Search NASA⌕ Search

SEARCH · Search NASA

Results for “robust execution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Usability Evaluation of Fleet Management Interface for High Density Vertiplex Environments

To meet the rising demand for an Advanced Air Mobility (i.e. urban and rural unmanned aircraft systems) ecosystem, NASA Aeronautics Research Mission Directorate (ARMD) is hosting a series of simulations and flight tests under the High Density Vertiplex sub-project (HDV). HDV aims to develop an integrated automation architecture to support terminal area flight operations. The HDV simulations and flight tests address safety, integration, and operational challenges, while integrated systems and software demonstrate design readiness, robustness, and interoperability. During the initial HDV simulation in 2021, a prototype traffic management tool developed by NASA called Fleet Management Interface (FMI) was tested. FMI was designed to introduce an advanced level of human-automation interaction to aid both Ground Control Station Operators (GCSOs) and Fleet Managers (FMs) in remotely managing flights under their ownership. In a human-in-the-loop simulation, a usability study was conducted with FMI to identify optimal approaches for displaying information for human operators using subjective measures of usability, workload, situation awareness, risk, and trust, along with qualitative feedback. This study consisted of task analysis in which GCSO and FM subjects used an Urban Air Mobility (UAM) environment to develop and execute a plan for two different traffic scenarios of remotely controlled vehicles. In each scenario, a controlled vehicle completed a takeoff, active flight, and landing sequence while automated traffic flew in the background at a rate of 20 operations per hour. In the first scenario, the controlled vehicle flew a nominal route with takeoff and landing at the same vertiport. In the second scenario, the controlled vehicle started on the nominal route, then diverted to an unplanned location mid-flight. Results showed that self-reported performance, usability, trust, and situation awareness ratings of FMI were moderately to strongly high. There were small differences between scenarios, with Scenario 2 being perceived as more unstable, complex, variable, risky, and potentially harmful than Scenario 1. Furthermore, participants described improvements that could be made to create a better user experience. For example, users would like greater configurability of the interface based on their personal information requirements, and they would like the opportunity to review routes before assigning them. The results from this study will inform future development of the FMI with the end goal of creating a reference automation tool for airspace management procedures in AAM. The FMI could be introduced as a potential way to reduce dependency on traditional air navigation services through increased automation in high density vertiplex environments.

vertiplex↗

BioSentinel: Leading the Way for Deep Space CubeSat Missions

Flagship science missions are not alone in Deep Space thanks to BioSentinel, a 6U spacecraft launched on Artemis-1. BioSentinel is one of the longest operating CubeSats beyond cislunar space. The subsystems and COTS components of the BioSentinel bus are a template for future deep space missions, and the lessons learned from over a year of operations will enable improved performance for the next missions. BioSentinel achieved its unprecedented performance for an SLS secondary payload due to preparation, planning, and a robust design. Pre-launch antenna and interface testing with both DSN and ESA confirmed command and data pathways and allowed for operational flexibility in the critical early hours post-deployment. Mission Operations simulations prior to launch identified potential risks and primed operators to respond in flight, preparing the team to react quickly to successfully detumble the spacecraft and enter a power-positive state. The spacecraft would not have survived without the inclusion of the trailblazing 3D-printed composite cold gas propulsion system. The non-standard tank geometry enabled efficient use of the limited space available in the CubeSat, as well as the capability to detumble the spacecraft and manage momentum, while providing sufficient margin to execute potential delta-V maneuvers. The Iris radio has operated for over 18 months with no significant issues. Initial Iris performance estimates have been accurate throughout the mission. BioSentinel continues to collect data on thermal conditions and to validate our performance models with real-world knowledge. We have received exemplary support from our DSN partners. Following the conclusion of the primary science mission, the Linear Energy Transfer (LET) Spectrometer continued to collect solar and galactic radiation data from its location in heliocentric orbit. The free space dataset offered by the BioSentinel LET is a valuable source of data for model validation and future mission planning. As the spacecraft travels farther from Earth it is poised to provide longitudinally distributed measurements of solar particle events during solar maximum. The lessons learned from BioSentinel suggest key areas to enhance performance. The ability to upload modified flight software can increase the stability of memory management. Additional heaters in the propulsion system design have already proven successful on the Starling mission. Streamlining mission operations can reduce costs, increase data return, and better utilize DSN time. Enhancements such as these will facilitate reliable, long-duration deep space exploration using the proven BioSentinel 6U CubeSat bus.

BioSentinel↗

Usability Evaluation of Fleet Management Interface for High Density Vertiplex Environments

To meet the rising demand for an Advanced Air Mobility (AAM) (i.e. urban and rural unmanned aircraft systems) ecosystem, the NASA Aeronautics Research Mission Directorate (ARMD) is hosting a series of simulations and flight tests under the High Density Vertiplex sub-project (HDV) to prototype and study the effectiveness AAM capabilities under various operational contexts. HDV aims to develop an integrated automation architecture to support terminal area flight operations. The HDV simulations and flight tests address safety, integration, and operational challenges, while integrated systems and software demonstrate design readiness, robustness, and interoperability. During the initial HDV simulation in 2021, a prototype traffic management tool developed by NASA called the Fleet Management Interface (FMI) was tested. FMI was designed to introduce an advanced level of human-automation interaction to aid both Ground Control Station Operators (GCSOs) and Fleet Managers (FMs) in remotely managing flights under their ownership. In a human-in-the-loop simulation, a usability study was conducted with the FMI to identify optimal approaches for displaying information to human operators using subjective measures of usability, workload, situation awareness, risk, and trust, along with qualitative feedback. This study consisted of task analysis in which GCSO and FM subjects used an Urban Air Mobility (UAM) environment to develop and execute a plan for two different traffic scenarios of remotely controlled vehicles. In each scenario, a remotely controlled vehicle completed a takeoff, active flight, and landing sequence while simulated traffic flew in the background at a rate of 20 operations per hour. In the first scenario, the controlled vehicle flew a nominal route with takeoff and landing at the same vertiport. In the second scenario, the controlled vehicle started on the nominal route, then diverted to an unplanned location mid-flight. Results showed that self- reported performance, usability, trust, and situation awareness ratings of FMI were moderately to strongly high. There were small differences between scenarios, with Scenario 2 being perceived as more unstable, complex, variable, risky, and potentially harmful than Scenario 1. Furthermore, participants described improvements that could be made to create a better user experience. For example, users suggested customizable interfaces to accommodate information display preferences, and the ability to review routes before assigning them. The results from this study will inform future development of the FMI with the end goal of creating a reference automation tool for airspace management procedures in AAM. The FMI could serve to reduce dependency on traditional air navigation services through increased automation in high density vertiplex environments.

Fleet manager↗

Spacesuit Portable Life Support System Breadboard (PLSS 1.0) Development and Test Results

A multi-year effort has been carried out at NASA-JSC to develop an advanced Extravehicular Activity (EVA) PLSS design intended to further the current state of the art by increasing operational flexibility, reducing consumables, and increasing robustness. Previous efforts have focused on modeling and analyzing the advanced PLSS architecture, as well as developing key enabling technologies. Like the current International Space Station (ISS) Extravehicular Mobility Unit (EMU) PLSS, the advanced PLSS comprises of three subsystems required to sustain the crew during EVA including the Thermal, Ventilation, and Oxygen Subsystems. This multi-year effort has culminated in the construction and operation of PLSS 1.0, a test rig that simulates full functionality of the advanced PLSS design. PLSS 1.0 integrates commercial off the shelf hardware with prototype technology development components, including the primary and secondary oxygen regulators, ventilation loop fan, Rapid Cycle Amine (RCA) swingbed, and Spacesuit Water Membrane Evaporator (SWME). Testing accumulated 239 hours over 45 days, while executing 172 test points. Specific PLSS 1.0 test objectives assessed during this testing include: confirming key individual components perform in a system level test as they have performed during component level testing; identifying unexpected system-level interactions; operating PLSS 1.0 in nominal steady-state EVA modes to baseline subsystem performance with respect to metabolic rate, ventilation loop pressure and flow rate, and environmental conditions; simulating nominal transient EVA operational scenarios; simulating contingency EVA operational scenarios; and further evaluating individual technology development components. Successful testing of the PLSS 1.0 provided a large database of test results that characterize system level and component performance. With the exception of several minor anomalies, the PLSS 1.0 test rig performed as expected; furthermore, many system responses trended in accordance with pre-test predictions.

Vogel, Matt R.↗

A block-corrected subdomain solution procedure for recirculating flow calculations

This paper describes a robust and efficient subdomain solution procedure for two-dimensional recirculating flows. The solution domain is divided into a number of overlapping subdomains, and a direct fully coupled solution is obtained for each subdomain using a sparse matrix form of LU decomposition. An effective parabolic block correction procedure, which calculates global corrections to the tentative solution by a marching technique similar to that used for boundary layer flows, is used to accelerate the convergence of the basic procedure. The use of effective block correction is found to be essential for the success of the subdomain approach on strongly recirculating flows. In a number of laminar two-dimensional flows, the new block-corrected method performed extremely well, rivaling the best direct methods in execution time, while requiring substantially less computer storage. The new method proved to be from two to ten times faster than conventional iterative methods, while requiring only a moderate increase in storage.

Braaten, M. E.↗

United States Control Module Guidance, Navigation, and Control Subsystem Design Concept

Should the Russian Space Agency (RSA) not participate in the International Space Station (ISS) program, then the United States (U.S.) National Aeronautics and Space Administration (NASA) may choose to execute the ISS mission. However, in order to do this, NASA must build two new space vehicles, which must perform the functions that the Russian vehicles and hardware were to perform. These functions include periodic ISS orbit reboost, initial ISS attitude control, and U.S. On-Orbit Segment (USOS) control Moment gyroscope (CMG) momentum desaturation. The two new NASA vehicles that must perform these functions are called the U.S. control module (USCM) and the U.S. resupply module. This paper presents a design concept for the USCM GN&C subsystem, which must play a major role in ISS orbit reboost and initial attitude control, plus USOS CMG momentum desaturation. The proposed concept is structured similar to the USOS GN&C subsystem, by design. It is very robust, in that it allows the USCM to assume a variety of vehicle attitudes and stay power-positive. It has a storage/safe mode that places the USCM in a gravity-gradient orientation and keeps it there for extended periods of time without consuming a great deal of propellant. Simulation results are presented and discussed that show the soundness of the design approach. An equipment list is included that gives detailed information on the baselined GN&C components.

Polites, M. E.↗

Cross Cutting Structural Design for Exploration Systems

The challenge of our new National Space Policy and NASA's Vision for Space Exploration (VSE) is keyed to the development of more effective space access and transportation systems. Optimizing in-space systems through innovative cross cutting structural designs that reduce mass, combine functional requirements and improve performance can significantly advance spacecraft designs to meet the ever growing demands of our new National Space Policy. Dependence on limited structural designs is no longer an option. We must create robust materials, forms, function and evolvable systems. We must advance national policy objectives in the design, development, test and operation of multi-billion dollar new generation crew capsules by enabling them to evolve in meeting the requirements of long duration missions to the moon and mars. This paper discusses several current issues and major design drivers for consideration in structural design of advanced spacecraft systems. Approaches to addressing these multifunctional requirements is presented as well as a discussion on utilizing Functional Analysis System Technique (FAST) in developing cross cutting structural designs for future spacecraft. It will be shown how easy it is to deploy such techniques in any conceptual architecture definition or ongoing preliminary design. As experts in merging mission, safety and life support requirements of the frail human existence into robust vehicle and habitat design, we will conquer the final frontier, harness new resources and develop life giving technologies for mankind through more innovative designs. The rocket equation tells us that a reduction in mass optimizes our propulsive results. Primary and secondary structural elements provide for the containment of gases, fluids and solids; translate and sustain loads/impacts; conduct/radiate thermal energy; shield from the harmful effects of radiation; provide for grounding/bonding of electrical power systems; compartmentalize operational functions; and provide physical interface with multiple systems. How can we redefine, combine, substitute, rearrange and otherwise modify our structural systems to reduce mass? New technologies will be needed to fill knowledge gaps and propagate new design methods. Such an integrated process is paramount in maintaining U.S. leadership and in executing our national policy goals. The cross cutting process can take many forms, but all forms will have a positive affect on the demanding design environment through initial radical thinking. The author will illustrate such cross cutting results achievable through a formal process called FAST. The FAST example will be used to show how a multifunctional structural system concept for long duration spacecraft might be generated.

Semmes, Edmund B.↗

BioSentinel: Forging the path for Deep Space CubeSat Missions

The BioSentinel mission was launched in 2022 aboard the SLS launch vehicle as part of the Artemis-I campaign and continues mission operations into 2024. The 6U CubeSat has been characterizing deep space radiation at large distances from Earth. This presentation gives a status of the mission performance to date, as well as some of the lessons learned from project. BioSentinel has achieved unprecedented performance as an SLS secondary payload due to preparation, planning, and a robust design. Pre-launch antenna and interface testing with both DSN and ESA confirmed command and data pathways and allowed for operational flexibility in the critical early hours post-deployment. Mission Operations simulations prior to launch identified potential risks and trained operators to respond in flight, preparing the team to react quickly and successfully to detumble the spacecraft and enter a power-positive state. The spacecraft would not have survived without the inclusion of the trailblazing 3D-printed composite cold gas propulsion system. The non-standard tank geometry enabled efficient use of the limited space available in the CubeSat form factor as well as the capability to detumble the spacecraft and manage momentum for extended mission durations, while providing sufficient margin to execute potential delta-V maneuvers. Following the conclusion of the primary science mission, the Linear Energy Transfer (LET) Spectrometer has continued to collect solar and galactic radiation data from its unique location in heliocentric orbit. The free space dataset offered by the BioSentinel LET is a valuable source of data for both model validation and future mission planning. As the spacecraft travels farther from Earth it is poised to provide longitudinally distributed measurements of solar particle events during solar maximum. NASA Ames led development of the BioSentinel spacecraft to operate for long durations in deep space. The novel subsystems and COTS components that comprise the BioSentinel bus can serve as a template for future deep space missions, while the lessons the team has learned from well over a year of continuous operations will enable improved performance in the generation of deep space CubeSat missions.

BioSentinel↗

NASA’s Efforts to Pursue Commercial Communications Services for Missions in Near Space

The National Aeronautics and Space Administration (NASA) Space Communications and Navigation (SCaN) Program enables high speed, robust, secure, and cost-effective space communications and navigation services to current and future science and exploration missions. Consistent with National Space Policy, NASA is seeking commercial services for all its future near-Earth requirements by incorporating additional direct to Earth (DTE) providers and introducing commercial satellite relay communications (SATCOM) vendors as NASA’s Tracking and Data Relay Satellites (TDRS) begin to decline. Through the progression of these efforts, SCaN is also integrating commercial services in the cislunar domain. The overarching objective is to satisfy the demands from the mission community – both in terms of capacity and capability – in a robust, reliable, and cost-effective way, leveraging the strong and growing commercial space sector. For near earth space relay, six SATCOM vendors were awarded Funded Space Act Agreements in June of 2022 to demonstrate the ability to serve near-Earth missions with space-based communication relay services. All six vendors are working through their committed milestones with end-to-end service demonstrations tacking place throughout the mid-2020’s. The failure of TDRS Flight-9 (F9) in late 2022 prompted an increased tempo of mission engagement to identify driving user needs that commercial SATCOM can meet in the near-term. NASA has set a course to accelerate a decision to terminate offering TDRS services to new missions and is developing a plan to execute validation and risk reduction efforts with early adopter “pathfinder” missions, paving the way to operational services. As the Artemis Program matures and builds on the successful Artemis I flight in November-December of 2022, the definition of the supporting communications and navigation architecture has further been refined. Although NASA government assets will continue to play a key role in provision of services, such as through the Deep Space Network, SCaN is pursuing commercial services offerings to expand ground network capability and implement lunar relay services. In February of 2023, SCaN released solicitation for services that include DTE services to missions near-Earth and in cislunar space, as well as lunar relay services. Further, SCaN is seeking opportunities to integrate commercial capability into lunar surface communications infrastructure. NASA is also advocating for standards that promote interoperability and strategic technology investments in the commercial sector. This paper addresses the recent progress and future plans in the near-Earth space and lunar regimes, discusses the unified approach for industry engagement, and highlights both the common and unique challenges of commercialization efforts in the two regimes.

commercial services↗

Probabilistic Analysis of Impact of Wake Vortices on Closely-Spaced Parallel Approaches

One of the primary constraints on the capacity of the nation's air transportation system is the landing capacity of its largest airports. Many airports with closely spaced parallel runways suffer a severe runway acceptance rate when the weather conditions do not allow full utilization of these parallel runways. The present requirement for simultaneous independent landings in Instrument Meteorological Conditions, IMC, is at least 4300 feet of lateral runway spacing (as close as 3000 feet for runways with a Precision Runway Monitor). Operations in Visual Meteorological Conditions, VMC, to Closely Spaced Parallel Approaches only require a lateral runway spacing greater than 750 feet. A study by Hardy and Lewis integrated and extended earlier studies and concepts in lateral traffic separation, longitudinal station keeping, wake prediction, wake display, and the concepts of R N P into a preliminary system concept for Closely Spaced Parallel Approaches in IMC. This system allows IMC airport acceptance rates to approach those for VMC. The system concept that was developed, presented traffic and wake information on the NAVigation Display, NAV, and developed operational procedures for a mix of conventional and Runway Independent Aircraft with different approach speeds to Closely Spaced Parallel Runways. This paper first describes some improvements made on the technology needed to better predict and formulate a probabilistic representation for the time-dependent motion and spreading of the hazardous region associated with the lift-generated vortex wakes of preceding aircraft. In this way, the time at which the vortex wakes of leading aircraft intrude into the airspace of adjacent flight-corridor/runway combinations can be more reliably predicted. Such a prediction is needed because it determines restraints to be placed on in-trail separation distances; or, the allowable time intervals between aircraft executing nearly simultaneous landings or takeoffs on very closely-spaced runways. Improved estimates of wake spreading are achieved by inclusion of representations in the equations for wake spreading due to ambient turbulence and due to the long-wave instability of a vortex pair. Wake motion and spreading due to the time-averaged wind and its variations with time, are retained. The more detailed representation of wake spreading presented here permits the development of probabilistically-based uncertainty estimates for wake spreading. Measurements needed within actual aircraft wake vortices to validate and support this analysis are also described. The second part of the paper uses the improvements in the accuracy of the location of wake vortices to extend the preliminary system concept for Closely Spaced Parallel Approaches described earlier with more robust operational procedures. Additionally, improvements in longitudinal station keeping, wake display, and risk assessment methodologies are incorporated and described.

Hardy, Gordon H.↗

TAMU: Blueprint for A New Space Mission Operations System Paradigm

The Transferable, Adaptable, Modular and Upgradeable (TAMU) Flight Production Process (FPP) is a System of System (SOS) framework which cuts across multiple organizations and their associated facilities, that are, in the most general case, in geographically disperse locations, to develop the architecture and associated workflow processes of products for a broad range of flight projects. Further, TAMU FPP provides for the automatic execution and re-planning of the workflow processes as they become operational. This paper provides the blueprint for the TAMU FPP paradigm. This blueprint presents a complete, coherent technique, process and tool set that results in an infrastructure that can be used for full lifecycle design and decision making during the flight production process. Based on the many years of experience with the Space Shuttle Program (SSP) and the International Space Station (ISS), the currently cancelled Constellation Program which aimed on returning humans to the moon as a starting point, has been building a modern model-based Systems Engineering infrastructure to Re-engineer the FPP. This infrastructure uses a structured modeling and architecture development approach to optimize the system design thereby reducing the sustaining costs and increasing system efficiency, reliability, robustness and maintainability metrics. With the advent of the new vision for human space exploration, it is now necessary to further generalize this framework to take into consideration a broad range of missions and the participation of multiple organizations outside of the MOD; hence the Transferable, Adaptable, Modular and Upgradeable (TAMU) concept.

Ruszkowski, James T.↗

Maturation of Dynamic Power Convertors for Radioisotope Power Systems

Dynamic Radioisotope Power Systems (DRPS) are being developed by NASA's RPS Program in collaboration with the U.S. Department of Energy (DOE) for space science and exploration missions. A development effort is currently underway to mature dynamic power convertors for infusion into a potential future flight generator. This convertor maturation effort was formulated by the RPS Program at NASA Headquarters based on successful maturation models and utilizes expertise from agency technology and mission centers to support requirements development and technology assessments. The effort is being executed by Glenn Research Center's Dynamic Radioisotope Power Systems (DRPS) project and the Thermal Energy Conversion Branch. The Dynamic Power Convertor (DPC) contracts consist of three phases to enable design, fabrication, and independent assessment after delivery to the government. The contracts are intended to gather data on candidate dynamic conversion technologies to fill knowledge gaps, support assessments of dynamic conversion technologies, and elicit generator requirements. The SRG-110 (Stirling Radioisotope Generator) and ASRG (Advanced Stirling Radioisotope Generator) flight development projects provided Stirling convertor demonstration units and engineering models to verify and validate convertors against performance specifications and mission requirements. These units utilize temperature resistance materials and non-contacting bearings to demonstrate wear-free, long-life operation. This maturation effort builds on past lessons learned and new requirements focused on demonstrating convertor robustness to critical environments meant to stress key aspects of each convertor within the margins of the design. This effort seeks to realize the full potential of dynamic power conversion technologies for NASA's space science and exploration missions.

Wilson, Scott↗

Lila: Optimal Dispatching in Probabilistic Temporal Networks using Monte Carlo Tree Search

Executing a Probabilistic Simple Temporal Network (PSTN) amounts at scheduling, i.e. \textit{dispatch}, a set of events under time uncertainty. This constitutes a NP-hard online optimization problem. The right execution time must be dynamically assigned to each event of the PSTN such that the temporal constraints are met, whereas activity durations are progressively observed as the execution unfolds. We propose a dispatching algorithm based on Monte Carlo Tree Search, called Lila, with the following characteristics: (i) it is an anytime algorithm, both offline and online, proven asymptotically optimal; (ii) it returns the current probability of success, either before or at any moment during operations; (iii) it handles any possible continuous or discrete, even non-parametric, probability distributions, as well as inter-dependencies between random variables, exogenous and endogenous uncertainty; and (iv) can be easily extended to handle probabilistic external events, PSTNs with resources, PSTNs with cutoff times and precondition chains, etc. Lila is universal in the sense that it can handle any dispatching protocol, simply by specifying it to the algorithm. It has the unlimited flexibility offered by the simulation paradigm, whilst it asymptotically converges to optimal decisions and/or robustness approximations.

Chien, Steve A.↗

Characteristics of a high-power ion beam deflection system necessary to deflect the hypothetical asteroid 2017 PD

The July 2027 impact date for the hypothetical asteroid 2017 PDC, that is the subject of an emergency response exercise, leaves just over ten years to implement a deflection approach. The analyses herein allocates four years to the design, fabrication, assembly, test and launch of a notional high-power Ion Beam Deflection (IBD) vehicle to meet a launch readiness date no later than May 2021. Using this launch date along with estimates for the vehicle mass and performance characteristics of the electric propulsion system, low-thrust trajectory analyses indicate a 2.56-year flight time to rendezvous with 2017 PDC. This would leave 3.6 years to execute the actual deflection phase. A 160-kW IBD vehicle could deflect 2017 PDC by at least one Earth radius within this time provided the asteroid’s actual diameter was less than about 140 m and its density was 2 g/cm3 or less. Larger diameters and/or higher densities would require a higher power IBD vehicle, multiple IBD vehicles, or a longer deflection phase. Ion beam deflection is largely independent of the characteristics of the threat object, but its effectiveness, like all deflection approaches, is sensitive to both the asteroid mass and the time available for deflection. The characteristics of IBD, i.e., large standoff distance between the spacecraft and the asteroid surface, as well as ion beam divergence angles of a few degrees, facilitates the possible simultaneous use of multiple IBD vehicles to improve the performance and robustness of the asteroid deflection. The 65-cm diameter, 20-kW NEXIS ion thruster developed in support of the Jupiter Icy Moons Orbiter mission concept is particularly well suited for application to a high-power IBD system. It has demonstrated an ion beam divergence angle of approximately 2 degrees and operation at 20 kW for over 2,000 hours. Completion of the development and flight qualification of this technology would significantly reduce the risk and time necessary to respond to the discovery of potentially hazardous asteroid in the size range of 50- to 100-m diameter.

Reeves, David↗

Maturation of Dynamic Power Convertors for Radioisotope Power Systems

Dynamic Radioisotope Power Systems (DRPS) are being developed by NASA’s Radioisotope Power Systems (RPS) Program in collaboration with the U.S. Department of Energy (DOE) for space science and exploration missions. A development effort is currently underway to mature dynamic power convertors for infusion into a potential future flight generator. This convertor maturation effort was formulated by the RPS Program at NASA Headquarters based on successful maturation models and utilizes expertise from agency’s technology and mission centers to support requirements development and technology assessments. The effort is being executed by Glenn Research Center’s (GRC) DRPS Project and the Thermal Energy Conversion Branch. The Dynamic Power Convertor (DPC) contracts consist of three phases to enable design, fabrication, and independent assessment of prototypes after delivery to the government. The contracts are intended to gather data on candidate dynamic conversion technologies to fill knowledge gaps, support assessments of dynamic conversion technologies, and elicit generator requirements. The 110-watt Stirling Radioisotope Generator (SRG-110) and Advanced Stirling Radioisotope Generator (ASRG) flight development projects provided Stirling convertor demonstration units and engineering models to verify and validate convertors against performance specifications and mission requirements. These units utilize temperature resistant materials and non-contacting bearings to demonstrate wear-free, long-life operation. This maturation effort builds on past lessons-learned and new requirements focused on demonstrating convertor robustness to critical environments meant to stress key aspects of each convertor within the margins of the design. This effort seeks to realize the full potential of dynamic power conversion technologies for NASA’s space science and exploration missions.

Wilson, Scott↗

Spaceborne Autonomous and Ground Based Relative Orbit Control for the TerraSAR-X/TanDEM-X Formation

TerraSAR-X (TSX) and TanDEM-X (TDX) are two advanced synthetic aperture radar (SAR) satellites flying in formation. SAR interferometry allows a high resolution imaging of the Earth by processing SAR images obtained from two slightly different orbits. TSX operates as a repeat-pass interferometer in the first phase of its lifetime and will be supplemented after two years by TDX in order to produce digital elevation models (DEM) with unprecedented accuracy. Such a flying formation makes indeed possible a simultaneous interferometric data acquisition characterized by highly flexible baselines with range of variations between a few hundreds meters and several kilometers [1]. TSX has been successfully launched on the 15th of June, 2007. TDX is expected to be launched on the 31st of May, 2009. A safe and robust maintenance of the formation is based on the concept of relative eccentricity/inclination (e/i) vector separation whose efficiency has already been demonstrated during the Gravity Recovery and Climate Experiment (GRACE) [2]. Here, the satellite relative motion is parameterized by mean of relative orbit elements and the key idea is to align the relative eccentricity and inclination vectors to minimize the hazard of a collision. Previous studies have already shown the pertinence of this concept and have described the way of controlling the formation using an impulsive deterministic control law [3]. Despite the completely different relative orbit control requirements, the same approach can be applied to the TSX/TDX formation. The task of TDX is to maintain the close formation configuration by actively controlling its relative motion with respect to TSX, the leader of the formation. TDX must replicate the absolute orbit keeping maneuvers executed by TSX and also compensate the natural deviation of the relative e/i vectors. In fact the relative orbital elements of the formation tend to drift because of the secular non-keplerian perturbations acting on both satellites. The goal of the ground segment is thus to regularly correct this configuration by performing small orbit correction maneuvers on TDX. The ground station contacts are limited due to the geographic position of the station and the costs for contact time. Only with a polar ground station a contact visibility is possible every orbit for LEO satellites. TSX and TDX use only the Weilheim ground station (in the southern part of Germany) during routine operations. This station allows two scheduled contact per day for the nominal orbit configuration, meaning that the satellite conditions can be checked with an interval of 12 hours. While this limitation is usually not critical for single satellite operations, the visibility constraints drive the achievable orbit control accuracy for a LEO formation if a ground based approach is chosen. Along-track position uncertainties and maneuver execution errors affect the relative motion and can be compensated only after a ground station contact.

Ardaens, J. S.↗

Gravity Recovery and Interior Laboratory Mission (GRAIL) Orbit Determination

Launched on 10 September 2011 from the Cape Canaveral Air Force Station, Florida, the twin-spacecraft Gravity Recovery and Interior Laboratory (GRAIL) has the primary mission objective of generating a lunar gravity map with an unprecedented resolution via the Ka-band Lunar Gravity Ranging System (LGRS). After successfully executing nearly 30 maneuvers on their six-month journey, Ebb and Flow (aka GRAIL-A and GRAIL-B) established the most stringent planetary formation orbit on 1 March 2012 of approximately 30 km x 90 km in orbit size. This paper describes the orbit determination (OD) filter configurations, analyses, and results during the Trans-Lunar Cruise, Orbit Period Reduction, and Transition to Science Formation phases. The maneuver reconstruction strategies and their performance will also be discussed, as well as the navigation requirements, major dynamic models, and navigation challenges. GRAIL is the first mission to generate a full high-resolution gravity field of the only natural satellite of the Earth. It not only enables scientists to understand the detailed structure of the Moon but also further extends their knowledge of the evolutionary histories of the rocky inner planets. Robust and successful navigation was the key to making this a reality.

Orbit Period Reduction (OPR)↗

On the Probabilistic Analysis of Neural Networks

Neural networks are powerful tools for automated decision-making,seeing increased application in safety-critical domains, such as autonomous driving. Due to their black-box nature and large scale,reasoning about their behavior is challenging. Statistical analysis is often used to infer probabilistic properties of a network, such as its robustness to noise and inaccurate inputs. While scalable, statistical methods can only provide probabilistic guarantees on the quality of their results and may underestimate the impact of low probability inputs leading to undesired behavior of the network.We investigate here the use of symbolic analysis and constraint solution space quantification to precisely quantify probabilistic properties in neural networks. We demonstrate the potential of the proposed technique in a case study involving the analysis of ACAS-Xu, a collision avoidance system for unmanned aircraft control.

neural nets↗