LS-DYNA Analysis of a Full-Scale Helicopter Crash Test

A full-scale crash test of an MD-500 helicopter was conducted in December 2009 at NASA Langley's Landing and Impact Research facility (LandIR). The MD-500 helicopter was fitted with a composite honeycomb Deployable Energy Absorber (DEA) and tested under vertical and horizontal impact velocities of 26 ft/sec and 40 ft/sec, respectively. The objectives of the test were to evaluate the performance of the DEA concept under realistic crash conditions and to generate test data for validation of a system integrated LS-DYNA finite element model. In preparation for the full-scale crash test, a series of sub-scale and MD-500 mass simulator tests was conducted to evaluate the impact performances of various components, including a new crush tube and the DEA blocks. Parameters defined within the system integrated finite element model were determined from these tests. The objective of this paper is to summarize the finite element models developed and analyses performed, beginning with pre-test and continuing through post test validation.

Annett, Martin S.↗

Experimental evaluation of direct current magnetron sputtered and high-power impulse magnetron sputtered Cr coatings on SiC for light water reactor applications

Two types of physical vapor deposition Cr coatings were deposited on chemical vapor deposited SiC coupons using conventional direct current magnetron sputtering (DCMS) and high-power impulse magnetron sputtering (HiPIMS) to mitigate the corrosion of SiC, an advanced fuel and structural material in light water nuclear reactor cores. Coating microstructure was characterized using scanning electron microscopy and scanning transmission election microscopy. X-ray diffraction analysis was conducted for phase identification and qualitative analysis of residual stresses. The mechanical integrity of the coatings was evaluated using scratch testing, micro-indentation, and nano-indentation tests. Additionally, the microstructure of the DCMS coating consisted of fine columnar grains with nanoscale intercolumnar channels, while the HiPIMS microstructure was denser and free of any columnar defects. The DCMS coating showed a small tensile residual stress, while the HiPIMS coating was under compressive stress. Both types of coatings showed good mechanical integrity in terms of ductility and adhesion to the substrate. Corrosion performance of the coatings was assessed with a 30-day high temperature water autoclave test. Both types of coatings formed a protective Cr 2 O 3 surface layer 20-30 nm thick during the autoclave test. In the DCMS coating, the columnar defects provided permeation pathways for water penetration resulting in oxide formation in the intercolumnar regions in the interior of the coating. Overall, both types of Cr coatings offer promise for the mitigation of hydrothermal corrosion of SiC in light water reactor operating environments.

36 MATERIALS SCIENCE↗

Ares Launch Vehicles Overview: Space Access Society

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission in ways that promote leadership in space and economic expansion on the new frontier. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed to return people to the Moon and go to Mars. The Vision commits NASA and the nation to an agenda of exploration that also includes robotic exploration and technology development, while building on lessons learned over 50 years of hard-won experience. NASA is building on common hardware, shared knowledge, and unique experience derived from the Apollo Saturn, Space Shuttle, and contemporary commercial launch vehicle programs. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, which transports the Orion Crew Exploration Vehicle, and the Ares V Cargo Launch Vehicle, which transports the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit, where it will rendezvous with the Lunar Module in the Earth Departure Stage, which will then propel the combination into lunar orbit. The imperative to explore space with the combination of astronauts and robots will be the impetus for inventions such as solar power and water and waste recycling. This next chapter in NASA's history promises to write the next chapter in American history, as well. It will require this nation to provide the talent to develop tools, machines, materials, processes, technologies, and capabilities that can benefit nearly all aspects of life on Earth. Roles and responsibilities are shared between a nationwide Government and industry team. The Exploration Launch Projects Office at the Marshall Space Flight Center manages the design, development, testing, and evaluation of both vehicles and serves as lead systems integrator. A little over a year after it was chartered, the Exploration Launch Projects team is testing engine components, refining vehicle designs, performing wind tunnel tests, and building hardware for the first flight test of Ares I-X, scheduled for spring 2009. The Exploration Launch Projects team conducted the Ares I System Requirements Review (SRR) at the end of 2006. In Ares' first year, extensive trade studies and evaluations were conducted to refine the design initially recommended by the Exploration Systems Architecture Study, conceptual designs were analyzed for fitness, and the contractual framework was assembled to enable a development effort unparalleled in American space flight since the Space Shuttle. Now, the project turns its focus to the Preliminary Design Review (PDR), scheduled for 2008. Taking into consideration the findings of the SRR, the design of the Ares I is being tightened and refined to meet the safety, operability, reliability, and affordability goals outlined by the Constellation Program. The Ares V is in the early design stage, focusing its activities on requirements validation and ways to develop this heavy-lift system so that synergistic hardware commonality between it and the Ares I can reduce the operational footprint and foster sustained exploration across the decades ahead.

Cook, Steve↗

Integration time required to extract accurate static and dynamic data from transonic wind-tunnel tests

Because the forces and pressures on wind-tunnel models tested at transonic speeds are not steady, even for 'static' aerodynamic tests, integration time is required to obtain data of acceptable accuracy. The integration time required for both static and dynamic tests is evaluated analytically and confirmed by experimental measurements. It is shown that, for static and dynamic tests, the accuracy obtained is a function of integration time, frequency content of the signal, and the ratio of the dynamic amplitude to the full signal of interest. In addition, for the dynamic case, the frequency band width used in analysis is important. Results of this study indicate that, for typical data accuracy desired from models in a large transonic wind tunnel (11- by 11-ft), up to the following integration times are required: static force and moment tests, 0.5 sec; static pressure tests, 0.1 sec; flutter tests, 30 to 60 sec; and random-dynamic tests, 10 sec.

Muhlstein, L., Jr.↗

Integration Time Required to Extract Accurate Data from Transonic Wind-Tunnel Tests

Because the forces and pressures on wind-tunnel models tested at transonic speeds are not steady, even for static aerodynamic tests, integration time is required to obtain data of acceptable accuracy. The integration time required for both static and dynamic tests is evaluated analytically and confirmed by experimental measurements. It is shown that, for static and dynamic tests, the accuracy obtained is a function of integration time, frequency of the signal, and the ratio of the dynamic amplitude to the full signal of interest. In addition, for the dynamic case, the frequency bandwidth used in analysis is important. Results of this study indicate that, for typical data accuracy desired from models in a large transonic wind tunnel (11- by 11-ft), up to the following integration times are required: static force and moment tests, 0.5 s; static pressure tests, 1 s; flutter tests, 30 to 60 s; and random-dynamic tests, 10 s.

Muhlstein, Lado, Jr.↗

An Evaluation of Visual and Textual Network Analysis Tools

User testing is an integral component of user-centered design, but has only rarely been applied to visualization for cyber security applications. This article presents the results of a comparative evaluation between a visualization-based application and a more traditional, table-based application for analyzing computer network packet captures. We conducted this evaluation as part of the user-centered design process. Participants performed both structured, well-defined tasks and exploratory, open-ended tasks with both tools. We measured accuracy and efficiency for the well-defined tasks, number of insights was measured for exploratory tasks and user perceptions were recorded for each tool. The results of this evaluation demonstrated that users performed significantly more accurately in the well-defined tasks, discovered a higher number of insights and demonstrated a clear preference for the visualization tool. The study design presented may be useful for future researchers performing user testing on visualization for cyber security applications.

99 GENERAL AND MISCELLANEOUS↗

High Temperature Storage Loop

A three year plan for thermal energy storage (TES) research was created at Sandia National Laboratories in the spring of 2012. This plan included a strategic goal of providing test capability for Sandia and for the nation in which to evaluate high temperature storage (>650ÀC) technology. The plan was to scope, design, and build a flow loop that would be compatible with a multitude of high temperature heat transfer/storage fluids. The High Temperature Storage Loop (HTSL) would be reconfigurable so that it was useful for not only storage testing, but also for high temperature receiver testing and high efficiency power cycle testing as well. In that way, HTSL was part of a much larger strategy for Sandia to provide a research and testing platform that would be integral for the evaluation of individual technologies funded under the SunShot program. DOE s SunShot program seeks to reduce the price of solar technologies to 6 /kWhr to be cost competitive with carbon-based fuels. The HTSL project sought to provide evaluation capability for these SunShot supported technologies. This report includes the scoping, design, and budgetary costing aspects of this effort.

Gill, David Dennis↗

Safeguard: Progress and Test Results for a Reliable Independent On-Board Safety Net for UAS

As demands increase to use unmanned aircraft systems (UAS) for a broad spectrum of commercial applications, regulatory authorities are examining how to safely integrate them without compromising safety or disrupting traditional airspace operations. For small UAS, several operational rules have been established; e.g., do not operate beyond visual line-of-sight, do not fly within five miles of a commercial airport, do not fly above 400 feet above ground level. Enforcing these rules is challenging for UAS, as evidenced by the number of incident reports received by the Federal Aviation Administration (FAA). This paper reviews the development of an onboard system - Safeguard - designed to monitor and enforce conformance to a set of operational rules defined prior to flight (e.g., geospatial stay-out or stay-in regions, speed limits, and altitude constraints). Unlike typical geofencing or geo-limitation functions, Safeguard operates independently of the off-the-shelf UAS autopilot and is designed in a way that can be realized by a small set of verifiable functions to simplify compliance with existing standards for safety-critical systems (e.g. for spacecraft and manned commercial transportation aircraft systems). A framework is described that decouples the system from any other devices on the UAS as well as introduces complementary positioning source(s) for applications that require integrity and availability beyond what can be provided by the Global Positioning System (GPS). This paper summarizes the progress and test results for Safeguard research and development since presentation of the design concept at the 35th Digital Avionics Systems Conference (DASC '16). Significant accomplishments include completion of software verification and validation in accordance with NASA standards for spacecraft systems (to Class B), development of improved hardware prototypes, development of a simulation platform that allows for hardware-in-the-loop testing and fast-time Monte Carlo evaluations, and flight testing on multiple air vehicles. Integration testing with NASA's UAS Traffic Management (UTM) service-oriented architecture was also demonstrated.

Young, Steven D.↗

A procedure for merging land cover/use data from LANDSAT, aerial photography, and map sources: Compatibility, accuracy, and cost. Remote Sensing Project

Regional planning agencies are currently expressing a need for detailed land cover/use information to effectively meet the requirements of various federal programs. Individual data sources have advantages and limitations in fulfilling this need, both in terms of time/cost and technological capability. A methodology has been developed to merge land cover/use data from LANDSAT, aerial photography and map sources to maximize the effective use of a variety of data sources in the provision of an integrated information system for regional analysis. A test of the proposed inventory method is currently under way in four central Michigan townships. This test will evaluate the compatibility, accuracy and cost of the integrated method with reference to inventories developed from a single data source, and determine both the technological feasibility and analytical potential of such a system.

Enslin, W. R.↗

Full-Scaled Advanced Systems Testbed: Ensuring Success of Adaptive Control Research Through Project Lifecycle Risk Mitigation

The National Aeronautics and Space Administration's Dryden Flight Research Center completed flight testing of adaptive controls research on the Full-Scale Advance Systems Testbed (FAST) in January of 2011. The research addressed technical challenges involved with reducing risk in an increasingly complex and dynamic national airspace. Specific challenges lie with the development of validated, multidisciplinary, integrated aircraft control design tools and techniques to enable safe flight in the presence of adverse conditions such as structural damage, control surface failures, or aerodynamic upsets. The testbed is an F-18 aircraft serving as a full-scale vehicle to test and validate adaptive flight control research and lends a significant confidence to the development, maturation, and acceptance process of incorporating adaptive control laws into follow-on research and the operational environment. The experimental systems integrated into FAST were designed to allow for flexible yet safe flight test evaluation and validation of modern adaptive control technologies and revolve around two major hardware upgrades: the modification of Production Support Flight Control Computers (PSFCC) and integration of two, fourth-generation Airborne Research Test Systems (ARTS). Post-hardware integration verification and validation provided the foundation for safe flight test of Nonlinear Dynamic Inversion and Model Reference Aircraft Control adaptive control law experiments. To ensure success of flight in terms of cost, schedule, and test results, emphasis on risk management was incorporated into early stages of design and flight test planning and continued through the execution of each flight test mission. Specific consideration was made to incorporate safety features within the hardware and software to alleviate user demands as well as into test processes and training to reduce human factor impacts to safe and successful flight test. This paper describes the research configuration, experiment functionality, overall risk mitigation, flight test approach and results, and lessons learned of adaptive controls research of the Full-Scale Advanced Systems Testbed.

Pavlock, Kate M.↗

Semi-integral LOCA test of cold-spray chromium coated zircaloy-4 accident tolerant fuel cladding

Enhancing the accident tolerance of PWRs came under serious consideration following the 2011 Fukushima Daiichi nuclear power plant events. While the current nuclear fuels are based on mature technology and have an excellent operational record, further enhancing their strength through accident tolerant fuel (ATF) research and development continues to be of interest. Particularly, the chromium coated clad ATF technology represents an evolutionary change to improve the high temperature performance of existing Zircaloy claddings. Additionally, despite several years of investigation of coated cladding, the integral loss of coolant accident (LOCA) performance of chromium coated cladding has had little attention. In this work, cold-spray chromium coated zircaloy-4 claddings are evaluated using EDF's semi-integral LOCA test facility. Results show that the chromium coating induces a reduced ballooning and burst and an increased burst temperature in the investigated conditions. However, these tests exhibit limited benefits concerning the post-quench behavior of the coated specimens which occurs in the last stage of a prototypical LOCA scenario.

36 MATERIALS SCIENCE↗

Using Dynamic Interface Modeling and Simulation to Develop a Launch and Recovery Flight Simulation for a UH-60A Blackhawk

Joint Shipboard Helicopter Integration Process (JSHIP) is a Joint Test and Evaluation (JT&E) program sponsored by the Office of the Secretary of Defense (OSD). Under the JSHDP program is a simulation effort referred to as the Dynamic Interface Modeling and Simulation System (DIMSS). The purpose of DIMSS is to develop and test the processes and mechanisms that facilitate ship-helicopter interface testing via man-in-the-loop ground-based flight simulators. Specifically, the DIMSS charter is to develop an accredited process for using a flight simulator to determine the wind-over-the-deck (WOD) launch and recovery flight envelope for the UH-60A ship/helicopter combination. DIMSS is a collaborative effort between the NASA Ames Research Center and OSD. OSD determines the T&E and warfighter training requirements, provides the programmatics and dynamic interface T&E experience, and conducts ship/aircraft interface tests for validating the simulation. NASA provides the research and development element, simulation facility, and simulation technical experience. This paper will highlight the benefits of the NASA/JSHIP collaboration and detail achievements of the project in terms of modeling and simulation. The Vertical Motion Simulator (VMS) at NASA Ames Research Center offers the capability to simulate a wide range of simulation cueing configurations, which include visual, aural, and body-force cueing devices. The system flexibility enables switching configurations io allow back-to-back evaluation and comparison of different levels of cueing fidelity in determining minimum training requirements. The investigation required development and integration of several major simulation system at the VMS. A new UH-60A BlackHawk interchangeable cab that provides an out-the-window (OTW) field-of-view (FOV) of 220 degrees in azimuth and 70 degrees in elevation was built. Modeling efforts involved integrating Computational Fluid Dynamics (CFD) generated data of an LHA ship airwake and integrating a real-time ship motion model developed based on a batch model from Naval Surface Warfare Center. Engineering development and integration of a three degrees-of-freedom (DOF) dynamic seat to simulate high frequency rotor-dynamics dependent motion cues for use in conjunction with the large motion system was accomplished. The development of an LHA visual model in several different levels of resolution and an aural cueing system in which three separate fidelity levels could be selected were developed. VMS also integrated a PC-based E&S simFUSION system to investigate cost effective IG alternatives. The DIMSS project consists of three phases that follow an approved Validation, Verification and accreditation (VV&A) process. The first phase will support the accreditation of the individual subsystems and models. The second will follow the verification and validation of the integrated subsystems and models, and will address fidelity requirements of the integrated models and subsystems. The third and final phase will allow the verification and validation of the full system integration. This VV&A process will address the utility of the simulated WOD launch and recovery envelope. Simulations supporting the first two stages have been completed and the data is currently being reviewed and analyzed.

Sweeney, Christopher↗

Evaluation of the Netherlands' International Test Facility for Smart Grids

The Netherlands Enterprise Agency (Rijksdienst voor Ondernemend Nederland, or RVO) engaged the U.S. National Renewable Energy Laboratory (NREL) for two primary purposes: to evaluate the International Test Facility for Smart Grids (ITF) sponsored by RVO and to learn best practices for integrated test facilities from NREL's Energy Systems Integration Facility (ESIF). This report covers the ITF evaluation and is largely based on a one-week visit to the Netherlands in November 2014.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of an Integrated Gas-Cooled Reactor Simulator and Brayton Turbine-Generator

A closed-loop brayton cycle, powered by a fission reactor, offers an attractive option for generating both planetary and in-space electric power. Non-nuclear testing of this type of system provides the opportunity to safely work out integration and system control challenges for a modest investment. Recognizing this potential, a team at Marshall Space Flight Center has evaluated the viability of integrating and testing an existing gas-cooled reactor simulator and a modified commercially available, off-the-shelf, brayton turbine-generator. Since these two systems were developed independently of one another, this evaluation had to determine if they could operate together at acceptable power levels, temperatures, and pressures. Thermal, fluid, and structural analyses show that this combined system can operate at acceptable power levels and temperatures. In addition, pressure drops across the reactor simulator, although higher than desired, are also viewed as acceptable. Three potential working fluids for the system were evaluated: N2, He/Ar, and He/Xe. Other potential issues, such as electrical breakdown in the generator and the operation of the brayton foil bearings using various gas mixtures, were also investigated.

Hissam, David Andy↗

Transient performance evaluation of an integrated heat pipe-thermal storage system

Transient performance tests of an integrated heat pipe-thermal storage system have been conducted. This system was developed as a part of an Organic Rankine Cycle-Solar Dynamic Power System receiver for future power systems. The integrated system consists of potassium heat pipe elements that incorporate thermal energy storage canisters within the vapor space and an organic fluid (toluene) heater tube used as the condenser region of the heat pipe. The transient performance tests determined the operating characteristics and power input limits of the integrated heat pipe-thermal storage unit under conditions corresponding to re-acquisition of the sun during emergence from eclipse conditions and to the initial start-up of the solar dynamic power system. The tests demonstrated that the heat pipe-thermal storage element is not limited under conditions corresponding to emergence from eclipse during normal orbital operations and the heat pipe will successfully start-up from the frozen condition with full input power at the onset. Details of the test procedures and results of the tests are presented in this paper.

Keddy, E.↗

BEAST: Expanding Sustainable Data Infrastructure for High-Enthalpy Facilities

Reproducible, data-driven thermal protection system (TPS) research requires that experimental records from high-enthalpy testing be consistently structured, traceable, and accessible across campaigns and institutions. In practice, however, arcjet and plasma facilities data remain largely fragmented: raw diagnostics are stored in ad hoc formats, material sample histories are disconnected from test conditions, and metadata standards are absent, precluding systematic cross-campaign analysis and long-term reuse. BEAST (Backend for Experiment Analysis, Storage, and Traceability) is an open-source, web-based platform that addresses these limitations by providing a unified, queryable infrastructure for high-enthalpy ground-test data [1]. First presented at the 15th Ablation Workshop [2], BEAST has since undergone significant development. The platform ingests and structures multi-channel time-series diagnostics, facility configurations, and material property records within a common provenance model, ensuring end-to-end traceability from raw sensor acquisition to reduced experimental quantities. A versioned material library links specimen identity and processing history to the specific runs in which each sample was tested. An integrated modeling workbench enables training and evaluation of regression models directly on archived experimental data, supporting condition interpolation and the construction of empirical material response databases. Beyond its original deployment at NASA Ames Research Center, BEAST has been designed to be facility-agnostic, with ongoing efforts to extend its adoption to other facilities. Its modular architecture accommodates heterogeneous diagnostic setups and facility types, and its future open-source distribution allows institutions to build on a common data standard rather than maintaining isolated, bespoke solutions. BEAST is further integrated within a broader ecosystem of companion tools: arcjetCV [3] extracts recession rates and shock standoff distances from high-speed video using computer vision, and miniSTARscan [4] provides sub-minute, portable photogrammetric surface reconstruction of test articles before and after exposure. All tools share a common data schema, enabling seamless ingestion of surface geometry, imagery, and time-series data into a single, coherent experimental record.

Database↗

BEAST: Expanding Sustainable Data Infrastructure for High-Enthalpy Facilities

Reproducible, data-driven thermal protection system (TPS) research requires that experimental records from high-enthalpy testing be consistently structured, traceable, and accessible across campaigns and institutions. In practice, however, arcjet and plasma facilities data remain largely fragmented: raw diagnostics are stored in ad hoc formats, material sample histories are disconnected from test conditions, and metadata standards are absent, precluding systematic cross-campaign analysis and long-term reuse. BEAST (Backend for Experiment Analysis, Storage, and Traceability) is an open-source, web-based platform that addresses these limitations by providing a unified, queryable infrastructure for high-enthalpy ground-test data [1]. First presented at the 15th Ablation Workshop [2], BEAST has since undergone significant development. The platform ingests and structures multi-channel time-series diagnostics, facility configurations, and material property records within a common provenance model, ensuring end-to-end traceability from raw sensor acquisition to reduced experimental quantities. A versioned material library links specimen identity and processing history to the specific runs in which each sample was tested. An integrated modeling workbench enables training and evaluation of regression models directly on archived experimental data, supporting condition interpolation and the construction of empirical material response databases. Beyond its original deployment at NASA Ames Research Center, BEAST has been designed to be facility-agnostic, with ongoing efforts to extend its adoption to other facilities. Its modular architecture accommodates heterogeneous diagnostic setups and facility types, and its future open-source distribution allows institutions to build on a common data standard rather than maintaining isolated, bespoke solutions. BEAST is further integrated within a broader ecosystem of companion tools: arcjetCV [3] extracts recession rates and shock standoff distances from high-speed video using computer vision, and miniSTARscan [4] provides sub-minute, portable photogrammetric surface reconstruction of test articles before and after exposure. All tools share a common data schema, enabling seamless ingestion of surface geometry, imagery, and time-series data into a single, coherent experimental record.

Database↗

Combining Simulation and Emulation Systems for Smart Grid Planning and Evaluation

Software-defined networking (SDN) enables efficient network management. As the technology matures, utilities are looking to integrate those benefits to their operations technology (OT) networks. To help the community to better understand and evaluate the effects of such integration, we develop DSSnet, a testing platform that combines a power distribution system simulator and an SDN-based network emulator for smart grid planning and evaluation. DSSnet relies on a container-based virtual time system to achieve efficient synchronization between the simulation and emulation systems. To enhance the system scalability and usability, we extend DSSnet to support a distributed controller environment. To enhance system fidelity, we extend the virtual time system to support kernel-based switches. In conclusion, we also evaluate the system performance of DSSnet and demonstrate the usability of DSSnet with a resilient demand response application case study.