Search NASA⌕ Search

SEARCH · Search NASA

Results for “requirements verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

ECAR-7300 Rev 1 Verification and Validation of MCNP6.2 for MARVEL Neutronic Analysis

This report documents the verification and validation (V&V) efforts of the Monte Carlo N-Particle transport code (MCNP) version 6.2 on the Sawtooth supercomputer for the Microreactor Applications Research Validation and Evaluation (MARVEL) microreactor required for the preliminary documented safety analysis. This document records V&V for a safety, hazards, analysis, and design software used for design and analysis of safety class structures, system and components (SSC)s.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Small Windowed PDV Slab Shot Verification

Windowed PDV probes are used as a time of arrival diagnostic where conventional PDV measurements cannot be made with accuracy i.e., measurements where the surface measured is bare HE or the surface measured does not provide quality optical return for PDV directly. Often hydro experiments require that these diagnostics be minimally invasive, so their installation does not negatively impact the device performance or the overall experiments goals. In this report we build 3 mm diameter windowed probes and show that they give an error that is still within the error of piezo pins.

13 HYDRO ENERGY↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management facility (EMF) stack monitor location was qualified using the LV-S1 scale model stack as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale models and its sampling locations were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the EMF stack was performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of stack flow rates for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on the LV-S1 scale model test DV values, the corresponding stack flow rates for the EMF stack are as listed in Table S1. Table S1. Effluent Management Facility Stack Qualified Flow Range. Stack Parameter EM-1 Minimum Qualified Stack Flow (scfm) 781 Maximum Qualified Stack Flow (scfm) 53,432 The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were less than 5°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, which were all within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes each combination of ACV fan with the DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applied radiation tags for warhead dismantlement transparency

Here, this study explores the feasibility of applying radiation tags as a Chain of Custody tool to confirm the dismantlement of individual warheads by investigating time dependent emissions from special nuclear material. Precedents of photon and neutron sources that have been used to irradiate warhead components are presented. Measurements of irradiated Highly Enriched Uranium (HEU) are used to benchmark simulations with the CINDER90 library for MCNP. Delayed gamma emissions are simulated as a function of time since irradiation of moderated HEU and Weapons Grade Plutonium with photon and neutron sources. Models of commercial 9 MV and 15 MV linacs were found to induce ~10 9 fissions/g and ~10 11 fissions/g, respectively, creating 3 to 4 orders of magnitude more delayed gammas than neutron sources, modeled at 10 10 n/s. However, a DT neutron source was found to induce sufficient fissions, ~10 7 fissions/g, to create quantifiable signatures relative to intrinsic emissions. Applied radiation tagging is determined to be technically feasible, but its operational context and practical implementation requires significant development.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Calculation of neutron flux spectra of the VVER-1000 mock-up shielding benchmark with Monte Carlo code MCS utilizing mesh-based weight window

The measurements of neutron spectra compiled inside the NEA-1517/82 package from the Shielding Integral Benchmark Archive and Database (SINBAD) are chosen as benchmark cases to validate the variance reduction technique based on weight window in Monte Carlo Code MCS. A full 3D model for fixed source mode calculation with hexagonal lattice source definition is developed to simulate total of 6 points of measurements at the vicinity of the reactor and the reactor pressure vessel region. A code/code comparison against MCNP6 code is first conducted as verification element for the mesh-based weight window capability in MCS. Finally, the validation results are presented against measurements. The verification against MCNP6 code gives good agreement in addition of the insight to the importance of user understanding to determine proper reference point and reference lower weight bound for scaling which is not required in MCS code due to its capability of automatic scaling. The comparison of neutron spectra between MCS and measurements shows good agreement within 3 standard deviations for all of six detector positions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Demonstration of a modeling toolkit for the design of building electrical distribution systems

The deployment of building equipment (e.g., lighting, security) and miscellaneous electrical loads that fundamentally require DC power for operation is increasing. Powering these DC loads has traditionally required an AC/DC converter, but the installation of photovoltaic (PV) and battery energy storage systems that primarily produce DC power eliminates the need for AC/DC converters at each end-device. However, analyzing system energy efficiency and cost for different electrical distribution architectures can be challenging as software tools that support this are not readily available. This paper presents preliminary results from a laboratory verification of the Building Electrical Efficiency Analysis Model (BEEAM) toolkit that was developed to address this gap. Three different eight-luminaire lighting systems comprised of market-available products were designed and modeled: one that used traditional AC distribution, a second that used a hybrid AC -to- centralized DC electrical distribution architecture, and a third that used a hybrid AC -to- distributed DC architecture. Notably, AC/DC conversions are required in all three systems. BEEAM models for LED drivers as well as Power-over-Ethernet (PoE) switches were created using laboratory characterization data. The lighting systems were simulated in Modelica, and the results were compared with each other and physics-based expectations. Simulation results show that PoE system energy efficiency is highly dependent on both device specification (e.g., LED driver and PoE switch efficiency) and system architecture (e.g., PoE switch loading) choices, as expected. For the products and system architectures selected for this study, the two DC systems were found to be less efficient than the AC system over the course of typical operation. In future work, simulation results will be compared with laboratory measurements to validate the usefulness of this software for design, and lighting systems with integrated PV and battery energy storage will be simulated to quantify the energy performance improvements that result from the elimination of some AC/DC converters.

Waghale, Anay S.↗

Requirements Description of the PERSENT Software

This report presents the modeling and simulation capabilities of Argonne National Laboratory’s PERSENT (PERturbation and SENsitivity for Transport) code [1] that is used in modern commercial deployment reactor technologies. The identified capabilities will be used to establish the set of PERSENT verification tasks necessary to verify PERSENT for usage on commercial projects. A similar path was followed for the REBUS [2] and DIF3D [3] software packages.

97 MATHEMATICS AND COMPUTING↗

Guidelines for Broadband Seismometer Testing

The Comprehensive Nuclear-Test-Ban Treaty mandates the four verification technologies to be used by the International Monitoring System (IMS) to monitor compliance to the Treaty. These technologies are seismic, hydroacoustic, infrasound, and radionuclide. Operational manuals for each of these technologies specify the requirements that equipment installed at IMS stations must meet for data from said stations to be accepted by the International Data Center. Following a model in which a revised set of infrasound sensor specifications and accompanying test procedures were developed in an international collaboration overseen by the Comprehensive Nuclear-Test-Ban Treaty Organization, the same process was recently followed for seismometers potentially of use by the IMS. This document, a product of that collaboration, defines key concepts and recommends test procedures to be followed to characterize broadband seismometers in a consistent and standardized way. Results from these test procedures can be used to verify that a seismometer meets the manufacturers stated specifications and IMS requirements. ACKNOWLEDGEMENTS The writers of this document would like to acknowledge Charles R. Hutt, John R. Evans, Fred Followill, Robert L. Nigbor, and Erhard Wielandt, the authors of the 2009 Guidelines for Standardized Testing of Broadband Seismometers and Accelerometers funded by the U.S. Department of Interior, on which this document is based. Although this document is limited in scope to seismometers and much of the document has been updated, the structure remains essentially the same.

58 GEOSCIENCES↗

Verification of a Modeling Toolkit for the Design of Building Electrical Distribution Systems

DC electrical distribution systems offer many potential advantages over their AC counterparts. They can facilitate easier integration with distributed energy resources, improve system energy efficiency by eliminating AC/DC converters at end-use devices (e.g., laptop chargers), and reduce installation material, time, and cost. However, DC electrical distribution systems present additional design considerations, largely resulting from potentially greater magnitude and variation in cable losses. Modeling and simulation are rarely used to design such systems. However, the greater dependency of DC system energy efficiency on design choices such as distribution voltages, architecture, and integration of PV and BESS suggests that modeling and simulation may be required. Such system performance analysis is currently not a standard practice, in part due to limited availability and validation of capable software tools. This paper characterizes the accuracy of a Modelica-based Building Electrical Efficiency Analysis Model (BEEAM) toolkit, as a precursor for validating its use to perform system performance analysis and inform design decisions. The study builds upon previous verification research by characterizing complete systems comprised of commercially available equipment, and providing a more detailed analysis of simulation results. Five lighting systems with varying electrical distribution architectures were designed using market-available equipment, installed in a laboratory environment, modeled using BEEAM, and simulated using three Modelica integrated development environments (IDEs). Simulated and measured results were compared to characterize toolkit accuracy. Initial results revealed that simulated performance was mostly within ±5% of measured system-level and device-level performance. While simulation results were not found to be dependent on the IDE, some Modelica compiler interoperability issues were identified. Although the BEEAM toolkit showed promise for the targeted use case, further work is needed to determine whether the demonstrated 5% accuracy is sufficient for making real-world design decisions, and for BEEAM to advance from an interesting research tool to one that can impact real-world building projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Shale gas: Geochemical and physical constraints on genesis, storage, and producibility

Our research project on shale gas included two tasks: (1) Testing of different shales’ ability to geocatalytically generate natural gas at low temperatures; verification of geocatalytic methanogenesis would potentially render shale gas a quasi-renewable resource, and (2) quantification and characterization of porosity and permeability in organic-rich rocks with implication for producibility. Adequate porosity is required for geological storage of shale gas. At the same time, pore connectivity is essential for gas producibility.

03 NATURAL GAS↗

Elevating SolTrace's Capabilities for the Next Generation of Concentrating Solar Analysis

SolTrace is an open-source Monte Carlo ray tracing software developed at NREL. SolTrace can characterize concentrating solar thermal (CST) collector optical performance and is CST technology agnostic. Shown in Fig. 1, SolTrace is a foundational tool in NREL's CST system and component modeling suite. SolTrace's generic surface elements can flexibly model novel collector and receiver designs to predict spatial and temporal flux distributions - critical to understand for CST component design, performance prediction, and system integration. Since its initial development, SolTrace has over 1,650 references on Google Scholar, over 9,800 downloads since 2017, and has served the CST research and development community as a benchmark of 3rd party verification. SolTrace provides users with many options for defining surface shape and boundaries. However, SolTrace provides limited documentation which can result in a steep learning curve for new users. Additionally, SolTrace lacks the computational performance required to evaluate optical performance of a CST system over the course of a year and/or iteratively over design parameters in a timely manner. To address this, we are working towards a new release of SolTrace that enables increased computational throughput by implementing ray tracing acceleration structures and enabling GPU parallelization. Additionally, we are working to improve SolTrace's usability, accessibility, and maintainability by (1) automating solar position time-dependent simulation processes, (2) creating general CST collector templates of grouped elements, (3) updating the user interface to better visualize model inputs and outputs, and (4) creating a user support network through forums, "how to" videos, and documentation.

14 SOLAR ENERGY↗

Building Blocks for Secure and Prosperous Defense Critical Supply Chains: A Case Study from Microelectronics

Securing defense-critical supply chains, built on resilient and sustainable microelectronics fabrication and deployment, is a national imperative and one that requires an investment in basic and applied research, development, and deployment into industries in (and out of) the Defense Industrial Base (DIB). Critical next steps include the development of pilots for revolutionary concepts in a new formal verification model and the Cyber-Physical Passport (CPP) concept for chain of custody. Critical infrastructure leadership should take action with a sense of urgency. Working in conjunction with the Under Secretary for Acquisition and Sustainment, the Assistant Secretary of Defense for Research and Engineering should establish pilot programs with the Defense Advanced Research Projects Agency and the service labs to build and test both concepts in legacy and new system development.. Additionally, the Pentagon may be aware that an existing Manufacturing Innovation Institute is piloting, with the semiconductor industry, cyber innovations to provide verifiable security properties and guarantees of physical functions to build a more cyber secure, resilient and efficient micro-electronics supply chain.

99 GENERAL AND MISCELLANEOUS↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management Facility (EMF) stack monitor location was qualified using a combination of scale model stacks to mitigate the risk of identifying that the sampling location does not meet the qualification criteria on the full-scale stack. The LV-S1 scale model stack was used as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling locations were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. The LV-S1, LB-S1, and LV-S2 scale model stack tests have met the criteria of the ANSI/HPS N13.1-1999 standard to demonstrate the stack sampling locations are well mixed. Verification tests of the EMF stack were performed at normal operating conditions. The minimum 1/6 DV value and the maximum 6 DV value from the scale model testing determine the range of stack flow rates for which the full-scale stack may be operated while remaining in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rate along with the average and maximum qualified stack flow rate based on the LV-S1 scale model DV values. The operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were <5°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, all of which were within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all planned fan operating configurations. This includes each combination of ACV fans with DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accurate Dosimetry for Radiobiology

Accurate radiation dose is required to ensure reproducibility in establishing the radiobiological effect in biological systems among institutions. The dose should be the most precise and accurate parameter of the entire process. The goal is a system to provide uniform radiation dose verification among institutions that is traceable to the National Institute of Standards and Technology (NIST) through an Accredited Dosimetry Calibration Laboratory.

61 RADIATION PROTECTION AND DOSIMETRY↗

Annual Summary Report for the Remote-Handled Low-Level Waste Disposal Facility—FY2021

This Fiscal Year (FY) 2021 annual summary report (ASR) documents the continued adequacy of the performance assessment (PA), the composite analysis (CA) and associated operating disposal-authorization statement (ODAS) technical basis documents for the Remote Handled (RH) Low-Level Waste (LLW) Disposal Facility at Idaho National Laboratory. Annual review of the adequacy of the PA and CA for the RHLLW Disposal Facility ensures that conclusions of the analyses remain valid in accordance with requirements of Department of Energy (DOE) Order 435.1, “Radioactive Waste Management.” In FY 2021, no significant operational changes or other activities occurred that would cause deviation from the assumptions in the PA and CA pertaining to disposal geometry, verification of waste characteristics, tracking disposal inventories against total limits, facility closure design, or institutional controls. Sixteen total waste-canister shipments were received at the RHLLW Disposal Facility, and 16 total waste canisters were emplaced.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Summary Report for the Remote-Handled Low-Level Waste Disposal Facility—FY 2022

This Fiscal Year (FY) 2022 annual summary report (ASR) documents the continued adequacy of the performance assessment (PA), the composite analysis (CA) and associated operating disposal-authorization statement (ODAS) technical-basis documents for the Remote-Handled (RH) Low-Level Waste (LLW) Disposal Facility at Idaho National Laboratory. Annual review of the adequacy of the PA and CA for the RHLLW Disposal Facility ensures that conclusions of the analyses remain valid in accordance with requirements of Department of Energy (DOE) Order 435.1, “Radioactive Waste Management.” In FY 2022, no significant operational changes or other activities occurred that would cause deviation from the assumptions in the PA and CA pertaining to disposal geometry, verification of waste characteristics, tracking disposal inventories against total limits, facility-closure design, or institutional controls. Fifteen waste canister shipments were received at the RHLLW Disposal Facility, and 15 waste canisters were emplaced in disposal vaults.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Summary Report for the Remote-Handled Low-Level Waste Disposal Facility—FY 2023

This Fiscal Year (FY) 2023 annual summary report (ASR) documents the continued adequacy of the performance assessment (PA), the composite analysis (CA) and associated operating disposal-authorization statement (ODAS) technical-basis documents for the Remote-Handled (RH) Low-Level Waste (LLW) Disposal Facility at Idaho National Laboratory. Annual review of the adequacy of the PA and CA for the RHLLW Disposal Facility ensures that conclusions of the analyses remain valid in accordance with requirements of Department of Energy (DOE) Order 435.1, “Radioactive Waste Management.” In FY 2023, no significant operational changes or other activities occurred that would cause deviation from the assumptions in the PA and CA pertaining to disposal geometry, verification of waste characteristics, tracking disposal inventories against total limits, facility-closure design, or institutional controls. Eleven waste canister shipments were received at the RHLLW Disposal Facility, and ten waste canisters were emplaced in disposal vaults.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Code Coverage Status of the ARC Code RCT

The Argonne Reactor Code (ARC) software system supports users in their fast reactor design goals by providing neutronic, thermal-hydraulic, and structural analysis capabilities. REBUS plays a pivotal role in the ARC system as the primary fuel cycle analysis capability for fast reactor problems. Over its 60 year history, ARC software usage with REBUS has been applied to numerous fast and thermal spectrum reactor analysis projects with good to excellent comparison against experiments. The RCT code is a later addition and uses the REBUS restart files to define its input. The RCT code was built to provide pin depletion details on EBR-II models and thus many features of RCT were specifically tailored to the needs of EBR-II models. Additional approximations were invoked which are likely only valid for the EBR-II reactor and the particular fuel management that was done for it. The purpose of the present work is to identify a set of test problems for RCT and assess the code coverage for those test problems. The goal is to document what parts of the existing RCT code are touched by the set of test problems and which are not. Because no detailed verification work has been done on RCT, the existing regression testing suite was chosen for the code coverage assessment. The code coverage analysis of RCT was performed with the Code Coverage Tool of the Intel Fortran compiler which requires modifications to the compilation of RCT. The detailed coverage tables are given for each part of RCT. As will be discussed and shown, some parts of the RCT capability that are known to be used by the EBR-II analysis work are not tested by the regression testing suite. These aspects should be resolved before major source code changes are taken for the RCT software. Because REBUS and DIF3D are not subroutines of RCT, the coverage changes in both of those codes is not altered by RCT. The same is true for all of the modules of DIF3D that are used by RCT such as SYSLIB and SEGLIB.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗