarily based on POD studies in the development of the Space Shuttle Program Orbiter fracture control plan. However, these Standard NDE flaw sizes were based on fatigue cracks in flat panels of one material alloy over a limited range of panel thicknesses. While the POD study was comprehensive, the inspection conditions are relatively narrow. An evaluation of similarity between the Standard NDE POD study and flight component conditions is required to apply Standard NDE to specific flight component inspections. A similarity evaluation may include differences in materials, surface finish, component geometry (e.g., curvature, corners, welds), and inspection access. Similarity is typically based on a qualitative engineering evaluation. Recently, NASA published a quantitative methodology to assess similarity. If similarity is not supported by test and analysis, then the methodology provides a transfer function of flaw size for Special NDE POD demonstration. NASA recommends that Special POD demonstrations use flaws that are flight-like or more difficult to detect than flight component flaws, which are commonly induced fatigue cracks. Often, it is not feasible to induce fatigue cracks in flight component geometry, and therefore, a simpler representative geometry is used, commonly a flat panel, for POD demonstration. Inducing cracks in simple geometry specimens can be time-consuming and expensive, and thus, minimizing the number of flawed specimens is desired. Traditionally, NASA Special NDE demonstration was limited to MIL-HDBK-1823A methods or the binomial point-estimate method (PEM), commonly known as 29/29. Recently, NASA published a limited-sample POD (LS-POD) methodology for signal-response NDE techniques (e.g., eddy current) that provides POD demonstration with fewer specimens than previous approaches. LS-POD suggests a minimum of 10 flawed specimens, compared to 29 in the PEM and the suggested minimum of 40 from MIL-HDBK-1823A. The methodology also includes new guidance on evaluating the probability of false calls. In this presentation, these new transfer function and LS-POD methodologies are described and illustrated through an eddy current detection capability of far-side flaws on thin welded panels. A geometry-based transfer function is developed using electro-discharge machined (EDM) notches in flight component and simple geometry to estimate the Special NDE flaw size that is representative of the critical initial flaw size required by the fracture analysis. Then, fatigue cracks are induced in simple flat panels of the transferred flaw size, and the LS-POD methodology is used for Special NDE demonstration.

P. A. Parker↗

Flight Certification Approach for NASA's Space Launch System

NASA’s Space Launch System (SLS) vehicle was successfully launched on November 16, 2022, initiating the Artemis I mission to send the uncrewed Orion spacecraft to the Moon and further into space than any human-rated spacecraft had previously flown. Flight certification of the launch vehicle was part of the systems engineering and integration (SE&I) effort conducted by NASA to successfully certify the mission and begin a new era of human space exploration of the Moon and eventually Mars. This paper describes the SLS Program flight certification approach including the organization, processes, and reporting. This approach used traditional NASA SE&I milestone reviews and lessons learned from the Space Shuttle Program, as well as unique methods to certify the complex system, procedures, and personnel readiness. The approach utilized by the SLS Program to conduct flight certification for the Artemis I mission can be extended to address flight certification for other complex programs.

flight certification↗

Modeling NASA’s Procedural Requirement Processes – Implications for a Digital Future

The National Aeronautics and Space Administration (NASA) has an ongoing Digital Transformation effort and to leverage and showcase the power of Digital Transformation, an effort is underway to develop an integrated, datacentric, model representing NASA’s key process requirements. The task was divided into three phases: As Is modeling, Analysis, and To Be Planning. As part of this effort, a team has completed the first Phase I of the modeling task and is nearing completion of the second phase. This effort will capture the key elements as requirements, responsibilities, allocations, roles, products, and associated lifecycle elements. The scope of modeling included NASA’s NPR 7120.5 (Project and Program Management), NPR 7123.1 (Systems Engineering) and NPRs 8705.2 (Risk classification for Robotic Missions) and 8705.4 (Human-Rating Requirements for Space Missions).

NPR↗

Considerations for Using Autonomous Flight Termination Software in Crewed Launch Vehicles

Autonomous flight termination systems (AFTS) are being progressively employed onboard launch vehicles to replace ground personnel and infrastructure needed to terminate flight or destruct the vehicle should an anomaly occur. This automation uses on-board real-time data and encoded logic to determine if the flight should be self-terminated. For uncrewed launch vehicles, FTS systems are required to protect the public and governed by the United States Space Force (USSF). For crewed missions, NASA must augment range AFTS requirements for crew safety and certify each flight according to human rating standards, thus adding unique requirements for reuse of software originally intended for uncrewed missions. This bulletin summarizes new information relating to AFTS to raise awareness of key distinctions, summarize considerations and outline best practices for incorporating AFTS into human-rated systems.

Avionics↗