Search NASA⌕ Search

SEARCH · Search NASA

Results for “payload challenges”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Space Shuttle Orbiter payload bay door mechanisms

The opening, closing, and latching of the first large clamshell door to operate in space presented some unusual challenges for the mechanism designer of the Space Shuttle Program. The requirements, hardware configuration, design trade-offs, and qualification testing in process to meet the challenge and to make the system operational for the Shuttle orbiter's approaching first orbital flight are described.

Mcanally, B. M.↗

Automated Impact Assessment: A New Approach to ISS Payload Operations Anomaly Response

The International Space Station (ISS) Payload Operations and Integration Center (POIC) is undergoing rapid growth as the space station program focuses on science and commercial activities. The ISS is expanding its onboard capabilities to support additional science activities. In parallel, the POIC is expanding the capabilities of our operations tools to support the higher pace of payload activities being executed each week. An effect of these changes is that anomaly resolution has become more challenging. In the event of a real-time system fault, operators are responsible for analyzing telemetry displays, anomaly monitoring tools, documentation, and system models in order to produce failure impacts and recovery strategies. This approach to operations relies on the operator to ingest, process, and analyze information from an array of deterministic sources to provide actionable data on impacted systems and activities. Changing the existing approach of anomaly response is necessary if the ISS community is to succeed in the age of science and commercialization of space. The creation of a tool that captures deterministic technical systems knowledge and integrates existing telemetry, documentation, and planning information will allow the burden of impact assessment to be automated, thereby allowing the operator to focus on non-deterministic tasks, such as recovering failed systems and restoring critical payload operations.

Hall, R. Mason↗

Structural Characterization of Linker Shielding in ADC Site-Specific Conjugates

Background/Objectives: Antibody–Drug Conjugates (ADCs) have rapidly evolved from early, rudimentary conjugates to highly targeted and precisely engineered molecules. Despite notable clinical successes, ADCs continue to face significant challenges, including aggregation and high hydrophobicity driven by high drug-to-antibody ratios (DARs), premature payload release, dose-limiting toxicities, and suboptimal pharmacokinetics. While site-specific linker–payload conjugation has improved ADC homogeneity and stability, the structural basis of antibody–linker interactions at specific sites remains underexplored. Methods: In this work, we present the crystal structures of trastuzumab Fab and Fc domains site-specifically conjugated with a cleavable linker–payload. Results: Our findings suggest that pockets within both Fab and Fc regions may interact with and shield the linker portion of the conjugate. Conclusions: These insights highlight the previously underappreciated potential of structure-based design to drive the optimization of ADC linker chemistry and facilitate the co-design of bespoke linker–payloads tailored to individual antibody conjugation sites.

Jaime-Garza, Maru [Discovery Chemistry, Merck & Co↗

The MESUR Mission

The MESUR mission will place a network of small, robust landers on the Martian surface, making a coordinated set of observations for at least one Martian year. MESUR presents some major challenges for development of instruments, instrument deployment systems, and on board data processing techniques. The instrument payload has not yet been selected, but the straw man payload is (1) a three-axis seismometer; (2) a meteorology package that senses pressure, temperature, wind speed and direction, humidity, and sky brightness; (3) an alphaproton-X-ray spectrometer (APXS); (4) a thermal analysis/evolved gas analysis (TA/EGA) instrument; (5) a descent imager, (6) a panoramic surface imager; (7) an atmospheric structure instrument (ASI) that senses pressure, temperature, and acceleration during descent to the surface; and (8) radio science. Because of the large number of landers to be sent (about 16), all these instruments must be very lightweight. All but the descent imager and the ASI must survive landing loads that may approach 100 g. The meteorology package, seismometer, and surface imager must be able to survive on the surface for at least one Martian year. The seismometer requires deployment off the lander body. The panoramic imager and some components of the meteorology package require deployment above the lander body. The APXS must be placed directly against one or more rocks near the lander, prompting consideration of a micro rover for deployment of this instrument. The TA/EGA requires a system to acquire, contain, and heat a soil sample. Both the imagers and, especially, the seismometer will be capable of producing large volumes of data, and will require use of sophisticated data compression techniques.

Squyres, S. W.↗

Exploring the Science Trade Space with the JPL Innovation Foundry A-Team

The JPL Innovation Foundry has established a new approach for exploring, developing, and evaluating early concepts with a group called the Architecture Team (A-Team). The A-Team combines innovative collaborative methods and facilitated sessions with subject matter experts and analysis tools to help mature mission concepts. Science, implementation, and programmatic elements are all considered during an ATeam study. In these studies, Concept Maturity Levels (CML) are used to group methods. These levels include idea generation and capture (CML 1), initial feasibility assessment (CML 2), and trade space exploration (CML 3). Methods used for exploring the science objectives, feasibility, and scope will be described including use of a new technique for understanding the most compelling science, called a Science Return Diagram (SRD). In the process of developing the SRD, gradients in the science trade space are uncovered along with their implications for implementation and mission architecture. Special attention is paid towards developing complete investigations, establishing a series of logical claims that lead to the natural selection of a measurement approach. Over 20 science-focused A-Team studies have used these techniques to help science teams refine their mission objectives, make implementation decisions and reveal the mission concept’s most compelling science. This paper will describe the A-Team process for exploring the mission concept's science trade space and the Science Return Diagram technique.In June of 2011 a new collaborative engineering approach forearly concept formulation began in the JPL InnovationFoundry [1], six months later becoming the “A-Team” [2].Responding to a need for exploring mission architecturelevel trades [3], the A-Team precedes Team X [4,5] in asequence of concurrent engineering teams at JPL that can beused to mature a concept from a “cocktail napkin” level ideato a complete mission point design. The A-Team efficientlyexplores the science, implementation, and programmatictrade space in early concept formulation. Small, facilitatedgroups of experts generate innovative ideas, quantitativelyassess feasibility, and discover key sensitivities in the tradespace through collaborative analysis and use of advancedmethods and tools. The A-Team process builds off theexperience within JPL and other recent approaches to earlyconcept formulation [6] including best practices of the JPLInnovation Foundry, Project Systems Engineering &Formulation Section, Team Eureka and the Rapid MissionArchitecture Team[7].The A-Team is a focal point for innovative formulationapproaches and people within JPL. It relies on a largebackground of study resources, creative thinkers and “greybeard” scrutinizers, advanced tools, and subject matterexperts with both breadth and depth in experience andexpertise that are all available at JPL. The A-Team isdesigned to be a rapid and efficient process takingapproximately 6 weeks (the entire process can be as short asjust a few days or as long as up to three months) and costingthe equivalent of a work-month of a full-time employee orless. Studies begin with detailed planning and client reviewfollowed by study sessions, analysis work, and reporting.The staffing on each study is customized to the study goalsand objectives, and it is addressed early in the A-Teamprocess. Sessions are generally half-day or whole-day eventsand conducted over a series of days with focused agendas thatare moderated by a trained facilitator. Preliminary results andknowledge capture are available within hours of each session,and a final report is generally available two weeks later.One of the biggest challenges facing early conceptdevelopment is understanding the gradient in science returnversus various available mission scenarios and payload options. Often times, major areas of scientific inquiry havealready been prioritized by science groups, including throughthe National Research Council’s Decadal Studies inAstronomy, Planetary, and Earth Science. Yet science teamscontinue to struggle, especially in competitive missionsolicitations, to capture the right amount of scope that’sachievable within the cost constraints of the opportunity.Often the desire to completely and comprehensively study ascience area in just one mission (after all, true missionopportunities are rare) drives teams to take on too much,providing requirements that are unachievable within theresources of the opportunity without inducing unacceptableimplementation risk. Alternatively, science teams can seekto reduce risk by using an established instrument, but havenot thought through the traceability and key aspects of thescience question to justify its use. Both scenarios lead to badassumptions at the beginning of the concept development thatcan then ripple through implementation option choices,potentially preventing what would have been a good scienceinvestigation from being selected.The purpose of this paper is first to provide some additionalbackground and summary of the A-Team process, tools,people, and facilities. We then focus on the A-Teammethodology for overcoming the barriers of defining thescience scope well at the early concept development stage.This includes understanding the science story andtraceability, and then examining the gradient in science returnversus key characteristics of observables, developing theright payload and mission requirement specification throughexamining the science and implementation trade space.

Ziemer, John K.↗

NASA Access 2 Space Workshop: Summary Report: Increased Science Return through Rideshare

This report summarizes the Access to Space (A2S) Workshop held on February 25-27, 2020 at the Johns Hopkins University Applied Physics Laboratory (APL) and hosted by NASA’s Science Mission Directorate (SMD). This workshop solicited community input on the creation and management of an ESPA-class1payload pipeline for NASA SMD launches. The workshop brought together roughly 180 participants including scientists, engineers, instrument developers, launch providers, and policy makers across NASA centers, government agencies, commercial industry, research institutes, and academia.

ESPA-Class Spacecraft↗

Astro-biological Exploration of Ocean Worlds, Enabled by an RPS Inside a Pressure Vessel

Exploring Ocean and Ice Worlds could help us to understand the origin and evolution of life in the universe. In our solar system we have identified six Ocean and Ice Worlds, namely Earth, Europa, Ganymede, Callisto, Enceladus, and Titan. Other potential targets include Dione, Triton, and Pluto. As documented in the Planetary Decadal Survey [1] and the NASA Roadmap to Ocean Worlds [2], these worlds are compelling science destinations, with oceans situated below their tens of kilometers thick ice shells. To reach them we need a new exploration paradigm with novel technological solutions. Key technological challenges revolve around the power for the probe and for melting, as well as protecting the payload against the extreme environments, including high pressure, low temperature, corrosion, and radiation. Far away from the Sun, and melted into the ice, we may only rely on long-lived internal power generation. Radioisotope Power Systems (RPS) with either static or dynamic conversion, utilizing the heat of decaying Plutonium-238, could be good candidates. We need suitable payloads that are protected and could survive the extreme environments, as well as enabling power and thermal systems for melting through the ice shield and to swim in the ocean below the ice. RPS could support the probe’s instruments and sub-systems, as well as provide a heat source for melting the ice while keeping the components at operating temperatures. Mitigating the external pressure while immersing inside the ice shell, and in the ocean, would require a new RPS design that operates inside a Pressure Vessel. In our paper, we will discuss general mission architecture trades and the sizing of a next generation RPS housed in a pressure vessel, broadly applicable to any of the Ocean Worlds satellites of interest. Through a technology focused approach, we address interconnected design and mission architecture aspects, including considerations for: the RPS and the Pressure Vessel; extreme environmental constraints; g-load tolerance; power and thermal systems sizing for science measurements; spacecraft operations through all mission phases; subsurface mobility; and planetary protection. The findings will inform the science community on instrument accommodation possibilities; the mission planning community on possible mission concepts; and the RPS development community on the science driven technology considerations.

Donitz, Benjamin P.↗

Robotic Assisted Non-Destructive Testing (NDT)

Mission Statement: Concrete wall characterization for structural integrity evaluation of H-Canyon exhaust tunnel using a remote controlled robotic arm with a NDT Concrete Instrument. Challenges: Rough and Curved Surfaces, Remote location. The UR5 is a collaborative robotic arm capable of: Payload: 11 lbs (5 kg), Reach: 33.5 in (850 mm), Footprint: 5.87 in (149 mm) diameter, Weight: 45.4 Ibs (20.6 kg). The force torque sensor reacts to a set value inputted by the user that can be utilized for sensitive products. This allows the UR5 to react to surfaces using the built-in function to search for a wall and orient itself normal to that plane. The Proceq Pundit 250 array is a nondestructive device that the user applies against a concrete wall and scans using ultrasonic transducers. The back wall and other defects can be show through the touchscreen. A fixture to hold the Proceq Pundit 250 array onto the UR5 robotic arm was designed and 3D printed. It includes openings for easy access to the buttons from the Pundit array as well as a reinforced structural design. The scan from the Pundit array can show the back-wall, rebars, and other defects to assist in determining the structural integrity. In order to scan, a program was made to search for the wall first. 1. The UR5 robotic arm will go to the desired location away from the wall. 2. It will then search for the wall by moving towards it slowly. 3. After contact, the force applied will slowly but steadily increase to a preset value inputted by the user. 4. The force torque sensor will use those values and communicate with the UR5 by adjusting the arm to become normal to the wall. 5. The arm will then apply force to push back the transducers on the Pundit array to avoid gaps. 6. It will then prompt the user to collect data and wait until finished. The UR5 teach pendant allows the user to program the robot to perform automated and repeatable tasks. It includes a free drive mode which allows the user to move the arm to a desired position by hand. The user can also apply restricted planes which include either stopped or slower motion to ensure safety. The concrete sample being tested includes rebars and different grades of surface roughness to understand the readings from the Proceq Pundit 250 array. Desired concrete samples are currently being fabricated that will simulate the terrain being tested.

3D PRINTING↗

Building on the Past - Looking to the Future: A Focus on Payload Safety

The history of the space industry stretches far and above lunar landings to the construction of the International Space Station. For years, humans have sought to understand the nature of the universe. As society grows in knowledge and curiosity of space, the focus of maintaining the safety of the crew and vehicle habitability is of utmost importance to the National Aeronautics and Space Administration (NASA) community. Through the years, Payload Safety has developed not only as a Panel, but also as part of the NASA community, striving to enhance the efficiency and understanding of how business should be conducted as more International Partners become involved. This is the first in a series of papers and presentations in what is hoped to be an annual update that provides continuous challenges and lessons learned in the areas of communication, safety requirements and processes and other areas which have been vital to the Payload Safety Review Panel (PSRP).

Nash, Sally K.↗

Lunar Node – 1: Initial Flight Results and the Role of Surface Psuedolites in Lunar Navigation

On February 22, 2024, the Intuitive Machines IM-1 NOVA-C lander, nick-named Odysseus, landed on the lunar surface, carrying with it a cadre of NASA scientific and technology demonstration payloads. These payloads and missions marked the first delivery of NASA instruments to operate from the lunar surface since the Apollo landings. One of these payloads is Lunar Node -1 (LN-1), a navigation beacon demonstration mission. The payload was designed and built by NASA’s Marshall Space Flight Center. The payload’s main goal was to demonstrate and provide insight into the use of lunar surface-based radio navigation aids. As part of the mission, LN-1 successfully conducted multiple one-way transmissions from the NOVA-C vehicle to Deep Space Network ground receivers using its onboard S-band transmitter, while being disciplined by an onboard Space Chip Scale Atomic Clock. LN-1 transmitted to DSN on an almost daily basis during transit to the moon, including two surface passes. The payload was originally plan to conduct 7-10 days of surface operation as an always-on beacon. These passes focused on evaluating two main navigation approaches: performance and stability of ranging using time-based transfer techniques on a cubesat size and grade platform, as well as one-way psuedonoise ranging approaches. To assess performance, the measurements were compared to independent navigation solutions using multiple approaches including: one-way Doppler tracking, two-way Doppler Tracking, and visual verification of the landing location provided by visual observations from orbital platforms. While the mission only conducted limited surface operations, the data provides some initial insight to performance form the lunar surface. These results are compared with initial ground-based testing as well as continued evaluation of the flight-space platform using multiple grades of oscillators for maintaining clock and frequency stability. These focus on the timing stability of platform in a deep-space environment as well variations in state determination. Given these insights, this paper provides additional description and evaluation of how this approach can be utilized as part of a broader lunar navigation architecture, such as being developed and deployed across multiple international space agencies. Analysis is provided to develop overall timing requirements and assessment of operational scenarios, such as orbit and surface location determination. In addition, the results support discussion as to how surface pseudolites could best be used within existing standard signal definitions, such as defined in the LunaNet Interoperability Specifications. This will consider concerns such as the near-/far- problem as well as operational considerations, including whether a beacon is better suited as two- or one-way ranging platform. The use cases are focused on how these psuedolites can provide additional coverage to augment and support planned operational coverage. For example, this analysis provides analysis of mid-latitude surface missions, where there may be limited geometry and availability of orbital relays. The results will show how these navigation psuedolites can fit within the developing architecture to provide additional robustness, capability, and support multiple use cases. Lastly, the paper will discuss challenges and next steps to be addressed in the implementation and testing of a follow-on payload and a continued path towards demonstration and integration of this capability into Lunar PNT architectures.

Evan Anzalone↗

Lunar Node – 1: Initial Flight Results and the Role of Surface Psuedolites in Lunar Navigation

On February 22, 2024, Intuitive Machines NOVA-C lander, nick-named Odysseus, landed on the lunar surface, carrying with it a cadre of NASA scientific and technology demonstration payloads. These payloads and missions marked the first delivery of NASA instruments to operate from the lunar surface since the Apollo landings. One of these payloads is Lunar Node -1 (LN-1), a navigation beacon demonstration mission. The payload was designed and built by NASA’s Marshall Space Flight Center. The payload’s main goal was to demonstrate and provide insight into the use of lunar surface-based radio navigation aids. As part of the mission, LN-1 successfully conducted multiple one-way transmissions from the NOVA-C vehicle to Deep Space Network ground receivers using its onboard S-band transmitter, while being disciplined by an onboard Space Chip Scale Atomic Clock. LN-1 transmitted to DSN on an almost daily basis during transit to the moon, including two surface passes. The payload was originally plan to conduct 7-10 days of surface operation as an always-on beacon. These passes focused on evaluating two main navigation approaches: performance and stability of ranging using time-based transfer techniques on a cubesat size and grade platform, as well as one-way psuedonoise ranging approaches. To assess performance, the measurements were compared to independent navigation solutions using multiple approaches including: one-way Doppler tracking, two-way Doppler Tracking, and visual verification of the landing location provided by visual observations from orbital platforms. While the mission only conducted limited surface operations, the data provides some initial insight to performance form the lunar surface. These results are compared with initial ground-based testing as well as continued evaluation of the flight-space platform using multiple grades of oscillators for maintaining clock and frequency stability. These focus on the timing stability of platform in a deep-space environment as well variations in state determination. Given these insights, this paper provides additional description and evaluation of how this approach can be utilized as part of a broader lunar navigation architecture, such as being developed and deployed across multiple international space agencies. Analysis is provided to develop overall timing requirements and assessment of operational scenarios, such as orbit and surface location determination. In addition, the results support discussion as to how surface pseudolites could best be used within existing standard signal definitions, such as defined in the LunaNet Interoperability Specifications. This will consider concerns such as the near-/far- problem as well as operational considerations, including whether a beacon is better suited as two- or one-way ranging platform. The use cases are focused on how these psuedolites can provide additional coverage to augment and support planned operational coverage. For example, this analysis provides analysis of mid-latitude surface missions, where there may be limited geometry and availability of orbital relays. The results will show how these navigation psuedolites can fit within the developing architecture to provide additional robustness, capability, and support multiple use cases. Lastly, the paper will discuss challenges and next steps to be addressed in the implementation and testing of a follow-on payload and a continued path towards demonstration and integration of this capability into Lunar PNT architectures.

Evan J Anzalone↗

Four Decades of Space-Borne Radio Sounding

A review is given of the 38 rocket, satellite, and planetary payloads dedicated to ionospheric/magnetospheric radio sounding since 1961. Between 1961 and 1995, eleven sounding-rocket payloads from four countries evolved from proof-of-concept flights to sophisticated instruments. Some involved dual payloads, with the sounder transmitter on one and the sounder receiver on the other. The rocket sounders addressed specific space-plasma-wave questions, and provided improved measurements of ionospheric electron-density (N(sub e)) field-aligned irregularities (FAI). Four countries launched 12 ionospheric topside-sounder satellites between 1962 and 1994, and an ionospheric sounder was placed on the Mir Space Station in 1998. Eleven magnetospheric radio sounders, most of the relaxation type, were launched from 1977 to 2000. The relaxation sounders used low-power transmitters, designed to stimulate plasma resonances for accurate local Ne determinations. The latest magnetospheric sounder designed for remote sensing incorporated long antennas and digital signal processing techniques to overcome the challenges posed by low Ne values and large propagation distances. Three radio sounders from three countries were included on payloads to extraterrestrial destinations from 1990 to 2003. The scientific accomplishments of space-borne radio sounders included (1) a wealth of global N(sub e) information on the topside ionosphere and magnetosphere, based on vertical and magnetic-field-aligned N(sub e) profiles; (2) accurate in-situ N(sub e) values, even under low-density conditions; and (3) fundamental advances in our understanding of the excitation and propagation of plasma waves, which have even led to the prediction of a new plasma-wave mode.

Benson, Robert F.↗

ISOBUS: A new versatile spacecraft platform using Shuttle small payloads

The new NASA credo of 'faster, better, cheaper' calls for a new generation of smaller and less complex spacecraft. In response to this challenge, many new spacecraft concepts have been generated within NASA, industry, and academia. The JPL, Rockwell International Space Systems Division, and The Space Dynamics Laboratory (SDL)/Utah State University (USU) are jointly examining one such new spacecraft concept, hereafter termed ISOBUS, which is derived from recent research and development work in isogrid structures based on a six-sided hexagon shaped structure. Two prototypical products from SDL/USU's work are ISOSPACEPACK and ISOSAT. These hexagon shaped elements serve as building blocks for the ISOBUS spacecraft concept. Various aspects of the ISOBUS concept are discussed.

Tamir, David↗

Directional Solidification of Mercury Cadmium Telluride During the Second United States Microgravity Payload Mission (USMP-2)

As a solid solution semiconductor having, a large separation between liquidus and solidus, mercury cadmium telluride (MCT) presents a formidable challenge to crystal growers desiring an alloy of high compositional uniformity. To avoid constitutional supercooling during Bridgman crystal growth it is necessary to solidify slowly in a high temperature gradient region. The necessary translation rate of less than 1 mm/hr results in a situation where fluid flow induced by gravity on earth is a significant factor in material transport. The Advanced Automated Directional Solidification Furnace (AADSF) is equipped to provide the stable thermal environment with a high gradient, and the required slow translation rate needed. Ground based experiments in AADSF show clearly the dominance of flow driven transport. The first flight of AADSF in low gravity on USMP-2 provided an opportunity to test theories of fluid flow in MCT and showed several solidification regimes which are very different from those observed on earth. Residual acceleration vectors in the orbiter during the mission were measured by the Orbital Acceleration Research Experiment (OARE), and correlated well with observed compositional differences in the samples.

Gillies, D. C.↗

Structural Design Challenges for Mars Rovers

On July 4, 1997 the Pathfinder Mission Successfully began a new era of robotic exploration of Mars. The primary scientific payload of the Pathfinder Lander is the Sojourner Truth Mars Rover, an autonomous robotic vehicle, which is exploring and conducting scientific measurements on the Mars surface.

Mars Rovers Structural Design↗

Control of on-orbit contamination for the Argos (P91-1) satellite

The ARGOS (P91-1) satellite presents a challenging combination of on-orbit contamination concerns while mandating a low-cost approach. Several experiment payloads contain contamination sensitive optics, another contains large quantities of CO2 and Xe for release in orbit, and one contains an NH3 fueled arc jet thruster. The latter includes a suite of sensors to measure contamination; so prelaunch calculations will be tested. Planned contamination control techniques include: physical separation of sensitive surfaces from contamination sources; flight covers to protect sensitive surfaces during early outgassing on-orbit; gas release and thruster operation early in the flight, before flight covers are opened; and careful control of plumes and venting through a detailed analysis of each.

Kelley, Joseph G.↗

Intelligent Observation Strategies for Geosynchronous Remote Sensing for Natural Hazards

Geosynchronous satellites offer a unique perspective for monitoring environmental factors important to understanding natural hazards and supporting the disasters management life cycle, namely forecast, detection, response, recovery and mitigation. In the NASA decadal survey for Earth science, the GEO-CAPE mission was proposed to address coastal and air pollution events in geosynchronous orbit, complementing similar initiatives in Asia by the South Koreans and by ESA in Europe, thereby covering the northern hemisphere. In addition to analyzing the challenges of identifying instrument capabilities to meet the science requirements, and the implications of hosting the instrument payloads on commercial geosynchronous satellites, the GEO-CAPE mission design team conducted a short study to explore strategies to optimize the science return for the coastal imaging instrument. The study focused on intelligent scheduling strategies that took into account cloud avoidance techniques as well as onboard processing methods to reduce the data storage and transmission loads. This paper expands the findings of that study to address the use of intelligent scheduling techniques and near-real time data product acquisition of both the coastal water and air pollution events. The topics include the use of onboard processing to refine and execute schedules, to detect cloud contamination in observations, and to reduce data handling operations. Analysis of state of the art flight computing capabilities will be presented, along with an assessment of cloud detection algorithms and their performance characteristics. Tools developed to illustrate operational concepts will be described, including their applicability to environmental monitoring domains with an eye to the future. In the geostationary configuration, the payload becomes a networked thing with enough connectivity to exchange data seamlessly with users. This allows the full field of view to be sensed at very high rate under the control of ground infrastructure, resulting in improved efficiencies, accuracy and science benefits. Hence a remote sensing payload and its data may become one of millions of connected objects in the emerging Internet of Things (IoT), and be as easily accessible by a users smart phone as any other smart appliance.

EMC Test Challenges for NASAs James Webb Space Telescope

This presentation describes the electromagnetic compatibility (EMC) tests performed on the Integrated Science Instrument Module (ISIM), the science payload of the James Webb Space Telescope (JWST), at NASAs Goddard Space Flight Center (GSFC) in August 2015. By its very nature of being an integrated payload, it could be treated as neither a unit level test nor an integrated spacecraft observatory test. Non-standard test criteria are described along with non-standard test methods that had to be developed in order to evaluate them. Results are presented to demonstrate that all test criteria were met in less than the time allocated.

Electromagnetics↗