Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Processes and Methods used for Nasa Communications Services Project Conceptualization and Formulation

The U.S. National Aeronautics and Space Administration (NASA) is partnering with the commercial SATCOM industry to demonstrate the industry’s capabilities to provide services to NASA’s near-Earth missions. Leveraging commercial capabilities will become increasingly necessary for NASA, as its incumbent Government-owned-and-operated near-Earth satellite network, the Tracking and Data Relay Satellite System (TDRSS), will approach retirement towards the end of the current decade. NASA is actively taking the first steps to making the vision of using commercial SATCOM a reality. For more than two years, NASA’s Communication Services Project (CSP) has been evaluating the feasibility of employing commercial satellite communication (SATCOM) networks for near-Earth operations. This past April, CSP awarded US$278.5 million in Funded Space Act Agreements to select commercial SATCOM providers, so they may begin developing and demonstrating their specific near-Earth space communication services that may support future agency missions. Each company will match or exceed agency contributions during the five-year development and demonstration period, totaling more than $1.5 billion of cost-share investment. The companies will complete technology development and in-space demonstrations by 2025, after which NASA intends to seek multiple long-term contracts to acquire these kinds of services. The six companies (Inmarsat Government Inc., Kuiper Government Solutions (KGS), SES Government Solutions, Space Exploration Technologies (SpaceX), Telesat U.S. Services and Viasat Inc.) will shortly begin developing and demonstrating their capabilities to provide services, ranging from launch to standard on-orbit operations. The demonstrations will be across multiple spectrum regimes from L-Band to optical, and will utilize Geostationary Orbit (GEO), Medium-Earth Orbit (MEO) and Low-Earth Orbit (LEO) constellations. This paper discusses methodologies and processes used over the past two years to reach the point of entering into these partnerships. It also includes CSP’s goals and objectives going forward, following the award of six Funded Space Act Agreements to commercial SATCOM providers to develop and demonstrate these capabilities.

Communications Services Project↗

Integrated Urban Services: Program Impact and Business Plan Summary

The Integrated Urban Services (IUS) program, launched in 2021 and funded by the U.S. State Department under the United States-Association of Southeast Asian Nations (US-ASEAN) Smart Cities Partnership, aimed to bolster resilience in ASEAN cities by addressing challenges across food, energy, and water systems. Led by the National Renewable Energy Lab (NREL) with support from Regenerative Impact Ventures, the program focused on demonstrating the socio-economic benefits of integrated urban planning, educating stakeholders on circular economy principles, providing technical assistance to two ASEAN cities, and attracting private sector involvement. The program facilitated peer learning events, engaging public and private sector participants and leveraging knowledge from a group of global experts to inform approaches and best practices. Technical assistance was provided to two pilot cities, Iskandar Malaysia and Cagayan de Oro, Philippines, resulting in the development of market-driven business plans for resilient, circular, and regenerative energy-water-food system projects. The Iskandar Malaysia pilot focused on development of a state-of-the-art AgriTech Innovation Hub and Modern Farming Complex to enhance agricultural productivity and produce enough renewable energy to power the facilities. The Cagayan de Oro project aimed to enhance urban agricultural productivity and waste management through development of an Urban Precision Agricultural Complex featuring aeroponics, hydroponics, aquaponics, agrivoltaics, and a Black Solider Fly Facility for converting municipal solid waste into commodities. The success of the IUS program sets a precedent for replicating integrated urban service models globally, offering valuable insights for cities aiming to enhance their resilience and sustainability.

ASEAN↗

Artemis I: Test Flight Buys Down Risk for Humanity's Return to the Moon

The Artemis program successfully demonstrated its foundational deep space human transportation system during the Artemis I test flight in late 2022. This bold mission put the Artemis program on a course to accomplish increasingly complex missions to return humans to the Moon and to prepare for Mars and other destinations. The Artemis I uncrewed mission tested the Space Launch System (SLS) rocket and the Orion spacecraft using the ground processing, launch and recovery services provided by the Exploration Ground Systems (EGS) program at the Kennedy Space Center (KSC). The Artemis team accomplished key mission priorities that deliberately bought down risk for upcoming crewed missions as part of a build-up flight test strategy. The Artemis I mission priorities were 1) demonstrate Orion heatshield at lunar re-entry conditions; 2) operate systems in flight environment; and 3) retrieve the spacecraft. The successful performance and demonstration of these primary mission objectives from lift-off thru orbital insertion, translunar injection, outbound transit towards the Moon, entry into lunar orbit, coast in the lunar Distant Retrograde Orbit (DRO), exit from lunar orbit, transit back to Earth, atmospheric re-entry, descent, splashdown and recovery successfully showed that NASA has a foundational deep space transportation capability in place for human class missions. In addition to the primary mission objectives, a set of scientific payloads, approved Flight Test Objectives (FTOs) and Development Flight Test Objectives (DFTOs) were incorporated into the nominal mission plan and were designated as secondary, or priority 4, and were considered “bonus objectives” in terms of crewed flight risk buydown. During the mission, the team found itself in a position where it was comfortable achieving even more content than originally planned. As a result, DFTOs were added during the mission to further buy down risk to later crewed test flights. This paper presents an overview of the Artemis I test flight, including mission priorities and key test objectives, the launch campaign and as-flown mission profile, test objectives accomplished over the course of the 25.5- day mission, and implications to the crewed Artemis II and later test flight missions.

Artemis↗

Scaling Energy Efficient Retrofits for Small Commercial Apartment Buildings

With support from the U.S. Department of Energy’s (DOE) Building Technologies Office (BTO), the International Center for Appropriate and Sustainable Technology (ICAST) recently completed a three-year cooperative agreement to scale energy efficiency retrofits (EER) on small multifamily (MF) buildings. ICAST EER strategies ranged from low-hanging “direct install” of measures such as LED lighting, low-flow showerheads and aerators, and smart thermostats to major strategies such as HVAC replacement with high-efficiency boilers or heat pumps. As feasible, some projects also included the addition of renewable energy sources such as photo voltaic (PV) solar. When ICAST began the BTO project, it operated in two states and oversaw EER at approximately 80 MF buildings per year. With assistance from BTO, ICAST has grown significantly and now has staff in six states with MF EER projects in another seven, and performed EER on 956 MF buildings. ). ICAST was able to successfully execute this project by 1) Improving viability and efficiency of its processes, 2) Launching two new services and 3) Creating an affiliate program. For the most part, ICAST focused on a specific type of MF property: naturally occurring affordable housing (NOAH), because it is a significantly underserved market within the hard-to-serve MF market. NOAHs are typically smaller properties (5 to 64 units), owned by small organizations or individual investors looking for positive cash flow. ICAST believes the NOAH market can be successfully served with a one-stop-shop approach that makes it easy, hassle-free, and cost-effective for owners to acquire green upgrades for their property(ies). With the assistance of BTO funding, ICAST successfully used the cited EER methods and strategies to scale-up its OSS approach to service a greater number of MF housing and expand into new geographies. Additionally, support from BTO helped ICAST create self-sustaining programs which will not need to rely on on-going funding.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Small self-contained payload overview

The low-cost Small Self-Contained Payload Program, also known as the Getaway Special, initiated by NASA for providing a stepping stone to larger scientific and manufacturing payloads, is presented. The steps of 'getting on board,' the conditions of use, the reimbursement policy and the procedures, and the flight scheduling mechanism for flying the Getaway Special payload are given. The terms and conditions, and the interfaces between NASA and the users for entering into an agreement with NASA for launch and associated services are described, as are the philosophy and the rationale for establishing the policy and the procedures.

Miller, D. S.↗

Space operations center: Shuttle interaction study extension, executive summary

The Space Operations Center (SOC) is conceived as a permanent facility in low Earth orbit incorporating capabilities for space systems construction; space vehicle assembly, launching, recovery and servicing; and the servicing of co-orbiting satellites. The Shuttle Transportation System is an integral element of the SOC concept. It will transport the various elements of the SOC into space and support the assembly operation. Subsequently, it will regularly service the SOC with crew rotations, crew supplies, construction materials, construction equipment and components, space vehicle elements, and propellants and spare parts. The implications to the SOC as a consequence of the Shuttle supporting operations are analyzed. Programmatic influences associated with propellant deliveries, spacecraft servicing, and total shuttle flight operations are addressed.

Source record↗

Lessons learned in ground processing scientific and applications payloads at Kennedy Space Center

The payload ground processing of experiments which flew on the Shuttle is examined, including studies of atmosphere and earth observation, life science, advance technology, materials science, plasma physics, astrophysics and solar physics, astronomy, navigation and communication, and fluid mechanics. The process of designing and development payloads, the integration of instruments, carrier interface verification, and late servicing at the launch pad are discussed. The problems of cost, red tape, contamination, safety, and propriety protection are considered.

Elfrey, Priscilla↗

Manifest - Payloads and accommodations

Developing a long-range manifest begins with the assessment of flight rate capability for the next 6 years. Payloads priorities, launch readiness, and service needs are reviewed and compatible mixed cargo flights are determined and integrated with the dedicated missions to become the manifest. Manifest development must also address Orbiter upgrades to assure that payload-related enhancements meet need dates and that new hardware integration does not adversely affect flight rate capability. A series of Space Shuttle upgrades and new capabilities are in development driven by a continuing effort to improve safety margins, support recognized payload needs, and unique SSF requirements. These enhancements include extended mission duration capability, ASRM development, extended middeck payload support capability, and improved attitude control systems.

Hedin, Dan↗

Extremely Accurate On-Orbit Position Accuracy using TDRSS

NASA is planning to launch a new service for Earth satellites providing them with precise GPS differential corrections and other ancillary information enabling decimeter level orbit determination accuracy and nanosecond time-transfer accuracy, onboard, in real-time. The TDRSS Augmentation Service for Satellites (TASS) will broadcast its message on the S-band multiple access forward channel of NASA s Tracking and Data Relay Satellite System (TDRSS). The satellite's phase array antenna has been configured to provide a wide beam, extending coverage up to 1000 km altitude over the poles. Global coverage will be ensured with broadcast from three or more TDRSS satellites. The GPS differential corrections are provided by the NASA Global Differential GPS (GDGPS) System, developed and operated by JPL. The GDGPS System employs global ground network of more than 70 GPS receivers to monitor the GPS constellation in real time. The system provides real-time estimates of the GPS satellite states, as well as many other real-time products such as differential corrections, global ionospheric maps, and integrity monitoring. The unique multiply redundant architecture of the GDGPS System ensures very high reliability, with 99.999% demonstrated since the inception of the system in early 2000. The estimated real time GPS orbit and clock states provided by the GDGPS system are accurate to better than 20 cm 3D RMS, and have been demonstrated to support sub-decimeter real time positioning and orbit determination for a variety of terrestrial, airborne, and spaceborne applications. In addition to the GPS differential corrections, TASS will provide real-time Earth orientation and solar flux information that enable precise onboard knowledge of the Earth-fixed position of the spacecraft, and precise orbit prediction and planning capabilities. TASS will also provide 5 seconds alarms for GPS integrity failures based on the unique GPS integrity monitoring service of the GDGPS System.

Stocklin, Frank↗

Constellation Training Facility Support

The National Aeronautics and Space Administration is developing the next set of vehicles that will take men back to the moon under the Constellation Program. The Constellation Training Facility (CxTF) is a project in development that will be used to train astronauts, instructors, and flight controllers on the operation of Constellation Program vehicles. It will also be used for procedure verification and validation of flight software and console tools. The CxTF will have simulations for the Crew Exploration Vehicle (CEV), Crew Module (CM), CEV Service Module (SM), Launch Abort System (LAS), Spacecraft Adapter (SA), Crew Launch Vehicle (CLV), Pressurized Cargo Variant CM, Pressurized Cargo Variant SM, Cargo Launch Vehicle, Earth Departure Stage (EDS), and the Lunar Surface Access Module (LSAM). The Facility will consist of part-task and full-task trainers, each with a specific set of mission training capabilities. Part task trainers will be used for focused training on a single vehicle system or set of related systems. Full task trainers will be used for training on complete vehicles and all of its subsystems. Support was provided in both software development and project planning areas of the CxTF project. Simulation software was developed for the hydraulic system of the Thrust Vector Control (TVC) of the ARES I launch vehicle. The TVC system is in charge of the actuation of the nozzle gimbals for navigation control of the upper stage of the ARES I rocket. Also, software was developed using C standards to send and receive data to and from hand controllers to be used in CxTF cockpit simulations. The hand controllers provided movement in all six rotational and translational axes. Under Project Planning & Control, support was provided to the development and maintenance of integrated schedules for both the Constellation Training Facility and Missions Operations Facilities Division. These schedules maintain communication between projects in different levels. The CxTF support provided is one that requires continuous maintenance since the project is still on initial development phases.

Flores, Jose M.↗

Waterhammer Testing and Modeling of the Ares I Upper Stage Reaction Control System

NASA's Ares I rocket is the agency's first step in completing the goals of the Constellation Program, which plans to deliver a new generation of space explorers into low earth orbit for future missions to the International Space Station, the moon, and other destinations within the solar system. Ares I is a two-stage rocket topped by the Orion crew capsule and its service module. The launch vehicle's First Stage is a single, five-segment reusable solid rocket booster (RSRB), derived from the Space Shuttle Program's four segment RSRB. The vehicle's Upper Stage, being designed at Marshall Space Flight Center (MSFC), is propelled by a single J-2X Main Engine fueled with liquid oxygen and liquid hydrogen. During active Upper Stage flight of the Ares I launch vehicle, the Upper Stage Reaction Control System (US ReCS) will perform attitude control operations for the vehicle. The US ReCS will provide three-axis attitude control capability (roll, pitch, and yaw) for the Upper Stage while the J-2X is not firing and roll control capability while the engine is firing. Because of the requirements imposed upon the system, the design must accommodate rapid pulsing of multiple thrusters simultaneously to maintain attitude control. In support of these design activities and in preparation for Critical Design Review, analytical models of the US ReCS propellant feed system have been developed using the Thermal Hydraulic Library of MSC.EASY5 v.2008, herein referred to as EASY5. EASY5 is a commercially available fluid system modeling package with significant history of modeling space propulsion systems. In Fall 2009, a series of development tests were conducted at MSFC on a cold-flow test article for the US ReCS, herein referred to as System Development Test Article (SDTA). A subset of those tests performed were aimed at examining the effects of waterhammer on a flight-representative system and to ensure that those effects could be quantified with analytical models and incorporated into the design of the flight system. This paper presents an overview of the test article and the test approach, along with a discussion of the analytical modeling methodology. In addition, the results of that subset of development tests, along with analytical model pre-test predictions and post-test model correlations, will also be discussed in detail.

Williams, J. Hunter↗

NASA's Space Launch System Progress Report

Exploration beyond Earth orbit will be an enduring legacy for future generations, as it provides a platform for science and exploration that will define new knowledge and redefine known boundaries. NASA s Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is responsible for designing and developing the first exploration-class rocket since the Apollo Program s Saturn V that sent Americans to the Moon in the 1960s and 1970s. The SLS offers a flexible design that may be configured for the Orion Multi-Purpose Crew Vehicle with associated life-support equipment and provisions for long journeys or may be outfitted with a payload fairing that will accommodate flagship science instruments and a variety of high-priority experiments. Building on legacy systems, facilities, and expertise, the SLS will have an initial lift capability of 70 tonnes (t) in 2017 and will be evolvable to 130 t after 2021. While commercial launch vehicle providers service the International Space Station market, this capability will surpass all vehicles, past and present, providing the means to do entirely new missions, such as human exploration of Mars. Building on the foundation laid by over 50 years of human and scientific space flight and on the lessons learned from the Apollo, Space Shuttle, and Constellation Programs the SLS team is delivering both technical trade studies and business case analyses to ensure that the SLS architecture will be safe, affordable, reliable, and sustainable. This panel will address the planning and progress being made by NASA s SLS Program.

May, Todd A.↗

UPSS and G2

The Universal Propellant Servicing System (UPSS) is a dedicated mobile launcher propellant delivery method that will minimize danger and complexity in order to allow vehicles to be serviced and ultimately launched from a variety of locations previously not seen fit for space launch. The UPPS/G2 project is the development of a model, simulation, and ultimately a working application that will control and monitor the cryogenic fluid delivery to the rocket for testing purposes. To accomplish this, the project is using the programming language/environment Gensym G2. The environment is an all-inclusive application that allows development, testing, modeling, and finally operation of the unique application through graphical and programmatic methods. We have learned G2 through classes and trial-and-error, and are now in the process of building the application that will soon be able to be tested on apparatuses here at Kennedy Space Center, and eventually on the actual unit. The UPSS will bring near-autonomous control of launches to those that need it, as well it will be a great addition to NASA and KSC's operational viability and the opportunity to bring space launches to parts of the world, and in time constraints, once not thought possible.

cryogenic fluids↗

More Than A SketchUp

This 2014 summer internship assignment at John F. Kennedy Space Center (K.S.C) was conducted with the National Aeronautics and Space Administration (NASA) Engineering and Technology (NE) group in support of the Control and Data Systems Division (NE-C) within the Test, Operations & Support Software Engineering Branch (NE-C2). The primary focus of this project was to assist Branch Chief Laurie B. Griffin, to support NASA's Small Payload Launch Integrated Testing Services (SPLITS) mission, by mastering the capabilities of 3-D modeling software called SketchUp. I used SketchUp to create a virtual environment for different laboratories of the NE-00 Division. My mission was to have these models uploaded into a K.S.C Partnerships Website and be used as a visual aid to viewers who browsed the site. The leads of this project were Kay L. Craig, Business and Industry Specialist (AD-A) and Steven E. Cain, (FA-C). I teamed with fellow intern Tait Sorenson of the Flight Structures and Thermal Protection Systems Branch (NE-M5) and met with many K.S.C lab managers willing to display their lab's structure and capabilities. The information collected during these lab tours was vital to the building of the K.S.C Partnerships Website. To accomplish this goal Sorenson and I later teamed with fellow Marketing intern Marlee Pereda-Ramos, of the Spaceport Planning Office In Center Planning And Development (AD-A) Along with Ramos, Tait and I toured an array of laboratories and got first hand exposure to their functions and capabilities.

Trimble Corporation↗

The Wallops Flight Facility Rapid Response Range Operations Initiative

While the dominant focus on short response missions has appropriately centered on the launch vehicle and spacecraft, often overlooked or afterthought phases of these missions have been launch site operations and the activities of launch range organizations. Throughout the history of organized spaceflight, launch ranges have been the bane of flight programs as the source of expense, schedule delays, and seemingly endless requirements. Launch Ranges provide three basic functions: (1) provide an appropriate geographical location to meet orbital other mission trajectory requirements, (2) provide project services such as processing facilities, launch complexes, tracking and data services, and expendable products, and (3) assure safety and property protection to participating personnel and third-parties. The challenge with which launch site authorities continuously struggle, is the inherent conflict arising from projects whose singular concern is execution of their mission, and the range s need to support numerous simultaneous customers. So, while tasks carried out by a launch range committed to a single mission pale in comparison to efforts of a launch vehicle or spacecraft provider and could normally be carried out in a matter of weeks, major launch sites have dozens of active projects separate sponsoring organizations. Accommodating the numerous tasks associated with each mission, when hardware failures, weather, maintenance requirements, and other factors constantly conspire against the range resource schedulers, make the launch range as significant an impediment to responsive missions as launch vehicles and their cargo. The obvious solution to the launch site challenge was implemented years ago when the Department of Defense simply established dedicated infrastructure and personnel to dedicated missions, namely an Inter Continental Ballistic Missile. This however proves to be prohibitively expensive for all but the most urgent of applications. So the challenge becomes how can a launch site provide acceptably responsive mission services to a particular customer without dedicating extensive resources and while continuing to serve other projects? NASA's Wallops Flight Facility (WFF) is pursuing solutions to exactly this challenge. NASA, in partnership with the Virginia Commercial Space Flight Authority, has initiated the Rapid Response Range Operations Initiative (R3Ops). R3Ops is a multi-phased effort to incrementally establish and demonstrate increasingly responsive launch operations, with an ultimate goal of providing ELV-class services in a maximum of 7-10 days from initial notification routinely, and shorter schedules possible with committed resources. This target will be pursued within the reality of simultaneous concurrent programs, and ideally, largely independent of specialized flight system configurations. WFF has recently completed Phase 1 of R3Ops, an in-depth collection (through extensive expert interviews) and software modeling of individual steps by various range disciplines. This modeling is now being used to identify existing inefficiencies in current procedures, to identify bottlenecks, and show interdependencies. Existing practices are being tracked to provide a baseline to benchmark against as new procedures are implemented. This paper will describe in detail the philosophies behind WFF's R3Ops, the data collected and modeled in Phase 1, and strategies for meeting responsive launch requirements in a multi-user range environment planned for subsequent phases of this initiative.

Underwood, Bruce E.↗

Energy Efficiency Public Service Advertising Campaign

The Advertising Council (“the Ad Council”) and The United States Department of Energy (DOE) created and launched a national public service advertising campaign designed to promote energy efficiency. The objective of the Energy Efficiency campaign was to redefine how consumers approach energy efficiency by showing that saving energy can save homeowners money.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗