Search NASA⌕ Search

SEARCH · Search NASA

Results for “testing phase”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Software Requirements Analysis as Fault Predictor

Waiting until the integration and system test phase to discover errors leads to more costly rework than resolving those same errors earlier in the lifecycle. Costs increase even more significantly once a software system has become operational. WE can assess the quality of system requirements, but do little to correlate this information either to system assurance activities or long-term reliability projections - both of which remain unclear and anecdotal. Extending earlier work on requirements accomplished by the ARM tool, measuring requirements quality information against code complexity and test data for the same system may be used to predict specific software modules containing high impact or deeply embedded faults now escaping in operational systems. Such knowledge would lead to more effective and efficient test programs. It may enable insight into whether a program should be maintained or started over.

Wallace, Dolores↗

Advanced Subsonic Technology (AST) 22-Inch Low Noise Research Fan Rig Preliminary Design of ADP-Type Fan 3

This report presents results of the work completed on the preliminary design of Fan 3 of NASA s 22-inch Fan Low Noise Research project. Fan 3 was intended to build on the experience gained from Fans 1 and 2 by demonstrating noise reduction technology that surpasses 1992 levels by 6 dB. The work was performed as part of NASA s Advanced Subsonic Technology (AST) program. Work on this task was conducted in the areas of CFD code validation, acoustic prediction and validation, rotor parametric studies, and fan exit guide vane (FEGV) studies up to the time when a NASA decision was made to cancel the design, fabrication and testing phases of the work. The scope of the program changed accordingly to concentrate on two subtasks: (1) Rig data analysis and CFD code validation and (2) Fan and FEGV optimization studies. The results of the CFD code validation work showed that this tool predicts 3D flowfield features well from the blade trailing edge to about a chord downstream. The CFD tool loses accuracy as the distance from the trailing edge increases beyond a blade chord. The comparisons of noise predictions to rig test data showed that both the tone noise tool and the broadband noise tool demonstrated reasonable agreement with the data to the degree that these tools can reliably be used for design work. The section on rig airflow and inlet separation analysis describes the method used to determine total fan airflow, shows the good agreement of predicted boundary layer profiles to measured profiles, and shows separation angles of attack ranging from 29.5 to 27deg for the range of airflows tested. The results of the rotor parametric studies were significant in leading to the decision not to pursue a new rotor design for Fan 3 and resulted in recommendations to concentrate efforts on FEGV stator designs. The ensuing parametric study on FEGV designs showed the potential for 8 to 10 EPNdB noise reduction relative to the baseline.

Jeracki, Robert J.↗

IER 516: Zirconium Test Assembly CED Phase-1: Preliminary Experiment Design

IER-516, Zirconium Test Assembly (ZTA), is a campaign to design, execute, and document a series of high-fidelity critical benchmark experiments to validate current and future zirconium (Zr) and zirconium hydride (ZrH x ) nuclear data evaluations. ZTA is a collaborative project between Los Alamos National Laboratory and the French Autoritè de Sûretè Nuclèaire et de Radioprotection. The experiments will be fueled with highly enriched uranium (HEU), and utilize the Comet critical assembly machine at the National Criticality Experiments Research Center. A total of ten preliminary critical experiments were designed and optimized for Zr and ZrHx nuclear data sensitivities using the MCNP-Particle Swarm Optimization methodology in the thermal, epithermal, intermediate, and fast neutron energy regions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Results of phase change paint tests of 0.040 scale 50% forebody models (82-0) of the space shuttle orbiter in the AEDC VKF B hypersonic wind tunnel (OH75)

Post-test information and data are presented from phase change paint, aerodynamic heating wind tunnel tests of a Rockwell International space shuttle orbiter forebody model. These tests were conducted in the Arnold Engineering and Development Center von Karman Facility Tunnel B Hypersonic Wind Tunnel. The purpose of these tests was to determine the effect of simulated orbiter protuberances and penetrations (including RCS nozzles) on aerodynamic heating rates during simulated entry conditions.

Dye, W. H.↗

Ranging/tracking system for proximity operations

The hardware development and testing phase of a hand held radar for the ranging and tracking for Shuttle proximity operations are considered. The radar is to measure range to a 3 sigma accuracy of 1 m (3.28 ft) to a maximum range of 1850 m (6000 ft) and velocity to a 3 sigma accuracy of 0.03 m/s (0.1 ft/s). Size and weight are similar to hand held radars, frequently seen in use by motorcycle police officers. Meeting these goals for a target in free space was very difficult to obtain in the testing program; however, at a range of approximately 700 m, the 3 sigma range error was found to be 0.96 m. It is felt that much of this error is due to clutter in the test environment. As an example of the velocity accuracy, at a range of 450 m, a 3 sigma velocity error of 0.02 m/s was measured. The principles of the radar and recommended changes to its design are given. Analyses performed in support of the design process, the actual circuit diagrams, and the software listing are included.

Nilsen, P.↗

SysML Success Tree for DAVINCI In-Situ Campaign Requirements Validation and Redundancy Assessment

The DAVINCI mission will scientifically study the Venusian atmosphere to better understand the current state of the planet and its evolutionary history. This will be accomplished by deploying a descent probe to collect in-situ atmospheric dynamic and spectroscopic measurements, characterize ambient temperatures and pressures during descent, and surface imaging below the cloud layer. To better characterize the DAVINCI In-Situ Campaign, a success tree, developed in the SysML tool, MagicDraw, was created to define the events necessary to have a successful in-situ campaign, for each phase of the campaign. This success tree was also used to validate DAVINCI Program, Mission, and Element level requirements. In addition, because DAVINCI is a single-string mission, the success tree was also used to identify areas of redundancy and resiliency throughout the campaign. The initial redundancy assessment recommended further on-orbit evaluation of the probe’s communication system, as well as further evaluation of the ability of the mass spectrometer turbo-molecular pump to handle the expected decent environment. During the integration and test phase of the overall mission, the success tree will be used to guide the mission validation process, helping to ensure that the in-situ mission elements can perform in accordance with the DAVINCI In-Situ Concept of Operations document.

model-based↗

SysML Success Tree for DAVINCI In-Situ Campaign Requirements Validation and Redundancy Assessment

The DAVINCI mission will scientifically study the Venusian atmosphere to better understand the current state of the planet and its evolutionary history. This will be accomplished by deploying a descent probe to collect in-situ atmospheric dynamic and spectroscopic measurements, characterize ambient temperatures and pressures during descent, and surface imaging below the cloud layer. To better characterize the DAVINCI In-Situ Campaign, a success tree, developed in the SysML tool, MagicDraw, was created to define the events necessary to have a successful in-situ campaign, for each phase of the campaign. This success tree was also used to validate DAVINCI Program, Mission, and Element level requirements. In addition, because DAVINCI is a single-string mission, the success tree was also used to identify areas of redundancy and resiliency throughout the campaign. The initial redundancy assessment recommended further on-orbit evaluation of the probe’s communication system, as well as further evaluation of the ability of the mass spectrometer turbo-molecular pump to handle the expected decent environment. During the integration and test phase of the overall mission, the success tree will be used to guide the mission validation process, helping to ensure that the in-situ mission elements can perform in accordance with the DAVINCI In-Situ Concept of Operations document.

ConOps↗

SysML Success Tree for DAVINCI In-Situ Campaign Requirements Validation and Redundancy Assessment

The DAVINCI mission will scientifically study the Venusian atmosphere to better understand the current state of the planet and its evolutionary history. This will be accomplished by deploying a descent probe to collect in-situ atmospheric dynamic and spectroscopic measurements, characterize ambient temperatures and pressures during descent, and surface imaging below the cloud layer. To better characterize the DAVINCI In-Situ Campaign, a success tree, developed in the SysML tool, MagicDraw, was created to define the events necessary to have a successful in-situ campaign, for each phase of the campaign. This success tree was also used to validate DAVINCI Program, Mission, and Element level requirements. In addition, because DAVINCI is a single-string mission, the success tree was also used to identify areas of redundancy and resiliency throughout the campaign. The initial redundancy assessment recommended further on-orbit evaluation of the probe’s communication system, as well as further evaluation of the ability of the mass spectrometer turbo-molecular pump to handle the expected decent environment. During the integration and test phase of the overall mission, the success tree will be used to guide the mission validation process, helping to ensure that the in-situ mission elements can perform in accordance with the DAVINCI In-Situ Concept of Operations document.

model-based↗

JPSS-1 VIIRS Radiometric Characterization and Calibration Based on Pre-Launch Testing

The Visible Infrared Imaging Radiometer Suite (VIIRS) on-board the first Joint Polar Satellite System (JPSS) completed its sensor level testing on December 2014. The JPSS-1 (J1) mission is scheduled to launch in December 2016, and will be very similar to the Suomi-National Polar-orbiting Partnership (SNPP) mission. VIIRS instrument has 22 spectral bands covering the spectrum between 0.4 and 12.6 m. It is a cross-track scanning radiometer capable of providing global measurements twice daily, through observations at two spatial resolutions, 375 m and 750 m at nadir for the imaging and moderate bands, respectively. This paper will briefly describe J1 VIIRS characterization and calibration performance and methodologies executed during the pre-launch testing phases by the government independent team to generate the at-launch baseline radiometric performance and the metrics needed to populate the sensor data record (SDR) Look-Up-Tables (LUTs). This paper will also provide an assessment of the sensor pre-launch radiometric performance, such as the sensor signal to noise ratios (SNRs), radiance dynamic range, reflective and emissive bands calibration performance, polarization sensitivity, spectral performance, response-vs-scan (RVS), and scattered light response. A set of performance metrics generated during the pre-launch testing program will be compared to both the VIIRS sensor specification and the SNPP VIIRS pre-launch performance.

VIIRS↗

JPSS-1 VIIRS Pre-Launch Radiometric Performance

The Visible Infrared Imaging Radiometer Suite (VIIRS) on-board the first Joint Polar Satellite System (JPSS) completed its sensor level testing on December 2014. The JPSS-1 (J1) mission is scheduled to launch in December 2016, and will be very similar to the Suomi-National Polar-orbiting Partnership (SNPP) mission. VIIRS instrument was designed to provide measurements of the globe twice daily. It is a wide-swath (3,040 kilometers) cross-track scanning radiometer with spatial resolutions of 370 and 740 meters at nadir for imaging and moderate bands, respectively. It covers the wavelength spectrum from reflective to long-wave infrared through 22 spectral bands [0.412 microns to 12.01 microns]. VIIRS observations are used to generate 22 environmental data products (EDRs). This paper will briefly describe J1 VIIRS characterization and calibration performance and methodologies executed during the pre-launch testing phases by the independent government team, to generate the at-launch baseline radiometric performance, and the metrics needed to populate the sensor data record (SDR) Look-Up-Tables (LUTs). This paper will also provide an assessment of the sensor pre-launch radiometric performance, such as the sensor signal to noise ratios (SNRs), dynamic range, reflective and emissive bands calibration performance, polarization sensitivity, bands spectral performance, response-vs-scan (RVS), near field and stray light responses. A set of performance metrics generated during the pre-launch testing program will be compared to the SNPP VIIRS pre-launch performance.

RSB↗

An Overview of Flight Test Results for a Formation Flight Autopilot

The first flight test phase of the NASA Dryden Flight Research Center Autonomous Formation Flight project has successfully demonstrated precision autonomous station-keeping of an F/A-18 research airplane with a second F/A-18 airplane. Blended inertial navigation system (INS) and global positioning system (GPS) measurements have been communicated across an air-to-air telemetry link and used to compute relative-position estimates. A precision research formation autopilot onboard the trailing airplane controls lateral and vertical spacing while the leading airplane operates under production autopilot control. Four research autopilot gain sets have been designed and flight-tested, and each exceeds the project design requirement of steady-state tracking accuracy within 1 standard deviation of 10 ft. Performance also has been demonstrated using single- and multiple-axis inputs such as step commands and frequency sweeps. This report briefly describes the experimental formation flight systems employed and discusses the navigation, guidance, and control algorithms that have been flight-tested. An overview of the flight test results of the formation autopilot during steady-state tracking and maneuvering flight is presented.

Curtis E Hanson↗

Preliminary design of an intermittent smoke flow visualization system

A prototype intermittent flow visualization system that was designed to study vortex flow field dynamics has been constructed and tested through its ground test phase. It produces discrete pulses of dense white smoke consisting of particles of terephthalic acid by the pulsing action of a fast-acting three-way valve. The trajectories of the smoke pulses can be tracked by a video imaging system without intruding in the flow around in flight. Two methods of pulsing the smoke were examined. The simplest and safest approach is to simply divert the smoke between the two outlet ports on the valve; this approach should be particularly effective if it were desired to inject smoke at two locations during the same test event. The second approach involves closing off one of the outlet ports to momentarily block the flow. The second approach requires careful control of valve dwell times to avoid excessive pressure buildup within the cartridge container. This method also increases the velocity of the smoke injected into the flow. The flow of the smoke has been blocked for periods ranging from 30 to 80 milliseconds, depending on the system volume and the length of time the valve is allowed to remain open between valve closings.

Ward, Donald T.↗

Flight service evaluation of composite components on the Bell Helicopter model 206L: Design, fabrication and testing

The design, fabrication, and testing phases of a program to obtain long term flight service experience on representative helicopter airframe structural components operating in typical commercial environments are described. The aircraft chosen is the Bell Helicopter Model 206L. The structural components are the forward fairing, litter door, baggage door, and vertical fin. The advanced composite components were designed to replace the production parts in the field and were certified by the FAA to be operable through the full flight envelope of the 206L. A description of the fabrication process that was used for each of the components is given. Static failing load tests on all components were done. In addition fatigue tests were run on four specimens that simulated the attachment of the vertical fin to the helicopter's tail boom.

Zinberg, H.↗

Mass spectrometer use in a large chamber

The early satellites were somewhat insensitive to contamination produced during the construction and testing phases. The On-Orbit lifetime was such that contamination effects went either unnoticed or unrecognized. With today's On-Orbit lifetimes approaching 10+ years, contamination has become a paramount concern. The scientific payloads have increased in complexity and sensitivity. The ability to clean a contaminated sensor has greatly diminished. This requires better pumping systems and methods for improved monitoring. The conversion from diffusion pumped thermal vacuum chambers to cryo pumped chambers with the use of Misner traps and selective cold traps has reduced contamination. Witness samples supply a record of the condensates that remain after a testing cycle, but impart no knowledge of the contaminant migration during the cycle that may be a month in duration. Due to a customer's request that mass spectrometry be used during the testing of their spacecraft, a consultant was contracted to install a mass spectrometer to determine the feasibility of the instrument. The equipment and methodology described will start with the original system and its evolution to GE's present system.

Chuvala, Tom↗

An Overview of the Mid-Infrared Spectro-Interferometer MATISSE: Science, Concept, and Current Status

MATISSE is the second-generation mid-infrared spectrograph and imager for the Very Large Telescope Interferometer (VLTI) at Paranal. This new interferometric instrument will allow significant advances by opening new avenues in various fundamental research fields: studying the planet-forming region of disks around young stellar objects, understanding the surface structures and mass loss phenomena affecting evolved stars, and probing the environments of black holes in active galactic nuclei. As a first breakthrough, MATISSE will enlarge the spectral domain of current optical interferometers by offering the L and M bands in addition to the N band. This will open a wide wavelength domain, ranging from 2.8 to 13 microns, exploring angular scales as small as 3 mas (L band) 10 mas (N band). As a second breakthrough, MATISSE will allow mid-infrared imaging - closure-phase aperture-synthesis imaging - with up to four Unit Telescopes (UT) or Auxiliary Telescopes (AT) of the VLTI. Moreover, MATISSE will offer a spectral resolution range from R approx. 30 to R approx. 5000. Here, we present one of the main science objectives, the study of protoplanetary disks, that has driven the instrument design and motivated several VLTI upgrades (GRA4MAT and NAOMI). We introduce the physical concept of MATISSE including a description of the signal on the detectors and an evaluation of the expected performances. We also discuss the current status of the MATISSE instrument, which is entering its testing phase, and the foreseen schedule for the next two years that will lead to the first light at Paranal.

interferometric instrument↗

Field Emission Analysis in SRF Cavities for PIP-II Using GEANT4

Field emission (FE) remains a significant hurdle for achieving optimal performance and reliability in superconducting radiofrequency (SRF) cavities used in accelerator cryomodules. A thorough understanding of the generation and propagation of FE-induced radiation is therefore essential to mitigate this problem. The absence of standardized measurement protocols further complicates the comparison of radiation data across different testing phases and facilities. This highlights the need for a precise quantitative method to diagnose and analyze FE-induced radiation. Such efforts could prove beneficial for improving cavity preparation and cleanroom assembly techniques during the prototype and production stages of Fermilab's Proton Improvement Plan-II (PIP-II) project. This study presents the initial steps of detailed Geant4 simulations aimed at analyzing FE-induced radiation in the low-beta 650 MHz 5-cell elliptical (LB650) cavity. Our goal is to combine these results with radiation diagnostics to enhance diagnostic accuracy and optimize detector positioning. This integrated approach ultimately aims to improve the preparation, assembly, and testing procedures for PIP-II SRF cavities, ensuring the delivery of FE-free cryomodules.

Wijethunga, Sajini A.K. [Fermilab] (ORCID:00000002↗

Field Emission Analysis in SRF Cavities for PIP-II Using GEANT4

Field emission (FE) remains a significant hurdle for achieving optimal performance and reliability in super-conducting radiofrequency (SRF) cavities used in accelerator cryomodules. A thorough understanding of the generation and propagation of FE-induced radiation is therefore essential to mitigate this problem. The absence of standardized measurement protocols further complicates the comparison of radiation data across different testing phases and facilities. This highlights the need for a precise quantitative method to diagnose and analyze FE-induced radiation. Such efforts could prove beneficial for improving cavity preparation and cleanroom assembly techniques during the prototype and production stages of Fermilab's Proton Improvement Plan-II (PIP-II) project. This study presents the initial steps of detailed Geant4 simulations aimed at analyzing FE-induced radiation in the low-beta 650 MHz 5-cell elliptical (LB650) cavity. Our goal is to combine these results with radiation diagnostics to enhance diagnostic accuracy and optimize detector positioning. This integrated approach ultimately aims to improve the preparation, assembly, and testing procedures for PIP-II SRF cavities, ensuring the delivery of FE-free cryomodules.

Wijethunga, S. A.K. [Fermilab] (ORCID:000000028765↗