Lessons Learned for Planning and Estimating Operations Support Requirements

Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

Newhouse, Marilyn

Cable Tester Box

Cables are very important electrical devices that carry power and signals across multiple instruments. Any fault in a cable can easily result in a catastrophic outcome. Therefore, verifying that all cables are built to spec is a very important part of Electrical Integration Procedures. Currently, there are two methods used in lab for verifying cable connectivity. (1) Using a Break-Out Box and an ohmmeter this method is time-consuming but effective for custom cables and (2) Commercial Automated Cable Tester Boxes this method is fast, but to test custom cables often requires pre-programmed configuration files, and cables used on spacecraft are often uniquely designed for specific purposes. The idea is to develop a semi-automatic continuity tester that reduces human effort in cable testing, speeds up the electrical integration process, and ensures system safety. The JPL-Cable Tester Box is developed to check every single possible electrical connection in a cable in parallel. This system indicates connectivity through LED (light emitting diode) circuits. Users can choose to test any pin/shell (test node) with a single push of a button, and any other nodes that are shorted to the test node, even if they are in the same connector, will light up with the test node. The JPL-Cable Tester Boxes offers the following advantages: 1. Easy to use: The architecture is simple enough that it only takes 5 minutes for anyone to learn how operate the Cable Tester Box. No pre-programming and calibration are required, since this box only checks continuity. 2. Fast: The cable tester box checks all the possible electrical connections in parallel at a push of a button. If a cable normally takes half an hour to test, using the Cable Tester Box will improve the speed to as little as 60 seconds to complete. 3. Versatile: Multiple cable tester boxes can be used together. As long as all the boxes share the same electrical potential, any number of connectors can be tested together.

Lee, Jason H.

Antarctic Exploration Parallels for Future Human Planetary Exploration: The Role and Utility of Long Range, Long Duration Traverses

Topics covered include: Antarctic Exploration Parallels for Future Human Planetary Exploration: Science Operations Lessons Learned, Planning, and Equipment Capabilities for Long Range, Long Duration Traverses; Parallels Between Antarctic Travel in 1950 and Planetary Travel in 2050 (to Accompany Notes on "The Norwegian British-Swedish Antarctic Expedition 1949-52"); My IGY in Antarctica; Short Trips and a Traverse; Geologic Traverse Planning for Apollo Missions; Desert Research and Technology Studies (DRATS) Traverse Planning; Science Traverses in the Canadian High Arctic; NOR-USA Scientific Traverse of East Antarctica: Science and Logistics on a Three-Month Expedition Across Antarctica's Farthest Frontier; A Notional Example of Understanding Human Exploration Traverses on the Lunar Surface; and The Princess Elisabeth Station.

Hoffman, Stephen J.

Advancing the Oxygen Generation Assembly Design to Increase Reliability and Reduce Costs for a Future Long Duration Mission

The state-of-the-art Oxygen Generation Assembly (OGA) has been reliably producing breathing oxygen for the crew aboard the International Space Station (ISS) for over eight years. Lessons learned from operating the ISS OGA have led to proposing incremental improvements to advance the baseline design for use in a future long duration mission. These improvements are intended to reduce system weight, crew maintenance time and resupply mass from Earth while increasing reliability. The proposed improvements include replacing the cell stack membrane material, deleting the nitrogen purge equipment, replacing the hydrogen sensors, deleting the wastewater interface, replacing the hydrogen dome and redesigning the cell stack power supply. The development work to date will be discussed and forward work will be outlined. Additionally, a redesigned system architecture will be proposed.

Takada, Kevin C.

International Space Station (ISS) Environmental Control and Life Support (ECLS) System Overview of Events: 2010-2014

Nov 2, 2014 marked the completion of the 14th year of continuous human presence in space on board the International Space Station (ISS). After 42 expedition crews, over 115 assembly & utilization flights, over 180 combined Shuttle/Station, US & Russian Extravehicular Activities (EVAs), the post-Assembly-Complete ISS continues to fly and the engineering teams continue to learn from operating its systems, particularly the life support equipment. Problems with initial launch, assembly and activation of ISS elements have given way to more long term system operating trends. New issues have emerged, some with gestation periods measured in years. Major events and challenges for each U.S. Environmental Control and Life Support (ECLS) subsystem occurring during calendar years 2010 through 2014 are summarily discussed in this paper, along with look-aheads for what might be coming in the future for each U.S. ECLS subsystem.

Gentry, Gregory J.

Risk of Adverse Cognitive or Behavioral Conditions and Psychiatric Disorders: Evidence Report

In April 2010, President Obama declared a space pioneering goal for the United States in general and NASA in particular. "Fifty years after the creation of NASA, our goal is no longer just a destination to reach. Our goal is the capacity for people to work and learn and operate and live safely beyond the Earth for extended periods of time, ultimately in ways that are more sustainable and even indefinite." Thus NASA's Strategic Objective 1.1 emerged as "expand human presence into the solar system and to the surface of Mars to advance exploration, science, innovation, benefits to humanity, and international collaboration" (NASA 2015b). Any space flight, be it of long or short duration, occurs in an extreme environment that has unique stressors. Even with excellent selection methods, the potential for behavioral problems among space flight crews remain a threat to mission success. Assessment of factors that are related to behavioral health can help minimize the chances of distress and, thus, reduce the likelihood of adverse cognitive or behavioral conditions and psychiatric disorders arising within a crew. Similarly, countermeasures that focus on prevention and treatment can mitigate the cognitive or behavioral conditions that, should they arise, would impact mission success. Given the general consensus that longer duration, isolation, and confined missions have a greater risk for behavioral health ensuring crew behavioral health over the long term is essential. Risk, which within the context of this report is assessed with respect to behavioral health and performance, is addressed to deter development of cognitive and behavioral degradations or psychiatric conditions in space flight and analog populations, and to monitor, detect, and treat early risk factors, predictors and other contributing factors. Based on space flight and analog evidence, the average incidence rate of an adverse behavioral health event occurring during a space mission is relatively low for the current conditions. While mood and anxiety disturbances have occurred, no behavioral emergencies have been reported to date in space flight. Anecdotal and empirical evidence indicate that the likelihood of an adverse cognitive or behavioral condition or psychiatric disorder occurring greatly increases with the length of a mission. Further, while cognitive, behavioral, or psychiatric conditions might not immediately and directly threaten mission success, such conditions can, and do, adversely impact individual and crew health, welfare, and performance.

Slack, Kelley J.

The Double Flybys of the Cassini Mission: Navigation Challenges and Lessons Learned

Since 2004, the Cassini spacecraft has flown by Titan and other Saturn moons numerous times, successfully accomplishing its 100th targeted encounter of Titan in March 2014. The navigation of Cassini is challenging, even more so with "double flybys," two encounters separated by at most a few days. Because of this tight spacing, there is not enough time for a maneuver in between. Additionally, maneuvers prior to a double flyby only target one of the two encounters. This paper discusses the challenges faced by the Cassini Navigation Team with each double flyby, as well as lessons learned during operational support of each dual encounter. The strengths and weaknesses of the targeting strategies considered for each double flyby are also detailed, by comparing downstream ?V costs and changes to the non-targeted flyby conditions.

maneuver

The Effect of Fatty Acids to Protect Forward Osmosis Membranes from Damage

NASA has conducted research and development on forward osmosis (FO) membranes for wastewater reclamation in space since 1993. The lessons learned during operation of the International Space Station and FO based technologies on the ground taught us that reliability is a key limitation. Membranes are susceptible to organic fouling, oxidation and calcium scaling, and these factors tend to damage the membrane reducing their operating life and performance. The development of a Synthetic Biological Membrane (SBM), a membrane that mimics naturally occurring biological processes, will mitigate membrane damage and improve reliability. The SBM is a lipid-based membrane with a protective fatty acid layer configured for use in a FO water purification system. In this configuration, the protective layer on the surface of the lipid membrane is composed of fatty acids (FA). The FA interact with the chemicals found in the wastewater feed, and protect the membrane from damage. In this study, we conducted preliminary experiments to determine the feasibility of using fatty acids to alleviate damage from calcium scaling, oxidation and organic fouling.

Romero Mangado, Jaione

Zero Launch Mass Three Dimensional Print Head

NASA's strategic goal is to put humans on Mars in the 2030's. The NASA Human Spaceflight Architecture Team (HAT) and NASA Mars Design Reference Architecture (DRA) 5.0 has determined that in-situ resource utilization (ISRU) is an essential technology to accomplish this mission. Additive construction technology using in-situ materials from planetary surfaces will reduce launch mass, allow structures to be three dimensionally (3D) printed on demand, and will allow building designs to be transmitted digitally from Earth and printed in space. This will ultimately lead to elimination of reliance on structural materials launched from Earth (zero launch mass of construction consumables). The zero launch mass (ZLM) 3D print head project addressed this need by developing a system that 3D prints using a mixture of in-situ regolith and polymer as feedstock, determining the optimum mixture ratio and regolith particle size distribution, developing software to convert g-code into motion instructions for a FANUC robotic arm, printing test samples, performing materials testing, and printing a reduced scale habitable structure concept. This paper will focus on the ZLM 3D Print Head design, materials selection, software development, and lessons learned from operating the system in the NASA KSC Swamp Works Granular Mechanics & Regolith Operations (GMRO) Laboratory.

3D print

Zero Launch Mass Three Dimensional Print Head

NASA's strategic goal is to put humans on Mars in the 2030s. The NASA Human Spaceflight Architecture Team (HAT) and NASA Mars Design Reference Architecture (DRA) 5.0 has determined that in-situ resource utilization (ISRU) is an essential technology to accomplish this mission. Additive construction technology using in-situ materials from planetary surfaces will reduce launch mass, allow structures to be three dimensionally (3D) printed on demand, and will allow building designs to be transmitted digitally from Earth and printed in space. This will ultimately lead to elimination of reliance on structural materials launched from Earth (zero launch mass of construction consumables). The zero launch mass (ZLM) 3D print head project addressed this need by developing a system that 3D prints using a mixture of in-situ regolith and polymer as feedstock, determining the optimum mixture ratio and regolith particle size distribution, developing software to convert g-code into motion instructions for a FANUC robotic arm, printing test samples, performing materials testing, and printing a reduced scale habitable structure concept. This paper will focus on the ZLM 3D Print Head design, materials selection, software development, and lessons learned from operating the system in the NASA KSC Swamp Works Granular Mechanics & Regolith Operations (GMRO) Laboratory.

Regolith

Mojave Volatiles Prospector (MVP): Science and Operations Results from a Lunar Polar Rover Analog Field Campaign

The Mojave Volatiles Prospector (MVP) project is a science-driven field program with the goal of producing critical knowledge for conducting robotic exploration of the Moon. MVP feeds science, payload, and operational lessons learned to the development of a real-time, short-duration lunar polar volatiles prospecting mission. MVP achieved these goals through a simulated lunar rover mission to investigate the composition and distribution of surface and subsurface volatiles in a natural and a priori unknown environment within the Mojave Desert, improving our understanding of how to find, characterize, and access volatiles on the Moon.

xGDS real-time science tools

Juno Gravity Science: Five Years of Radio Science Operations with Ka-band Uplink

Since entering orbit on July 4, 2016, the Juno spacecraft has executed 34 closest approach passes of Jupiter, completing the prime mission. During each closest approach, called perijove, the spacecraft comes within 4,000 km of the cloud tops and the motion of the spacecraft becomes perturbed by the gravitational field of Jupiter. These small changes in the motion of the spacecraft are detected using the Juno Gravity Science Instrument by measuring the Doppler shift of the radio link between the Juno spacecraft and NASA’s Deep Space Network (DSN). During a majority of these closest approach passes, the 34-meter DSS-25 antenna transmits simultaneous X-band and Ka-band uplink to the spacecraft. Juno’s onboard X-band transponder and Ka-band translator phase-coherently return the signals back to Earth for reception at the same DSS-25 antenna. The precise frequency of these signals is measured by processing open-loop recordings of the signal. These measurements, characterized by ~5-10 micron/sec accuracies (after calibration of charged particle noise and Earth troposphere), have probed the gravity field of Jupiter to unprecedented precision, allowing for discoveries of Jupiter’s core size and depth of the zonal winds. Successful operations of the instrument during perijoves requires careful planning and coordination between DSN engineers, the Juno project, and the Juno science team. This work discusses the operations of the Juno Gravity Science Instrument after five years of prime mission operations. Lessons learned are documented to be applied to future missions and the Juno extended mission. Although the Juno extended mission formally started on August 1, 2021, on June 7, 2021, the trajectory was modified with a flyby of Ganymede, the third Galilean moon of Jupiter. Gravity and radio science investigations of Jupiter and its moons will continue to play a key role in Juno’s objectives during the extended mission.

Oudrhiri, Kamal

Training the Powered-Lift Evaluation Pilot

This poster describes a project to prepare pilots for a study assessing novel aircraft automation concepts for electric Vertical Takeoff and Landing (eVTOL) aircraft using NASA’s Vertical Motion Simulator (VMS). By exploring the operational and learning challenges related to transitioning between forward flight and vertical landing, we seek to establish baselines of pilot workload and aircraft handling qualities across varying atmospheric conditions and automation states. The simulated eVTOL design differentiates flight control allocations as a function of airspeed across four speed ranges as the vehicle transitions between fully thrust-borne lift and wing-borne lift. As speed increases, side stick controls command: translational ground speeds, vertical and lateral acceleration, vertical rate, vertical flight path angle, and bank angle. This novel approach to flight control allocation creates a significant learning challenge for pilots. Since initial eVTOL aircraft may have limitations on hover capabilities, automation and flight guidance cues also vary with airspeed to provide efficient landing profiles while still providing cues suitable for cruise flight. The NASA team prepared the study pilots to follow these flight guidance cues along curved Required Navigation Performance (RNP) approaches and along 6o and 12o glide paths to energy-efficient assistive-hover landing and goarounds. The pre-VMS preparation sought to prepare pilots from diverse levels of experience and background. To do this, NASA researchers designed and developed a fixed-based, large field-ofview simulator with terrain, structures, and air traffic. With one day of combined classroom learning and skill development in the fixedbase simulator, pilots were largely able to fly the simulated eVTOL in the VMS with sufficient mastery to provide handling quality assessments using the Cooper-Harper Handling Qualities Rating and workload assessments through the Bedford Workload Scale.

AAM

Emergency vacuum repairs in an aging accelerator: Case studies and lessons learned

Jefferson Lab operates the CEBAF electron accelerator at energies to 12 GeV for the Department of Energy Nuclear Physics program. The CEBAF injector beamline was designed and built in the early 1990s. Although we’ve upgraded and replaced many of the vacuum systems, we still have unique original components installed which operate daily. Over the past 3 years, we have had several vacuum leaks in ageing components leading to emergency repairs on a tight timeline. I’ll discuss the nature of these vacuum component failures, the difficulties in repair due to their ages, the lessons we’ve learned, and how we hope to minimize similar failures going forward.

Stutzman, Marcy [Thomas Jefferson National Acceler

Data Processing And Machine Learning Methods For Multi-Modal Operator State Classification Systems

This document is intended as an introduction to a set of common signal processing learning methods that may be used in the software portion of a functional crew state monitoring system. This includes overviews of both the theory of the methods involved, as well as examples of implementation. Practical considerations are discussed for implementing modular, flexible, and scalable processing and classification software for a multi-modal, multi-channel monitoring system. Example source code is also given for all of the discussed processing and classification methods.

Machine learning