Search NASA⌕ Search

SEARCH · Search NASA

Results for “launcher”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Postflight Evaluation of Atlas-Centaur AC-6 (Launched August 11, 1965)

The sixth Atlas Centaur vehicle (AC-6) was successfully launched from the Eastern T e s t Range, Complex 36B, on August 11, 1965, at 0931:04.430 EST. A 2084-pound dynamic model of the Surveyor payload was placed in a simulated lunar transfer trajectory. Vehicle systems operated satisfactorily and all the flight objectives were accomplished. Lift-off within 4 seconds of the window opening demonstrated the launch-on-time capability of the vehicle were accurately compensated for by the Centaur guidance system. the Surveyor model into a near-perfect lunar transfer trajectory would have resulted in an impact of the moon without a midcourse correction. To hit the precise target area on the lunar surface, the required correction would have been 4.25 meters per second, which is well within the spacecraft capability. Normal thrust and impulse levels were obtained with both the A t l a s and Centaur propulsion systems. However, a sizeable thrust overshoot on startup of the Centaur engines has not been resolved. A propellant-utilization system used for the first time on the Centaur, accurately controlled the fuel and oxidant consumption. The turnaround and retrothrust maneuver were performed without incident. Relatively high longitudinal modal excitations and lateral payload excitations were obtained at lift-off; these high perturbations are believed t o be related t o the launcher holddown arms. Nominal temperatures were recorded for both the external vehicle skin and the payload compartment; however, abnormally low temperatures were measured in the forward equipment area, which may have resulted from leakage of cold helium purge gas. All vehicle electrical systems performed satisfactorily; the only difficulty with the RF systems was obtained with the C-band transponder. of the vehicle instrumentation yielded valid data. The AC-6 vehicle was constructed with several new lightweight designs including the forward bulkhead, thrust barrel, interstage adapter and tank skin thickness reduction from 0.016 t o 0.014 inch. No deficiencies were observed in any of these new structural elements.

Source record↗

Payload impact of space shuttle and tug

The advantages offered by space shuttle and tug for space operations are summarized. Economical transportation to a space station and operations in orbit; frequent sorties, with flexible scheduling, for experiment missions; and an economical and flexible replacement for conventional launchers are discussed. These advantages include many potential benefits for payload design, construction, and use.

Newell, H. E.↗

Pyrotechnic hazards classification and evaluation program. Electrostatic vulnerability of the E8 and XM15/XM165 clusters, phase 1

A survey of the electrostatic vulnerability of explosive manufacturing plants and recommendations for reducing the vulnerability are discussed. During the course of the investigations, the XM15/XM165 and the E8 launcher were shown to be susceptible to electrostatic ignition. The pyrotechnic hazard of prime concern associated with electrostatics is that of the spark which can be generated. The heat, shock, and ionization produced by the spark can cause ignition of pyrotechnics. However, as a result of the initial ignition tests (XM15 fuse train), changes have been incorporated to make the fusing system relatively safe from premature electrostatic activation.

Source record↗

AS-511 facilities and environmental measurements program

A list is presented of the facilities and environmental measurements to be monitored in support of the Apollo/Saturn vehicle AS-511. The measurement identification number, description, transducer operating range, recorder type and drawings illustrating measurement location are included. The following launch complex 39 facilities will be used on this vehicle: launch complex 39 pad A, and launcher umbilical tower number 3.

Source record↗

Investigation of the use of microwave image line integrated circuits for use in radiometers and other microwave devices in X-band and above

Program results are described in which the use of a/high permittivity rectangular dielectric image waveguide has been investigated for use in microwave and millimeter wavelength circuits. Launchers from rectangular metal waveguide to image waveguide are described. Theoretical and experimental evaluations of the radiation from curved image waveguides are given. Measurements of attenuation due to conductor and dielectric losses, adhesives, and gaps between the dielectric waveguide and the image plane are included. Various passive components are described and evaluations given. Investigations of various techniques for fabrication of image waveguide circuits using ceramic waveguides are also presented. Program results support the evaluation of the image line approach as an advantageous method for realizing low loss integrated electronic circuits for X-band and above.

Knox, R. M.↗

Gasdynamics of explosions today.

A brief review is given of blast and detonation wave phenomena and some of their uses in war and peace. It is concluded that great strides have been made over the last three decades toward the physical understanding, the analytical-numerical solution, and the measurement of dynamic and thermodynamic quantities, also taking into consideration severe environments and extremely short durations. Questions of internal ballistics are discussed together with hypervelocity launchers and shock tubes, collapsing cylindrical drivers, spherical implosions, explosive weapons, dynamic response, and equation of state data.

Brode, H. L.↗

Prediction of hail damage to aircraft.

Description of a hailstone impact simulator, a valuable laboratory apparatus which can be used for such hailstone research as the testing of prospective structural designs or generating data to compare with theory. The simulator consists of a launcher and a velocity-measuring system. It has been successfully used to obtain deformation data on flat sheets and spherical caps of various sizes impacted by hailstones at typical flight velocities. A computer program is described which adequately predicts the damage to a simple structure when impacted by a hailstone.

Hayduk, R. J.↗

VICS-120 - A tube-vehicle system test facility.

Description of a large test facility for carrying out research in support of the aerodynamic and ventilation section of a handbook on subway design. The facility described is vertically oriented and has a test section with a nominal inside diameter of 2 in. and a length of 109 ft. It is capable of operating at Reynolds numbers up to full-scale (60,000,000) under open-end tube conditions. The facility is distinguished by a high degree of flexibility in configuration and operational limits. Details are given concerning the plenum assembly, the test section tubes, the scaffold, the instrumentation, the model launcher, the model arrestor, and the models themselves. A step-by-step account is given of the operation of the facility, and a brief sample of the type of data obtained from the facility is presented.

Marte, J. E.↗

Welding at the Kennedy Space Center.

Brief description of the nature of the mechanical equipment at a space launch complex from a welding viewpoint. including an identification of the major welding applications used in the construction of this complex. The role played by welding in the ground support equipment is noted, including the welded structures and systems required in the vehicle assembly building, the mobile launchers, transporters, mobile service structure, launch pad and launch site, the propellants system, the pneumatics system, and the environmental control system. The welding processes used at the Kennedy Space Center are reviewed, and a particularly detailed account is given of the design and fabrication of the liquid hydrogen and liquid oxygen storage spheres and piping. Finally, the various methods of testing and inspecting the storage spheres are cited.

Clautice, W. E.↗

Acceptance test report (MI-74067-009-00). SVWS access arm (Serial number AA-09-03) (drawing 75M08129-13)

Acceptance tests were conducted at Kennedy Space Center of the Saturn Vehicle Workshop Spacecraft Access Arm and related equipment. The tests were conducted to prove complete system capability to operate satisfactorily under conditions required to support spacecraft operations and activities. The SVWS Access Arm, serial number AA-09-03, is a Command Module Service Arm, S/A 9, which was removed from the mobile launcher and modified to support the SVWS operations. The C/M environmental chamber was removed and a completely new chamber was installed. The retract system was redesigned to remove the automatic/remote control capability and replaced with a local manual control. The SVWS Access Arm System was successfully tested and supported spacecraft processing without major problems.

Hagood, J. T.↗

Hybrid 3-D rocket trajectory program. Part 1: Formulation and analysis. Part 2: Computer programming and user's instruction

Models utilizing various sub-sets of the six degrees of freedom are used in trajectory simulation. A 3-D model with only linear degrees of freedom is especially attractive, since the coefficients for the angular degrees of freedom are the most difficult to determine and the angular equations are the most time consuming for the computer to evaluate. A computer program is developed that uses three separate subsections to predict trajectories. A launch rail subsection is used until the rocket has left its launcher. The program then switches to a special 3-D section which computes motions in two linear and one angular degrees of freedom. When the rocket trims out, the program switches to the standard, three linear degrees of freedom model.

Huang, L. C. P.↗

Safety considerations involved in testing, checkout and launch operations at Cape Kennedy

This paper concerns itself with identifying safety problems associated with launch operations conducted during preparations for manned space flights at Cape Kennedy. This includes transportation and assembly of large space vehicles in the Vehicle Assembly Building, rollout to Launch Pad 39, test, checkout, and the launch countdown. Under these broad categories, the risks of fuel and oxidizer loading, installation of pyrotechnics, and similar hazardous operations are discussed. The many aspects for fire and rescue requirements are examined. These encompass the water deluge systems on the Mobile Service Structure and the Mobile Launcher, the insulated fire and rescue tractor, slide wire escape system, fire proximity suits, self-contained breathing apparatus and emergency cutting tools. In addition, written procedures for tests, emergencies, rescue and backout, as well as certification of personnel and TV monitoring of the launch system are detailed.-

Bolger, P. H.↗

Crawler Transporter Steering and Jel Systems

The transporter weighing 2.8 million kilograms (6.3 million pounds) was used to lift a 5.7-million-kilogram (12.6-million-pound) combination of mobile launcher and space vehicle, transfer this load approximately 5.6 kilometers (3.5 miles) from its point of assembly, negotiate curves of 152-meter (500-foot) mean radius, climb a 5-percent grade while maintaining the 122-meter (400-foot) structure in a vertical position within 10 minutes of arc, and smoothly position this huge structure to within plus or minus 5.1 centimeters (plus or minus 2 inches) on support pedestals at the launch pad. The crawler-transporter is described in detail.

Davis, V. L.↗

Lightning - Apollo to Shuttle

The history of lightning striking NASA spacecraft and the development of lightning protection systems is reviewed from the Apollo 12 flight, involving a lightning strike thirty six seconds after launch, to the present date. Particular attention is paid to problems that may arise in this field in the context of planning and implementing the Space Shuttle program. The lightning protection design for Apollo is described: a folding mast mounted on top of the hammerhead crane on top of the Launcher Umbilical Tower, with a lightning rod on top. The effect of lightning storms on the launches of Apollos 12 through 17 is examined, as is the effect of lightning in the Skylab program. The lightning problems encountered by the Apollo-Soyuz mission and by the two unmanned Viking launches to Mars are discussed. The Lightning Detection And Ranging system for detecting RF emission from lightning discharges is described.

Durrett, W. R.↗

Development of fiber shields for engine containment

Tests were conducted in translational launchers and spin pits to generate empirical data used in the design of a Kevlar shield for containing engine burst debris. Methods are given for modeling the relationship of fragment characteristics to shielding requirements. The change in relative importance of shield mounting provisions as fragment energy is increased is discussed.

Bristow, R. J.↗

Baykonur

The 'Baykonur' cosmodrome, its functions, operations, and services are described in considerable detail. The launch complex, launching pads, launch structures, launchers with cable masts and propellant loading towers, are included. The sequence of all phases of rocket assembly and preparations for launch are depicted. Prelaunch procedures and the launch itself are described.

Vladimirov, B. P.↗

Boeing 747 aircraft with large external pod for transporting outsize cargo

The effect on structural arrangement, system weight, and range performance of the cargo pod payload carrying capability was determined to include either the bridge launcher or a spacelab module on a Boeing 747 aircraft. Modifications to the carrier aircraft and the installation time required to attach the external pod to the 747 were minimized. Results indicate that the increase in pod size was minimal, and that the basic 747 structure was adequate to safely absorb the load induced by ground or air operation while transporting either payload.

Price, J. E.↗

Wind-tunnel investigation of an armed mini remotely piloted vehicle

A wind tunnel investigation of a full scale remotely piloted vehicle (RPV) armed with rocket launchers was conducted. The model had unacceptable longitudinal stability characteristics at negative angles of attack in the original design configuration. The addition of a pair of fins mounted in a V arrangement on the propeller shroud resulted in a configuration with acceptable longitudinal stability characteristics. The addition of wing mounted external stores to the modified configuration resulted in a slight reduction in the longitudinal stability. The lateral directional characteristics of the model were generally good, but the model had low directional stability at low angles of attack. Aerodynamic control power was very strong around all three axes.

Phelps, A. E., III↗