Search NASA⌕ Search

SEARCH · Search NASA

Results for “programmatic requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Exploration Space Suit Architecture and Destination Environmental-Based Technology Development

This paper continues forward where EVA Space Suit Architecture: Low Earth Orbit Vs. Moon Vs. Mars [1] left off in the development of a space suit architecture that is modular in design and could be reconfigured prior to launch or during any given mission depending on the tasks or destination. This paper will address the space suit system architecture and technologies required based upon human exploration extravehicular activity (EVA) destinations, and describe how they should evolve to meet the future exploration EVA needs of the US human space flight program.1, 2, 3 In looking forward to future US space exploration to a space suit architecture with maximum reuse of technology and functionality across a range of mission profiles and destinations, a series of exercises and analyses have provided a strong indication that the Constellation Program (CxP) space suit architecture is postured to provide a viable solution for future exploration missions4. The destination environmental analysis presented in this paper demonstrates that the modular architecture approach could provide the lowest mass and mission cost for the protection of the crew given any human mission outside of low-Earth orbit (LEO). Additionally, some of the high-level trades presented here provide a review of the environmental and non-environmental design drivers that will become increasingly important the farther away from Earth humans venture. This paper demonstrates a logical clustering of destination design environments that allows a focused approach to technology prioritization, development, and design that will maximize the return on investment, independent of any particular program, and provide architecture and design solutions for space suit systems in time or ahead of need dates for any particular crewed flight program in the future. The approach to space suit design and interface definition discussion will show how the architecture is very adaptable to programmatic and funding changes with minimal redesign effort such that the modular architecture can be quickly and efficiently honed into a specific mission point solution if required. Additionally, the modular system will allow for specific technology incorporation and upgrade as required with minimal redesign of the system.

Hill, Terry R.↗

Autonomous Rendezvous and Docking Conference, volume 3

This document consists of the presentation submitted at the Autonomous Rendezvous and Docking (ARD) Conference. The document contains three volumes: ARD hardware technology; ARD software technology; and ARD operations. The purpose of this conference is to identify the technologies required for an on orbit demonstration of ARD, assess the maturity of these technologies, and provide the necessary insight for a quality assessment of programmatic management, technical, schedule, and cost risks.

Source record↗

HFI Bolometer Detectors Programmatic CDR

Programmatic Critical Design Review (CDR) of the High Frequency Instrument (HFI) Bolometer Detector on the Planck Surveyor is presented. The topics include: 1) Scientific Requirements and Goals; 2) Silicon Nitride Micromesh 'Spider-Web' Bolometers; 3) Sub-Orbital Heritage: BOOMERANG; 4) Noise stability demonstrated in BOOMERANG; 5) Instrument Partners; 6) Bolometer Environment on Planck/HFI; 7) Bolometer Modules; and 8) Mechanical Interface. Also included are the status of the receivables and delivery plans with Europe. This paper is presented in viewgraph form.

Lange, Andrew E.↗

Phase 1 Space Fission Propulsion Energy Source Design

Fission technology can enable rapid, affordable access to any point in the solar system. If fission propulsion systems are to be developed to their full potential; however, near-term customers must be identified and initial fission systems successfully developed, launched, and operated. Studies conducted in fiscal year 2001 (IISTP, 2001) show that fission electric propulsion (FEP) systems with a specific mass at or below 50 kg/kWjet could enhance or enable numerous robotic outer solar system missions of interest. At the required specific mass, it is possible to develop safe, affordable systems that meet mission requirements. To help select the system design to pursue, eight evaluation criteria were identified: system integration, safety, reliability, testability, specific mass, cost, schedule, and programmatic risk. A top-level comparison of four potential concepts was performed: a Testable, Passive, Redundant Reactor (TPRR), a Testable Multi-Cell In-Core Thermionic Reactor (TMCT), a Direct Gas Cooled Reactor (DGCR), and a Pumped Liquid Metal Reactor.(PLMR). Development of any of the four systems appears feasible. However, for power levels up to at least 500 kWt (enabling electric power levels of 125-175 kWe, given 25-35% power conversion efficiency) the TPRR has advantages related to several criteria and is competitive with respect to all. Hardware-based research and development has further increased confidence in the TPRR approach. Successful development and utilization of a "Phase I" fission electric propulsion system will enable advanced Phase 2 and Phase 3 systems capable of providing rapid, affordable access to any point in the solar system.

Houts, Mike↗

GeoSTAR : developing a new payload for GOES satellites

The Geostationary Synthetic Thinned Aperture Radiometer (GeoSTAR) is a new concept for a microwave sounder, intended to be deployed on NOAA's next generation of geostationary weather satellites, the GOES-R series - due to first launch in 2012. This will fill a serious gap in OW remote sensing capabilities of long standing - a key capability that NOAA is book keeping at the top of its list of 'pre-planned product improvements' for GOES-R - i.e. the most urgently needed additional payload, which will be added as soon as funding has been allocated and programmatic issues resolved. Although real-aperture GEO microwave sounders have been proposed over the years, only GeoSTAR is capable of meeting the measurement requirements and is therefore now the leading candidate.

microwave↗

Comprehensive Shuttle Foam Debris Reduction Strategies

The Columbia Accident Investigation Board (CAIB) was clear in its assessment of the loss of the Space Shuttle Columbia on February 3, 2003. Foam liberated from the External Tank (ET) impacting the brittle wing leading edge (WLE) of the orbiter causing the vehicle to disintegrate upon re-entry. Naturally, the CAB pointed out numerous issues affecting this exact outcome in hopes of correcting systems of systems failures any one of which might have altered the outcome. However, Discovery s recent return to flight (RTF) illustrates the primacy of erosion of foam and the risk of future undesirable outcomes. It is obvious that the original RTF focused approach to this problem was not equal to a comprehensive foam debris reduction activity consistent with the high national value of the Space Shuttle assets. The root cause is really very simple when looking at the spray-on foam insulation for the entire ET as part of the structure (e.g., actual stresses > materials allowable) rather than as some sort of sizehime limited ablator. This step is paramount to accepting the CAB recommendation of eliminating debris or in meeting any level of requirements due to the fundamental processes ensuring structural materials maintain their integrity. Significant effort has been expended to identify root cause of the foam debris In-Flight Anomaly (FA) of STS-114. Absent verifiable location specific data pre-launch (T-0) and in-flight, only a most probable cause can be identified. Indeed, the literature researched corroborates NASNTM-2004-2 13238 disturbing description of ill defined materials characterization, variable supplier constituents and foam processing irregularities. Also, foam is sensitive to age and the exposed environment making baseline comparisons difficult without event driven data. Conventional engineering processes account for such naturally occurring variability by always maintaining positive margins. Success in a negative margin range is not consistently achieved. Looking at the ET S spray-on foam insulation as part of the structural system (e.g., glass half full mentality) will create an environment where ET debris levels as low as reasonably achievable (ALARA) can be realized. ALARA is a NASA requirements philosophy deployed for the complex, mission altering radiation exposure requirements for life safety of astronauts. In the Shuttle s case, reasonableness is established by exhaustive engineering rigor, allowable debris size/quantity, technology maturity and programmatic constraints. A more robust urethane foam thermal protection system (TPS) will enhance the hctionality of the new Ares I Crew Launch Vehicle (CLV) Upper Stage. This paper will outline the strategy for a comprehensive effort to reduce ET foam debris and outline steps leading to an improved foam TPS. The NASA must remain committed to such an approach no matter what becomes of the next flight s actual debris field lest we fall back into a false sense of security. This commitment along with full implementation of all the other CAB recommendations such as orbiter hardening will significantly improve the Shuttle system, the engineering workforce, future capabilities & alternate policy offramps, national human resource protection, high value national asset protection and increase the level of service to the overall NASA mission.

Semmes, Edmund B.↗

Implementation of a Hybrid Edge Node-Centroid Node Approach for the Generation of Reduced Thermal Models

Reduced thermal models are often required for delivery to organizations that manage models at the highest levels of assembly. The effort to generate/verify these models against their detailed counterparts is a challenge not yet conclusively solved. Higher level organizations often place a limit on the node count for delivered models, assuming smaller models result in faster computation. The burden of producing and verifying the accuracy of reduced models is primarily on the lower-level organizations, which consumes resources to produce these models. Limiting the number of allowable nodes may prevent users from taking full advantage of software capabilities that allow for faster generation of models, such as finite elements, which require more nodes than centroid based models. A methodology using Thermal Desktop was described in 2010 using: (1) finite elements and edge nodes for the conduction matrix, (2) centroid nodes for capacitance and radiative computations, and (3) the super network feature to produce a conduction matrix based only on the centroid nodes. While the methodology was clear, the implementation would have had to be done manually; with the inclusion of the OpenTD Application Programming Interface, this methodology can now be implemented programmatically and be a viable approach for the generation of reduced models. The approach was implemented at NASA-Goddard for the Capture-Containment-and-Return-System (CCRS) payload, resulting in the TCYEE tool. CCRS requires delivery with node limitations through the European Space Agency to its contractors. TCYEE generated the reduced model for delivery and the predictions compared favorably to the detailed model. Furthermore, TCYEE is being explored for potential use on the Roman Space Telescope (RST) for the generation of reduced models for delivery to the launch provider, which also has node limit requirements. This paper describes the methodology, implementation, and the performance of reduced models compared to their detailed counterparts.

Computer Programming and Software↗

Space construction system analysis. Part 2: Cost and programmatics

Cost and programmatic elements of the space construction systems analysis study are discussed. The programmatic aspects of the ETVP program define a comprehensive plan for the development of a space platform, the construction system, and the space shuttle operations/logistics requirements. The cost analysis identified significant items of cost on ETVP development, ground, and flight segments, and detailed the items of space construction equipment and operations.

Vonflue, F. W.↗

Evolutionary space platform concept study. Volume 3: Programmatics for manned space platform concepts

The programmatic data for the reference concept of the Manned Space Platform is presented. Details regarding work breakdown structure (WBS) and dictionary, the facilities and equipment required to produce the modules, the project schedule and logic diagram, a preliminary assessment of environmental impacts and details regarding the estimated costs for the reference concept are included. The proposed WBS which was developed to provide summary and system level segregation of the nonrecurring and recurring portions of the Manned Space Platform project is also included. The accompanying dictionary outlines the function and activities contained within each WBS element. The facility and equipment required to produce the various modules is discussed. Generally, required equipment is within the existing state of the art although the size of some of the items to be manufactured is a consideration. A preliminary manufacturing flow was also provided. The project schedules presented consist of the Master Project Summary Schedule, the Master Project Phasing Chart and the Logic Network.

Source record↗

The Office of Space Science and Applications strategic plan, 1990: A strategy for leadership in space through excellence in space science and applications

A strategic plan for the U.S. space science and applications program during the next 5 to 10 years was developed and published in 1988. Based on the strategies developed by the advisory committees of both the National Academy of Science and NASA, the plan balances major, moderate, and small mission initiatives, the utilization of the Space Station Freedom, and the requirements for a vital research base. The Office of Space Science and Applications (OSSA) strategic plan is constructed around five actions: establish a set of programmatic themes; establish a set of decision rules; establish a set of priorities for missions and programs within each theme; demonstrate that the strategy will yield a viable program; and check the strategy for consistency within resource constraints. The OSSA plan is revised annually. This OSSA 1990 Strategic Plan refines the 1989 Plan and represents OSSA's initial plan for fulfilling its responsibilities in two major national initiatives. The Plan is now built on interrelated, complementary strategies for the core space science and applications program, for the U.S. Global Change Research Program, and for the Space Exploration Initiative. The challenge is to make sure that the current level of activity is sustained through the end of this century and into the next. The 1990 Plan presents OSSA's strategy to do this.

Source record↗

Autonomous Rendezvous and Docking Conference, volume 2

Autonomous Rendezvous and Docking (ARD) will be a requirement for future space programs. Clear examples include satellite servicing, repair, recovery, and reboost in the near term, and the longer range lunar and planetary exploration programs. ARD will permit more aggressive unmanned space activities, while providing a valuable operational capability for manned missions. The purpose of the conference is to identify the technologies required for an on-orbit demonstration of ARD, assess the maturity of those technologies, and provide the necessary insight for a quality assessment of programmatic management, technical, schedule, and cost risks.

Source record↗

Pharmacy in Space: A Session on NASA Technologies

In 1993, Vice-president Gore was charged with creation of a correctional plan for the poor findings from an efficiency study of governmental agencies. That correctional analysis was then used to support efforts to balance the budget in ways anticipated to improve the value returned per tax payer dollar spent. The final result was a broad initiative collectively termed "reinventing the government", which included major restructuring within NASA as well, termed "reinventing NASA This included substantial elimination of middle management and downsizing such that about 2 million government workers employed in 1992 has shrunk now to about 1.2 million government workers who are employed in ways that at least somewhat decrease bureaucratic and programmatic inefficiencies. Today, "reinvented NASA" has an awareness of contractual commitment to the public. NASA now operates within a so-called "strategic plan" that requires awareness and response to domestic needs. This is important to this audience because it means that NASA is committed to exploring interactions that you may wish to initiate. That is, you are urged to explore with NASA on topics of educational support, collaborative research, or commercial partnerships in drug development and application, as the pertinent examples here, in ways that can include involvement of central NASA resources and missions.

Richmond, Robert C.↗

A Network of Geophysical Observatories for Mars

For the past 30 years there has been a strong consensus within the international scientific community in favor of sending a network of geophysical landers to Mars to characterize the near-surface weather and climate, determine the large-scale atmospheric dynamics and explore the interior structure and composition. Despite this scientific support, there has been an unbroken string of proposed missions over the past fifteen years which have failed for programmatic reasons to progress beyond the design stage (Mars Network Mission, MESUR, Marsnet, InterMarsnet, NetLander). In this presentation, we review the scientific rationale and technical requirements for such a mission, and discuss current activities aimed toward its implementation.

Banerdt, W. Bruce↗

JPL Innovation Foundry

NASA supports the community of mission principal investigators by helping them ideate, mature, and propose concepts for new missions. As NASA's Federally Funded Research and Development Center (FFRDC), JPL is a primary resource for providing this service. The environmental context for the formulation lifecycle evolves continuously. Contemporary trends include: more competitors; more-complex mission ideas; scarcer formulation resources; and higher standards for technical evaluation. Derived requirements for formulation support include: stable, clear, reliable methods tailored for each stage of the formulation lifecycle; on-demand access to standout technical and programmatic subject-matter experts; optimized, outfitted facilities; smart access to learning embodied in a vast oeuvre of prior formulation work; hands-on method coaching. JPL has retooled its provision of integrated formulation lifecycle support to PIs, teams, and program offices in response to this need. This mission formulation enterprise is the JPL Innovation Foundry.

foundry↗

Consolidated Development Objectives Document (CDOD) For MB-60

This document defines the objectives related to liquid rocket engine system development to be undertaken by JAXA in support of the Space Launch System (SLS) Program managed out of the NASA Marshall Space Flight Center (MSFC). These objectives include furnishing the necessary management, labor, facilities, tools, equipment, and materials required to execute the specified activities. 1.1 Project Scope: The scope of this effort is to develop a rocket engine and associated products per the objectives and technical requirements established in this document. This engine, minus the engine controller, designated here as MB ]60, is to be developed through to a prequalification point of maturity. It is assumed that should JCNE ]1 development proceed beyond this maturity point towards actual flight qualification, the engine controller will be supplied and integrated by NASA. 1.2 Document Structure: The structure of this Consolidated Development Objectives Document (CDOD) includes a traditional description of objectives in a SOO, plus the associated Data Products Document (DPD) in an attached appendix, and then Engine Requirements Document (ERD) as another attached appendix. It is the intent that this document, in conjunction with the cited applicable documents, should constitute a complete programmatic and technical description of the development effort to be pursued.

Greene, William D.↗

Benefits of Using a Mars Forward Strategy for Lunar Surface Systems

This paper identifies potential risk reduction, cost savings and programmatic procurement benefits of a Mars Forward Lunar Surface System architecture that provides commonality or evolutionary development paths for lunar surface system elements applicable to Mars surface systems. The objective of this paper is to identify the potential benefits for incorporating a Mars Forward development strategy into the planned Project Constellation Lunar Surface System Architecture. The benefits include cost savings, technology readiness, and design validation of systems that would be applicable to lunar and Mars surface systems. The paper presents a survey of previous lunar and Mars surface systems design concepts and provides an assessment of previous conclusions concerning those systems in light of the current Project Constellation Exploration Architectures. The operational requirements for current Project Constellation lunar and Mars surface system elements are compared and evaluated to identify the potential risk reduction strategies that build on lunar surface systems to reduce the technical and programmatic risks for Mars exploration. Risk reduction for rapidly evolving technologies is achieved through systematic evolution of technologies and components based on Moore's Law superimposed on the typical NASA systems engineering project development "V-cycle" described in NASA NPR 7120.5. Risk reduction for established or slowly evolving technologies is achieved through a process called the Mars-Ready Platform strategy in which incremental improvements lead from the initial lunar surface system components to Mars-Ready technologies. The potential programmatic benefits of the Mars Forward strategy are provided in terms of the transition from the lunar exploration campaign to the Mars exploration campaign. By utilizing a sequential combined procurement strategy for lunar and Mars exploration surface systems, the overall budget wedges for exploration systems are reduced and the costly technological development gap between the lunar and Mars programs can be eliminated. This provides a sustained level of technological competitiveness as well as maintaining a stable engineering and manufacturing capability throughout the entire duration of Project Constellation.

Mulqueen, Jack↗

Autonomous Rendezvous and Docking Conference, volume 1

This document consists of the presentation submitted at the Autonomous Rendezvous and Docking (ARD) Conference. It contains three volumes: ARD hardware technology; ARD software technology; and ARD operations. The purpose of this conference is to identify the technologies required for an on orbit demonstration of the ARD, assess the maturity of these technologies, and provide the necessary insight for a quality assessment of the programmatic management, technical, schedule, and cost risks.

Source record↗

Space Exploration Technologies Developed through Existing and New Research Partnerships Initiatives

The Space Partnership Development Program of NASA has been highly successful in leveraging commercial research investments to the strategic mission and applied research goals of the Agency through industry academic partnerships. This program is currently undergoing an outward-looking transformation towards Agency wide research and discovery goals that leverage partnership contributions to the strategic research needed to demonstrate enabling space exploration technologies encompassing both robotic spacecraft missions and human space flight. New Space Partnership Initiatives with incremental goals and milestones will allow a continuing series of accomplishments to be achieved throughout the duration of each initiative, permit the "lessons learned" and capabilities acquired from previous implementation steps to be incorporated into subsequent phases of the initiatives, and allow adjustments to be made to the implementation of the initiatives as new opportunities or challenges arise. An Agency technological risk reduction roadmap for any required technologies not currently available will identify the initiative focus areas for the development, demonstration and utilization of space resources supporting the production of power, air, and water, structures and shielding materials. This paper examines the successes to date, lessons learned, and programmatic outlook of enabling sustainable exploration and discovery through governmental, industrial, academic, and international partnerships. Previous government and industry technology development programs have demonstrated that a focused research program that appropriately shares the developmental risk can rapidly mature low Technology Readiness Level (TRL) technologies to the demonstration level. This cost effective and timely, reduced time to discovery, partnership approach to the development of needed technological capabilities addresses the dual use requirements by the investing partners. In addition, these partnerships help to ensure the attainment of complimenting human and robotic exploration goals for NASA while providing additional capabilities for sustainable scientific research benefiting life and security on Earth.

Nall, Mark↗