242 records · Page 14

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Chelation ion chromatography as an automated, and cost-effective analytical technique for REE determination: method development and applications

Rare earth elements (REEs), as critical minerals, have important uses in modern energy and technologies, yet are vulnerable to potential supply chain disruptions. To establish domestic REE supply chain, efficient REE detection methods for resource characterization and mineral processing will be needed to accelerate innovations for domestic REE recovery. This study developed a rapid, novel, and cost-effective for REE detection method using ion chromatography (IC) for aqueous samples. Various REE-targeted eluent gradients and post-column agent compositions were tested on the chelation ion chromatography (CIC) with UV-vis detector for optimal separation and quantification of REEs within approximately 20 min. The single-channel pump to deliver the post-column solution to UV-vis detector was replaced with a 4-channel gradient pump, to increase operation and maintenance efficiencies. After method optimization, resulting calibration curves for more than ten REEs achieved high coefficients of determination (R2>0.999) and low relatively standard deviations (below 3.24%), demonstrating sub-ppm level detection limits (0.0897 to 0.1149 mg/L). The reliability of the CIC method was validated through comparison with inductively coupled plasma mass spectrometry (ICP-MS), showing strong agreement in REE recovery from certified standards. The impact of metal ions and salts on REE recovery using CIC was also systematically investigated. CIC consistently exhibited reliable performance in the presence of salt solutions such as NaCl and Na₂SO₄ (up to 10,000 mg/L). Our study also found the presence of high concentrations of Al ions (at 10,000 mg/L) significantly influenced REE determination, and elevated concentrations of Ca ions affected the recovery of specific REEs, including La, Ce, and Pr. The CIC method was further tested on REE-containing eluents from solvent extraction tests out of fly ash leachates. REE detection from these real processing fluids were reported to achieve 90% to 100% recovery rate from our IC method, compared to ICP-MS results. This study underscores the potential of CIC as a reliable and efficient alternative for REE determination in complex matrices. It also highlights the importance of minimizing select interfering metal ions in solutions to ensure accurate results. The REE CIC method presents a promising, low-maintenance, salt-tolerant, and cost-effective alternative to traditional analytical methods for REE analysis.

detection of rare earth elements (REE)↗

Printable Fiber Reinforced Cement Composites – Feasibility Study

Additive manufacturing is enabling the manufacturability of structures with previously unattainable complexity or functionality, and there is growing interest in additive manufacturing of “printed” concrete structures. The focus of this Phase 1 Technical Collaboration (TC) project was to evaluate feasibility of printing hybrid cement composite structures reinforced with textile carbon fibers (tCF). This project leverages other (non-IACMI) projects on cement formulation and printing process development, as well as on the production process for tCF. This project’s primary focus was to explore cement composite mix design with textile carbon fibers to be manufactured by MonteFibre (TC partner) and evaluate suitable fiber-matrix interface or sizing for cement composites working with Michelman (TC Partner). This project supports IACMI’s goal of reducing the cost and embodied energy of carbon fiber composites. Cost is one of the fundamental challenges to carbon fiber reinforced cement composites. Cement is an extremely inexpensive material (approximately $\$$0.05/lb). Adding 1 wt% of conventional carbon fiber to cement quadruples its cost. Therefore, the need to use low-cost carbon fiber and ensure that the additional cost of the carbon fiber has a greater cost benefit to the final product. This was the first preliminary evaluation to integrate tCF reinforcement in cement composites, and such potential tCF utilization should significantly reduce materials cost. Cement composite production is energy and emissions intensive, thus by strengthening it less material will be required. Hence, the embodied energy and production time of the resulting structures will be reduced. Additionally, integrating these new materials into additive processes can enable selective use of the material in high load or stress areas. It is noteworthy that past work in this field of fiber reinforced cement composites did not consider the optimization of fiber-matrix interface using suitable sizing. Carbon fiber reinforcement offers potential added benefits of thermal conductivity (which affects cure rate) and flow behavior that could provide opportunities for site specific utilization of carbon fiber on hybrid cement structures (e.g. use the fiber reinforcement on outer surfaces to enhance strength and modulus and then infiltrating the internal structures with conventional concrete). MonteFibre was the industry lead and planned on supplying the tCF for this project. However, during the short Phase-1 duration of this project, MonteFibre was unable to produce tCF for this project due to manufacturing plant being off-line throughout the course of the project. The project team decided to pursue an alternate option which involved demonstrating printable concrete with steel fibers by the ORNL lead, Dr. Brian Post. The University of Tennessee collaboration team focused on evaluating the suitable chemical sizing for carbon fibers working with Michelman and also developed methods for material characterization of cement-based composites to evaluate the material response for compression, shear, flexure, and tension. The two milestones for University of Tennessee, Knoxville were realized related to identification of one sizing suitable for carbon fiber reinforced cement composite and developing data associated with mechanical behavior of unreinforced (neat) and carbon fiber reinforced cement composites. ORNL could not complete the task of carbon fiber reinforced printed cement composites due to the reasons mentioned earlier, but was able to replace tCF with steel fibers to demonstrate the feasibility of printing with fiber reinforced cement composites. The Project team reviewed possible sizing chemistry available in collaboration with Michelman for use on carbon fiber reinforcement in cement composites and concrete applications. Our initial goal was to identify a sizing most promising for formulation with textile carbon fibers (tCF) to deliver excellent mechanical properties in composite material state. Since tCF was not available for this project as originally envisioned, the team continued this task to identify a suitable sizing for carbon fiber applications by applying such sizing to lower cost carbon fibers currently available commercially from Zoltek called Panex fibers. At a future time this can be optimized for textile carbon fibers from Montefibre. The bulk of previous work on carbon fiber reinforced cement has neglected the importance of fiber-matrix adhesion on mechanical properties of the cement composite and identifying this missing link was an important accomplishment for future research. Tensile behavior of fiber reinforced concrete is important to evaluate in order to realize the dream of concrete products that do not need reinforcing steel. Important sample preparation and testing procedures were addressed in this study and it was concluded that substantial improvements in tensile behavior, without compromising compressive strength, and improved ductility can result from the use of carbon fiber reinforcement.

36 MATERIALS SCIENCE↗

Utilizing Commercial Submersible Mixer Pumps for Sludge Removal in Savannah River Site's Tank 26 - 20289

The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Determining the Effects of Neutron Irradiation on the Structural Integrity of Additively Manufactured Heat Exchangers for Very Small Modular Reactor Applications, DOE Final Report (Project # 19-16980)

Auburn University (AU) teamed with the University of Missouri Research Reactor (MURR) and Kansas State University (KSU) to determine how to best use laser-powder bed fusion (L-PBF) additive manufacturing (AM) methods for generating radiation resistant nickel-based superalloys, Inconel alloy 625 and 718, for special purpose reactor (SPR) or very small modular reactor (vSMR) heat-exchangers (HeXs). Compact, conformal, and durable HeXs that are tolerant of extreme environments are needed for supporting the technical maturity of next-generation, portable compact reactors. AM is an enabler for realizing this new wave of HeXs – providing a means to make customizable hot and cold stream architectures with novel flow path geometries (e.g., tortuous channels with non-uniform, asymmetric cross-sections) and reduced layer-to-layer contact resistance (i.e., no separate bonding procedure required). AM further enables a more time/cost efficient means for fabricating SPRs by reducing the number of suppliers required for HeX assembly and allowing for on-site HeX fabrication. The project aim has been to better understand how neutron irradiation affects the microstructure and properties of additively manufactured nickel-based superalloys, to accelerate their safe, reliable use in the modular reactor industry. The major objective was to qualify/quantify the microstructure and microhardness of nickel-based superalloys (including Inconel 718 and 625) additively manufactured via the L-PBF process in the neutron-dosed (irradiated) and non-irradiated states over a course of 3 years. Effects of build orientation during L-PBF and post-AM heat treatments on neutron resistance, microstructure and mechanical properties were also investigated. Neutron damage mechanisms via hardening were characterized. This project combined subject-matter experts in AM, mechanical/microstructure metallic part characterization, and neutron irradiation, as well as unique assets and capabilities at AU and MURR at MU, to ensure project results translated to effectively addressing known gaps in nuclear science and engineering. Parts were fabricated using L-PBF systems readily available at AU. Specimens were then irradiated using MURR facilities; a manipulator equipped hot cell was also used to measure material hardness after dosing. MURR, a 10 MW, light-water nuclear reactor, is the largest, highest powered, highest-flux university owned research reactor in the U.S. The major findings in this project provide evidence that AM can serve as an alternative way to build structural components for future advanced small modular reactors using advanced materials like Inconel 625 (IN625) or Inconel 718 (IN718). After full spectrum neutron irradiation, vertically as-built AM IN625 samples were observed to display better resistance towards radiation-induced-hardening defects relative to traditionally machined metals. A Vickers microhardness tester, using settings of 1 kgf and dwell time of 15 seconds per indentation, was used to measure hardness in this study. The as-built, vertically printed samples experienced 1.2% of radiation hardening vs. 5.25% radiation hardening observed in wrought IN625. Another set of IN625 and IN718 samples were exposed to fast neutron irradiation. It was observed that IN718 showed more resistance towards radiation hardening compared to IN625 samples indicating IN718 had a better performance. Results showed that the IN718 samples experienced less change (-2.5 to 3.24 %) in microhardness. On the other hand, IN625 samples underwent more (0.9 to 7.21%) change in microhardness after fast neutron irradiation. AM IN625 samples were irradiated using an ion (proton) beam in cyclotron. The mechanical properties of AM samples post irradiation were compared with wrought samples. The irradiated region on the samples were tested using nano-hardness indention. It was observed that the beam current and time used in this study generated an annealing effect and thus reduced the hardness of the samples. The sum of the project results provide precious insight into how one may minimize radiation hardening in AM materials while maintaining material property constraints. Results should assist engineers in selecting an appropriate heat treatment for AM nickel-based superalloys for increased radiation resistance. Results should increase confidence levels for adopting AM for building nuclear reactor components which perform the same or better than conventionally manufactured components. Fast neutron irradiation testing provided an accelerated means of obtaining radiation effects without making materials radioactive and difficult to handle.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Oxidation of Glycolate in the Defense Waste Processing Facility (DWPF) Recycle Collection Tank - 20305

The Savannah River Site's Defense Waste Processing Facility (DWPF) operations are being upgraded with the introduction of the Nitric-Glycolic Flowsheet. Glycolic acid has been shown superior to formic acid as the reducing acid used during chemical processing. The new flowsheet improves or maintains necessary parameters such as 1) reduction of mercury, 2) adjustment of feed rheology and 3) adjustment of melter oxidation/reduction potential. Further, the potential for catalytic hydrogen generation in DWPF processing is virtually eliminated. DWPF process condensates are collected and returned to the SRS Concentration, Storage and Transfer Facilities (CSTF). The Recycle Collection Tank (RCT) collects off-gas condensate during chemical processing, vitrification, and other unit operations performed in DWPF and is the singular return vessel delivering recycle effluent back to CSTF. Each batch of recycle may contain a small amount of glycolate from chemical processing and melter off-gas condensates. To avoid potential flammability issues due to thermolysis of glycolate in the CSTF, chemical oxidation within the RCT has been investigated as an option for mitigating the transfer of glycolate. Sodium permanganate has been down-selected as the best option for oxidation of glycolate. Testing was performed using both 2-L and 22-L reactors (16,800:1 and 1,530:1 scale by volume) with non-radioactive waste simulants to approximate the expected RCT compositions. RCT simulants were evaluated at various process pH and temperature conditions. Also, RCT operations, namely the sequence of addition of corrosion inhibitors (NaOH and NaNO{sub 2}) versus a permanganate strike, were evaluated. Glycolate was introduced via a sludge simulant to mimic both expected entrainment and abnormal process foam-over conditions - the range being between 68 and 5100 mg/kg glycolate. Glycolate destruction was monitored by ion chromatography (IC). The corresponding manganese behavior was monitored in real-time using in situ ultraviolet-visible (UV-Vis) spectroscopy. RCT glycolate content can be reduced to below the IC detection limit within 90 minutes for all concentrations investigated. Ion Chromatography analysis revealed that under alkaline conditions, glycolate is primarily oxidized to oxalate with no significant formation of CO{sub 2} or carbonate, and nitrite is not oxidized to nitrate. Initially, complete oxidation of organics species and nitrite was assumed. Determination of the mechanistic chemical reaction has allowed the required amount of permanganate to be more accurately predicted and the total addition to be significantly reduced. UV-Vis measurements reveal that permanganate (Mn{sup 7+}) is reduced to manganate (Mn{sup 6+}) in the RCT. The oxidant stoichiometry is defined by using the initial permanganate to glycolate (P/G) molar ratio. At low initial glycolate concentration (68 and 140 mg/kg), the minimum required initial permanganate to glycolate (P/G) molar ratio was found to be 5-6. With high initial glycolate concentrations (5100 mg/kg) a lower (P/G) molar ratio of ∼2.5 was needed. The final portion of this effort supporting the nitric/glycolic flowsheet will be to test actual (fully radioactive) RCT samples as per the above simulant tests. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data and scripts associated with “Non-random processes impacting organic matter chemistry are maximized in mid-order streams”

NOTE: The manuscript associated with this data package is currently in review. The data may be revised based on reviewer feedback. Upon manuscript acceptance, this data package will be updated with the final dataset and additional metadata. This data package is associated with the publication “Non-random processes impacting organic matter chemistry are maximized in mid-order streams” submitted to Limnology and Oceanography (L&O) by Danczak et al. (in review). This package contains data and scripts used to investigate dissolved organic matter (DOM) molecular chemistry and diversification processes across 47 surface-water sampling sites in the Yakima River Basin, Washington, USA, during an August 2021 sampling campaign. The package contains analyses of ultrahigh-resolution Fourier transform ion cyclotron resonance mass spectrometry (FTICR-MS), geochemical measurements, geospatial attributes, molecular diversity, and meta-metabolome ecological null models needed to reproduce the main manuscript results. The underlying field data were pulled from exising data packages at https://doi.org/10.15485/1892052 (Fulton et al., 2022) and https://doi.org/10.15485/1898914 (Grieger et al., 2022). For details on how to navigate data packages generated by this project, see https://data.ess-dive.lbl.gov/portals/PNNLRiverCorridorSFA/About. We thank the following organizations for providing access to field locations for sample collection: the United States Forest Service, Washington Department of Fish and Wildlife, Washington Department of Natural Resources, the Confederated Tribes and Bands of the Yakama Nation, and the Cowiche Canyon Conservatory. Research was conducted under Washington State Parks and Recreation Commission Scientific Research Permit #210901. We are grateful to the Yakama Nation Tribal Council and Yakama Nation Fisheries for their collaboration in facilitating sample collection and ensuring data usage aligns with their values and worldview. This data package contains an R-Markdown file for analyses and five folders: (1) Data, (2) Geospatial Data, (3) Supplemental_Files, (5) Figures_pdf, (4) and src. The Data folder contains tabular inputs and derived files used in the manuscript analysis. The Geospatial Data folder contains climate and water-balance, hydrologic, land-cover, population/regional water-use, stream, topographic, and stream-order attribute CSV files. The src folder contains scripts used to process data, run analyses, and generate figures. The Figures_pdf folder contains manuscript figure outputs. The Supplemental_Files folder contains supplemental analysis products. All files are .csv, .pdf, .html, .png, .R, .Rmd, .svg, or .tre. This data package is associated with the rcfsa-RC2-SPS_Null_Modeling repository found at https://github.com/river-corridors-sfa/rcfsa-RC2-SPS_Null_Modeling.

54 ENVIRONMENTAL SCIENCES↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗