Search NASA⌕ Search

SEARCH · Search NASA

Results for “mission execution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Human Mission to Europa and Titan - Why Not? Executive Summary

Outline a step-by-step Development Plan of the key barriers and their solutions to enable human exploration of the outer solar system. Secondary: Perform a case study which supports and emphasizes the key elements of the Development Plan.

Finarelli, Margaret G.↗

Simulation Framework for Rapid Entry, Descent, and Landing (EDL) Analysis, Phase 2 Results

The NASA Engineering and Safety Center (NESC) was requested to establish the Simulation Framework for Rapid Entry, Descent, and Landing (EDL) Analysis assessment, which involved development of an enhanced simulation architecture using the Program to Optimize Simulated Trajectories II simulation tool. The assessment was requested to enhance the capability of the Agency to provide rapid evaluation of EDL characteristics in systems analysis studies, preliminary design, mission development and execution, and time-critical assessments. Many of the new simulation framework capabilities were developed to support the Agency EDL-Systems Analysis (SA) team that is conducting studies of the technologies and architectures that are required to enable human and higher mass robotic missions to Mars. The findings, observations, and recommendations from the NESC are provided in this report.

Murri, Daniel G.↗

Manned geosynchronous mission requirements and systems analysis study. Volume 1: Executive summary

The crew capsule of the MOTV was studied with emphasis on crew accommodations, crew capsule functional requirements, subsystem interface definition between crew module and propulsion module, and man rating requirements. Competing mission modes were studied covering a wide range of propulsion concepts. These included one stage, one and one half stage, and two stage concepts using either the standard STS or an augmented STS. Several deorbit concepts were considered, including all propulsive modes, direct re-entry, and aeromaneuvering skip in skip out in the upper reaches of Earth's atmosphere. A five year plan covering costs, schedules, and critical technology issues is discussed.

Boyland, R. E.↗

Simulation Framework for Rapid Entry, Descent, and Landing (EDL) Analysis

The NASA Engineering and Safety Center (NESC) was requested to establish the Simulation Framework for Rapid Entry, Descent, and Landing (EDL) Analysis assessment, which involved development of an enhanced simulation architecture using the Program to Optimize Simulated Trajectories II (POST2) simulation tool. The assessment was requested to enhance the capability of the Agency to provide rapid evaluation of EDL characteristics in systems analysis studies, preliminary design, mission development and execution, and time-critical assessments. Many of the new simulation framework capabilities were developed to support the Agency EDL Systems Analysis (EDL-SA) team, that is conducting studies of the technologies and architectures that are required to enable higher mass robotic and human mission to Mars. The findings of the assessment are contained in this report.

Murri, Daniel G.↗

Simulation Framework for Rapid Entry, Descent, and Landing (EDL) Analysis: Appendices - Volume 2

The NASA Engineering and Safety Center (NESC) was requested to establish the Simulation Framework for Rapid Entry, Descent, and Landing (EDL) Analysis assessment, which involved development of an enhanced simulation architecture using the Program to Optimize Simulated Trajectories II (POST2) simulation tool. The assessment was requested to enhance the capability of the Agency to provide rapid evaluation of EDL characteristics in systems analysis studies, preliminary design, mission development and execution, and time-critical assessments. Many of the new simulation framework capabilities were developed to support the Agency EDL Systems Analysis (EDL-SA) team, that is conducting studies of the technologies and architectures that are required to enable higher mass robotic and human mission to Mars. The appendices to the original report are contained in this document.

Murri, Daniel G.↗

Analog Testing of Operations Concepts for Mitigation of Communication Latency During Human Space Exploration

OBJECTIVES: NASA Extreme Environment Mission Operations (NEEMO) is an underwater spaceflight analog that allows a true mission‐like operational environment and uses buoyancy effects and added weight to simulate different gravity levels. Three missions were undertaken from 2014‐2015, NEEMO's 18‐20. All missions were performed at the Aquarius undersea research habitat. During each mission, the effects of varying operations concepts and tasks type and complexity on representative communication latencies associated with Mars missions were studied. METHODS: 12 subjects (4 per mission) were weighed out to simulate near‐zero or partial gravity extravehicular activity (EVA) and evaluated different operations concepts for integration and management of a simulated Earth‐based science backroom team (SBT) to provide input and direction during exploration activities. Exploration traverses were planned in advance based on precursor data collected. Subjects completed science‐related tasks including presampling surveys, geologic‐based sampling, and marine‐based sampling as a portion of their tasks on saturation dives up to 4 hours in duration that were to simulate extravehicular activity (EVA) on Mars or the moons of Mars. One‐way communication latencies, 5 and 10 minutes between space and mission control, were simulated throughout the missions. Objective data included task completion times, total EVA times, crew idle time, translation time, SBT assimilation time (defined as time available for SBT to discuss data/imagery after it has been collected, in addition to the time taken to watch imagery streaming over latency). Subjective data included acceptability, simulation quality, capability assessment ratings, and comments. RESULTS: Precursor data can be used effectively to plan and execute exploration traverse EVAs (plans included detailed location of science sites, high‐fidelity imagery of the sites, and directions to landmarks of interest within a site). Operations concepts that allow for presampling surveys enable efficient traverse execution and meaningful Mission Control Center (MCC) interaction across long communication latencies and can be done with minimal crew idle time. Imagery and information from the EVA crew that is transmitted real‐time to the intravehicular (IV) crewmember(s) can be used to verify that exploration traverse plans are being executed correctly. That same data can be effectively used by MCC (across comm latency) to provide further instructions to the crew from a SBT on sampling priorities, additional tasks, and changes to the plan. Text / data capabilities are preferred over voice capabilities between MCC and IV when executing exploration traverse plans over communication latency. Autonomous crew planning tools can be effective at modifying existing plans if the objectives and constraints are clearly defined.

Chappell, Steven P.↗

A Technique for Simulating Conditions of Walking and Performing Other Self-Locomotive Activities on the Lunar Terrain

One of the most important and probably the most interesting phase of a manned lunar mission will be the time the astronauts spend outside their vehicle on the moon's surface taking scientific measurements, exploring the surface features, surveying possible sites for a lunar base, inspecting their vehicle and preparing it for their return trip. Because the lunar gravity is only one-sixth that of the earth gravity, the explorers undoubtedly will have to adjust their accustomed methods of walking, climbing, jumping and performing other self-locomotive activities in order to carry out these various tasks. In as much as the over-all success of the lunar mission will depend to a large extent upon the self-reliance of the explorers, it will be necessary to have extensive knowledge of the effects of the moon's reduced gravity on the physical capabilities of man and of man's ability to adopt to the new environment prior to the planning and execution of the mission. At the present time there is a dearth of information on this subject due primarily to the lack of a practical technique for simulating the reduced gravity. Several techniques such as immersion in water and riding in an airplane flying a Keplerian trajectory have been used for zero-g or weightlessness studies to determine the physical capabilities of man but these techniques are limited in their usefulness either by restrictions imposed by the viscous effect of the water or by the short duration and small test area available in an airplane. Consequently, an effort was made at the NASA Langley Research Center to devise a new technique that would provide a realistic simlation of a reduced gravity for unlimited periods of time and allow freedom of movement over considerable distances. This paper concerns itself with a discussion of the newly developed simulation technique and a presentation of some preliminary results which were obtained utilizing a working model based on this scheme.

Hewes, Donald E.↗

The Wallops Flight Facility Rapid Response Range Operations Initiative

While the dominant focus on short response missions has appropriately centered on the launch vehicle and spacecraft, often overlooked or afterthought phases of these missions have been launch site operations and the activities of launch range organizations. Throughout the history of organized spaceflight, launch ranges have been the bane of flight programs as the source of expense, schedule delays, and seemingly endless requirements. Launch Ranges provide three basic functions: (1) provide an appropriate geographical location to meet orbital other mission trajectory requirements, (2) provide project services such as processing facilities, launch complexes, tracking and data services, and expendable products, and (3) assure safety and property protection to participating personnel and third-parties. The challenge with which launch site authorities continuously struggle, is the inherent conflict arising from projects whose singular concern is execution of their mission, and the range s need to support numerous simultaneous customers. So, while tasks carried out by a launch range committed to a single mission pale in comparison to efforts of a launch vehicle or spacecraft provider and could normally be carried out in a matter of weeks, major launch sites have dozens of active projects separate sponsoring organizations. Accommodating the numerous tasks associated with each mission, when hardware failures, weather, maintenance requirements, and other factors constantly conspire against the range resource schedulers, make the launch range as significant an impediment to responsive missions as launch vehicles and their cargo. The obvious solution to the launch site challenge was implemented years ago when the Department of Defense simply established dedicated infrastructure and personnel to dedicated missions, namely an Inter Continental Ballistic Missile. This however proves to be prohibitively expensive for all but the most urgent of applications. So the challenge becomes how can a launch site provide acceptably responsive mission services to a particular customer without dedicating extensive resources and while continuing to serve other projects? NASA's Wallops Flight Facility (WFF) is pursuing solutions to exactly this challenge. NASA, in partnership with the Virginia Commercial Space Flight Authority, has initiated the Rapid Response Range Operations Initiative (R3Ops). R3Ops is a multi-phased effort to incrementally establish and demonstrate increasingly responsive launch operations, with an ultimate goal of providing ELV-class services in a maximum of 7-10 days from initial notification routinely, and shorter schedules possible with committed resources. This target will be pursued within the reality of simultaneous concurrent programs, and ideally, largely independent of specialized flight system configurations. WFF has recently completed Phase 1 of R3Ops, an in-depth collection (through extensive expert interviews) and software modeling of individual steps by various range disciplines. This modeling is now being used to identify existing inefficiencies in current procedures, to identify bottlenecks, and show interdependencies. Existing practices are being tracked to provide a baseline to benchmark against as new procedures are implemented. This paper will describe in detail the philosophies behind WFF's R3Ops, the data collected and modeled in Phase 1, and strategies for meeting responsive launch requirements in a multi-user range environment planned for subsequent phases of this initiative.

Underwood, Bruce E.↗

International Space Station Multi-Element Integrated Test

The International Space Station offers a unique challenge for integrated testing since the entire station is not launched as an integrated vehicle. The ISS design evolved for over 10 years from the station Freedom program that was based on a "ship and shoot" approach. Ship and shoot assumed the program would accept the hardware for launch and integrate the vehicle on orbit without any ground element-to-element integrated testing. Element-to-Element powered-on integrated testing is needed to identify operational problems on the ground rather than once the hardware is on orbit. The industry is accustomed to testing an integrated vehicle and then verifying it is ready for its operational missions. These tests require ground element emulators to represent on-orbit elements. The ISS Multi-Element Integrated Tests (MEIT) are element-to-element integrated tests bringing together hardware representing several flights. The major purpose of these tests is: 1) Element-to-Element interface compatibility, 2) Systems end-to-end operability and functionality and 3) utilize on-orbit procedures with the crew and mission control center. Execution of these tests is critical since the hardware is available for only a limited period of time. Test configurations are defined which test specific interfaces or functionality. These tests develop operational confidence in the Element-to-Element interfaces and identify major problems on the ground to avoid on-orbit anomalies that could threaten mission success, element survivability or assembly activities. This paper addresses the MEIT process, configurations and lessons-learned from these tests.

Filler, Russell E.↗

Cast Glance Near Infrared Imaging Observations of the Space Shuttle During Hypersonic Re-Entry

High resolution calibrated infrared imagery of the Space Shuttle was obtained during hypervelocity atmospheric entries of the STS-119, STS-125 and STS128 missions and has provided information on the distribution of surface temperature and the state of the airflow over the windward surface of the Orbiter during descent. This data collect was initiated by NASA s Hypersonic Thermodynamic Infrared Measurements (HYTHIRM) team and incorporated the use of air- and land-based optical assets to image the Shuttle during atmospheric re-entry. The HYTHIRM objective is to develop and implement a set of mission planning tools designed to establish confidence in the ability of an existing optical asset to reliably acquire, track and return global quantitative surface temperatures of the Shuttle during entry. On Space Shuttle Discovery s STS-119 mission, NASA flew a specially modified thermal protection system tile and instrumentation package to monitor heating effects from boundary layer transition during re-entry. On STS-119, the windward airflow on the port wing was deliberately disrupted by a four-inch wide and quarter-inch tall protuberance built into the modified tile. In coordination with this flight experiment, a US Navy NP-3D Orion aircraft was flown 28 nautical miles below Discovery and remotely monitored surface temperature of the Orbiter at Mach 8.4 using a long-range infrared optical package referred to as Cast Glance. Approximately two months later, the same Navy Cast Glance aircraft successfully monitored the surface temperatures of the Orbiter Atlantis traveling at approximately Mach 14.3 during its return from the successful Hubble repair mission. In contrast to Discovery, Atlantis was not part of the Boundary Layer Transition (BLT) flight experiment, thus the vehicle was not configured with a protuberance on the port wing. In September 2009, Cast Glance was again successful in capturing infrared imagery and monitoring the surface temperatures on Discovery s next flight, STS-128. Again, NASA flew a specially modified thermal protection system tile and instrumentation package to monitor heating effects from boundary layer transition during re-entry. During this mission, Cast Glance was able to image laminar and turbulent flow phenomenology optimizing data collection for Mach 14.7. The purpose of this paper is to describe key elements associated with STS-119/125/128 mission planning and execution from the perspective of the Cast Glance flight crew that obtained the imagery. The paper will emphasize a human element of experience, expertise and adaptability seamlessly coupled with Cast Glance system and sensor technology required to manually collect the required imagery. Specific topics will include a near infrared (NIR) camera upgrade that was implemented just prior to the missions, how pre-flight radiance modeling was utilized to optimize the IR sensor configuration, communications, the development of aircraft test support positions based upon Shuttle trajectory information, support to contingencies such as Shuttle one orbit wave-offs/west coast diversions and then the Cast Glance perspective during an actual Shuttle imaging mission.

Tack, Steve↗

Argumentation for coordinating shared activities

an increasing need for space missions to be able to collaboratively (and competitively) develop plans both within and across missions. In addition, interacting spacecraft that interleave onboard planning and execution must reach consensus on their commitments to each other prior to execution. In domains where missions have varying degrees of interaction and different constraints on communication and computation, the missions will require different coordination protocols in order to efficiently reach consensus with in their imposed deadlines. We describe a Shared Activity Coordination (SHAC) framework that provides a decentralized algorithm for negotiating the scheduling of shared activities over the lifetimes of multiple agents and a foundation for customizing protocols for negotiating planner interactions. We investigate variations of a few simple protocols based on argumentation and distributed constraints satisfaction techniques and evaluate their abilities to reach consistent solutions according to computation, time, and communication costs in an abstract domain where spacecraft propose joint measurements.

Mars↗

Dawn's Mission at Ceres

Dawn is NASA's ninth Discovery class mission. The Dawn spacecraft was designed to orbit both the giant asteroid Vesta and the dwarf planet Ceres in succession, a mission only made possible by the high efficiency of ion propulsion. While the same spacecraft visited both bodies, the mission planning and maneuver execution at the two bodies were necessarily very different. The mission at Vesta benefited from at least three functioningreaction control wheels. At Ceres, all maneuvering and coasting during transfers was done without reaction wheel control due to the loss of the second of four wheels while departing Vesta. Loss of the second wheel made conserving attitude control propellant (hydrazine) critical to achieving mission success at Ceres. To save hydrazine, avoiding unnecessary coasting and attitude turns became essential during the interplanetary cruise to Ceres and for all transfers once at Ceres. In contrast, operations at Vesta did not need to avoid coasting. Operating at Ceres requires being farther from the Sun. Greaterheliocentric distances (approaching 3 AU (Astronomical Units) make Dawn's attitude control constraints while maneuvering more restrictive as a result of reduced control authority.

Whiffen, Gregory J.↗

BioSentinel: To the Moon or Beyond?

BioSentinel, an Artemis-1 secondary spacecraft, will carry a biology experiment into deep space for the first time in 50 years. A 6U CubeSat form factor was utilized for the spacecraft and included technologies newly developed or adapted for operations beyond Earth orbit. This is the maiden deep-space voyage for the radio, propulsion system, electrical power system, and BioSensor payload. The spacecraft carries onboard budding yeast, Saccharomyces cerevisiae, as an analog to human cells to test the biological response to deep space radiation. Flying a secondary payload beyond LEO comes with unique challenges with respect to trajectory uncertainty and mission operations planning. BioSentinel does not carry propulsion for trajectory maneuvers, so plans for Comms and Power need to be developed for all trajectories. The nominal plan is a lunar flyby followed by an insertion into Heliocentric orbit. However, some possible scenarios include lunar eclipses that could severely impact the power budget during that phase of the mission, while others could result in a “Retrograde” hyperbola at swingby resulting in the spacecraft traveling inward toward Earth or even towards a collision with the lunar surface. BioSentinel’s final trajectory will not be known until after launch and deployment so possible scenarios need to be planned for ahead of time. This paper discusses the operational scenarios that were planned for as well as the actual execution of the mission operations including: command pass scheduling with the Deep Space Network, selecting bandwidth limits, medium gain antenna versus low gain antenna usage, and conserving power prior to a lunar eclipse. Note: Artemis-1 is planned to launch in the Spring of 2022

BioSentinel↗

Access to Space for NASA Small Sats: Current and Future Needs

Small spacecraft technology advancements have fundamentally shifted how NASA’s Science Mission Directorate (SMD) executes science investigations. To support this approach, the SMD Rideshare Office (SRO) was established in 2020 to lead the definition and implementation of a directorate-wide rideshare strategy. Serving as the central point of contact for coordinating compatible NASA payloads with launch opportunities, the SRO maximizes science, exploration, and technology return on investment by enabling rideshare or other access to space opportunities for small spacecraft on SMD primary mission launches, VADR commercial launch procurements, and other government agency launch opportunities. As NASA seeks to reduce costs and increase the rate of discovery, small satellites and multi manifest access to space have become integral to achieving the agency’s strategic vision. While NASA has created the above-mentioned mechanisms to expand access to space and achieve lower launch costs for its small satellites, many factors have limited full exploit of the opportunity these mechanisms can bring. NASA continues to evolve its mission cultures and technical requirements to adapt and take advantage of burgeoning commercial launch and rideshare advancements. To do so NASA requires collaboration with small satellite manufacturers, principal investigators, and commercial industry partners. Current needs include technical development and design of structurally robust spacecraft buses capable of withstanding varied launch loads, which will increase rideshare interchangeability and versatility. Further, instrument and spacecraft designs must also evolve to handle diverse launch environments and loads factors, while reducing reliance on complex purge and cleanliness constraints, sensitivities to silicones and hydrocarbons, and magnetic requirements. Continued maturation of small and medium launch providers in the near-term is also essential to drive down costs through competition. The current mission selection cadence often complicates the ability to synchronize multiple missions on a single launch. Future needs can include affordable space maneuverability options such as enhanced spacecraft propulsion systems and unique orbital maneuvering capabilities for our individual smallsats or constellations. These emerging capabilities offer a path to unique science orbits for NASA small satellites, but only under the condition that their cost remains affordable and competitive to accommodate inherently smaller mission budgets. Additionally, the projected surge of multiple SMD small satellites launching simultaneously and to unique deep space science orbits necessitates evaluation of expanding deep space communications capabilities. This presentation provides a comprehensive overview of NASA SMD’s access to space landscape and offers further unique insights and discussion, backed by NASA rideshare experiences and lessons learned, on the current and future developments required to unleash the full potential of rideshare opportunities.

Rideshare↗

Access to Space for NASA SmallSats: Current and Future Needs

Small spacecraft technology advancements have fundamentally shifted how NASA’s Science Mission Directorate (SMD) executes science investigations. To support this approach, the SMD Rideshare Office (SRO) was established in 2020 to lead the definition and implementation of a directorate-wide rideshare strategy. Serving as the central point of contact for coordinating compatible NASA payloads with launch opportunities, the SRO maximizes science, exploration, and technology return on investment by enabling rideshare or other access to space opportunities for small spacecraft on SMD primary mission launches, VADR commercial launch procurements, and other government agency launch opportunities. As NASA seeks to reduce costs and increase the rate of discovery, small satellites and multi manifest access to space have become integral to achieving the agency’s strategic vision. While NASA has created the above-mentioned mechanisms to expand access to space and achieve lower launch costs for its small satellites, many factors have limited full exploit of the opportunity these mechanisms can bring. NASA continues to evolve its mission cultures and technical requirements to adapt and take advantage of burgeoning commercial launch and rideshare advancements. To do so NASA requires collaboration with small satellite manufacturers, principal investigators, and commercial industry partners. Current needs include technical development and design of structurally robust spacecraft buses capable of withstanding varied launch loads, which will increase rideshare interchangeability and versatility. Further, instrument and spacecraft designs must also evolve to handle diverse launch environments and loads factors, while reducing reliance on complex purge and cleanliness constraints, sensitivities to silicones and hydrocarbons, and magnetic requirements. Continued maturation of small and medium launch providers in the near-term is also essential to drive down costs through competition. The current mission selection cadence often complicates the ability to synchronize multiple missions on a single launch. Future needs can include affordable space maneuverability options such as enhanced spacecraft propulsion systems and unique orbital maneuvering capabilities for our individual smallsats or constellations. These emerging capabilities offer a path to unique science orbits for NASA small satellites, but only under the condition that their cost remains affordable and competitive to accommodate inherently smaller mission budgets. Additionally, the projected surge of multiple SMD small satellites launching simultaneously and to unique deep space science orbits necessitates evaluation of expanding deep space communications capabilities. This presentation provides a comprehensive overview of NASA SMD’s access to space landscape and offers further unique insights and discussion, backed by NASA rideshare experiences and lessons learned, on the current and future developments required to unleash the full potential of rideshare opportunities.

Rideshare↗

The Rapid Response Radiation Survey (R3S) Mission Using the HISat Conformal Satellite Architecture

The Rapid Response Radiation Survey (R3S) experiment, designed as a quick turnaround mission to make radiation measurements in LEO, will fly as a hosted payload in partnership with NovaWurks using their Hyper-integrated Satlet (HiSat) architecture. The need for the mission arises as the Nowcast of Atmospheric Ionization Radiation for Aviation Safety (NAIRAS) model moves from a research effort into an operational radiation assessment tool. The data collected by R3S, in addition to the complementary data from a NASA Langley Research Center (LaRC) atmospheric balloon mission entitled Radiation Dosimetry Experiment (RaDX), will validate exposure prediction capabilities of NAIRAS. This paper discusses the development of the R3S experiment as made possible by use of the HiSat architecture. The system design and operational modes of the experiment are described, as well as the experiment interfaces to the HiSat satellite via the user defined adapter (UDA) provided by NovaWurks. This paper outlines the steps taken by the project to execute the R3S mission in the 4 months of design, build, and test. Finally, description of the engineering process is provided, including the use of facilitated rapid/concurrent engineering sessions, the associated documentation, and the review process employed.

Miller, Nathanael↗

Artemis: An Overview of NASA’s Activities to Return Humans to the Moon

NASA is well underway in its plans to return humans to the Moon and build long-term infrastructure both in orbit and on the surface. Following the Artemis I and Artemis II flight tests, NASA will begin crewed landings and regular missions to the Moon. Artemis will return value to the American public and the global community, enable groundbreaking scientific discovery, and prepare NASA and its partners for exploration of the solar system. Work on the initial Human Landing System (HLS), procurement activities for future HLS, and work on the initial modules of the lunar-orbiting Gateway are underway. International partnerships are playing a critical role in the planning, development, and execution of these missions. As of December 2021, three international partners have entered agreements to contribute to the Gateway and 14 nations have signed the Artemis accords. A new spacesuit acquisition strategy will stimulate economic growth and meet the growing needs of NASA and emerging customers. Requirements development is underway for an unpressurized lunar surface rover and plans for a pressurized rover, foundation surface habitat, and the Artemis Base Camp are in work. This paper will provide an update on the HLS demonstration missions and the procurement status for HLS services; a comprehensive look at the Gateway’s components and related statuses; a summary of planned surface systems; and an outline of the strategies NASA will use to successfully implement these plans, preparing for humanity's next giant leap: Mars.

Artemis↗