Search NASA⌕ Search

SEARCH · Search NASA

Results for “inverter-based resource (IBR)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Impact of Geomagnetic Induced Current Neutral Blocking Devices on Distance Relays in Sub-transmission Networks with IBR

Geomagnetically induced currents (GICs) can flow through transmission lines during geomagnetic disturbances, such as solar flares or coronal mass ejections. These currents can cause problems like transformer saturation and equipment damage. The most common method of mitigating GICs involves installing GIC neutral blocking devices (NBDs) in transformer neutrals. However, the wide application of capacitive GIC blocking devices may have unintended adverse effects on other devices, such as distance protection relays. As the number of inverter-based resources being connected to the transmission and sub-transmission systems increases, the likelihood of a sub-transmission line protected by a distance relay connected to a transformer with NBDs is increasing. Therefore, distance relays fed by IBRs and transmission lines with GIC-NBDs must be studied. This paper studies the effect of GIC-NBDs on a 69kV sub-transmission line of various lengths fed by a 25 MVA IBR and synchronous source. This work focused on the behavior of the GIC-NBDs using the measured apparent phase-to-ground and phase-to-phase impedance calculated by the relay and the source impedance ratio (SIR) during various electrical faults.

Patel, Trupal R [Sandia National Laboratories (SNL↗

Enhanced Frequency Support Scheme of Generic Inverter-Based Resource Models for Renewable-Dominated Power Grids

The frequency response of SG-dominated power grids is predictable ahead of an occurrence of a frequency event because the frequency response of SGs is consistent, and it can be inferred from the swing equation [1]. However, increasing the portion of IBRs in an SG-dominated power grid might make the characteristics of the conventional power grids no longer valid because this changing resource mix affects grid dynamics and controls [2]. Thus, maintaining these characteristics greatly benefits the control and operation of the power grids with high penetration of IBRs. To maintain these characteristics in IBR-dominated power grids, IBRs should have frequency response capability similar to that of an SG. The WECC modeling validation subcommittee has developed generic IBR models for large system planning [3]-[5]. These models can represent various vendors' dynamic behavior for WTG, PV, and ESS [5]. The current generic IBR models approved by WECC can provide frequency response only from droop control loops in REPC models [6], [7]. The contribution of the loops is proportional to the frequency deviation from the nominal frequency. Thus, it presents an insufficient contribution to arrest frequency variation compared to the frequency response of SGs because it allows a high ROCOF in the early stage of frequency events. This shortfall will become greater as the PL of IBRs increases in power grids. Controller enhancement for the generic IBR models is required to secure the frequency stability under high PL of IBRs as in the SG-dominated power grids. This paper proposes a control extension for the generic IBR models to enhance the frequency support capabilities and discusses the classification of frequency support for the different types of IBR considering their operating constraints. An inertial control scheme is implemented in the REPC and REEC models of the generic IBR models to achieve these objectives. The inertial control scheme includes the following stages: Control area data acquisition, inertia time constant estimation, IBR-related constraint check, IBR contribution determination, and inertial response provision. In the scheme, a REPC acquires control area data from a system operator and estimates a total inertia time constant for the control area the applicable IBR power plant belongs. Then, the estimated inertial time constant is transferred to each IBR controller—REEC—within the power plant. Each REEC checks the availability of applicable IBR for inertial response participation. If the IBR is available, the REEC amplifies the estimated inertial time constant to utilize it for inertial response provision. In this way, the proposed inertial response scheme extends the functionality of the generic IBR models to provide SG-like frequency response within their constraints. Various scenarios considering different IBR types, IBR penetration levels, and frequency control schemes were simulated and compared in an IEEE 39-bus system using PSCAD simulator to verify the effectiveness of the proposed scheme.

Kim, Jinho↗

A Reversed Impedance-Based Stability Criterion for IBR Grids: Preprint

The existing impedance-based stability criterion is effective for analyzing local control interactions; however, it is difficult to scale the existing criterion to analyze wide-area control interactions among numerous IBRs through a complex power system network. The scaled version of the existing criterion requires the impedance response of each IBR in the system as well as of the network looking from all the IBRs. It is quite challenging to obtain all these impedance responses because of the computational effort and the requirement of separately scanning the impedance of the network and the IBRs. We propose a reversed criterion for the impedance-based stability analysis to address these problems. In contrast to the existing criterion, the reversed criterion analyzes the stability of a power system when an IBR is disconnected from the system. The reversed criterion estimates the impact of an IBR on the frequency and damping of power system oscillation modes using the impedance scans of only the IBR and the grid at its terminal. It can be sequentially applied at different IBRs to evaluate their impact on the power system stability. In addition to scalability, the reversed criterion gives flexibility to focus only on a few selected IBRs, depending on their rating, the magnitude of oscillations observed at their terminals, and the vendor support available for implementing stabilizing control system updates. The reversed criterion is demonstrated on a 14-bus power system with 100% IBRs.

control interactions↗

Identifying Potential Sub-Synchronous Oscillations Using Impedance Scan Approach: Preprint

This paper presents an impedance scan study on the real-world power system in Australia that has observed 17 to 20 Hz intermittent subsynchronous oscillations. Through the impedance scan of each of the IBRs, both individually and collectively, potential resonance modes are identified. The impedance scans were carried out using electromagnetic transient PSCAD models of the network. The network comprises of site-specific, black-boxed models of IBRs supplied by the generators. The impedance scan approach was divided in three major steps: (1) the first step is to identify IBRs where impedance analysis needs to be performed based on the magnitude of oscillations observed at their points of interconnection (POIs); (2) the second step focuses on performing impedance scans at selected IBRs in single-machine infinite-bus (SMIB) configuration to identify internal resonance modes of an IBR and to evaluate if any of these modes become unstable under certain grid conditions; (3) the third step performs impedance scans at a few selected IBRs while connected to the wider network model to obtain the impedance response of both the IBR and the grid - this step evaluates control interactions among IBRs. The impedance scan study found that a few IBRs have an underdamped resonance mode at around 17 Hz, which becomes unstable under a certain operating condition. Another interesting finding was that certain IBRs increase the effective grid impedance seen by another IBR in proximity for a particular operating condition. Under this operating condition, the resulting subsynchronous oscillation mode is more pronounced due to a combination of control interactions among IBRs through the transmission network under study and a resonance mode inside the IBRs.

control interactions↗

Model of Inverter-Based Resources

Blackbox modelling for SC analysis is a possible solution. Accuracy can be acceptable even without having vendor control diagrams. Is an NDA required to share a vendor Blackbox model for SC analysis? Differences in VRT detection and injection logics. Angle rotation is not addressed in control logics of most vendors. Current limitation logic during unbalanced faults is not clear. Model IBR as a current source with shunt to improve convergence

IBRs, Model of IBRs, Short Circuit Analysis, Class↗

Validation of the Fault Ride-Through Response of a Generic EMT Inverter Model by Laboratory Testing

This paper presents the validation of the fault ride-through response of a large-scale inverter model using laboratory testing of a commercial inverter. First, we present the generic inverter model specifications. The generic inverter control is developed based on the fault ride-through response performance requirements of IEEE Std 2800-2022 for inverter-based resources. Next, we present laboratory tests that emulate voltages at the inverter terminal resulting from balanced and unbalanced faults on the transmission system. The tests are performed on a commercia12.2 MVA battery storage inverter at the U.S. National Renewable Energy Laboratory. Comparisons of the model's response to the laboratory measurements show the generic model presented can predict the controlled response of the commercial equipment. The differences between the model's response and the laboratory measurements during the initial transient at fault inception are discussed.

fault ride-through↗

Real-World 20-Hz IBR Subsynchronous Oscillations: Signatures and Mechanism Analysis

This article provides analyses of subsynchronous oscillations associated with solar photovoltaics (PVs) observed in real world. All have oscillation frequencies at approximately 20 Hz in voltage and current magnitudes. On the other hand, in phase voltage and current, the oscillations show very different signatures. Through constructing simplified linear models and conducting sensitivity analysis, we are able to associate dynamic phenomena with the underlying mechanism and speculate the possible causes of the 20-Hz oscillations. The analysis results have all been validated via simulation results from electromagnetic transient (EMT) test beds constructed in MATLAB/Simscape.

inverter-based resources↗

A Reversed Impedance-Based Stability Criterion for IBR Grids

The existing impedance-based stability criterion is effective for analyzing local control interactions; however, it is difficult to scale the existing criterion to analyze wide-area control interactions among numerous IBRs through a complex power system network. The scaled version of the existing criterion requires the impedance response of each IBR in the system as well as of the network looking from all the IBRs. It is quite challenging to obtain all these impedance responses because of the computational effort and the requirement of separately scanning the impedance of the network and the IBRs. We propose a reversed criterion for the impedance-based stability analysis to address these problems. In contrast to the existing criterion, the reversed criterion analyzes the stability of a power system when an IBR is disconnected from the system. The reversed criterion estimates the impact of an IBR on the frequency and damping of power system oscillation modes using the impedance scans of only the IBR and the grid at its terminal. It can be sequentially applied at different IBRs to evaluate their impact on the power system stability. In addition to scalability, the reversed criterion gives flexibility to focus only on a few selected IBRs, depending on their rating, the magnitude of oscillations observed at their terminals, and the vendor support available for implementing stabilizing control system updates. The reversed criterion is demonstrated on a 14-bus power system with 100% IBRs.

control interactions↗

Inverter Model Validation and Calibration Using Phasor Measurement Unit Data

As the penetration of inverter-based renewable energy resources increases in the power grid, especially at the distribution and microgrid levels, the need to accurately represent them in planning studies increases as well. However, due to the lack of well-established standard procedures, and vendor reluctance towards the detailed sharing of proprietary models, automated dynamic model validation and parameter calibration tools for inverter based resources (IBRs) remain scarce. This work presents a model validation and parameter calibration platform for representing IBRs with generic phasor-domain models. Phasor measurements of power system events are used for continuous validation using the data playback method, and model parameters are re-calibrated if a significant mismatch between measurements and model response is observed. Unique features of the proposed platform include- (a) an iterative Bayesian optimization approach towards parameter calibration to address a possible mismatch between the structures of generic models implemented in simulation softwares and actual commercial inverters, (b) error metrics designed to account for a possible mismatch between the time resolution of simulation and measurements, and (c) analysis of the measurement-simulation mismatch to provide guidance to engineering personnel regarding model shortcomings. The performance of the platform has been illustrated using both simulated data and field measurements to validate/calibrate inverter models in GridLAB-D.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modeling and Automation Framework for High IBR Integration in Large-Scale Power Systems

The increasing prevalence of power electronics- interfaced renewable generation sources is leading to a gradual replacement of traditional thermal generation-based synchronous machines. In this context, the modeling of a large-scale power grid that incorporates a significant number of inverter-based resources is crucial for understanding the dynamics and effects of these resources on the power system. This study investigates the positive sequence model of grid-following and grid-forming inverters. Additionally, this work explores the integration of distributed energy resources using population as an indicator of their relative geographic locations. To address challenge to integrate these inverter based resources into a realistic grid of the US Western interconnection, automation scripts are developed to streamline the process of replacing conventional generators with grid-following and grid-forming inverters, as well as allocating distributed energy resources. Different penetration levels of these inverters are considered, and their frequency regulation support following a disturbance is compared through dynamic simulations.

Lyu, Xue↗

Aggregation of Inverter-Based Resources for Modeling and Simulation

In order to conduct system dynamic studies, it is necessary to have dynamic models of both inverter and plant levels. Detailed and aggregated modeling approaches are two essential options. The detailed modeling method involves capturing the dynamic characteristics of each individual device (e.g., wind turbine or PV array), as well as their interconnections. However, as the scale of the IBR plant increases, the complexity and computation time required for detailed modeling also increase. On the other hand, aggregated modeling offers a more efficient way of representing large-scale IBRs in power system dynamic studies. This approach involves aggregating a large number of wind turbines, PV arrays, inverters, and/or plant controllers into one or a smaller number of equivalent models. In order to analyze the impact of a high-level IBR penetration in power systems, it is important to develop accurate and computationally efficient models for both the detailed and aggregated methods.

14 SOLAR ENERGY↗

Impact of K-factor on Short Circuit Program Convergence for Inverter-Based Resources during Faults

Classical short-circuit programs that linearize the power network are no longer applicable for inverter based resources (IBRs), necessitating an iterative approach. Phasor domain programs can model the IBRs using an iterative approach considering nonlinear fault responses. In phasor domain models, the IBR can be modeled as a voltage controlled current source (VCCS) in tabular form with positive, negative, and zero sequence information for balanced and unbalance short-circuit faults. In the VCCS modeling of the IBR, positive and negative incremental reactive current, also known as the k-factor, plays an important role in short circuit program convergence. In this work, a few approaches: conventional VCCS modeling with a k-factor of 2, conventional VCCS modeling with a k-factor of 2 with modified pre-fault voltages, VCCS characteristics based on the power flow solution with a k-factor of 2, and VCCS characteristics based on the power flow solution with a k-factor of 1 are investigated for short circuit program convergence under higher IBR penetration. The IEEE 39 bus New England Test System is taken as the test system, and simulations are carried out in PSS®CAPE 15.0.26 simulation software. Simulation results demonstrate that IBR penetration is higher for the VCCS model, which corresponds to the power flow solution with k-factor 1, compared to other approaches.

42 ENGINEERING↗

T&D LIBRA: Simulation Framework for Transmission and Distribution Load and IBR Assessment

This paper introduces T&D LIBRA, a HELICS-based dynamic co-simulation framework designed for transmission and distribution (T&D) load and inverter-based resource assessment. This framework is designed to model interactions between single-phase induction motors (i.e., Motor-D), distributed energy resources (DERs) and the transmission network, emphasizing system stability during fault conditions. The primary objective of this research is to study the fault-induced delayed voltage recovery (FIDVR) behavior of the T&D networks using the co-simulation framework and to compare the results with conventional PSS/E only simulations. Simulations are validated using T&D co-simulations with a single distribution node and the IEEE 123-bus distribution test case. The co-simulation results demonstrate the value of using T&D co-simulations to capture motor stalling, DER tripping and other sources of voltage diversity on distribution networks.

24 POWER TRANSMISSION AND DISTRIBUTION↗