Search NASA⌕ Search

SEARCH · Search NASA

Results for “parallel state estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

239 records · Page 14

Shallow cumuli cover and its uncertainties from ground-based lidar–radar data and sky images

Cloud cover estimates of single-layer shallow cumuli obtained from narrow field-of-view (FOV) lidar–radar and wide-FOV total sky imager (TSI) data are compared over an extended period (2000–2017 summers) at the established United States Atmospheric Radiation Measurement mid-continental Southern Great Plains site. We quantify the impacts of two factors on hourly and sub-hourly cloud cover estimates: (1) instrument-dependent cloud detection and data merging criteria and (2) FOV configuration. Enhanced observations at this site combine the advantages of the ceilometer, micropulse lidar (MPL) and cloud radar in merged data products. Data collected by these three instruments are used to calculate narrow-FOV cloud fraction (CF) as a temporal fraction of cloudy returns within a given period. Sky images provided by TSI are used to calculate the wide-FOV fractional sky cover (FSC) as a fraction of cloudy pixels within a given image. To assess the impact of the first factor on CF obtained from the merged data products, we consider two additional subperiods (2000–2010 and 2011–2017 summers) that mark significant instrumentation and algorithmic advances in the cloud detection and data merging. We demonstrate that CF obtained from ceilometer data alone and FSC obtained from sky images provide the most similar and consistent cloud cover estimates; hourly bias and root-mean-square difference (RMSD) are within 0.04 and 0.12, respectively. However, CF from merged MPL–ceilometer data provides the largest estimates of the multiyear mean cloud cover, about 0.12 (35 %) and 0.08 (24 %) greater than FSC for the first and second subperiods, respectively. CF from merged ceilometer–MPL–radar data has the strongest subperiod dependence with a bias of 0.08 (24 %) compared to FSC for the first subperiod and shows no bias for the second subperiod. The strong period dependence of CF obtained from the combined ceilometer–MPL–radar data is likely results from a change in what sensors are relied on to detect clouds below 3 km. After 2011, the MPL stopped being used for cloud top height detection below 3 km, leaving the radar as the only sensor used in cloud top height retrievals. To quantify the FOV impact, a narrow-FOV FSC is derived from the TSI images. We demonstrate that FOV configuration does not modify the bias but impacts the RMSD (0.1 hourly, 0.15 sub-hourly). In particular, the FOV impact is significant for sub-hourly observations, where 41 % of narrow- and wide-FOV FSC differ by more than 0.1. A new “quick-look” tool is introduced to visualize impacts of these two factors through integration of CF and FSC data with novel TSI-based images of the spatial variability in cloud cover. The influence of cloud field organization, such cloud streets parallel to the wind direction, on narrow- and wide-FOV cloud cover estimates can be visually assessed.

54 ENVIRONMENTAL SCIENCES↗

Preliminary Long-term Safety Assessment for the Planned LLW Disposal Facility at Al-Tuwaitha, Iraq - 18142

Before 1991, Iraq had a significant nuclear program which encompassed ten nuclear sites spread out across the country. The largest nuclear site was located at the Al-Tuwaitha site near Baghdad where 18 nuclear facilities were concentrated. During the first Gulf War in 1991, all sites suffered significant damage from bombing and subsequent looting. Currently, the Ministry of Science and Technology is responsible for the ten heavily damaged nuclear sites and for the management of radioactive waste in Iraq in general. The task of decommissioning the damaged nuclear facilities and managing the resulting waste is being supported by the International Atomic Energy Agency (IAEA), the European Commission (EC), and the United States (US). In the framework of its Instrument for Nuclear Safety Cooperation (INSC), the EC has launched a cooperation project to support the planned construction of an engineered repository for short-lived low- and intermediate level waste for the safe disposal of radioactive waste resulting from the decommissioning activities, as well as for waste from the continuing use of radioisotopes in medicine and the oil and gas industry in the country. The main objectives of this project, which was awarded to a Consortium led by NUKEM Technologies Engineering Services GmbH and joined by DBE Technology GmbH of Germany and JAVYS a.s. of Slovakia, are the development of an initial conceptual level basic design and preliminary safety assessment report (PSAR) and the subsequent detailed engineering design and supporting pre-construction safety assessment report (PCSAR). The current paper focuses on the development of the PSAR. Special focus is given to the long-term calculations and difficulties associated with the limited data base in regard to site characterization as well as the expected inventory for the future repository. Because of the ongoing security concerns in Iraq, the Ministry of Science and Technology had already selected the Al-Tuwaitha Site as the best suited location for the planned surface repository at the start of the project. Although some site characterization work had already been carried out prior to the start of the project, certain data for modelling the geology and hydrology of the site are still lacking. Missing data have been compensated by conservative assumptions and the assessment of alternative scenarios. Consequently, for the development of the simplified GoldSim{sup R} computer model used to carry out the long-term calculations supporting the PSAR, existing site information was used and, as appropriate, amended or replaced by conservative assumptions. Due to the nature of the waste, data on the expected inventory are associated with large uncertainties. Although certain estimates related to the future volume of the waste exist, little to no information is available on the expected radionuclide vector and respective activities. Therefore, the long-term calculations were carried out for a generic inventory including a broad range of radionuclides that are to be expected as being important considering the kind of waste to be disposed of in the facility. Based on the results of these calculations, the maximum total capacity of the facility was estimated and converted into activity limits for individual radionuclides that will be integrated into the existing general WAC for the facility. Compliance with these WAC will then guarantee the safety of the repository in regard to potential radionuclide releases via the groundwater pathway. In parallel to the determination of activity limits for the WAC, long-term calculations were carried using different estimates for the expected total activity to determine the general suitability of the proposed technical solution of the repository for receiving the total amount of Iraqi radioactive waste principally acceptable for surface disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Potential Leakage Pathways and Mineralization within Caprocks for Geologic Storage of CO 2

We used a multifaceted approach to investigate the nature of caprocks above, and the interface between, reservoir-quality rocks that might serve as targets for carbon storage. Fieldwork in southeastern Utah examined the regional- to m-scale nature of faults and fractures across the sedimentiological interfaces. We also used microscopic analyses and mechanical modeling to examine the question as to how the contacts between units interact, and how fractures may allow fluids to move from reservoirs to caprock. Regional-­scale analyses using ASTER data enabled us to identify location of alteration, which led to site-­specific studies of deformation and fluid flow. In the Jurassic Carmel Formation, a seal for the Navajo Sandstone, we evaluated mesoscale variability in fracture density and morphology and variability in elastic moduli in the Jurassic Carmel Formation, a proposed seal to the underlying Navajo Sandstone for CO 2 geosequestration. By combining mechano-stratigraphic outcrop observations with elastic moduli derived from wireline log data, we characterize the variability in fracture pattern and morphology with the observed variability in rock strength within this heterolithic top seal. Outcrop inventories of discontinuities show fracture densities decrease as bed thickness increases and fracture propagation morphology across lithologic interfaces vary with changing interface type. Dynamic elastic moduli, calculated from wireline log data, show that Young’s modulus varies by up to 40 GPa across depositional interfaces, and by an average of 3 GPa across the reservoir/seal interface. We expect that the mesoscale changes in rock strength will affect the distributions of localized stress and thereby influence fracture propagation and fluid flow behavior within the seal. These data provide a means to closely tie outcrop observations to those derived from subsurface data and estimates of subsurface rock strength. We also studied damage zones associated normal faults in the Permian Cedar Mesa Sandstone, southeastern Utah. These faults are characterized by a single slip surfaces and damage zones containing deformation bands, veins, and joints. Field observations include crosscutting relationships, permeability increase, rock strength decrease, and ultraviolet light induced mineral fluorescence within the damage zone. These field observations combined with the interpreted paragenetic sequence from petrographic analysis, suggests a deformation history of reactivation and several mineralization events in an otherwise low-permeability fault. All deformation bands and veins fluoresce under ultraviolet light, suggesting connectivity and a shared mineralization history. Pre-­existing deformation features act as loci for younger deformation and mineralization events, this fault and its damage zone illustrate the importance of the fault damage zone to subsurface fluid flow. We model a simplified stress history in order to understand the importance of rock properties and magnitude of tectonic stress on the deformation features within the damage zone. The moderate confining pressures, possible variations in pore pressure, and the porous, fine-­grained nature of the Cedar Mesa Sandstone results in a fault damage zone characterized by enhanced permeability, subsurface fluid flow, and mineralization. Structural setting greatly influences fracture spacing and orientation. Three structural settings were examined and include fault proximity, a fold limb of constant dip, and a setting proximal to the syncline hinge. Fracture spacing and dominant fracture orientation vary at each setting and distinctions between regional and local paleo-stress directions can be made. Joints on the fold limb strike normal to the fold axis/bedding and are interpreted to be sub-parallel to the maximum regional paleo-stress direction as there is no fold related strain. Joints proximal to faults and the syncline hinge may have formed under local stress conditions associated with folding and faulting, and in some cases, are perpendicular to the maximum regional paleo-stress direction. Macroscale analyses of the Iron Wash fault, which cuts most of the stratigraphy of the reservoir- seal analogs, reveals that seal bypass occurs along faults with mixed lithologic composition. While portions of the fault may be effective seals, when modeled as a whole the fault zone cannot support a high CO 2 column. We adapted oil-field methods to calculate column heights and sealing capacities. Examination of the burial and tectonic histories of the rocks, coupled with field- and micro-­scale studies, allow us to examine the potential for seal failure using basic rock mechanics failure analyses. These studies reveal that the sealing lithologies experienced multiple episodes of deformation that resulted in numerous fractures and small faults. In a stress state based on burial history and overburden loads, we show that most of the seals could fail with normal to slightly excess pore pressures.

58 GEOSCIENCES↗

Evaluation of Steam Cycle Upgrades to Improve the Competitiveness of U.S. Coal Power Plants (Final Scientific / Technical Report)

Increasing the competitiveness of the existing pulverized-coal utility fleet in the United States may be achieved by decreasing heat rate, via increases in steam cycle efficiency through upgraded steam temperatures and use of latest technology available in steam turbine and blading design. The average net plant efficiency of the US coal-fired fleet is approximately 33% (HHV). Plant efficiency increases to approximately 41.4% (HHV) at 1,350°F (732°C) steam temperature. However, achieving these Advanced Ultra-Super Critical (AUSC) steam conditions requires the use of advanced high-temperature materials. While there has been a significant amount of DOE-funded materials R&D, most of the related design work has focused on new (greenfield) units, rather than on opportunities to retrofit this advanced technology to the existing utility fleet. If technology, based upon the advanced materials required for AUSC steam conditions, may be applied to the existing fleet, using an economically viable retrofit, a higher capacity factor can be expected as a result of the increased plant competitiveness. The Electric Power Research Institute (EPRI) was awarded a project by the US Department of Energy to examine the technical and economic feasibility of a series of steam cycle upgrades to the two most prevalent types of U.S. coal power plants: 2,400 psig (16.6 MPa) subcritical and 3,500 psig (24.1 MPa) supercritical pulverized coal units. The nine upgrade options that were originally being considered included increasing the main and reheat steam temperatures from 1,000°F (538°C) to 1,100°, 1,200°, and 1,350°F (593°C, 649°C, and 732°C) while holding the steam pressures constant at their original design values, and cases where just the main steam or reheat steam temperatures were increased. The objective was to minimize the modifications required to the existing power plant while still providing a significant improvement in heat rate. The upgrade options assumed that the boiler enclosure envelope remained unchanged from each base case, and that all applicable OEM design guidelines for normal commercial units were imposed. For the highest temperature supercritical case, an option of using a low-pressure molten salt loop to transfer heat from the furnace to the steam was examined. The first major task of the work scope was designed to examine the technical feasibility of various upgrade options, while the subsequent work determined economic viability of the technically feasible upgrade options. Prior to evaluating the effect of these increased temperatures, a “base case” model of a subcritical and supercritical PC boiler was created, which was used for comparative purposes. Upgrade options were evaluated at full-load, part-load and dynamic transient conditions. Once the technical feasibility of each upgrade option was evaluated, the economic value of the heat rate improvement of each feasible option was determined by detailed modeling of unit dispatch in several regional power markets. The dispatch model was used to estimate the amount of revenue from power sales the upgraded unit would receive in comparison to a non-upgraded version of the same power plant. As a parallel task to the dispatch analysis, the capital cost of implementing the upgrades was estimated. The capital cost estimates were then compared to the increased revenue estimated by the dispatch modeling to determine the economic attractiveness of each upgrade option. Several upgrade options were determined to be technically feasible. The net present value (NPV) of the costs for steam cycle upgrades considered in this study ranged from approximately $\$$111 to $\$$130 million. The economic modeling results show that the unit dispatch changes resulting from steam cycle upgrades are relatively small, due largely to heat rate (and operating cost) changes being relatively small. Additionally, the cost of each upgrade exceeds the net revenue increases associated with the upgrade case. Note that the breakeven values are higher for subcritical retrofits, but the capital costs for the subcritical upgrades are also slightly higher. In typical new pulverized coal plants, fuel accounts for approximately 25% of the cost of electricity (COE), while capital costs represent around 50% of the COE. Therefore, in order to improve the heat rate by 4% one can only afford to increase the capital cost by 2%, at the same cost of electricity. The conclusion of this study is that without a cost for emitting CO 2 , it will be difficult to pay for significant efficiency improvements on plants firing low cost coals.

01 COAL, LIGNITE, AND PEAT↗

A Public-Private-Acadmic Partnership to Advance Solar Power Forecasting

The National Center for Atmospheric Research (NCAR) is pleased to have led a partnership to advance the state-of-the-science of solar power forecasting by designing, developing, building, deploying, testing, and assessing the SunCast™ Solar Power Forecasting System. The project has included cutting edge research, testing in several geographically- and climatologically-diverse high penetration solar utilities and Independent System Operators (ISOs), and wide dissemination of the research results to raise the bar on solar power forecasting technology. The partners include three other national laboratories, six universities, and industry partners. This public-private-academic team has worked in concert to perform use-inspired research to advance solar power forecasting through cutting-edge research to advance both the necessary forecasting technologies and the metrics for evaluating them. The project has culminated in a year-long, full-scale demonstration of provide irradiance and power forecasts to utilities and ISOs to use in their operations. The project focused on providing elements of a value chain, beginning with the weather that causes a deviation from clear sky irradiance and progresses through monitoring and observations, modeling, forecasting, dissemination and communication of the forecasts, interpretation of the forecast, and through decision-making, which produces outcomes that have an economic value. The system has been evaluated using metrics developed specifically for this project, which has provided rich information on model and system performance. Research was accomplished on the very short range (0-6 hours) Nowcasting system as well as on the longer term (6-72 hour) forecasting system. The shortest range forecasts are based on observations in the field. The shortest range system, built by Brookhaven National Laboratory (BNL) and based on Total Sky Imagers (TSIs) is TSICast, which operates on the shortest time scale with a latency of only a few minutes and forecasts that currently go out to about 15 min. This project has facilitated research in improving the hardware and software so that the new high definition cameras deployed at multiple nearby locations allow discernment of the clouds at varying levels and advection according to the winds observed at those levels. Improvements over “smart persistence” are about 29% for even these very short forecasts. StatCast is based on pyranometer data measured at the site as well as concurrent meteorological observations and forecasts. StatCast is based on regime-dependent artificial intelligence forecasting techniques and has been shown to improve on “smart persistence” forecasts by 15-50%. A second category of short-range forecasting systems employ satellite imagery and use that information to discern clouds and their motion, allowing them to project the clouds, and the resulting blockage of irradiance, in time. CIRACast (the system produced by the Cooperative Institute for Atmospheric Research [CIRA] at Colorado State University) was already one of the more advanced cloud motion systems, which is the reason that team was brought to this project. During the project timeframe, the CIRA team was able to advance cloud shadowing, parallax removal, and implementation of better advecting winds at different altitudes. CIRACast shows generally a 25-40% improvement over Smart Persistence between sunrise and approximately 1600 UTC (Coordinated Universal Time) . A second satellite-based system, MADCast (Multi-sensor Advective Diffusive foreCast system), assimilates data from multiple satellite imagers and profilers to assimilate a fully three-dimensional picture of the cloud into the dynamic core of WRF. During 2015, MADCast (provided at least 70% improvement over Smart Persistence, with most of that skill being derived during partly cloudy conditions. That allows advection of the clouds via the Weather Research and Forecasting (WRF) model dynamics directly. After WRF-Solar™ showed initial success, it was also deployed in nowcasting mode with coarser runs out to 6 hours made hourly. It provided improvements on the order of 50-60% over Smart Persistence for forecasts up to 1600 UTC. The advantages of WRF-Solar-Nowcasting and MADCast were then blended to develop the new MAD-WRF model that incorporates the most important features of each of those models, both assimilating satellite cloud fields and using WRF-So far physics to develop and dissipate clouds. MAE improvements for MAD-WRF for forecasts from 3-6 hours are improved over WRF-Solar-Now by 20%. While all the Nowcasting system components by themselves provide improvement over Smart Persistence, the largest benefit is derived when they are smartly blended together by the Nowcasting Integrator to produce an integrated forecast. The development of WRF-Solar™ under this project has provided the first numerical weather prediction (NWP) model specifically designed to meet the needs of irradiance forecasting. The first augmentation improved the solar tracking algorithm to account for deviations associated with the eccentricity of the Earth’s orbit and the obliquity of the Earth. Second, WRF-Solar™ added the direct normal irradiance (DNI) and diffuse (DIF) components from the radiation parameterization to the model output. Third, efficient parameterizations were implemented to either interpolate the irradiance in between calls to the expensive radiative transfer parameterization, or to use a fast radiative transfer code that avoids computing three-dimensional heating rates but provides the surface irradiance. Fourth, a new parameterization was developed to improve the representation of absorption and scattering of radiation by aerosols (aerosol direct effect). A fifth advance is that the aerosols now interact with the cloud microphysics, altering the cloud evolution and radiative properties, an effect that has been traditionally only implemented in atmospheric computationally costly chemistry models. A sixth development accounts for the feedbacks that sub-grid scale clouds produce in shortwave irradiance as implemented in a shallow cumulus parameterization Finally, WRF-Solar™ also allows assimilation of infrared irradiances from satellites to determine the three dimensional cloud field, allowing for an improved initialization of the cloud field that increases the performance of short-range forecasts. We find that WRF-Solar™ can improve clear sky irradiance prediction by 15-80% over a standard version of WRF, depending on location and cloud conditions. In a formal comparison to the NAM baseline, WRF-Solar™ showed improvements in the Day-Ahead forecast of 22-42%. The SunCast™ system requires substantial software engineering to blend all of the new model components as well as existing publically available NWP model runs. To do this we use an expert system for the Nowcasting blender and the Dynamic Integrated foreCast (DICast®) system for the NWP models. These two systems are then blended, we use an empirical power conversion method to convert the irradiance predictions to power, then apply an analog ensemble (AnEn) approach to further tune the forecast as well as to estimate its uncertainty. The AnEn module decreased RMSE (root mean squared error) by 17% over the blended SunCast™ power forecasts and provided skill in the probabilistic forecast with a Brier Skill Score of 0.55. In addition, we have also developed a Gridded Atmospheric Forecast System (GRAFS) in parallel, leveraging cost share funds. An economic evaluation based on Production Cost Modeling in the Public Service Company of Colorado showed that the observed 50% improvement in forecast accuracy will save their customers $819,200 with the projected MW deployment for 2024. Using econometrics, NCAR has scaled this savings to a national level and shown that an annual expected savings for this 50% forecast error reduction ranges from $11M in 2015 to $43M expected in 2040 with increased solar deployment. This amounts to a $455M discounted savings over the 26 year period of analysis.

14 SOLAR ENERGY↗