Search NASA⌕ Search

SEARCH · Search NASA

Results for “program costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

First-Principles Cost Estimation of a Sodium Fast Reactor Nuclear Plant

A multi-tiered cost analysis is performed to estimate full costs of a nuclear power plant (NPP) based on sodium-cooled fast reactor (SFR) technology. To address the lack of fully transparent cost estimations from past undertakings for NPPs, we have developed a detailed and first-principles-based cost estimate for a generalized SFR NPP. Our intent is to achieve a high degree of transparency with our cost assumptions and develop a cost model that is flexible and easily extendable to variations in NPP design and other nuclear reactor types. Furthermore, we strive to achieve a clear organization of costs and complete identification of key cost drivers based on first principles. To this end, the cost results of our analysis as given in Table 24 and Table 25 are organized and categorized into a code of accounts (COA) under development at Idaho National Laboratory (INL). Varying degrees of first-principles methods are employed, such as design for manufacture and assembly® (DFMA® ), to elucidate costs in all process levels of the plant equipment, buildings and site structures, personnel, and other miscellaneous but significant cost elements. These approaches have been successfully applied in past cost analysis projects and are designed to enable rapid and flexible cost estimation. Application of these techniques for evaluating NPP costs is similar in concept to the full, detailed estimation of construction and fabrication costs determined in a later stage of NPP development. Note that our approach tries to avoid use of other past analysis results and data such as those from the legacy Energy Economic Data Base (EEDB) Program, as these resources are based on historical NPP costs and thus may not be indicative of new reactor technologies or construction and fabrication/manufacturing techniques. However, we provide a comparison of our SFR NPP cost results in Table 90 against those included in the EEDB for a representative pressurized water reactor (PWR).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Identification of Balance of Plant Asset and Wireless Instrumentation to Enable Predictive Maintenance

One of the major contributors to the total operating costs of domestic nuclear fleet of reactors today is the operation and maintenance (O&M) costs. These include labor-intense preventive maintenance programs involving manually-performed inspection, calibration, testing, and maintenance of plant assets at periodic frequency and time-based replacement of assets at periodic frequency, irrespective of its condition. This has resulted in a labor-centric business model to achieve high capacity factors. To achieve optimal maintenance program, it’s time to transition from this labor-centric business model to a technology-centric business model. Fortunately, there are technologies (advanced sensor, data analytics, and risk assessment methodologies) that will support transition from a labor-centric business model to a technology-centric business model. The technology-centric business model will result in significant plant life extension and reduction of time-based maintenance activities. This will drive down O&M costs as labor is a rising cost and technology is a declining cost. This approach will lay the foundation for real-time condition assessment of plant assets, allowing condition-based maintenance to enhance plant safety, reliability, and economics of operation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Multidimensional perspectives of geo-epidemiology: from interdisciplinary learning and research to cost–benefit oriented decision-making

Research typically promotes two types of outcomes (inventions and discoveries), which induce a virtuous cycle: something suspected or desired (not previously demonstrated) may become known or feasible once a new tool or procedure is invented and, later, the use of this invention may discover new knowledge. Research also promotes the opposite sequence—from new knowledge to new inventions. This bidirectional process is observed in geo-referenced epidemiology—a field that relates to but may also differ from spatial epidemiology. Geo-epidemiology encompasses several theories and technologies that promote inter/transdisciplinary knowledge integration, education, and research in population health. Based on visual examples derived from geo-referenced studies on epidemics and epizootics, this report demonstrates that this field may extract more (geographically related) information than simple spatial analyses, which then supports more effective and/or less costly interventions. Actual (not simulated) bio-geo-temporal interactions (never captured before the emergence of technologies that analyze geo-referenced data, such as geographical information systems) can now address research questions that relate to several fields, such as Network Theory. Thus, a new opportunity arises before us, which exceeds research: it also demands knowledge integration across disciplines as well as novel educational programs which, to be biomedically and socially justified, should demonstrate cost-effectiveness. Grounded on many bio-temporal-georeferenced examples, this report reviews the literature that supports this hypothesis: novel educational programs that focus on geo-referenced epidemic data may help generate cost-effective policies that prevent or control disease dissemination.

59 BASIC BIOLOGICAL SCIENCES↗

An open control sequence specification to scale building demand flexibility via analytics software

For over two decades, researchers and practitioners have showcased the ability of large commercial buildings to provide grid services by shedding or shifting load. Various utility demand response (DR) and virtual power plant (VPP) programs throughout the United States are presently utilizing these demand-side resources. However, growth of these programs have been limited, in part due to the high cost necessary to integrate the DR control strategies into the building automation system (BAS). Implementing these strategies involves adjusting control sequences, necessitating dozens of hours of customized programming per building, limiting their adoption to large organizations and progressive owners. Recent efforts by researchers and industry have demonstrated the capability of energy management and information systems (EMIS), originally designed for fault detection and diagnostics, to interface with existing BAS and perform supervisory control to optimize building operations. While these approaches are quickly being adopted by industry, demand flexibility (DF) control strategies remain limited in product offerings. One of the challenges is the lack of documented best-practice DF sequences, despite the rich literature on field implementations. This paper develops a new open-specification for a zone-based temperature adjustment shed strategy for commercial building HVAC systems, describing the specification’s implementation in two EMIS tools in both experimental and field settings. Both implementations successfully reduced electric load by at least 40% on average during the called event, while maintaining temperature limits. This study’s detailed process from specification to deployment shows the potential for scalability as well as highlights challenges related to integration with heterogeneous BAS products.

Granderson, Jessica↗

Advanced silver sheathed 2212/Ag wire for high field magnets

Commercial High Temperature Superconductors (HTS) are all tape shaped (widths > 10 times thickness), because achieving useful current densities required them to be processed into this form, even though this also makes it more problematic to use them in some important coil types. Our product is based on 2212 (Bi2Sr2CaCu2O8) and it is the only HTS that can be processed into high current density wire forms that are similar to proven low temperature superconductors (LTS), while surpassing them in field generating and operating temperature capability. Required now are higher current density, lower cost and longer length 2212 wires to enable broad utilization where HTS tape usage is problematic. In Phase II we developed vital cost-lowering process technology elements and we test-processed longer wires with the standard commercial design as baseline and benchmark for our lower cost, higher quality and longer piece length wire advances. By initial application of Jc-boosting wire features, these wires exhibited significant performance increases. This Phase IIA program has now developed and qualified these technologies for lower cost, higher quality and longer piece length manufacturing in combination with current density-boosting wire features, paving the way to manufacturing capability that is essential for cost-effective commercial utilization of 2212 wire. Technical areas included automated, high uniformity powder packing, advanced drawing, annealing, lubricant cleaning and filament bundling, followed by integration of higher current density wire features and process variations.

17 WIND ENERGY↗

Designing a drone delivery network with automated battery swapping machines

Drones are projected to alter last-mile delivery, but their short travel range is a concern. In this study, we propose a drone delivery network design using automated battery swapping machines (ABSMs) to extend ranges. The design minimizes the long-term delivery costs, including ABSM investment, drone ownership, and cost of the delivery time, and locates ABSMs to serve a set of customers. We build a mixed-integer nonlinear program that captures the nonlinear waiting time of drones at ABSMs. To solve the problem, we create an exact solution algorithm that finds the globally optimal solution using a derivative-supported cutting-plane method. To validate the applicability of our program, we conduct a case study on the Chicago Metropolitan area using cost data from leading ABSM manufacturer and geographical data from the planning and operations language for agent-based regional integrated simulation (more commonly known as POLARIS). A sensitivity analysis identifies that ABSM service times and costs are the key parameters impacting the long-term adoption of drone delivery.

25 ENERGY STORAGE↗

Optimizing resource allocation in Miscanthus breeding via sparse testing designs for genomic prediction

Phenotyping high-biomass perennial crops is laborious and the rate of genetic gain in conventional perennial crop breeding programs is typically low. So, it is especially important to identify methods that produce efficiency gains in the breeding process. Miscanthus is a C4 perennial grass with favorable characteristics for producing biomass as a feedstock for biofuels and diverse bio-based products. Increasing biomass yield will increase profitability and environmental benefits, so it is a key target for Miscanthus breeding. In addition, the identification of well-adapted genotypes across a wide range of environmental conditions requires the establishment of multi-environment trials (METs). Sparse testing is a genomic prediction-based strategy that reduces the phenotyping costs in METs by selecting a subset of genotypes to evaluate in a subset of environments and then predicts the performance of the unobserved genotype-environment combinations. A Miscanthus sacchariflorus (MSA) population comprising 336 genotypes observed across three environments was analyzed implementing sparse testing designs. Three prediction models considering main effects (environments, genotypes, genomic) and interaction effects (genotype-by-environment; G×E interaction) were implemented for forecasting dry biomass yield (YDY), total culm (TCM), average internode length (AIL), and culm node number (CNN). Multiple calibration sets based on different compositions and sizes were considered to evaluate performance in terms of the predictive ability (PA) and the mean square error (MSE) for a fixed testing set size. The training set size ranged from 52 to 112 to predict a fixed set of 224 unobserved genotypes across all three environments. The results showed that the model accounting for G×E interaction consistently presented the highest PA and the lowest MSE: for CNN (PA: ~0.77, MSE: ~0.5) and YDY (PA: ~0.70, MSE: ~1.3) while for TCM and AIL these ranged from ~0.28 to 0.41 and ~1.3 to 4.3, respectively. Overall, varying training sets and allocation strategies did not affect PA and MSE, with 52 non-overlapping and 0 overlapping genotypes per environment as the optimal cost-effective allocation framework. This suggests that implementing sparse testing designs could significantly reduce phenotyping costs by fivefold, without compromising PA in breeding programs for perennial crops such as Miscanthus.

Miscanthus sacchariflorus (MSA)↗

Improving operational flexibility of integrated energy system with uncertain renewable generations considering thermal inertia of buildings

Insufficient flexibility in system operation caused by traditional "heat-set" operating modes of combined heat and power (CHP) units in winter heating periods is a key issue that limits renewable energy consumption. In order to reduce the curtailment of renewable energy resources through improving the operational flexibility, a novel optimal scheduling model based on chance-constrained programming (CCP), aiming at minimizing the lowest generation cost, is proposed for a small-scale integrated energy system (IES) with CHP units, thermal power units, renewable generations and representative auxiliary equipments. In this model, due to the uncertainties of renewable generations including wind turbines and photovoltaic units, the probabilistic spinning reserves are supplied in the form of chance-constrained; from the perspective of user experience, a heating load model is built with consideration of heat comfort and inertia in buildings. To solve the model, a solution approach based on sequence operation theory (SOT) is developed, where the original CCP-based scheduling model is tackled into a solvable mixed-integer linear programming (MILP) formulation by converting a chance constraint into its deterministic equivalence class, and thereby is solved via the CPLEX solver. We report the simulation results on the modified IEEE 30-bus system demonstrate that the presented method manages to improve operational flexibility of the IES with uncertain renewable generations by comprehensively leveraging thermal inertia of buildings and different kinds of auxiliary equipments, which provides a fundamental way for promoting renewable energy consumption.

30 DIRECT ENERGY CONVERSION↗

Integrated Risk-Informed Condition Based Maintenance Capability and Automated Platform: Technical Report 1

Due to continuing global energy market trends, driven heavily by the abundant preserves of natural gas, there is an immediate need to reduce costs associated with operation and maintenance (O&M) for the current domestic nuclear power industry and for future reactor developments. This is to ensure that nuclear power generation remains an economically competitive and viable option in the energy market. O&M costs include labor-intensive preventive maintenance (PM) programs, which involve manually-performed inspection, calibration, testing, and maintenance of plant assets at periodic frequency and time-based replacement of assets, irrespective of their condition. This has resulted in an expensive, labor-centric business model to achieve high capacity factors. Fortunately, there are technologies (advanced sensors, data analytics, and risk assessment methodologies) that can enable the transition from a labor-centric business model to a technology-centric business model. The technology-centric business model will result in a significant reduction of PM activities, laying the foundation for real-time condition assessment of plant assets, reducing overall labor and part costs. To enable this transition, PKMJ Technical Services LLC is partnering with the U.S. Department of Energy’s Idaho National Laboratory (operated by the Battelle Energy Alliance, LLC) and the Public Services Enterprise Group (PSEG) Nuclear, LLC in the Integrated Risk-Informed Condition-Based Maintenance Capability and Automated Platform Project. In this report, the configuration of a digital cloud platform using Microsoft Azure is discussed, data from the PSEG Salem Nuclear Generating Station Units 1 & 2 are imported into a digital cloud platform, and the data is used for an evaluation of several key areas: cost impact analysis, risk-informed model development, and preventive maintenance strategy optimization. First, the cost impact analysis reviews which plant assets are potential good candidates for condition-based monitoring. Next, INL utilized the data in their local environment to develop the risk-informed model; which provides estimates of failure rates and probability of failures of assets based upon their past performance. The developed model is performed on assets selected from the cost impact analysis. Lastly, engineers assess the preventive maintenance strategy for the selected assets at PSEG against maintenance strategies in the nuclear industry for similar assets to potentially identify acceptable justification for the extension of current maintenance frequencies.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Review of Life Cycle Cost Analysis Tools

Life cycle costing (LCC) is a vital aspect of decision-making in building retrofitting. It allows stakeholders to thoroughly assess all expenses involved throughout the lifespan of these retrofits, covering initial costs; ongoing operation, maintenance, and repair costs; and disposal costs of the system. The Federal Energy Management Program of the US Department of Energy has established clear guidelines for conducting LCC analysis, particularly for investments aimed at energy and water conservation, as well as renewable energy projects. These guidelines are detailed in the Code of Federal Regulations, 10 CFR 436, Subpart A, which outlines the methodology and procedure for LCC analysis (Department of Energy 1990). The National Institute of Standards and Technology (NIST) has developed the NIST Handbook 135 (Joshua Kneifel 2022) to standardize the process of LCC analysis within the building industry. Whereas the handbook is tailored to the needs of federal agencies, its principles and methodologies can be valuable for other organizations and industries interested in conducting life cycle costing analyses for their building projects.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Available land for cellulosic biofuel production: a supply chain centered comparison

The land that is potentially available to produce dedicated cellulosic bioenergy crops, often referred to as 'marginal' land, depends heavily on the underlying assumptions used to classify and identify it. In this study we compare three definitions and types of marginal land to identify the interactions between the bioenergy landscape and the logistics networks needed for the biofuel supply chain. Typical studies of the scale, cost, and greenhouse gas (GHG) mitigation potential of cellulosic biofuel take a land-centered approach which may neglect to account for the trade-offs between establishing bioenergy crops and the supply chain design decisions needed to allow those crops to be converted to liquid fuel. A mathematical programming approach is used to minimize the total annualized cost of a large-scale field-to-product system producing bioethanol in the USA midwest. Results show that a high concentration of marginal land leads to efficient systems and that the bioenergy landscape design becomes increasingly important with a higher emphasis on GHG mitigation. Additionally, targeted landscape design (including fertilization) with a focus on fields with high soil carbon sequestration potential can greatly reduce the system-wide GHG emissions for only a small increase in the unit cost of biofuel.

09 BIOMASS FUELS↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GIS-Based Modeling of Contaminated Soil Volumes at Multiple Sites in the Formerly Utilized Sites Remedial Action Program - 20149

The remediation of hazardous, toxic, and radioactive waste (HTRW) sites produces cost-related risks associated with the estimation of contaminated soil or debris volumes. Historical risk-management techniques include cost contingencies to cover volume uncertainties that affect project budgeting and decision-making. The Buffalo District teamed with project partners to lessen volume uncertainty and reduce project risks at multiple HTRW sites managed under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Historical remedial investigations under FUSRAP commonly identified the presence of radiological material in site media, the associated human health risk, and then areas of remediation. To manage remedial execution and reduce risk, pre-design or remediation-phase sampling essentially 'chased' contamination, which was not conducive to efficient predictive budgeting derived from Feasibility Study (FS) cost analyses. The Buffalo District first optimized their approach to better understand volume uncertainty by utilizing the Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software [1]. BAASS processed soft data (e.g., gamma walk-over data) and spatial sampling data to estimate the lateral extent of contaminated soil irrespective of depth (i.e., gross contamination extent) and define areas of contaminant uncertainty. The software performed a binary transformation of contaminant concentrations at all sampling points based upon remedial action goals or a sum of ratios approach (i.e., clean, impacted, or range of impacts in soil). The model produced two-dimensional (horizontal) contaminant probability contours and statistical uncertainty in the sampling coverage and resulting contaminant extents. This method was translated vertically by partitioning the sampling data into depth brackets that produced a stacked representation of contaminant extents and uncertainty in the subsurface (i.e., similar to construction lifts). The results commonly led to a better understanding of project uncertainty and the need for sampling strategies that produce high-confidence soil volumes, which control costs. The BAASS-based delineations were eventually replaced by Empirical Bayesian Kriging (EBK) methods available in ArcGIS Spatial or 3D Analysts [2]. The EBK method calculates contaminant probability zones derived from user-controlled semivariograms of the spatial datasets. The resulting probability zones (e.g., 50% or 80% of contaminant probability) represent the two-dimensional surface delineation of the overall horizontal remedial area, similarly to BAASS. However, unlike BAASS, the vertical sampling data within these probability zones became vertical control points to contour a subterranean surface that connects subsurface points to the land-surface delineations of contamination. The resulting representation of horizontal and vertical impacts within an enclosed envelop (volume) of soil included uncertainty distributions that are used to plan uncertainty-reduction sampling. These data-driven and math-based models of three-dimensional sampling results produced well-bounded remedial volumes for project planning and better uncertainty predictions during project budgeting. The EBK method was applied to several FUSRAP sites managed by the Buffalo District and compared to less rigorously modeled sites previously remediated by the District. The comparison of modeled to actual remediated volumes provide a basis for validating the volume-estimation method. This comparison is important to ensure modeled volumes match physical boundaries of site remediation. FUSRAP sites with denser investigative sampling and lesser volume uncertainty proved useful in remedial planning and contracting. The Buffalo District noted that historical sites with sparser sampling arrays had greater disparity between estimated volumes and final remedial volumes. The benefit achieved over the cost of detailed soil sampling appears positive for FUSRAP projects, especially where impacts vary widely and appear unbounded by investigation-phase sampling. The subsequent Empirical Bayesian Kriging of contamination coupled with vertical contouring for soil estimations reduces uncertainty in soil volumes or indicates where sampling is required to reduce uncertainty, which together optimize remedial planning and budgeting. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental and economic optima of solar home systems design: A combined LCA and LCC approach

Here, we compare the economic and environmental optimal design of Solar Home Systems (SHSs) and explore the role of economic incentives (such as tariffs and technology costs) in approximating the two optima. To achieve that, we present a methodology for the environmental and economic evaluation of grid-connected SHSs: user-scale electric systems involving a photovoltaic (PV) power system and a battery energy storage system. The proposed methodology is based on a mixed integer linear programming (MILP) optimization, life cycle assessment and life cycle costing. This methodological framework is applied to a case study involving a typical SHS installation in Italy. The results of the environmental optimal design brought to the evaluation of a 3.25 kW PV assisted by 8.66 kWh of nickel cobalt manganese batteries, whereas the costs of the SHS are minimized by a small PV system (less than 1 kW). Results underline that the environmental optimal configurations rely on battery technologies, which entails a significant cost compared to the grid connection. In contrast, the economic optimal design solutions is less impactful than the grid mix both from an environmental and economic points of view. Thanks to a reduction of batteries and PV costs, the environmental impact of the economic optimal design is expected to decrease in the future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Path to Zero Energy Ready Home Construction

This paper will be presented at the 5th Residential Building Design & Construction Conference in State College, Pennsylvania. While the number of zero energy homes constructed in the U.S. has grown dramatically, increasing nearly 400% since 2015, zero energy homes still accounted for less than 1% of all U.S. homes constructed as of December 2018. Concerns about high costs or implementation challenges have kept many builders from attempting zero energy home construction. However, builders participating in the U.S. Department of Energy’s Zero Energy Ready Home Program are showing that zero energy ready home construction can be achieved simply and cost effectively with off-the-shelf equipment and materials and common construction techniques. Construction methods used by builders in the DOE program are compared with those used in just-to-code new homes and existing homes for several key components, including wall assemblies and HVAC systems. Examples of cost-effective assemblies used in the Mid Atlantic states are provided.

U.S. Department of Energy Building Technologies Pr↗

Scalable and Cost-Effective Roll-To-Roll Additive Manufacturing of Highly Durable and Thermal Insulating Silica-Carbon Aerogel (Final Report)

The research objective of this project is to demonstrate low cost silica aerogel insulation materials with high R-value and low installed price of R7.5/inch, and $0.94/ft2-inch, respectively, which can meet the cost and performance targets of the Department of Energy’s 2030 Building Technology Office Emerging Technologies program. The main tasks of this project include the following three topics: a) Low-cost silica gel precursor: Repeat silica sol gel chemical approach which is reproducible and scalable. Also explore suitability of water-glass on silica aerogel system to further control cost efficiency. In addition, our aim is to synthesize hollow silica using low-cost precursors. Sodium silicate (water glass) was chosen as our silica source because of its availability and low price compared to the other precursors; b) In situ ambient pressure-drying (APD) and surface modification: confirm and improve silica aerogel under cost-effective continuous ambient pressure-drying and investigate silica aerogel performance under time and temperature dependence; c) Roll-to-Roll (R2R) manufacturing with the targeted structure, thermal and mechanical characteristics: evaluate 3D printing with silica aerogel precursor to modify aerogel formation.

36 MATERIALS SCIENCE↗

A multi-stage stochastic programming model for adaptive biomass processing operation under uncertainty

Variations of physical and chemical characteristics of biomass reduce equipment utilization and increase operational costs of biomass processing. Biomass processing facilities use sensors to monitor the changes in biomass characteristics. Integrating sensory data into the operational decisions in biomass processing will increase its flexibility to the changing biomass conditions. In this paper, we propose a multi-stage stochastic programming model that minimizes the expected operational costs by identifying the initial inventory level and creating an operational decision policy for equipment speed settings. These policies take the sensory information data and the current biomass inventory level as inputs to dynamically adjust inventory levels and equipment settings according to the changes in the biomass' characteristics. We ensure that a prescribed target reactor utilization is consistently achieved by penalizing the violation of the target reactor feeding rate. A case study is developed using real-world data collected at Idaho National Laboratory's biomass processing facility. We show the value of multi-stage stochastic programming from an extensive computational experiment. Our sensitivity analysis indicates that updating the infeed rate of the system, the processing speed of equipment, and bale sequencing based on the moisture level of biomass improves the processing rate of the reactor and reduces operating costs.

09 BIOMASS FUELS↗

Dispatch optimization of electric thermal energy storage within System Advisor Model

A stand-alone electric thermal energy storage (ETES) system converts low-value electricity into heat using resistance heating elements. During periods of high-value electricity, an ETES system uses a thermodynamic power cycle to convert stored thermal energy back to electricity. These dispatchable systems derive value from their ability to store energy when prices are low and generate electricity when prices are favorable, i.e., energy arbitrage. Consequently, dispatch optimization of system operations, through maximizing revenue subject to system constraints, is essential to evaluate the economic value of a particular system design. While stand-alone ETES systems offer potential advantages as dispatchable grid storage technologies, there is a lack of a neutral third-party, publicly available, open-source model to evaluate the performance, dispatch, and financial viability of these systems. To address this problem, we have developed a techno-economic model for stand-alone ETES systems, within National Renewable Energy Laboratory's (NREL's) System Advisor Model (SAM). We implement a mixed-integer linear program to determine an ETES optimal operating schedule that maximizes electricity sales less maintenance costs caused by operation and cycling given temporal-varying grid electricity prices. Our contributions include a mixed-integer linear program for energy arbitrage of an ETES system, an ETES performance model through a publicly-available software (i.e., SAM), and an exercise of our model through case studies that compare ETES operational strategies and annual financial metrics. With our dispatch optimization model, we were able to improve revenue by 20% compared to a myopic heuristic while reducing the operational cost of the ETES system through decreases in cycle starts, cycles per day, and heater starts.

24 POWER TRANSMISSION AND DISTRIBUTION↗