Search NASA⌕ Search

SEARCH · Search NASA

Results for “installation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Pyrolysis of Radioactive Spent Resins in the PRIME Installation - 20190

Montair and Belgoprocess developed the pilot PRIME (Pyrolysis Resins In Mobile Electric) Installation for treatment of spent resins in one single reactor without pre-treatment and without intermixing of other waste, allowing for easy traceability and isotopic characterization of the end product. Both low level waste (LLW, < 2 mSv/h) and medium level waste (MLW, > 2 mSv/h) can be treated in the installation. The PRIME pilot installation is designed to treat 2 batches of 100 liter of saturated ion exchange resins over a period of 24 hours. A dosing unit with screw feeder is used for the dosing of the saturated ion exchange resins to the pyrolysis reactor. This completely new developed innovative pyrolysis reactor contains a special design mechanical stirrer and can operate at a temperature of up to 600 deg. C under inert conditions. As a result, the organic molecules will decompose at an accelerated rate until only the mineralized material remains. The lower temperature and the absence of oxygen also prevent the breakdown of ion exchange resins into (powdery) ash, which is a considerable advantage during further handling. Gases that are released during drying and pyrolysis are treated in an also newly developed thermal oxidizer, which uses an innovative, electrically heated design instead of a traditional natural gas- or fuel oil secondary combustion chamber design. After passing through the thermal oxidizer, the gases are cooled down to saturation temperature and treated in the wet scrubbing system. An extraction fan keeps the system under negative pressure to prevent the possibility of any off-gas leakage out of the system. A series of tests were performed successfully with wet cationic resins, anionic resins and a mixture of both. The results of these tests are described in the presentation. For intellectual property protection, the system and process of pyrolysis of organic waste and the system of thermal oxidation of pyrolysis gases described in this paper are patent pending. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Preliminary Analysis of a U.S. Geothermal Heat Pump Installation Database

This paper seeks to addresses the significant gap in the literature regarding the installation and adoption of geothermal heat pump (GHP) systems in the United States. While the "2021 U.S. Geothermal Power Production and District Heating Market Report" published by the National Renewable Energy Laboratory (NREL) focused on direct-use geothermal district heating systems, it did not include an analysis of GHP installations (Robins et al. 2021). To bridge this gap, NREL has compiled a novel database currently containing 70,470 records of GHP installations, primarily sourced from state well permits and small-scale studies. Our methodology emphasizes the collection, cleaning, and standardization of data, addressing challenges such as inconsistent reporting formats and privacy concerns. Despite limitations in data on capacity, costs, and performance, our preliminary geospatial analysis reveals insights into the distribution of GHP systems across urban and rural areas and climate zones. The paper highlights the importance of publicly accessible data for advancing GHP technology adoption with a discussion of existing data sources and their limitations, advocating for improved collaboration between NREL and industry stakeholders.

data collection↗

Production and installation of wavelength-shifting reflective light enhancers for the Short-Baseline Near Detector

We report on the design, production, and installation of a wavelength-shifting reflective system on the cathode of the Short-Baseline Near Detector (SBND), a liquid argon time projection chamber located along the Fermilab Booster Neutrino Beam. To increase and homogenize scintillation-light collection, 64 double-sided plates were fabricated from FR4, laminated with specular reflector film and coated with 300 $μ$g/cm$^2$ of tetraphenyl butadiene (TPB) wavelength shifter using controlled physical vapor deposition. The coating uniformity was validated through dedicated measurements of deposited mass and profilometry studies. Because exposure to ambient blue/UV light could degrade the TPB, protective filtering and controlled storage conditions were implemented during handling and installation. The coated plates were assembled between conductive meshes for high-voltage compatibility and installed in situ during detector integration. This system constitutes the largest TPB-coated area deployed in a neutrino detector. It operates in conjunction with SBND's photon detection system, which consists of photomultiplier tubes and X-ARAPUCAs. Early light-collection measurements show high uniformity and light response across the detector, supporting improved triggering, calorimetry, and position reconstruction in SBND.

Acciarri, R. [Fermilab]↗

DEVELOPMENT, INSTALLATION AND OPERATION OF THE MPC&A OPERATIONS MONITORING (MOM) SYSTEM AT THE JOINT INSTITUTE FOR NUCLEAR RESEARCH (JINR) DUBNA, RUSSIA

The Material Protection, Control and Accounting (MPC&A) Operations Monitoring (MOM) systems handling at the International Intergovernmental Organization - Joint Institute for Nuclear Research (JINR) is described in this paper. Category I nuclear material (plutonium and uranium) is used in JINR research reactors, facilities and for scientific and research activities. A monitoring system (MOM) was installed at JINR in April 2003. The system design was based on a vulnerability analysis, which took into account the specifics of the Institute. The design and installation of the MOM system was a collaborative effort between JINR, Brookhaven National Laboratory (BNL) and the U.S. Department of Energy (DOE). Financial support was provided by DOE through BNL. The installed MOM system provides facility management with additional assurance that operations involving nuclear material (NM) are correctly followed by the facility personnel. The MOM system also provides additional confidence that the MPC&A systems continue to perform effectively.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Extra-Territorial Siting of Nuclear Installations

Arrangements might be created for siting nuclear installations on land ceded by a host State for administration by an international or multinational organization. Such arrangements might prove useful in terms of resolving suspicions of proliferation in troubled areas of the world, or as a means to introduce nuclear activities into areas where political, financial or technical capabilities might otherwise make such activities unsound, or as a means to enable global solutions to be instituted for major nuclear concerns (e.g., spent fuel management). The paper examines practical matters associated with the legal and programmatic aspects of siting nuclear installations, including diplomatic/political frameworks, engaging competent industrial bodies, protection against seizure, regulation to ensure safety and security, waste management, and conditions related to the dissolution of the extra-territorial provisions as may be agreed as the host State(s) achieve the capabilities to own and operate the installations. The paper considers the potential for using such a mechanism across the spectrum of nuclear power activities, from mining to geological repositories for nuclear waste. The paper considers the non-proliferation dimensions associated with such arrangements, and the pros and cons affecting potential host States, technology vendor States, regional neighbors and the international community. It considers in brief potential applications in several locations today.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

GHPsRUS: Geothermal Heat Pump Employment and Installation Price Data

The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

15 GEOTHERMAL ENERGY↗

An evaluation of a risk-based environmental regulation in Brazil: Limitations to risk management of hazardous installations

The environmental regulation of hazardous projects with risk-based decision-making processes can lead to a deficient management of human exposure to technological hazards. Such an approach for regulation is criticized for simplifying the complexity of decisions involving the economic, social, and environmental aspects of the installation and operation of hazardous facilities in urban areas. Results of a Brazilian case study indicate that oil and gas transmission pipelines may represent a threat to diverse communities if the relationship between such linear projects and human populations is overlooked by regulatory bodies. Results also corroborate known challenges to the implementation of EIA processes and outline limitations to an effective environmental and risk management. Two preliminary topics are discussed to strengthen similar regulatory practices. Firstly, an effective integration between social impact assessment and risk assessment in EIA processes to have a more comprehensive understanding of the social fabric. Secondly, the advancement of traditional management practices for hazardous installations to pursue a strong transition from assessment and evaluation to management and control and to promote an effective interaction between land-use planning and environmental regulation.

54 ENVIRONMENTAL SCIENCES↗

Revisiting the Effects of Photovoltaic Module Efficiency on Installed System Cost and Market Adoption

We conduct bottom-up analysis of how PV module efficiency could influence residential rooftop installed system costs, using models with improved representation of how soft costs and power electronics are affected by efficiency. We show that the amount of system installed cost savings resulting from high efficiency modules depends on whether or not the system is area-constrained, with much larger savings for the area-constrained case. We then estimate the fraction of physically area-constrained rooftops in the United States to be 61%, with variation between 20% to over 80% of rooftops depending on the state. We find that fraction of area-constrained systems could grow to over 88% by 2050 if building and transportation loads are electrified.

efficiency↗

Update on Geothermal Direct-Use Installations in the United States

An updated database of geothermal direct-use systems in the U.S. has been compiled and analyzed, building upon the Oregon Institute of Technology (OIT) Geo-Heat Center direct-use database. Types of direct-use applications examined include hot springs resorts and pools, aquaculture farms, greenhouses, and district heating systems, among others; power-generating facilities and ground-source heat pumps were excluded. Where possible, the current operation status, open and close dates, well data, and other technical data were obtained for each entry. The database contains 545 installations, of which 407 are open, 108 are closed, and 30 have an unknown status. A report is also included which details and analyzes current geothermal direct-use installations and barriers to further implementation.

15 GEOTHERMAL ENERGY↗

Guidance: Requirements for Installing Renewable Fuel Pumps at Federal Fleet Fueling Centers under EISA Section 246: Federal Fleet Program, Federal Energy Management Program, U.S. Department of Energy, Revised April 2011

On December 19, 2007, the Energy Independence and Security Act of 2007 (EISA) was signed into law as Public Law 110-140. Section 246(a) of EISA directs Federal agencies to install at least one renewable fuel pump at each Federal fleet fueling center under their jurisdiction by January 1, 2010. Section 246(b) requires the President to submit an annual report to Congress on Federal agency progressin meeting this renewable fuel pump installation mandate. This guidance document provides guidelines to help agencies understand these requirements and how to comply with EISA Section 246.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Broad Overview of Energy Efficiency and Renewable Energy Opportunities for Department of Defense Installations

The Strategic Environmental Research and Developmental Program (SERDP)/Environmental Security Technology Certification Program (ESTCP) is the Department of Defense?s (DOD) environmental science and technology program focusing on issues related to environment and energy for the military services. The SERDP/ESTCP Office requested that the National Renewable Energy Laboratory (NREL) providetechnical assistance with strategic planning by evaluating the potential for several types of renewable energy technologies at DOD installations. NREL was tasked to provide technical expertise and strategic advice for the feasibility of geothermal resources, waste-to-energy technology, photovoltaics (PV), wind, microgrids, and building system technologies on military installations. Thistechnical report is the deliverable for these tasks.

14 SOLAR ENERGY↗

Guidance. Requirements for Installing Renewable Fuel Pumps at Federal Fleet Fueling Centers under EISA Section 246

On December 19, 2007, the Energy Independence and Security Act of 2007 (EISA) was signed into law as Public Law 110-140. Section 246(a) of EISA directs Federal agencies to install at least one renewable fuel pump at each Federal fleet fueling center under their jurisdiction by January 1, 2010. Section 246(b) requires the President to submit an annual report to Congress on Federal agency progress in meeting this renewable fuel pump installation mandate. This guidance document provides guidelines to help agencies understand these requirements and how to comply with EISA Section 246.

annual report to Congress↗

Solar Access to Public Capital (SAPC) Working Group: Best Practices in Commercial and Industrial (C&I) Solar Photovoltaic System Installation; Period of Performance: November 28, 2014-September 1, 2015

This Best Practices in Commercial and Industrial Solar Photovoltaic System Installation Guide is the second of a series of guides designed to standardize and improve solar asset transparency for investors and rating agencies, provide an industry framework for quality management, and reduce transaction costs in the solar asset securitization process. The Best Practices in C&I PV System Installation Guide is intended to outline the minimum requirements for commercial and industrial solar project developments. Adherence to the guide is voluntary. Providers that adhere to the guide are responsible for self-certifying that they have fulfilled the guide requirements. Investors and rating agencies should verify compliance.

14 SOLAR ENERGY↗

Residential HVAC Installation Practices: A Review of Research Findings

This report summarizes relevant findings from available literature and research that were evaluated to better quantify the potential benefits of improving current installation practices for heating, ventilation, and air conditioning (HVAC) equipment in existing homes (i.e., equipment replacements). Although some of the findings may be informative and applicable to the new construction market, this report focuses on analyses specific to the single-family residential HVAC replacement market. The research findings summarized in this report reveal that improving the installation of central heating and air conditioning systems has the potential to decrease operating and maintenance costs, decrease equipment purchase price, improve indoor air quality and overall indoor comfort, and reduce household energy consumption by mitigating a variety of common system performance issues.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Solar PV Manufacturing Cost Model Group: Installed Solar PV System Prices (Presentation)

EERE's Solar Energy Technologies Program is charged with leading the Secretary's SunShot Initiative to reduce the cost of electricity from solar by 75% to be cost competitive with conventional energy sources without subsidy by the end of the decade. As part of this Initiative, the program has funded the National Renewable Energy Laboratory (NREL) to develop module manufacturing and solar PVsystem installation cost models to ensure that the program's cost reduction targets are carefully aligned with current and near term industry costs. The NREL cost analysis team has leveraged the laboratories' extensive experience in the areas of project finance and deployment, as well as industry partnerships, to develop cost models that mirror the project cost analysis tools used by projectmanagers at leading U.S. installers. The cost models are constructed through a 'bottoms-up' assessment of each major cost element, beginning with the system's bill of materials, labor requirements (type and hours) by component, site-specific charges, and soft costs. In addition to the relevant engineering, procurement, and construction costs, the models also consider all relevant costs to aninstaller, including labor burdens and overhead rates, supply chain costs, and overhead and materials inventory costs, and assume market-specific profits.

14 SOLAR ENERGY↗

Prediction of the safety level to an installation of the tritium process through predictive maintenance

The safety level for personnel and environment to a nuclear installation is given in generally by the technological process quality of operation and maintenance and in particular by a lot of technical, technological, economic and human factors. The maintenance role is fundamental because it has to quantify all the technical, economic and human elements as an integrated system for it creates an important feedback for activities concerning the life cycle of the nuclear installation. In maintenance activities as in any dynamic area, new elements appear continuously which, sometimes require new approaches. The theory of fuzzy logic and the software LabVIEW supplied to the Nuclear Detritiation Plant (NDP) is part of National Research and Development Inst. for Cryogenics and Isotopic Technologies-ICIT, Rm.Valcea, used for predictive maintenance to assure safety operation. The final aim is to achieve the best practices for maintenance of the Plant that processes tritium. (authors)

07 ISOTOPE AND RADIATION SOURCES↗