Search NASA⌕ Search

SEARCH · Search NASA

Results for “parachute deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

The science of the Viking missions

The Viking missions involve the launching of two identical spacecraft in the summer of 1975. Each spacecraft consists of a Lander and an Orbiter combination. The initial deceleration of the Lander during its descent to the Martian surface will be caused by aerodynamic drag. At about 5 km above the surface, a parachute is deployed. At 2 km three retrorockets are fired. The investigations to be conducted are discussed, giving attention to studies of the Martian surface with the aid of TV cameras, water mapping with an IR spectrometer, a thermal mapping experiment, studies of the Martian atmosphere, investigations conducted with a surface sampler, the search for life, and studies of the Martian surface composition.

Soffen, G. A.↗

Scale parachute fabrication

Report describes highlights in developing six 12.5-percent scale drogue parachute models. Deployment bags are fabricated for each model.

Bacchus, D.↗

Feasibility study using large ribbon parachutes, retrorockets, and hydrodynamic attenuation to recover liquid rocket boosters for the Space Shuttle

A new three-phase approach to recovery of the large liquid rocket boosters being studied for the Space Shuttle is proposed. The concept consists of a cluster of larger ribbon parachutes, retrorockets, and spar mode flotation. The two inert liquid rocket boosters weighing 115,000 lb to 183,000 lb descend from high altitude in a side-on coning attitude to 16,000 ft altitude where a cluster of large ribbon parachutes are deployed. The terminal velocity near water landing is 80 ft/sec. Retrorockets are used to decrease the velocity to about 40 ft/sec. The third phase is opening of the front end of the cylindrical rocket case to allow flooding to cushion impact and allow vertical flotation in the spar mode keeping the four expensive liquid rocket engines dry.

Pepper, William B.↗

An Investigation of Terminal Guidance and Control Techniques for a Robotic Mars Lander

Two separate Mars lander touchdown scenarios arc considered and compared o a baseline study with the goal of minimizing the landed distance to a specified location on the Mars surface. This study considers a set of points from parachute handoff to touchdown on the surface. The first scenario examines the effect of thrust vectoring while the parachute is deployed and includes an algorithm for determining targeting initial guesses. The second considers a reverse gravity turn lo a hover condition 500 meters above!meterstl e surface and then uses lateral thrusting to minimize the range to target. The effects of both scenarios on fuel usage targeting and targeting success are discussed.

Birge, Brian K.↗

The Cassini/Huygens Mission to the Saturnian System

Cassini/Huygens will carry out an in-depth exploration of the Saturnian system. On October 15, 1996 the spacecraft was launched on its interplanetary journey. On the way to Saturn, Cassini/Huygens, will flyby Venus, twice (April 26, 1998; June 24, 1999), the Earth once (August 18, 1999), and Jupiter (December 30, 2000). On approach to Saturn, the small satellite Phoebe will be encountered on June 11, 2004. Upon arrival at Saturn on July 1, 2004, Cassini/Huygens will fire its main engine and go into orbit about the planet. Huygens will be delivered to Titan on November 27, 2004. After deceleration in the upper atmosphere, Huygens will deploy a parachute system and its six instruments will make scientific measurements and observations as it descends to the surface. These data then will be transmitted to the Orbiter which, in turn, will relay them to the Earth. The Orbiter will then commence a four year long tour of the Saturnian system. With its complement of 12 instruments, Cassini is capable of making a wide range of in situ and remote sensing observations. There will be repeated close flybys of Titan both to make measurements and for gravity-assisted orbit changes that will enable Cassini to visit other satellites, various parts of the magnetosphere, and obtain occultations of the rings and atmospheres of Saturn and Titan. During the span of the mission, Cassini will also record temporal changes in many of the properties that it can observe. The presentation will emphasize current status and plans for the mission. (The Cassini mission is a joint undertaking by NASA and ESA. This work was carried out at Jet Propulsion Laboratory, California Institute of Technology, under contract to NASA.)

Matson, D. L.↗

SHARP-B2: Flight Test Objectives, Project Implementation and Initial Results

On September 28, 2000 the SHARP-B2 flight experiment was launched from Vandenberg Air Force Base, California. SHARP-B2 is the 2nd Ballistic flight test in the SHARP (Slender Hypervelocity Aerothermodynamic Research Probes) program which develops and tests new thermal protection materials and sharp body concepts. The flight tested Ultra-High Temperature Ceramics (UHTCs), which may radically change the design and performance of future aerospace vehicles. The new designs may overturn an age-old tenet of aerodynamics: that blunt-body aerospace vehicles, but not those with sharp leading edges, can survive the searing temperatures created as the vehicles tear through the atmosphere. Sharp leading edges offer numerous advantages over the blunt-body design currently in use. They could allow a space shuttle or crew return vehicle to maneuver in space more like an airplane and potentially allow astronauts to return to Earth from anywhere on orbit. They may allow improved astronaut safety by decreasing the risk of aborting into the ocean. They may reduce the electromagnetic interference that causes the communications blackouts that plague reentering blunt-body space vehicles. Reducing the amount of drag could lead to a reduction in propulsion requirements. Planetary probes could make use of sharp-body technology for aerobraking and to maximize their maneuvering capability. SHARP-B2 was a joint effort among NASA Ames, Sandia National Laboratories, the U.S. Air Force and the U.S. Army. It was funded by the Pathfinder Program at NASA's Marshall Space Flight Center. The SHARP-B2 payload was carried aboard a U.S. Air Force Minuteman III missile carrying a modified Mk 12A reentry vehicle (RV), which blasted off from Vandenberg Air Force Base near Lompoc, CA, at 3:01 a.m. PDT on Sept. 28. The RV was equipped with four 5. 1 inch-long strakes, or sharp leading edges. Each strake contained three UHTCs: ZrB2/SiC/C; ZrB2/SiC; and HfB2/SiC. Once it reached an altitude of about 400 nautical miles, the RV was released, returning through Earth's atmosphere at speeds exceeding Mach 22. One pair of strakes was designed to retract just before reaching temperatures high enough to cause the material to begin ablating. The other pair was designed to retract shortly after ablation began, at an expected temperature of nearly 5,100 degrees Fahrenheit. Sensors in the strakes measured how closely performance matched pre-flight calculations, and data was successfully collected throughout the 23-minute flight. A parachute was deployed (but not fully inflated) and the RV splashed down in a lagoon at the Kwajalein missile range in the Pacific Ocean. Within 3 hours radar track analysis showed ocean entry to be precisely at the latitude/longitude coordinates estimated during pre-flight simulation. An hour later a ship was deployed by the Army to recover the reentry vehicle, which was recovered in 165 feet of water, just 500 feet from its planned splash-down point. This is the first RV recovery in over a decade.

Salute, Joan↗

Space-Based Range

Space-Based Range (SBR), previously known as Space-Based Telemetry and Range Safety (STARS), is a multicenter NASA proof-of-concept project to determine if space-based communications using NASA's Tracking and Data Relay Satellite System (TDRSS) can support the Range Safety functions of acquiring tracking data and generating flight termination signals, while also providing broadband Range User data such as voice, video, and vehicle/payload data. There was a successful test of the Range Safety system at Wallops Flight Facility (WFF) on December 20, 2005, on a two-stage Terrier-Orion spin-stabilized sounding rocket. SBR transmitted GPS tracking data and maintained links with two TDRSS satellites simultaneously during the 10-min flight. The payload section deployed a parachute, landed in the Atlantic Ocean about 90 miles downrange from the launch site, and was successfully recovered. During the Terrier-Orion tests flights, more than 99 percent of all forward commands and more than 95 percent of all return frames were successfully received and processed. The time latency necessary for a command to travel from WFF over landlines to White Sands Complex and then to the vehicle via TDRSS, be processed onboard, and then be sent back to WFF was between 1.0 s and 1.1 s. The forward-link margins for TDRS-10 (TDRS East [TDE]) were 11 dB to 12 dB plus or minus 2 dB, and for TDRS-4 (TDRS Spare [TDS]) were 9 dB to 10 dB plus or minus 1.5 dB. The return-link margins for both TDE and TDS were 6 dB to 8 dB plus or minus 3 dB. There were 11 flights on an F-15B at Dryden Flight Research Center (DFRC) between November 2006 and February 2007. The Range User system tested a 184-element TDRSS Ku-band (15 GHz) phased-array antenna with data rates of 5 Mbps and 10 Mbps. This data was a combination of black-and-white cockpit video, Range Safety tracking and transceiver data, and aircraft and antenna controller data streams. IP data formatting was used.

Source record↗

Ares I-X: On the Threshold of Exploration

Ares I-X, the first flight of the Ares I crew launch vehicle, is less than a year from launch. Ares I-X will test the flight characteristics of Ares I from liftoff to first stage separation and recovery. The flight also will demonstrate the computer hardware and software (avionics) needed to control the vehicle; deploy the parachutes that allow the first stage booster to land in the ocean safely; measure and control how much the rocket rolls during flight; test and measure the effects of first stage separation; and develop and try out new ground handling and rocket stacking procedures in the Vehicle Assembly Building (VAB) and first stage recovery procedures at Kennedy Space Center (KSC) in Florida. All Ares I-X major elements have completed their critical design reviews, and are nearing final fabrication. The first stage--four-segment solid rocket booster from the Space Shuttle inventory--incorporates new simulated forward structures to match the Ares I five-segment booster. The upper stage, Orion crew module, and launch abort system will comprise simulator hardware that incorporates developmental flight instrumentation for essential data collection during the mission. The upper stage simulator consists of smaller cylindrical segments, which were transported to KSC in fall 2008. The crew module and launch abort system simulator were shipped in December 2008. The first stage hardware, active roll control system (RoCS), and avionics components will be delivered to KSC in 2009. This paper will provide detailed statuses of the Ares I-X hardware elements as NASA's Constellation Program prepares for this first flight of a new exploration era in the summer of 2009.

Davis, Stephan R.↗

Flight Analysis of an Autonomously Navigated Experimental Lander for High Altitude Recovery

First steps have been taken to qualify a family of parafoil systems capable of increasing the survivability and reusability of high-altitude balloon payloads. The research is motivated by the common risk facing balloon payloads where expensive flight hardware can often land in inaccessible areas that make them difficult or impossible to recover. The Autonomously Navigated Experimental Lander (ANGEL) flight test introduced a commercial Guided Parachute Aerial Delivery System (GPADS) to a previously untested environment at 108,000ft MSL to determine its high-altitude survivability and capabilities. Following release, ANGEL descended under a drogue until approximately 25,000ft, at which point the drogue was jettisoned and the main parachute was deployed, commencing navigation. Multiple data acquisition platforms were used to characterize the return-to-point technology performance and help determine its suitability for returning future scientific payloads ranging from 180 to 10,000lbs to safer and more convenient landing locations. This report describes the test vehicle design, and summarizes the captured sensor data. Various post-flight analyses are used to quantify the system's performance, gondola load data, and serve as a reference point for subsequent missions.

Parafoil↗

Simulation Development and Analysis of Crew Vehicle Ascent Abort

NASA's Commercial Crew Program is an integral step in its journey to Mars as it would expedite development of space technologies and open up partnership with U.S. commercial companies. NASA reviews and independent assessment of Commercial Crew Program is fundamental to its success, and being able to model a commercial crew vehicle in a simulation rather than conduct a live test would be a safer, faster, and less expensive way to assess and certify the capabilities of the vehicle. To this end, my project was to determine the feasibility of using a simulation tool named SOMBAT version 2.0 to model a multiple parachute system for Commercial Crew Program simulation. The main tasks assigned to me were to debug and test the main parachute system model, (capable of simulating one to four main parachute bodies), and to utilize a graphical program to animate the simulation results. To begin tackling the first task, I learned how to use SOMBAT by familiarizing myself with its mechanics and by understanding the methods used to tweak its various parameters and outputs. I then used this new knowledge to set up, run, and analyze many different situations within SOMBAT in order to explore the limitations of the parachute model. Some examples of parameters that I varied include the initial velocity and orientation of the falling capsule, the number of main parachutes, and the location where the parachutes were attached to the capsule. Each parameter changed would give a different output, and in some cases, would expose a bug or limitation in the model. A major bug that I discovered was the inability of the model to handle any number of parachutes other than three. I spent quite some time trying to debug the code logically, but was unable to figure it out until my mentor taught me that digital simulation limitations can occur when some approximations are mistakenly assumed for certain in a physical system. This led me to the realization that unlike in all of the programming classes I have taken thus far that focus on pure logic, simulation code focuses on mimicking the physical world with some approximation and can have inaccuracies or numerical instabilities. Learning from my mistake, I adopted new methods to analyze these different simulations. One method the student used was to numerically plot various physical parameters using MATLAB to confirm the mechanical behavior of the system in addition to comparing the data to the output from a separate simulation tool called FAST. By having full control over what was being outputted from the simulation, I could choose which parameters to change and to plot as well as how to plot them, allowing for an in depth analysis of the data. Another method of analysis was to convert the output data into a graphical animation. Unlike the numerical plots, where all of the physical components were displayed separately, this graphical display allows for a combined look at the simulation output that makes it much easier for one to see the physical behavior of the model. The process for converting SOMBAT output for EDGE graphical display had to be developed. With some guidance from other EDGE users, I developed a process and created a script that would easily allow one to display simulations graphically. Another limitation with the SOMBAT model was the inability for the capsule to have the main parachutes instantly deployed with a large angle between the air speed vector and the chutes drag vector. To explore this problem, I had to learn about different coordinate frames used in Guidance, Navigation & Control (J2000, ECEF, ENU, etc.) to describe the motion of a vehicle and about Euler angles (e.g. Roll, Pitch, Yaw) to describe the orientation of the vehicle. With a thorough explanation from my mentor about the description of each coordinate frame, as well as how to use a directional cosine matrix to transform one frame to another, I investigated the problem by simulating different capsule orientations. In the end, I was able to show that this limitation could be avoided if the capsule is initially oriented antiparallel to its velocity vector.

Wong, Chi S.↗

Flight Analysis of an Autonomously Navigated Experimental Lander

First steps have been taken to qualify a family of parafoil systems capable of increasing the survivability and reusability of high-altitude balloon payloads. The research is motivated by the common risk facing balloon payloads where expensive flight hardware can often land in inaccessible areas that make them difficult or impossible to recover. The Autonomously Navigated Experimental Lander (ANGEL) flight test introduced a commercial Guided Parachute Aerial Delivery System (GPADS) to a previously untested environment at 108,000 feet Mean Sea Level (MSL) to determine its high-altitude survivability and capabilities. Following release, ANGEL descended under a drogue until approximately 25,000 feet, at which point the drogue was jettisoned and the main parachute was deployed, commencing navigation. Multiple data acquisition platforms were used to characterize the return-to-point technology performance and help determine its suitability for returning future scientific payloads ranging from 180 to 10,000 pounds to safer and more convenient landing locations. This report describes the test vehicle design, and summarizes the captured sensor data. Various post-flight analyses are used to quantify the systems performance, gondola load data, and serve as a reference point for subsequent missions.

Parafoil↗

Findings from the Supersonic Qualification Program of the Mars Science Laboratory Parachute System

In 2012, the Mars Science Laboratory Mission (MSL) will deploy NASA's largest extra-terrestrial parachute, a technology integral to the safe landing of its advanced robotic explorer on the surface. The supersonic parachute system is a mortar deployed 21.5 m disk-gap-band (DGB) parachute, identical in geometric scaling to the Viking era DGB parachutes of the 1970's. The MSL parachute deployment conditions are Mach 2.3 at a dynamic pressure of 750 Pa. The Viking Balloon Launched Decelerator Test (BLDT) successfully demonstrated a maximum of 700 Pa at Mach 2.2 for a 16.1 m DGB parachute in its AV4 flight. All previous Mars deployments have derived their supersonic qualification from the Viking BLDT test series, preventing the need for full scale high altitude supersonic testing. The qualification programs for Mars Pathfinder, Mars Exploration Rover, and Phoenix Scout Missions were all limited to subsonic structural qualification, with supersonic performance and survivability bounded by the BLDT qualification. The MSL parachute, at the edge of the supersonic heritage deployment space and 33% larger than the Viking parachute, accepts a certain degree of risk without addressing the supersonic environment in which it will deploy. In addition, MSL will spend up to 10 seconds above Mach 1.5, an aerodynamic regime that is associated with a known parachute instability characterized by significant canopy projected area fluctuation and dynamic drag variation. This aerodynamic instability, referred to as "area oscillations" by the parachute community has drag performance, inflation stability, and structural implications, introducing risk to mission success if not quantified for the MSL parachute system. To minimize this risk and as an alternative to a prohibitively expensive high altitude test program, a multi-phase qualification program using computation simulation validated by subscale test was developed and implemented for MSL. The first phase consisted of 2% of fullscale supersonic wind tunnel testing of a rigid DGB parachute with entry-vehicle to validate two high fidelity computational fluid dynamics (CFD) tools. The computer codes utilized Large Eddy Simulation and Detached Eddy Simulation numerical approaches to accurately capture the turbulent wake of the entry vehicle and its coupling to the parachute bow-shock. The second phase was the development of fluid structure interaction (FSI) computational tools to predict parachute response to the supersonic flow field. The FSI development included the integration of the CFD from the first phase with a finite element structural model of the parachute membrane and cable elements. In this phase, a 4% of full-scale supersonic flexible parachute test program was conducted to provide validation data to the FSI code and an empirical dataset of the MSL parachute in a flight-like environment. The final phase is FSI simulations of the full-scale MSL parachute in a Mars type deployment. Findings from this program will be presented in terms of code development and validation, empirical findings from the supersonic testing, and drag performance during supersonic operation.

EDL↗

Application of Stereo PIV on a Supersonic Parachute Model

The Mars Science Laboratory (MSL) is the next step in NASA's Mars Exploration Program, currently scheduled for 2011. The spacecraft's descent into the Martian atmosphere will be slowed from Mach 2 to subsonic speeds via a large parachute system with final landing under propulsive control. A Disk-Band-Gap (DBG) parachute will be used on MSL similar to the designs that have been used on previous missions, however; the DBG parachute used by MSL will be larger (21.5 m) than in any of the previous missions due to the weight of the payload and landing site requirements. The MSL parachute will also deploy at higher Mach number (M 2) than previous parachutes, which can lead to instabilities in canopy performance. Both the increased size of the DBG above previous demonstrated configurations and deployment at higher Mach numbers add uncertainty to the deployment, structural integrity and performance of the parachute. In order to verify the performance of the DBG on MSL, experimental testing, including acquisition of Stereo Particle Imaging Velocimetry (PIV) measurements were required for validating CFD predictions of the parachute performance. A rigid model of the DBG parachute was tested in the 10x10 foot wind tunnel at GRC. Prior to the MSL tests, a PIV system had never been used in the 10x10 wind tunnel. In this paper we discuss some of the technical challenges overcome in implementing a Stereo PIV system with a 750x400 mm field-of-view in the 10x10 wind tunnel facility and results from the MSL hardshell canopy tests.

Wernet, Mark P.↗

Selectable-Towline Spin-Chute System

Selectable-towline spin-chute system designed to enable in-flight deployment of single emergency spin-recovery parachute from more than one attachment point on airplane. Eliminates multiple parachutes and multiple deployment systems, reducing weight and cost of emergency system. Minimizes inertial and aerodynamic deviations on airplane, contributing to overall simplification of structure and aerodynamics.

Vairo, Daniel M.↗

Reconstructed Parachute System Performance During the Second LDSD Supersonic Flight Dynamics Test

NASA’s Low-Density Supersonic Decelerators project (LDSD) has developed and tested four new aerodynamic decelerator technologies for future Mars missions: two attached toroidal inflatable decelerators, a ballute, and a large supersonic parachute. On June 8, 2015, the project conducted a high-altitude, supersonic flight test of a 30.5-meter supersonic Ringsail (SSRS) canopy at the US Navy’s Pacific Missile Range Facility (PMRF) on Kauai, HI. This test, the second in a series of Supersonic Flight Dynamics Tests (SFDT-2), allowed the LDSD project to test the deployment and performance of its parachute decelerator system in the wake of a representative test vehicle (a 4.7-meter aeroshell and 6-meter toroidal inflatable aerodynamic decelerator) at conditions relevant to Mars entry for the second time. The parachute decelerator system consisted of the SSRS main parachute and a 4.4-meter ballute (called the parachute deployment device, or PDD) for its extraction. The ballute was mortar-deployed at a Mach number of 2.78 and a dynamic pressure of 493 Pa, and inflated with the aid of a water-methanol based gas generator. After flying in the wake of the test vehicle for ten seconds, the PDD was released and allowed to extract the main parachute pack. The SSRS reached line-stretch at a Mach number of 2.37 and dynamic pressure of 602 Pa. Following full inflation, the propagation of a tear in the canopy led to the failure of the parachute skirt band and to the subsequent failure of the vent band. The test vehicle was instrumented with load sensors, inertial sensors, and high-speed and high resolution cameras that provided data on the performance of the PDD and SSRS through deployment, inflation, and flight. This paper describes the resulting reconstructed behavior of the PDD and SSRS during deployment and inflation, their aerodynamic performance on SFDT-2, the failure of the SSRS shortly after full inflation, and the LDSD project’s investigation into its underlying causes.

O'Farrell, Clara↗

Low Density Supersonic Decelerator Flight Dynamics Test-1 Flight Design and Targeting

NASA's Low Density Supersonic Decelerator (LDSD) program was established to identify, develop, and eventually qualify to Test [i.e. Technology] Readiness Level (TRL) - 6 aerodynamic decelerators for eventual use on Mars. Through comprehensive Mars application studies, two distinct Supersonic Inflatable Aerodynamic Decelerator (SIAD) designs were chosen that afforded the optimum balance of benefit, cost, and development risk. In addition, a Supersonic Disk Sail (SSDS) parachute design was chosen that satisfied the same criteria. The final phase of the multi-tiered qualification process involves Earth Supersonic Flight Dynamics Tests (SFDTs) within environmental conditions similar to those that would be experienced during a Mars Entry, Descent, and Landing (EDL) mission. The first of these flight tests (i.e. SFDT-1) was completed on June 28, 2014 with two more tests scheduled for the summer of 2015 and 2016, respectively. The basic flight design for all the SFDT flights is for the SFDT test vehicle to be ferried to a float altitude of 120 kilo-feet by a 34 thousand cubic feet (Mcf) heavy lift helium balloon. Once float altitude is reached, the test vehicle is released from the balloon, spun-up for stability, and accelerated to supersonic speeds using a Star48 solid rocket motor. After burnout of the Star48 motor the vehicle decelerates to pre-flight selected test conditions for the deployment of the SIAD system. After further deceleration with the SIAD deployed, the SSDS parachute is then deployed stressing the performance of the parachute in the wake of the SIAD augmented blunt body. The test vehicle/SIAD/parachute system then descends to splashdown in the Pacific Ocean for eventual recovery. This paper will discuss the development of both the test vehicle and the trajectory sequence including design trade-offs resulting from the interaction of both engineering efforts. In addition, the SFDT-1 nominal trajectory design and associated sensitivities will be discussed as well as an overview of the on-board flight software used to trigger and sequence the main flight events necessary to deploy the deceleration technologies. Finally, as-flown performance of the SFDT-1 system will be discussed.

Ivanov, Mark↗

Genesis failure investigation report : JPL Failure Review Board, Avionics Sub-Team

On January 7, 2001, the Genesis spacecraft lifted off from Cape Canaveral. Its mission was to collect solar wind samples and return those samples to Earth for detailed analysis by scientists. The mission proceeded successfully for three-and-a-half years. On September 8, 2004, the spacecraft approached Earth, pointed the Sample Return Capsule (SRC) at its entry target, and then fired pyros that jettisoned the SRC. The SRC carried the valuable samples collected over the prior 29 months. The SRC also contained the requisite hardware (mechanisms, parachutes, and electronics) to manage the process of entry, descent, and landing (EDL). After entering Earthas atmosphere, the SRC was expected to open a drogue parachute. This should have been followed by a pyro event to release the drogue chute, and then by a pyro event to deploy the main parachute at an approximate elevation of 6.7 kilometers. As the SRC descended to the Utah landing site, helicopters were in position to capture the SRC before the capsule touched down. On September 8, 2004, observers of the SRCas triumphant return became concerned as the NASA announcer fell silent, and then became even more alarmed as they watched the spacecraft tumble as it streaked across the sky. Long-distance cameras clearly showed that the drogue parachute had not deployed properly. On September 9, 2004, General Eugene Tattini, Deputy Director of the Jet Propulsion Laboratory formed a Failure Review Board (FRB). This board was charged with investigating the cause of the Genesis mishap in close concert with the NASA Mishap Investigation Board (MIB). The JPL-FRB was populated with experts from within and external to the Jet Propulsion Laboratory. The JPL-FRB participated with the NASA-MIB through all phases of the investigation, working jointly and concurrently as one team to discover the facts of the mishap.

solar wind↗