Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbit plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Guidance system operations plan for manned LM earth orbital and lunar missions using program luminary 1E. Section 2: Data links

Data links for the guidance system of manned lunar module orbital and lunar missions are presented. Subjects discussed are: (1) digital uplink to lunar module, (2) lunar module liftoff time increment, (3) lunar module contiguous block update, (4) lunar module scatter update, (5) lunar module digital downlink, and (6) absolute addresses for update program.

Hamilton, M. H.↗

Saturn 5 Launch Vehicle Flight Evaluation Report, SA-513, Skylab 1

Saturn V SA-513 (Skylab-1) was launched at 13:30:00 Eastern Daylight Time (EDT) on May 14, 1973, from Kennedy Space Center, Complex 39, Pad A. The vehicle lifted off on a launch azimuth of 90 degrees east of north and rolled to a flight azimuth of 40.88 degrees east of north. The launch vehicle successfully placed the Saturn Work Shop in the planned earth orbit. All launch vehicle objectives were accomplished. No launch vehicle failures or anomalies occurred that seriously affected the mission.

Source record↗

Mariner 9 mapping science sequence design.

The primary mission of Mariner 9 was to map the Martian surface. This paper discusses in detail the design of the mapping science sequences which were executed by the spacecraft in sixty days and during which over eighty percent of the surface was photographed. The sequence design was influenced by many factors: experimenter scientific objectives, instrument capabilities, spacecraft capabilities, orbit characteristics, and data return rates, which are illustrated graphically. Typical orbits are depicted for each of the three different mapping phases lasting twenty days. Examples of typical orbital sequence plans prepared daily during mission operations are given.

Goldman, A. M., Jr.↗

A north-south stationkeeping ion thruster system for ATS-F

A one millipound cesium ion thruster system experiment designed for the ATS-F satellite will be used to demonstrate north-south stationkeeping for synchronous satellites. Development effort leading to the present design will be described and test data for qualification and flight acceptance tests will be presented. These include a review of EMI evaluations tests made with the power conditioning subsystem and the thruster simulator, and an extended system operational test. During the extended test, 90 on-off cycles simulated thruster operation in orbit. A planned 18,000 hour ground test of a flight qualified thruster will be discussed.

James, E.↗

Concept design and alternate arrangements of orbiter mid-deck habitability features

The evaluations and recommendations for habitability features in the space shuttle orbiter mid-deck are summarized. The orbiter mission plans, the mid-deck dimensions and baseline arrangements along with crew compliments and typical activities were defined. Female and male anthropometric data based on zero-g operations were also defined. Evaluations of baseline and alternate feasible concepts provided several recommendations which are discussed.

Church, R. A.↗

Spaceborne astronomy with electro-optical image sensors

The Space Telescope, planned for orbiting in the early 1980s, is described, with emphasis on its electro-optical image sensing capability. Relative advantages of image tubes and solid state arrays as image detectors are summarized; image tube technology is well characterized, but preference may be given to a more versatile tandem solid state array consisting of one module with high silicon response covering most of the spectrum, and a second intensified array with ultraviolet sensitivity and low noise readout. The classical 'photoelectron noise limit' calculation is reviewed, and a detailed calculation of sensitivity limits adaptable to analysis of image tube or solid state array detectors is also given. In particular, characteristics of a filter to optimize the signal to noise ratio is determined. Typical sensitivity calculations for an image tube detector show that with an exposure of one orbital night (approximately 2000 seconds), 10% photometry may be done to a low limit of visual magnitude.

Bradley, W. C.↗

An overview of Viking navigation

Viking flight path design and inflight control of Viking-1's path from earth launch to Mars landing are described. Attention is directed to the Lander descent, accessible area constraints, orbit insertion design, and earth departure control. Other topics include the orbital operations plan, the Viking heliocentric trajectory, and Mars approach control.

Oneil, W. J.↗

Preliminary Concept, Specifications, and Requirements for a Zero-Gravity Combustion Facility for Spacelab

The preliminary concept, specifications, and requirements of a reusable zero gravity combustion facility (0-GCF) for use by experimenters aboard the spacelab payload of the space transportation system (STS) orbiter are described. The facility will be amenable to any mission of the STS orbiter in which a spacelab habitable segment and pallet segment are integral and for which orbital mission plans specify induced accelerations of 0.0001 g or less for sufficiently long periods so as not to impact experiment performance.

Dewitt, Richard L.↗

Venus Orbital Imaging Radar mission analysis

Mission objectives for the Venus Orbital Imaging Radar (VOIR) project are outlined with attention to its scientific instrumentation. Design parameters of the SAR (Synthetic Aperture Radar) are described, including a high resolution capability of 200 m from a circular orbit of 375 km, which will be able to map the entire surface of the planet. Nineteen atmospheric experiments are foreseen, among them: CO2 stability assays, measurements of vertical mass transfer rates, observations of cloud circulation and composition, and an evaluation of solar wind effects on atmospheric dynamics. Navigation and orbital injection plans are reviewed, noting that the 1983 launch window (using STS) is optimum.

Nock, K. T.↗

The Saturn System

Mission planning for orbiter and entry probes of the Saturn system emphasizes scientific studies of Saturn, its satellites, its rings, and its magnetosphere.

Hunten, D. M.↗

Shuttle program. Solar activity prediction of sunspot numbers, predicted solar radio flux

A solar activity prediction technique for monthly mean sunspot numbers over a period of approximately ten years from February 1979 to January 1989 is presented. This includes the predicted maximum epoch of solar cycle 21, approximately January 1980, and the predicted minimum epoch of solar cycle 22, approximately March 1987. Additionally, the solar radio flux 10.7 centimeter smooth values are included for the same time frame using a smooth 13 month empirical relationship. The incentive for predicting solar activity values is the requirement of solar flux data as input to upper atmosphere density models utilized in mission planning satellite orbital lifetime studies.

Johnson, G. G.↗

The Inertial Upper Stage - A space transportation system element nearing first flight

The Inertial Upper Stage (IUS) developed by the USAF and NASA is a highly reliable, cost-effective solid propellant upper stage, with inherent flexibility and adaptability for integration with the Space Shuttle. The propulsion system is simple, utilizing safe, solid rocket motors with extremely light-weight nonmetallic cases and nozzles. The IUS can deliver 2268 kg from the Shuttle to geosynchronous altitude; it consists of a 9700 kg propellant weight first stage, an interstage structure, a 2720 kg propellant weight second stage, and an equipment support section. The avionics system includes the electronic and electrical hardware used to perform all signal conditioning, data processing, and software formatting associated with navigation, guidance, control, data management, and redundancy management. The generic thermal design of the IUS is suited to a wide range of thermal environments; the software design provides for selectable thermal maneuvers (rotisserie, reciprocating, toasting, space facing, sun facing) to satisfy different payload thermal requirements. A 1982 launch with the Titan 34D and a 1983 launch with the Shuttle Orbiter are planned.

Rohrbaugh, D. J.↗

RCA-E/Delta post launch report

The RCA-E spacecraft launch is summarized. Performance of the three stage Delta launch vehicle was nominal and placed the payload in a transfer orbit as planned. The ABM firing is also summarized.

Abrahamson, J. A.↗

LDR segmented mirror technology assessment study

In the mid-1990s, NASA plans to orbit a giant telescope, whose aperture may be as great as 30 meters, for infrared and sub-millimeter astronomy. Its primary mirror will be deployed or assembled in orbit from a mosaic of possibly hundreds of mirror segments. Each segment must be shaped to precise curvature tolerances so that diffraction-limited performance will be achieved at 30 micron (nominal operating wavelength). All panels must lie within 1 micron on a theoretical surface described by the optical precipitation of the telescope's primary mirror. To attain diffraction-limited performance, the issues of alignment and/or position sensing, position control of micron tolerances, and structural, thermal, and mechanical considerations for stowing, deploying, and erecting the reflector must be resolved. Radius of curvature precision influences panel size, shape, material, and type of construction. Two superior material choices emerged: fused quartz (sufficiently homogeneous with respect to thermal expansivity to permit a thin shell substrate to be drape molded between graphite dies to a precise enough off-axis asphere for optical finishing on the as-received a segment) and a Pyrex or Duran (less expensive than quartz and formable at lower temperatures). The optimal reflector panel size is between 1-1/2 and 2 meters. Making one, two-meter mirror every two weeks requires new approaches to manufacturing off-axis parabolic or aspheric segments (drape molding on precision dies and subsequent finishing on a nonrotationally symmetric dependent machine). Proof-of-concept developmental programs were identified to prove the feasibility of the materials and manufacturing ideas.

Krim, M.↗

Status of the National Space Transportation System

The National Space Transportation System is a national resources serving the government, Department of Defense and commercial needs of the USA and others. Four orbital flight tests were completed July 4, 1982, and the first Operational Flight (STS-5) which placed two commercial communications into orbit was conducted November 11, 1982. February 1983 marked the first flight of the newest orbiter, Challenger. Planned firsts in 1983 include: use of higher performance main engines and solid rocket boosters, around-the-clock crew operations, a night landing, extra-vehicular activity, a dedicated DOD mission, and the first flight of a woman crew member. By the end of 1983, five commercial payloads and two tracking and data relay satellites should be deployed and thirty-seven crew members should have made flights aboard the space shuttle.

Abrahamson, J. A.↗

The GSFC Flight Support System for on-orbit satellite servicing

To plan and execute a successful on-orbit satellite servicing mission, space support hardware, a serviceable spacecraft design, and flexible ground operations are required. This paper addresses space support hardware and in particular the Goddard Space Flight Center (GSFC) Satellite Servicing Project's (SSP) Flight Support System (FSS). The FSS is designed to be compatible with the Space Transportation System Orbiter and to support on-orbit servicing of Multimission Modular Spacecraft. It provides mechanical, electrical, and thermal support to the spacecraft during the servicing mission. Standardization of spacecraft design, components, and interfaces is required to make a satellite serviceable. Spacecraft ground operation capabilities must accommodate servicing mission requirements. Space support tools and equipment, such as the Power Ratchet Tool, assists the astronaut during time critical EVA operations to more efficiently perform the servicing mission.

Griffin, Thomas J.↗

NASA lidar velocimetry measurements

A large number of turbulence experiments performed at the Marshall Space Flight Center are reviewed. These experiments include measurements of clear air turbulence, aircraft landing wakes, wind shear, and severe storm turbulence. Also discussed is a plan to orbit a lidar on a satellite in a north-south orbit to make daily worldwide wind measurements.

Anderson, Richard↗