Search NASA⌕ Search

SEARCH · Search NASA

Results for “model credibility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

239 records · Page 14

Parameter inference with non-linear galaxy clustering: accounting for theoretical uncertainties

ABSTRACT We implement euclidemulator (version 1), an emulator for the non-linear correction of the matter power spectrum, into the Markov chain Monte Carlo forecasting code montepython. We compare the performance of halofit, hmcode, and euclidemulator1, both at the level of power spectrum prediction and at the level of posterior probability distributions of the cosmological parameters, for different cosmological models and different galaxy power spectrum wavenumber cut-offs. We confirm that the choice of the power spectrum predictor has a non-negligible effect on the computed sensitivities when doing cosmological parameter forecasting, even for a conservative wavenumber cut-off of $0.2\, h\, {\rm Mpc}^{-1}$. We find that euclidemulator1 is on average up to 17 per cent more sensitive to the cosmological parameters than the other two codes, with the most significant improvements being for the Hubble parameter of up to 42 per cent and the equation of state of dark energy of up to 26 per cent, depending on the case. In addition, we point out that the choice of the power spectrum predictor contributes to the risk of computing a significantly biased mean cosmology when doing parameter estimations. For the four tested scenarios we find biases, averaged over the cosmological parameters, of between 0.5σ and 2σ (from below 1σ up to 6σ for individual parameters). This paper provides a proof of concept that this risk can be mitigated by taking a well-tailored theoretical uncertainty into account as this allows to reduce the bias by a factor of 2 to 5, depending on the case under consideration, while keeping posterior credibility contours small: the standard deviations are amplified by a factor of ≤1.4 in all cases.

Astronomy & Astrophysics↗

U.S. Offshore Pipeline and Reported Incident Datasets

The U.S. Offshore Pipeline and Reported Incident Datasets provide a compilation of data from a variety of credible resources, spatially-temporally integrated into multivariate resources. This spatial resource includes more than 80,000 points along existing and abandoned pipelines in the Gulf with matched incidents based on similar lease blocks and temporal timelines (e.g., the incident date occurs within reported pipeline lifespan), structural characteristics, geologic and seafloor data, and meteorological, oceanographic, and biochemical statistics spatially and temporally matched to each point. This is provided as both a feature class in a file geodatabase, as well as a CSV file for ease of use. The pipeline incidents table is a CSV file containing more than 900 reported incidents from 1986 to 2021, including incident date, area (Outer Continental Shelf (OCS) lease block and area code), reported causes, reported incident information, and results (i.e., cost, repairs, inspections), along with quantitative severity metrics. Field dictionaries are included for both the pipeline locations and incidents datasets, which detail field definitions. The pipeline locations field dictionary includes original resource reference information.

Advanced Infrastructure Integrity Model↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Nuclear Criticality Safety Assessment of Criticality Control Containers without Moderation Control at the Waste Isolation Pilot Plant

The Waste Isolation Pilot Plant (WIPP) provides for safe, permanent disposal of government-owned transuranic (TRU) and TRU mixed wastes. Receipt and disposal of waste at the WIPP site began in March 1999. The Sandia report, Consideration of Nuclear Criticality When Disposing of Transuranic Waste at the Waste Isolation Pilot Plant, addressed potential nuclear criticality safety issues based on the projected inventory characteristics known at the time [1]. As designs for inventory, waste forms, and disposal packages have changed, new analyses have been performed, and updates have been made to address any potential effects to the WIPP safety basis. New analyses performed include Saylor 2017 [2] and Brickner 2019 [3], which address certain waste containers with specified loadings under post-closure conditions. Both examined several hypothetical scenarios and included analyses to bound (from a criticality potential standpoint) credible configurations that could occur at WIPP during the repository regulatory post-closure disposal time period for feature, event, and process (FEP) considerations—10,000 years. During this post-closure period at WIPP, the screening of FEPs is governed by the risk-based standards and implementing regulations of the US Environmental Protection Agency (EPA) (i.e., 40 CFR 191 and 40 CFR 194, respectively) [4,5]. An FEP screening can be based on either a low-consequence or low-probability rationale. A low-probability rationale includes either (a) a qualitative rationale that the FEP is not credible or (b) a quantitative demonstration that the probability is less than 10-4 in 104 years. In this evaluation, a qualitative lowprobability rationale of not credible is used by demonstrating that bounding configurations of the waste are not critical. The demonstration of subcriticality is through quantitative calculations, but a probability of criticality is not evaluated. Rather, the rationale for this evaluation is that bounding configurations with an effective neutron multiplication factor (keff) well below the upper subcriticality limit (USL) make criticality incredible. Reference [2] documented a nuclear criticality assessment of the WIPP repository for disposal of dilute surplus plutonium materials using the Dilute and Dispose Approach and packaging in criticality control overpacks (CCOs). The CCO is the waste disposal container recently designed to allow for up to 380 fissile gram equivalent (FGE) 239 Pu per drum, which is a higher fissile loading than typical waste containers. The CCO consists of a criticality control container (CCC) positioned by upper and lower plywood spacers within a standard 55 gal drum. The CCC is used to establish a geometry control for fissile materials during transportation and WIPP emplacement operations. The current WIPP waste acceptance criteria for CCO payloads limit beryllium to less than or equal to 1% by weight of the waste contents and require the waste form to be non-machine compacted. Reference [2] considered two scenario progressions—room closure from salt creep, hereafter referred to as the reconfigured dry scenario, and flooding with brine, hereafter referred to as the reconfigured wet scenario. The subsequent drying out of the reconfigured wet scenarios was also considered. For all scenarios, subcriticality was maintained when 50 g of B 4 C (acting as a neutron absorber) per CCC was intermixed within the plutonium disposition waste form. The analysis used a waste form description that limits the amount of moderation that could be present within the waste form (i.e., it limits the amount of water and polyethylene that could be present based on planned processing conditions). This analysis to evaluate increased limits on the amount of moderation that could be present was performed as a companion to Reference [2] to address concerns associated with verifying moisture and/or plastic contents of waste materials following packaging of dilute surplus plutonium in the CCO. To that end, this analysis used the models and methods from Reference [2] to evaluate a more generic base waste form consisting of water and polyethylene that is more similar (and nearly identical) to the generic waste forms utilized in other models/analyses supporting the TRU Package Transporter Model II (TRUPACTII) safety analysis [6] (all are without moderation controls). The waste form in this analysis uses a base mixture of 75% water and 25% polyethylene, the total amount of which is varied to determine the optimum moderation to fissile material (H/Pu) ratio. The fissile loading is maintained at up to 380 FGE 239 Pu (modeled as PuO 2 ) per CCO with an additional 545 g of beryllium (to bound the 1% by weight contents restriction) and 50 g of B 4 C intermixed per CCO. The beryllium content (1% by weight) is based on the total allowed waste weight (this does not include packaging and container weights). Figures ES-1 and ES-2 display summary results, showing that with this model including 50 g of B 4 C per CCO, the system keff remains under 0.85 for all moderator amounts and provides a significant margin against post-closure criticality under postulated bounding conditions for compaction. Figure ES-1 compares an infinite model with a room model at the initial emplacement spacing and under full radial compaction. Full radial compaction places each CCC in direct contact and does not credit any anticipated spacing associated with current post-closure geomechanical modeling of the repository [7]. The effects of variations in the H/Pu ratio were evaluated by varying the amount of the water/polyethylene component of the waste model, with fissile loading maintained at 380 239 Pu FGE. Similarly, Figure ES-2 illustrates how various amounts of B 4 C per CCO influence k eff at different radial compactions, all at the H/Pu ratio of 200 (in the room array model). Therefore, while the results from Saylor 2017 [2] modeled more realistic process limits associated with packaging of dilute surplus plutonium, this analysis demonstrates that limits on moderation (plastic and water content) are not necessary to ensure subcriticality in the WIPP repository, provided the requisite B 4 C absorber is present.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Credible Criticality Safety Margin in the 30B Package with LEU+ UF 6 and Hypothetical Water Ingress

The commercial nuclear industry is pursuing advancements in fuel and reactor design that increase the uranium enrichment above 5 wt. % 235 U. These advancements will necessitate the ability to transport bulk quantities of UF 6 at increased enrichments. Currently, the 30B cylinder is the primary container used by the industry for UF 6 storage and transportation and has a long history of successful shipments. This container can support up to 2,277 kg of UF 6 at a maximum enrichment of 5 wt. % 235 U. Previous evaluations have assessed the potential impact of criticality safety for 30B transport at higher enrichments but assumed moderator intrusion would not require evaluation. Although current regulations allow for the exception of moderator intrusion for UF 6 packages through the design and quality control of the package content, this exception is limited to enrichments up to 5 wt. % 235 U. Thus, an investigation of moderator intrusion into a 30B cylinder should be performed. Moderator intrusion into a 30B cylinder is a unique condition for criticality safety evaluation in transportation because of the violent chemical reactions that occur between UF 6 and H 2 O. The resulting intrusion is strongly dependent on the breach size, breach location, breach interface solid/ullage of the UF 6 content, the UF 6 distribution (which is temperature dependent), and temperature/pressure conditions which are dynamic in accident conditions. Additionally, the complexity of the HF-UO 2 F 2 -H 2 O interface that occurs during the event can influence the potential solubility of uranium in the system, as well as influence the amount of UF 6 reaction with H 2 O. With the operating experience from Orano Federal Services LLC, the UF 6 chemical expertise from Oak Ridge National Laboratory (ORNL), and the criticality safety expertise from ORNL, this paper evaluates the neutronic conditions (i.e., k eff ) that apply the understood chemistry and experimental conditions that occur during moderator intrusion of a breached 30B cylinder under postulated accidents. This report examines the historical evaluations of UF 6 transport and expands these evaluations for the enrichments expected for nuclear industry advancement. These simulations primarily feature a homogeneous mixture of UF 6 and H 2 O as an infinite media system and as a sphere with water reflection given an impurity limit of 0.5 wt. % UF 6 . This report demonstrates that this H/U limit is valid up to 8 wt. % enrichment for both H 2 O and HF as the moderating mixture. The water-reflected homogeneous mixed spheres evaluated demonstrate the amount of safety margin applied by restricting the 30B cylinder impurity limit to 0.5 wt. %. Additionally, this report evaluates moderator ingress scenarios of a 30B cylinder. The 30B cylinder simulations vary the cylinder orientation, the mass of UF 6 in the system, the mass of H 2 O in the system, and how much H 2 O has reacted with UF 6 . The moderator ingress of a 30B cylinder was evaluated for the water-reflected homogeneous mixed spheres to demonstrate the amount of safety margin applied by restricting the 30B cylinder impurity limit to 0.5 wt. %. These simulations are standard practice and are independent of the UF 6 -H 2 O reaction. This work also explored more complex simulations that layer the H 2 O over the UF 6 , which incorporates the amount of reacted UF 6 as a separate layer and considers solubility limits of UO 2 F 2 in H 2 O as it is produced. This approach is intended to simulate the postulated event of a large hairline crack occurring on a submerged cylinder. Finally, this work considers the potential of H 2 O mixing into the UF 6 solid heterogeneously using a sponge-like model. The water ingress into the UF 6 is treated as random size spheres, and the reaction products form into a layer over the spheres.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗