Search NASA⌕ Search

SEARCH · Search NASA

Results for “site assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Hazards and Probabilistic Risk Assessments of Advanced Nuclear Reactors Coupled with Industrial Facilities

This report provides a roadmap and tool kit for site specific risk assessments across a broad range of industrial customers co-located with advanced nuclear power plants (ANPP) that are not currently built and operating in the U.S. This report builds upon the body of work sponsored by the Department of Energy (DOE) Integrated Energy Systems Pathway that has produced industrial requirements studies and techno-economic assessments on the topics of feasibility of ANPP supported industrial processes. This report also leverages the DOE Light Water Reactor Sustainability (LWRS) program that has presented hazards assessment and generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors (LWRs) co-located with hydrogen production facilities. Many of the hazard assessments and risk assessments performed for the LWRS report are agnostic to whether the nuclear reactor is an ANPP or were adapted to the ANPP focus. The report performs hazards assessments to include industrial facilities: an oil refinery, a methanol plant, a synthetic fuel (synfuel) plant, the production of synthetic gas (syngas) as part of the methanol and synfuel plants, wood pulp and paper mills, and hydrogen production. Hydrogen production facilities are assessed in depth through prior reports in the LWRS program and the results are leveraged in this report. All these facilities are specified through industrial process and requirements research performed by national laboratories, universities, and interaction with industry. Many of the processes used in this report are pre-conceptual designs to use for decarbonization of the current technology facilities. A process of failure modes and effects analysis (what can go wrong) and accidentology (what has historically gone wrong) was used to determine the hazards presented to the nuclear power plant by the addition of the HES and the industrial customer. Chemical properties of feedstocks and products are summarized as part of the hazards assessment. Example analysis procedures are provided for each of the hazard types identified. These deterministic analyses can be used to assess adherence to licensing criteria. They can also be used to meet other safety goals like protection of the public, workers, or industrial facility equipment. A modular high temperature gas-cooled reactor (MHTGR) PRA only existing on paper was modeled and verified in modern PRA software. This will provide a tool for representative ANPP probabilistic analyses for future research.

10 SYNTHETIC FUELS↗

Preliminary Approach to Assess the Seismic Hazard on a Lunar Site

The passive seismic network deployed on the Moon during the Apollo missions operated for eight years and allowed the observation of seismic activity. More than 12500 seismic events were registered, where 28 were classified as shallow moonquakes with moment magnitudes up to 4.1. Seismic events of this nature pose a significant risk to future long-term lunar habitats; thus, these events must be carefully studied and considered in the seismic design of these structures. This paper proposes a preliminary seismic hazard assessment imposed by shallow moonquakes. The hazard assessment is performed using the Probabilistic Seismic Hazard Analysis (PSHA) methodology, considering previous studies and theories regarding the seismic environment of the Moon. The study zone covers ~860 km2 of the Taurus-Littrow Valley, containing the Apollo 17 landing site and the Lee-Lincoln lobate scarp as the considered seismic source. The seismic hazard is quantified in terms of peak ground acceleration (PGA) and spectral acceleration (5% damped pseudo-acceleration, PSA). Seismic hazard deaggregation scenarios, Uniform Hazard Spectra (UHS) for different hazard levels, and a Conditional Mean Spectrum (CMS) for a target period of 0.2 s are obtained to quantify the seismic hazard on a specific site on the Moon. The developed seismic hazard assessment provides a preliminary approach for realistic scenarios to conduct structural designs that ensure the seismic performance of fully operational long-term lunar structures.

Moonquake↗

Low Temperature CO 2 Hydrogenation on Unsupported Mo 2 C Catalysts

CO 2 hydrogenation to methanol, a key reaction for decarbonizing the fuel and chemical industries, requires catalyst formulations that hydrogenate CO 2 selectively to methanol at temperatures where methanol conversion is not significantly equilibrium limited (<423 K). Herein we report continuous CO 2 hydrogenation at low temperatures (348-408 K, H 2 /CO 2 = 0.1-50, 5-35 bar) with high selectivity to methanol (up to ca. 80%) over unsupported β-Mo 2 C catalysts. Active site density quantification via titration with trifluoroacetic acid at reaction temperatures enables an assessment of site-specific rates. Methanation and reverse water gas shift (RWGS) occur concurrently with methanol synthesis during CO 2 hydrogenation over Mo 2 C. Reaction pathway analysis, product cofeeds, and reversibility formalisms show that all products form through primary reaction pathways from CO 2 , but secondary reactions of CO contribute significantly to rates of methanation. Dependences of forward rates on reactant and product concentration determined by independently varying the CO 2 , H 2 , CO, H 2 O, CH 3 OH, and CH 4 pressure in conjunction with reversibility formalisms reveal that all products form through H-assisted CO 2 activation and involve partially hydrogenated CO 2 -derived intermediates. Here, these inferences were verified by quantitative agreement between measured site-time yields and site-time yields predicted by closed form kinetic rate expressions in an integral reactor model over widely varying conditions (85-2000 kPa H 2 , 80-1500 kPa CO 2 , 0-45 kPa H 2 O, 0-21 kPa CO, 0-25 kPa CH 3 OH, 0-75 kPa CH 4 , 5-87 mol Mo s s mol CO 2 -1 ). Coverages calculated based on the kinetic model reveal that the Mo 2 C surface is covered with bidentate CO- and CO 2 -derived intermediates of the stoichiometry H 2 CO 2 and H 2 CO, indicating that H 2 and CO x do not compete for surface occupancy but instead adsorb cooperatively to form partially hydrogenated intermediates. Hydrogenation of the CO-derived H 2 CO** intermediate favors methanation, while hydrogenation of CO 2 -derived H 2 CO 2 ** favors methanol synthesis. Together, these findings demonstrate the ability of unsupported Mo 2 C to catalyze the hydrogenation of CO 2 to methanol at low temperatures and provide insight into the reaction network and mechanisms involved in its formation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Hazards and Probabilistic Risk Assessments of a Light-Water Reactor Coupled with Industrial Facilities

This report provides a roadmap and toolkit for site-specific risk assessments across a broad range of industrial customers co-located with nuclear power plants (NPPs). This report builds upon the body of work sponsored by the Department of Energy (DOE) Light-Water Reactor Sustainability (LWRS) Flexible Plant Operation and Generation Pathway that presented hazards assessment and generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors co-located with hydrogen production facilities. The report expands the hazards assessments to include other industrial facilities: an oil refinery, a methanol plant, a synthetic fuel (synfuel) plant, the production of synthetic gas (syngas) as part of the methanol and synfuel plants, and wood pulp and paper mills. All these facilities are specified through industrial process and requirements research performed by national laboratories, universities, and interaction with industry. Many of the processes used in this report are pre-conceptual designs to use for decarbonization of the current technology facilities. A process of failure modes and effects analysis (what can go wrong) and accidentology (what has historically gone wrong) was used to determine the hazards presented to the NPP by the addition of the HES and the industrial customer. Chemical properties of feedstocks and products are summarized as part of the hazards assessment. Example analysis procedures are provided for each of the hazard types identified. These deterministic analyses can be used to assess adherence to licensing criteria. They can also be used to meet other safety goals like protection of the public, workers, or industrial facility equipment. The probabilistic analysis consisted of three sizes of HESs modeled in a PRA to assess the impact on the initiating events (IE) and results of the PRA. The PRA results conclude that the resulting increases in IE frequencies are below the limits required for small changes to existing NPPs under 10 CFR 50.59.

08 HYDROGEN↗

Managed aquifer recharge as a strategy to redistribute excess surface flow to baseflow in snowmelt hydrologic regimes

Water management in snowmelt hydrologic regimes, characterized by large annual fluctuations in stream flow driven by seasonal snow melt, faces the challenge of highly variable supply that often does not align with timing of demand. Climate change may exacerbate management challenges by significantly reducing snowpack or shifting snow melt earlier. Here, managed aquifer recharge (MAR) is evaluated as a potential strategy to reallocate excess early-season stream flow to time periods when less surface water is available. This strategy differs from traditional MAR, where the goal is to minimize loss to surface water. We assess how to site MAR operations such that groundwater recharge flows back to the surface water system in a lagged manor to benefit water management objectives, which we term “enhanced baseflow.” We use a regional groundwater model for the Treasure Valley aquifer located in southwestern Idaho, United States to demonstrate a generalizable approach using regional groundwater models as tools to identify favorable baseflow enhancement locations. Hypothetical MAR is simulated at 197 candidate locations, which are then evaluated for how effectively they meet potential management objectives. In addition to demonstrating the modeling and evaluation approach, we discuss lessons learned from applying a pre-existing regional groundwater model to MAR for enhanced baseflow and also describe important considerations, such as the physical and institutional availability of surface flows and specific management objectives, when assessing regional and site-specific suitability of MAR for enhanced baseflow as a potential management strategy.

54 ENVIRONMENTAL SCIENCES↗

Environmental projects. Volume 6: Environmental assessment. New 34-meter antenna at Venus site

The Jet Propulsion Lab has proposed replacing the 26-meter antenna at the Venus Station of the Goldstone Deep Space Communications Complex with a new 34-meter antenna. An environmental impact assessment of this proposed change is presented. It is concluded that the proposed antenna and its operation would not result in significant adverse impacts to the physical or human environment. It will, however, be necessary to manage electromagnetic transmissions from the antenna in such a manner as to ensure safe operation.

Kushner, L.↗

Unseen Winds: Harnessing High-Altitude Winds in the Southeast USA

This project aims to identify potential sites in the United States for further testing and development of airborne wind energy systems (AWES). Through industry questionnaires and interviews with AWES companies, the study assesses existing test sites' capabilities and gaps, leading to a three-tiered test site strategy: short-duration prototype demonstrations, long-duration technical assessments and power validations, and airspace interaction and deconfliction studies. Notably, the southeastern United States presents significant potential for AWES due to its lack of traditional wind turbines, which is attributed to low wind speeds at lower altitudes. However, wind conditions improve significantly at higher altitudes, making this region a promising candidate for AWES deployment. The project considers factors such as wind resources, infrastructure proximity, social acceptance, and environmental impacts to recommend sites that can support the unique needs of AWES manufacturers and facilitate their commercialization. Early findings suggest rural communities with low grid resiliency could benefit economically and technologically from hosting AWES test sites, especially with operator training centers and potential for long-term skilled employment in future disaster relief and other applications.

17 WIND ENERGY↗

Appropriateness and Readiness of Cold Crucible Vitrification of Calcine Solids at the Idaho Site and H-Canyon Effluent at the Savannah River Site

This report summarizes the results from an assessment of the technology readiness and deployment of cold crucible induction melter (CCIM) technology to vitrify high level waste (HLW) calcine solids at the Idaho Site and H-Canyon liquid effluent at the Savannah River Site (SRS). The assessment was requested by the Department of Energy’s Office of Environmental Management (DOE-EM), but is not a DOE 413-3-4a assessment for technology deployment. A joint Savannah River National Laboratory (SRNL) and Fluor Idaho Cleanup Project (ICP) team with subject matter experts evaluated the existent literature and experience both within the DOE as well as relevant external experience. The technology assessment focused on the site-specific technology readiness and appropriateness based on a number of system factors including feasibility and appropriateness of the technology for the specific site application, the potential extent of the regulatory and design challenges, and evaluation of the ability to deploy within the treatment needs of each site. This initial assessment provides information to support DOE-EM in making a go/no-go decision to carry out additional work on the technology maturation for critical decisions and planning.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oil and Natural Gas Development near and beneath Uranium Tailings Cells and Other Remediated Sites - 20358

DOE LM is responsible for maintaining remedies at more than 50 remediated sites that require active long-term surveillance and maintenance (LTS and M). Institutional controls (ICs) were established to limit human and environmental exposures to residual contamination by controlling land use, restricting access to potential hazards, and making the public aware of potential dangers from the residual contamination. ICs for each site were developed based on current and foreseeable conditions; however, these controls should evolve to mitigate potential human health and other environmental risks from unanticipated changes in activities or site conditions. Activities conducted beyond the DOE long-term care boundaries by non-DOE parties may impact the effectiveness of ICs or even the long-term stability of disposal cells and groundwater remedies. Several sites that LM manages or that will transfer to LM for LTS and M are in active oil and gas production basins. The sites are associated with uranium ore milling or nuclear test sites and have been remediated or are in the process of remediation and have no ongoing DOE mission. Particularly since 2005, hydraulic fracturing ('fracking') combined with directional drilling has dramatically increased oil and natural gas (oil/gas) production in the United States, now making it the number one hydrocarbon-producing country. Fracking has allowed production from shale and other rocks of low natural permeability that were historically not considered viable oil/gas resources. Also, because wellbores can now be drilled as many as 5 kilometers or more horizontally, hydrocarbons can be recovered from zones without having access to the surface above them. Drilling activity near Rulison, Colorado, the location of an underground nuclear detonation managed by LM, has raised public concerns that remnant radioactivity in the detonation zone could migrate to producing wells and enter the natural gas distribution system. At sites like the Falls City, Texas, Disposal site, transitioned to LM with a split estate, increased production in the region has resulted in wellbores beneath the long-term care boundary of the site. While the DOE license for Falls City was approved by the NRC in 1997 without the acquisition of the subsurface rights, NRC has raised concerns on whether this activity impacts the integrity of the cell and/or groundwater remedies. In Wyoming, LM is anticipating receiving the license for the Bear Creek site and manages the Spook site, both locations of uranium mill tailings disposal cells. These Wyoming sites are in an active region of major oil and gas development. This change in surrounding land use will require LM to work collaboratively with NRC to address these concerns. At several DOE sites radioactive waste, and often intermixed nonradioactive constituents, is permanently isolated in engineered disposal cells. At other sites, residual contamination can be present in groundwater, blast cavities, and infinite amounts within soil. Areas targeted for oil and gas development at the Texas and Wyoming sites range from depths of 2440 to 3350 meters (8000-11000 feet) below ground surface. When most site remedies were designed, oil and gas development was not considered to be an issue within the site boundary. With the more recent uses of directional drilling, fracking, and associated wastewater injections, the evaluative criteria for incoming sites and ICs for managing long-term protectiveness and regulatory compliance are changing. Although DOE surface ownership was previously thought to be a robust IC to prevent surface and subsurface development, particularly at disposal sites, that may no longer be the case. Whereas the subsurface development at Texas and Wyoming sites is currently occurring at thousands of meters beneath the surface, shallower and direct onsite development would be more of a concern for LM. The energy introduced when a well is hydraulically fractured causes microseismic events (magnitude -2 to 1.0) as the fractures propagate but does not directly cause seismic events (earthquakes) of sufficient magnitude to damage surface structures. Additionally, the extent of the hydraulic fractures is limited to the targeted depths, which are far below the surface. However, earthquakes of sufficient magnitude to damage surface structures have been attributed to the injection of wastewater into disposal wells. States that have experienced these effects have enacted regulations that limit the rate and pressures that wastewater can be injected into disposal wells. Items LM may consider are the need for monitoring the volume of water injected into nearby disposal wells and possibly installing seismic stations at sites most susceptible to damage. While the need to demonstrate that no impact from oil and gas extraction activities on a site groundwater remedy or disposal cells will vary from site to site, LM is assessing risk criteria for this activity. Though LM has not experienced an issue yet at a uranium tailings disposal site, it cannot assume that there will be none, and must address NRC concerns. LM is building on past experiences at other sites and beginning to form new processes with the hope that these concepts can be applied for other future sites. (authors)

04 OIL SHALES AND TAR SANDS↗

Assessing the representativeness of wind data for wind turbine site evaluation

Once potential wind turbine sites (either for single installations or clusters) are identified through siting procedures, actual evaluation of the sites must commence. This evaluation is needed to obtain estimates of wind turbine performance and to identify hazards to the machine from the turbulence component of the atmosphere. These estimates allow for more detailed project planning and for preliminary financing arrangements to be secured. The site evaluation process can occur in two stages: (1) utilizing existing nearby data, and (2) establishing and monitoring an onsite measurement program. Since step (2) requires a period of at least 1 yr or more from the time a potential site has been identified, step (1) is often an essential stage in the preliminary evaluation process. Both the methods that have been developed and the unknowns that still exist in assessing the representativeness of available data to a nearby wind turbine site are discussed. How the assessment of the representativeness of available data can be used to develop a more effective onsite meteorological measurement program is also discussed.

Renne, D. S.↗

Geochemical data package for performance assessment calculations related to the Savannah River Site

The Savannah River Site (SRS) disposes of low-level radioactive waste (LLW) and stabilizes high-level radioactive waste (HLW) tanks in the subsurface environment. Calculations used to establish the radiological limits of these facilities are referred to as Performance Assessments (PAs), Special Analyses (SAs), and Composite Analyses (CAs). The purpose of this document is to revise the existing geochemical data package used for these calculations (Kaplan, 2016). This work builds on earlier compilations of geochemical data, referred to a geochemical data packages (Kaplan, 2007; Kaplan, 2010; Kaplan, 2016; McDowell-Boyer et al., 2000). This work is being conducted as part of the on-going maintenance program of the SRS PA programs that periodically updates calculations and data packages when new information becomes available.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CO2-Locate: A Dynamic Database and Tool for Accessing National Oil and Gas Well Data to Inform Carbon Storage Projects

The CO2-Locate Database is a growing compilation of publicly available wellbore resources that have been merged based on common attributes across data sources with an attribute schema developed to be consistent across disparate resources, reduce data gaps, and eliminate record redundancy. The first version of CO2-Locate has been published to Energy Data eXchange (EDX) and includes the integrated public wells dataset as well as additional geospatial summary layers of key wellbore characteristics to protect proprietary resources. Additionally, the CO2-Locate database has been deployed into a web application, enabling easy access, data filtering capabilities, and visualization of U.S. wellbore infrastructure by stakeholders to inform injection site selection and risk assessments.

Dyer, Alec S. [NETL Site Support Contractor, Natio↗

2019 Nevada National Security Site Environmental Report Attachment A: Site Description

This attachment expands on the general description of the Nevada National Security Site (NNSS) presented in the Introduction to the Nevada National Security Site Environmental Report 2019. Included are subsections that summarize the site’s geological, hydrological, climatological, and ecological settings and the cultural resources of the NNSS. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NNSS. An adequate knowledge of the site’s environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NNSS. The NNSS environment contributes to several key features of the site that afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NNSS operations. These key features include the general remote location of the NNSS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

54 ENVIRONMENTAL SCIENCES↗

Use of remote sensing in facility siting

Environmental parameters important to, and necessary for, an environment impact assessment in terms of site selection for an electric power plant are defined. Remote sensing techniques and/or instrumentation applicable to site evaluation are described. Problem areas are discussed and recommendations given.

Moon, M. L.↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Incorporating adaptation and resilience into an integrated watershed and coral reef management plan

Changing environmental conditions are forcing natural resource managers and communities to adapt their strategies to account for global shifts in precipitation, temperature, sea level and more, all of which are occurring in addition to local human impacts. Adapting to threats from climate change requires a fundamental shift in the practice of natural resource management through the development of forward-looking “climate-smart” goals and strategies. Here we present a proof-of-concept application of a decision-support tool to help design climate-smart management actions for the watershed and coral reef management plan for Guánica Bay watershed in southwest Puerto Rico. We also explore the connection between adaptation planning and coral reef resilience, using a recently developed Puerto Rico-wide reef resilience assessment. In the first phase of the study, we used the publicly available Adaptation Design Tool to draft initial climate-smart versions of twelve proposed management actions. In the second phase, two actions (dirt road management on steep slopes, and coral reef restoration) were further refined through consultations with local experts to make more detailed design adjustments; this included the option to use information from the coral reef resilience assessment to inform design improvements. The first phase resulted in moderately detailed assessments that broadly accounted for anticipated direct and indirect effects of climate change on the planned management actions. The second phase resulted in more site-specific technical assessments and additional important design details. The expert panel charged with discussing climate-smart reef restoration around Guánica used the reef resilience assessment to guide discussion of reef restoration, highlighting the importance of having such information available for adaptation planning. This study demonstrates how climate change impacts can be effectively incorporated into a management plan at the most granular level of planning and how a structured, formalized process can be as valuable as the resulting adaptation information.

Gibbs, David A. (ORCID:0000000173898569)↗

Platte River Water Resources: Assessing Urban Flood Vulnerability to Select Restoration Sites for Urban Woods and Prairies in the Great Plains

In the Platte River Basin, wetlands provide ecosystem services such as flood mitigation and wildlife habitat. However, increasing urban development in the area has impacted natural floodplain processes, leading to a decline in wildlife habitat and an elevated flood risk for nearby communities. To address this issue, Audubon Great Plains’ Urban Woods and Prairies (UWP) Initiative focuses on restoring vital habitats within urban areas to protect bird species and reduce flood hazards. Our project used remotely sensed data, including Landsat 8 Operational Land Imagery (OLI), Sentinel-2 Multispectral Instrument (MSI), and Sentinel-1 Synthetic Aperture Radar (SAR), to assess land use and land cover from 2013 to 2023, as well as flood extent. Broad-scale analysis of the LULC showed some changes in land use patterns across the Central Platte River Basin, with the most notable being a decrease in Agricultural land coverage and an increase in Vegetation and Grassland coverage. Land use changes varied across 13 focal cities across the entire basin. In particular, developed land in Grand Island, NE, nearly tripled from 2019 to 2023, making it a good possible candidate for restoration efforts. We overlaid a flood extent map with the LULC classifications in Grand Island to identify possible restoration sites under UWP. This data will inform Audubon Great Plains in identifying potential restoration sites in key cities.

Jennifer Mathis↗

Assessment of Potential Pennycress Availability and Suitable Sites for Sustainable Aviation Fuel Refineries in Ohio

Pennycress grain has a relatively high oil content (25–36%) and it is considered a desirable feedstock to produce sustainable aviation fuel (SAF). Pennycress crop can be integrated into the corn–soybean rotation as a winter cover crop in the midwestern U.S. to provide both ecosystem services and economic benefits for the farmers, while serving as a promising feedstock for SAF production. For pennycress-based SAF biorefineries to be established at the commercial scale, a sustainable design of the supply system is required to provide reliable information on feedstock availability and optimal facility locations. The objectives of this research were to assess the pennycress production potential in Ohio, and to identify the best locations to establish the SAF biorefineries. To estimate the pennycress production potential in Ohio, a geographic information system (GIS)-based model was developed using the spatially explicit six-year historical data on areas that were planted in the corn–soybean rotation for the period of 2013 through 2018, pennycress yield estimates from field-based experiments reported in the literature, and the soil productivity index for the region of study. Optimal SAF biorefinery locations were identified using a GIS-based location-allocation model. Annual land potentially available for pennycress production in Ohio was estimated to be ~0.6 million ha, which could produce ~1.1 million metric tons of pennycress grain as feedstock to produce ~210 million liters of SAF, depending on the pennycress yield level, oil content, and conversion efficiencies. In addition, the optimum locations for 12 biorefineries, each at an annual capacity of 18.9 million liters of SAF, were identified, and the average transportation distance was estimated to be 35 and 58 km for maximizing attendance and coverage conditions, respectively. The outcomes of this research would help minimize the risks associated with feedstock supply and cost variabilities for pennycress-based SAF production in the region.

Mousavi-Avval, Seyed Hashem↗