Search NASA⌕ Search

SEARCH · Search NASA

Results for “mission systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Developing Fuel Cell Electric Powertrain Architectures for Commercial Vehicles

Here, this article addresses the architecture development for a commercial vehicle fuel cell electric powertrain by establishing a clear multi-step formalized workflow that employs a unique technoeconomic solution for architecture selection. The power capability of the fuel cell, the energy capacity and chemistry of the electrical energy storage (battery), the DC-DC converter (including the input current rating and isolation resistance requirements), the traction drive solution, the on-board hydrogen storage solution, and the real-time power-split management of the fuel cell and the battery are all considered and developed in this effort. The methods were used to select architecture for Class 8 urban, regional, and line haul applications. When compared to traditional load-following power-split controllers, an energy management power-split controller can increase system energy efficiency by up to 19.5%. The energy-efficient power-split controller may increase the required battery capacity for an equivalent life by up to 2.6 times. The impact on the total cost of ownership (TCO) for a variety of financial cases demonstrates that high C-rate capable batteries have the potential to provide better TCO solutions over a six-year vehicle life than low C-rate capable batteries. To achieve TCO parity with the 600 A non-isolated DC-DC converter case, the specific choice of the fuel cell DC-DC converter to achieve a target power output based on current levels (from 500 A to 2400 A) shows that efficiency decreases and cost increases due to the higher current, requiring fuel cell prices to decrease by $50–$100/kW, $60–$110/kW, and $100–$220/kW for urban, regional, and line haul applications, respectively. Key recommendations for powertrain system architectures are provided, with specifics based on vehicle dynamics, mission and application characteristics, end customer use-case profile, critical powertrain component costs, and architecture selection cost function. This study rigorously demonstrates the interplay of the above parameters, with a focus on TCO, and provides application decision-makers with a mechanism and well-defined set of impact factors to consider as part of their architecture selection process.

25 ENERGY STORAGE↗

Spatio-temporal and weather characterization of road loads of electrified heavy-duty commercial vehicles across U.S. interstate roads

Adoption of battery electric vehicles (BEV) in heavy duty (HD) commercial freight transportation is difficult due to technological and economic hurdles. Beyond safety and compliance, fleet and operational logistics necessitate both high uptime and parity with diesel system productivity/Total Cost of Ownership to support widespread deployment of electric powertrains. However, relatively high energy storage costs, along with the higher weight of BEV systems, limit the viability of HD commercial freight transport to shorter-range applications where smaller batteries will serve for mission energy requirements (single operational shift). Knowing the energy consumption and operating variations of these commercial vehicle systems is crucial for effectively sizing the energy storage systems. This paper is the first in a series of studies to understand the regional specific operating design domain variations of commercial Class 8 HD trucks and the associated impact to their energy requirements. In particular, the local weather conditions are shown to influence the total vehicle energy usage. Further, the impact of temperature, pressure, and humidity changes are shown to impact the local air density. This is needed to calculate aerodynamic drag on vehicles and has been found to play a significant role in the overall performance of a vehicle. Although the methodology of calculating air density varies only slightly throughout the literature, the application to transportation has still been limited. This study provides a means by which air density can be estimated for the contiguous U.S. using the NOAA MADIS dataset. These air density estimates were then used to determine vehicle performance in varying regions of the country to highlight the importance of consideration of weather variables when monitoring vehicle performance, but also to provide recommendations based on these locales upon fleet conversion to BEVs.

Moore, Amy↗

Wave Energy Converter Power Take-Off Modeling and Validation From Experimental Bench Tests

This article describes the implementation of a new numerical model of the power take-off system installed in the Monterey Bay Aquarium Research Institute wave energy converter, a device developed to provide power to various oceanic research missions. The simultaneous presence of hydraulic, pneumatic, and electrical subsystems in the power take-off system represents a significant challenge in forging an accurate model able to replicate the main dynamic characteristics of the system. The validation of the new numerical model is addressed by comparing simulations with the measurements obtained during a series of bench tests. Data from the bench tests show good agreement with the numerical model. The validated model provides deeper insights into the complex nonlinear dynamics of the power take-off system and will support further performance improvements in the future.

16 TIDAL AND WAVE POWER↗

Boundary Layer Exploration of Aerosols and Clouds ON Ships (BEACONS)

BEACONS aims to demonstrate autonomous deployment of a shipborne system that routinely observes atmospheric, cloud, and aerosol properties. These observations enable scientists to study aerosol-cloud interactions, advancing energy resilience and the Department of Energy's mission to improve model prediction. Key Project Outcomes Autonomous deployment of aerosol and cloud measurement systems aboard a Pasha Hawaii Marjorie C commercial ship. Six-month campaign for continuous, high-resolution aerosol and cloud data collection with minimal crew intervention. Development and testing of instruments in two phases, advancing from essential to complex systems. AI-ready processed data on the BEACONS Data Platform for near-real-time data access. Validation of aerosol-cloud interaction hypotheses for improved modeling. Establishment of best practices for instrument deployment in marine environments. Scientific collaboration to support the U.S. Department of Energy (DOE) Biological and Environmental Research (BER) mission.

54 ENVIRONMENTAL SCIENCES↗

Target Diagnostic Menu Lawrence Livermore National Laboratory SYSM-5620: Design Thinking and Systems Engineering

Target Diagnostic’s Engineering Science (TDES) currently supports over 80 diagnostic systems, all of which draw from a fixed budget that covers staff time and procurement. As the division continues to add new diagnostics, demand on these limited resources increases, yet the budget remains unchanged. Shot Responsible Individuals (RIs) have unrestricted freedom to select any number or type of diagnostics for each experiment, often by copying previous shot configurations with only minor modifications. This practice makes it easy to generate new shots but does not encourage critical evaluation of diagnostic necessity. As a result, many diagnostics are routinely included in a shot without a clear justification, and in practice, much of the data collected is not analyzed. The ever-growing arsenal of diagnostics also increases the burden on TDES personnel, requiring more staff for support, maintenance, and service. This environment creates challenges in focusing resources on diagnostics that provide the greatest value to the NIF mission and raises concerns about the continued justification for maintaining all existing systems. The static TDES budget cannot sustain the ongoing growth in demand for new diagnostic systems. Shot RIs currently face no constraints on the number or type of diagnostics they assign to each experiment, often defaulting to previous configurations without critically assessing the necessity of each diagnostic. This results in the routine inclusion of diagnostics whose data may not be analyzed or may no longer directly support the NIF mission. Consequently, TDES is required to maintain and support an expanding set of diagnostics, straining limited resources and risking inefficient use of staff and funding. There is a need for TDES to efficiently allocate limited resources by establishing a process that requires shot RIs to critically evaluate and justify the inclusion of each diagnostic in their experiments. This process should discourage the routine, unexamined inclusion of diagnostics, support the identification of underutilized or obsolete systems, and ensure that only those diagnostics providing the greatest value to the NIF mission are maintained and supported. Ultimately, this approach must enable TDES to operate within budget constraints while maximizing scientific impact and operational efficiency.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

FY 2021 Mid-Year HPC Utilization Report M3UF-21IN0701018

Idaho National Laboratory (INL), supported by the Department of Energy Office of Nuclear Energy (DOE-NE) through the Nuclear Science User Facilities, provides access to supercomputer systems and data storage along with support staff for system management, software installation, cybersecurity and user support to the broader DOE-NE user community. Users include individuals at universities, industry, and government laboratories enabling a wide range of research and development and mission-supporting activities. The availability of high-performance computing (HPC) capabilities is a key foundation of collaboration and innovation in nuclear energy systems research. HPC resources and INL directly support the mission and objectives of DOE-NE. From October 2020 through March 2021, INL HPC capabilities were utilized by a diverse set of computing and applied researchers, for a wide range of research and engineering activities. This report focuses on current INL HPC systems and utilization from October 1, 2020 through March 31, 2021.

99 GENERAL AND MISCELLANEOUS↗

Nuclear Science User Facilities High Performance Computing: Provide a Science Gateway for HPC Users

Idaho National Laboratory (INL), supported by the Department of Energy Office of Nuclear Energy (DOE-NE) through the Nuclear Science User Facilities (NSUF), provides direct access to the Barracuda Virtual Reactor and 18 Multiphysics Object-Oriented Simulation Environment (MOOSE) applications via a web-based science gateway developed using Open Ondemand on the INL high performance computing (HPC) systems. This gateway features the computational tools of the Nuclear Computational Resource Center (NCRC) and the computing resources of the INL high performance computing systems. These computational tools are a key foundation of collaboration and innovation in nuclear energy systems research. High performance computing resources and INL staff directly support the mission and objectives of DOE-NE. The Barracuda Virtual Reactor was the first science gateway deployed in Jan 2021 to support NSUF users. In July 2021, the science gateway was expanded to support access to NCRC codes for use across all supported INL HPC systems. The HPC science gateway currently supports 20 total applications. The gateway also includes access to training resources specific to NCRC tools.

99 GENERAL AND MISCELLANEOUS↗

Distributed Resilience in High-Energy Physics Data Acquisition

Historical experience in the High-Performance Computing community teaches us that as computing systems grow, the instance of failures goes from rare to a regular occurrence. A survey of the growth in the size and complexity of Data AcQuisition (DAQ) networks in High-Energy Physics (HEP) experiments reveals that these networks are scaling exponentially, trending to a point where automated fault handling should be considered over the current manual practice, especially given the rarity of data such as in DUNE's mission to observe core-collapse supernovae. We propose a general system, DiDAQt, which is designed to provide fault detection and handling in HEP DAQs specifically, through MPI-like primitives that allow it to be added easily to existing systems. We evaluate the scalability and response time of a prototype on the FABRIC national testbed, with results indicating sufficient scalability for current and near-future DAQs as well as practical response times (under 1 microsecond decision time).

Wolosewicz, A. [IIT, Chicago]↗

Cluster Difference Imaging Photometric Survey. II. TOI 837: A Young Validated Planet in IC 2602

We report the discovery of TOI 837b and its validation as a transiting planet. We characterize the system using data from the NASA Transiting Exoplanet Survey Satellite mission, the ESA Gaia mission, ground-based photometry from El Sauce and ASTEP400, and spectroscopy from CHIRON, FEROS, and Veloce. We find that TOI 837 is a T = 9.9 mag G0/F9 dwarf in the southern open cluster IC 2602. The star and planet are therefore 35$_{-5}^{+11}$ million years old. Combining the transit photometry with a prior on the stellar parameters derived from the cluster color–magnitude diagram, we find that the planet has an orbital period of 8.3 days and is slightly smaller than Jupiter (R p =0.77$_{-0.07}^{+0.09}$ R Jup ). From radial velocity monitoring, we limit M p sin i to less than 1.20 M Jup (3σ). The transits either graze or nearly graze the stellar limb. Grazing transits are a cause for concern, as they are often indicative of astrophysical false-positive scenarios. Our follow-up data show that such scenarios are unlikely. Our combined multicolor photometry, high-resolution imaging, and radial velocities rule out hierarchical eclipsing binary scenarios. Background eclipsing binary scenarios, though limited by speckle imaging, remain a 0.2% possibility. TOI 837b is therefore a validated adolescent exoplanet. The planetary nature of the system can be confirmed or refuted through observations of the stellar obliquity and the planetary mass. Such observations may also improve our understanding of how the physical and orbital properties of exoplanets change in time.

79 ASTRONOMY AND ASTROPHYSICS↗

CIE Analysis Process for Engineered Systems

"CIE Analysis Process for Engineered Systems" outlines a comprehensive methodology for integrating Cyber-Informed Engineering (CIE) principles into both new and existing engineered systems. Sponsored by the U.S. Department of Energy’s Office of Cybersecurity, Energy Security, and Emergency Response (DOE CESER), the process aims to achieve cyber-informed decisions by producing functional security requirements for new systems and retrofitting existing systems to mitigate digital risks. The document details a step-by-step approach, including mission and function definition, digital asset awareness, consequence analysis, and mitigation analysis. It emphasizes the importance of documenting mechanical, electrical, programmable, and network components to protect system functions and provides examples and considerations for each step. The ultimate goal is to ensure that engineered systems remain resilient against cyber threats, maintaining safety, performance, and reliability.

42 - ENGINEERING↗

The fully coupled regionally refined model of E3SM version 2: overview of the atmosphere, land, and river results

Abstract. This paper provides an overview of the United States (US) Department of Energy's (DOE's) Energy Exascale Earth System Model version 2 (E3SMv2) fully coupled regionally refined model (RRM) and documents the overall atmosphere, land, and river results from the Coupled Model Intercomparison Project 6 (CMIP6) DECK (Diagnosis, Evaluation, and Characterization of Klima) and historical simulations – a first-of-its-kind set of climate production simulations using RRM. The North American (NA) RRM (NARRM) is developed as the high-resolution configuration of E3SMv2 with the primary goal of more explicitly addressing DOE's mission needs regarding impacts to the US energy sector facing Earth system changes. The NARRM features finer horizontal resolution grids centered over NA, consisting of 25→100 km atmosphere and land, a 0.125∘ river-routing model, and 14→60 km ocean and sea ice. By design, the computational cost of NARRM is ∼3× of the uniform low-resolution (LR) model at 100 km but only ∼ 10 %–20 % of a globally uniform high-resolution model at 25 km. A novel hybrid time step strategy for the atmosphere is key for NARRM to achieve improved climate simulation fidelity within the high-resolution patch without sacrificing the overall global performance. The global climate, including climatology, time series, sensitivity, and feedback, is confirmed to be largely identical between NARRM and LR as quantified with typical climate metrics. Over the refined NA area, NARRM is generally superior to LR, including for precipitation and clouds over the contiguous US (CONUS), summertime marine stratocumulus clouds off the coast of California, liquid and ice phase clouds near the North Pole region, extratropical cyclones, and spatial variability in land hydrological processes. The improvements over land are related to the better-resolved topography in NARRM, whereas those over ocean are attributable to the improved air–sea interactions with finer grids for both atmosphere and ocean and sea ice. Some features appear insensitive to the resolution change analyzed here, for instance the diurnal propagation of organized mesoscale convective systems over CONUS and the warm-season land–atmosphere coupling at the southern Great Plains. In summary, our study presents a realistically efficient approach to leverage the fully coupled RRM framework for a standard Earth system model release and high-resolution climate production simulations.

54 ENVIRONMENTAL SCIENCES↗

Helium recovery system at IB3a

The increasing need for optimal and sustainable use of cryogenic resources to support Fermilab’s scientific mission has highlighted the necessity of improving the Laboratory’s helium management practices. An assessment of cryogenic test facilities identified the Technical Division’s Industrial Building 3a (IB3A) as a key site requiring upgrades to integrate a helium recovery system. The IB3A facility is essential for characterizing and testing superconductors, cables, and coils for various R&D projects, including the US High-Luminosity LHC Accelerator Upgrade Project (AUP), Mu2e, and other external collaborations. Currently, the facility relies on 500 L helium Dewars and vents the vaporized helium directly into the atmosphere, leading to significant helium loss. Given the non-renewable nature of helium, recovering and reusing this resource is critical for the sustainability of Fermilab’s operations. To address this challenge, a project has been initiated to connect IB3A to an existing helium purification station and refrigeration system located in another building via a dedicated pipeline pass over the roof of several buildings. This solution will enable the efficient capture of vented helium, its transfer to the purification station, and subsequent liquefaction for reuse in future operations. The project includes a detailed design phase, specifying the pipeline route, flow control mechanisms, and integration with the existing cryogenic infrastructure, followed by phased implementation and commissioning. By implementing this pipeline connection and upgrading IB3A, Fermilab aims to significantly reduce helium waste, lower operational costs, and align with its commitment to sustainability. This initiative provides a model for resource-efficient cryogenic operations and reinforces the Laboratory’s capacity to support its science mission for the long term.

Porwisiak, D. [Fermilab]↗

Measurement Acceptance Region (MAR) Assessment Results Based on Confirmation Sample Sludge Batch 10 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, 26F, 40H (heel only), and Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In October 2022, SRMC System Planning provided an updated SB10 Tank 40H blend baseline projection based on the Tank 51 confirmation sample results. Due to the reduced Na concentration relative to previous SB10 projections, two additional projections based on the addition of 7,000 gallons of caustic were provided in November 2022.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Upgrade of the mechanically pumped CO 2 two-phase cooling system for the alpha magnetic spectrometer on the international space station

This study describes the successful upgrade of a mechanically pumped CO 2 two-phase cooling system in space by designing a new pump module for the Alpha Magnetic Spectrometer-02 on the International Space Station. Key factors for mission success are emphasized, including achieving high coolant filling accuracy within 10% of the target and maintaining system stability within ±1 °C. The impact of adding radiators to improve cooling efficiency is examined, and it is found that operating multi-radiators out-of-phase does not significantly affect system reliability. The centrifugal pump design is shown to allow for better lubricant circulation, while the in-house designed controller incorporates protective measures to prevent cavitation, overheating, and over-current. Further, this research advances the understanding of circulation loop systems and their upgrades in space and demonstrates the potential for extending the lifetime of space-borne mechanically pumped two-phase cooling systems.

42 ENGINEERING↗

National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan

Ensuring the reliability of the NIF, including its support systems, laser systems, target diagnostic systems, and utilities, is essential to the availability of the NIF in its support of NNSA missions. NIF is a key capability in the DOE Stockpile Stewardship Program and supports high energy physics experiments for nuclear weapons, energy, and astrophysics applications. High system reliability provides opportunities for shots and scientific discoveries with opportunities to enhance and upgrade capabilities. This Maintenance Plan (MP) identifies the policies and procedures used to perform and support asset management of the NIF Facility and Infrastructure Systems (FInS), NIF Lasers & Alignment (LASE), NIF Target Experimental Operations (TOPS), NIF Target Area Science and Engineering (TASE), and NIF&PS Control Systems (NCS). The FInS systems include the facility, HVAC, contamination control, beampath, and Line Replaceable Units (LRUs) as well as utilities which create the beampath environments, such as vacuum, argon, or clean dry air. The LASE systems are Programmatic systems which include laser diagnostics, alignment, power conditioning, pulsed power, and input laser systems. The TOPS and TASE systems are also Programmatic systems which include target and diagnostic delivery systems and positioners, many different insertable and fixed target diagnostics, and cryogenic and target gas fill systems. Finally, the NCS systems include both software and hardware for industrial and shot operation control systems. Policies governing administrative and operational practices related to maintenance of FInS, LASE, TOPS, TASE, and NCS systems are described in this plan. In addition, the plan provides processes and procedures for managing, tracking, and documenting the work. This document, the NIF Operations Management Plan, NIF-5020544 (Ref. 1), and NIF Shot Operations Plan, NIF-5018506 (Ref. 2), together satisfy the requirements of the Conduct of Operations. Duties, responsibilities, and reporting requirements of the various positions associated with FInS, LASE, and TOPS maintenance are detailed in this plan. The FInS systems include both Real Property systems with asset management requirements specified in DOE Order 430.1C (Ref. 3) and Programmatic systems. In addition, for FInS, there is a list of the System Level Maintenance Plans (SLMPs) in NIF-1007419198 (Ref. 4) which provide the system descriptions and maintenance plan and schedule. In addition, the list includes the Reliability Centered Maintenance (RCM) and Experience Centered Maintenance (ECM) evaluations that have been performed for applicable FInS systems as well as reliability criticality per Section 3.5. The -AM version of the NIF Maintenance Plan focuses on the reliability program for FInS, LASE, TOPS, TASE, and NCS within the context of the overall NIF Reliability, Availability, and Maintainability (RAM) program and incorporates changes since the -AL version from August 2011 and has been updated to be fully consistent with the updates to Ref. 1. It also includes asset management considerations, updates to the Work Order (WO) process within the NIF Computerized Maintenance Management System (CMMS) which is EAM infor® System Maintenance and Reliability Tracking (SMaRT) (Ref. 5), and updates to metrics and key performance indicators (KPIs).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Moving from Information Assurance to Functional Assurance with Engineered Controls

Cyber threats to operational technology demand more than traditional IT defenses—they require full-spectrum mission assurance. Cyber-Informed Engineering (CIE) is an approach that embeds engineered controls into system design to ensure critical functions remain safe and reliable, even under attack. Unlike conventional cybersecurity tools, engineered controls act directly on physical processes to prevent unacceptable outcomes such as equipment damage or mission failure. This session will outline the CIE framework and share examples of consequence-based design that deliver true resilience, not just fail-safe behaviors. Attendees will learn how to integrate these principles into the engineering lifecycle to support resilient-by-design architectures and inform emerging standards. This talk sets the stage for the panel discussion on advancing CIE across sectors as digital and physical systems converge.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Cooperative Agreement To Analyze variabiLity, change and predictabilitY in the earth SysTem (CATALYST)

CATALYST proposes to perform foundational coordinated research in a team-oriented collaborative effort aimed at advancing a robust understanding of modes of Earth system variability and change using models, observations and process studies. The proposed research will address the DOE/BER mission by exploring the limits to predictability, identifying fundamental underlying mechanisms, quantifying interactions among modes of variability, and discovering tipping points in the Earth system to understand the current and future impacts of these phenomena on regional and global climate. Four fundamental gaps are identified in our knowledge of the Earth system: 1) What are the limits to predictability on various timescales? 2) What are the interactions among modes of Earth system variability? 3) How may modes of Earth system variability change in response to changes in external forcing, and what are the tipping points involved with those changes? 4) How are high impact events connected to modes of Earth system variability and how may they change in the future? Related to those gaps in our knowledge, we formulate four research objectives to address those gaps using a combination of Earth system models (ESMs) and machine learning (ML) methods. Research Objective 1 (RO1) addresses the first gap above and proposes to understand modes of variability and their limits of predictability on subseasonal to decadal timescales using ESMs and ML. Research Objective 2 (RO2) addresses the second gap and proposes to use a hierarchy of models to understand relevant processes and feedbacks related to how modes of variability interact with each other. Research Objective 3 (RO3) is designed to study the third gap and proposes to examine the role of external forcings in changes of modes of Earth system variability and their interactions, and the likelihood and predictability of tipping points and irreversible changes. Research Objective 4 (RO4) will address the fourth gap and proposes to use high resolution ESMs, regionally refined models (RRMs), and ML methods to investigate the relationships between high impact events (e.g. flash droughts and precipitation extremes, atmospheric rivers (ARs), tropical cyclones (TCs), storm surge/sea level rise), the synoptic systems that produce them, and their changes related to modes of Earth system variability. The research will involve the use of the Community Earth System Model (CESM), Energy Exascale Earth System Model (E3SM), CMIP multi-model data sets, a hierarchy of simpler models, and numerous observational data sets. In the course of the proposed research, CATALYST will contribute to metrics and diagnostics that will be integrated in Coordinated Model Evaluation Capabilities (CMEC), particularly with regards to the Quasi-biennial Oscillation (QBO) and its interactions with the Madden-Julian Oscillation (MJO), high atmospheric pressure blocking, and new precipitation metrics.

54 ENVIRONMENTAL SCIENCES↗