Search NASA⌕ Search

SEARCH · Search NASA

Results for “000”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production

The Energy & Environmental Research Center (EERC), in partnership with Red Trail Energy, LLC (RTE), a North Dakota ethanol producer; the North Dakota Industrial Commission (NDIC) Renewable Energy Program (REP); and the U.S. Department of Energy (DOE), conducted a feasibility and implementation study for a commercial carbon capture and storage (CCS) effort. This subtask provided technical support and developed recommended practices of how small-scale industrial CO2 emitters (<1,000,000 tonnes of CO2 emitted annually) may economically deploy CCS. The 64-million-gallon dry mill RTE ethanol facility, emitting an average 180,000 tonnes of CO2 annually, was the subject of the case study. The positive outcome of this research, which shows technical and economic potential for ethanol–CCS in North Dakota, has resulted in RTE acquiring an approved Permit to Drill on December 2, 2019, for a stratigraphic test well in early 2020, a necessary step toward a North Dakota CO2 Storage Facility Permit (SFP) for the RTE CCS effort. Outcomes include 1) validating the Broom Creek Formation as a regional target for CCS, 2) determining the full carbon life cycle of an industrial fuel production facility with CCS, 3) developing a field implementation plan (FIP) for small-scale CCS, and 4) determining the validity and pathway for using CCS to meet low-carbon fuel (LCF) standards. The technical team included the EERC, RTE, Trimeric Corporation, Schlumberger Carbon Services, and Computer Modelling Group (CMG). Findings from activities conducted November 2016 – May 2020 are summarized as follows. Several key steps have been accomplished toward validating the Broom Creek Formation as a CO2 injection and storage target at the RTE CCS site, including verification of the presence and structure of sandstone layers that may comprise the potential CO2 storage reservoir and the several thousand feet of overlying confining zone. Work included site characterization using existing data, interpretation of seismic data within the study area, and geologic modeling simulation of CO2 injection. Interpreted results estimate 3000 feet of confining zone between the Broom Creek Formation (storage target) and the lowermost underground source of drinking water (e.g., the Fox Hills Formation). The thickness of the Broom Creek injection target varies 230–420 ft within the survey area. Results were used to inform the location of a stratigraphic test well and associated characterization test program. No impediments were identified within the targeted CO2 storage complex that would prevent the project from moving forward. A stratigraphic test well is the next step to validate these results and to acquire remaining data necessary to develop a North Dakota CO2 SFP application. The EERC generated full carbon life cycle estimates for CCS integration with the RTE ethanol facility. Results indicated that an average 40% reduction in CO2 emissions is possible through CCS implementation. Approximately half of the carbon in the overall life cycle for a dry mill ethanol plant is generated through the fermentation process and emitted to the atmosphere; this is the CO2 stream targeted for CCS. The remaining carbon is attributed to corn feedstock farming (diesel, fertilizer), energy for fuel processing (natural gas, electricity), and transportation (diesel) of the fuel product. Life cycle carbon estimates are also affected by the anticipated energy consumption of a potential capture facility, which depend on the type of CO2 product generated. For example, a 30%–40% net CO2 emission reduction is estimated if a liquefied CO2 facility were incorporated compared to a 40%–50% net CO2 reduction if a supercritical “injection-grade” CO2 product is generated; i.e., more energy is required to further refine the CO2 stream, affecting the full carbon life cycle estimates. A CCS FIP was developed and initiated at the RTE CCS site, resulting in the development of several guidance documents: a CO2 Capture Process Design Package, a North Dakota CO2 geologic Storage Permits Template, and a Public Outreach Package for CCS in North Dakota. General FIP components include CO2 capture system, pipeline and well designs; monitoring, verification, and accounting (MVA) plans; geologic characterization and testing programs; and permitting and outreach plans. Vendor bids were also acquired for the CO2 liquefaction facility. Near-surface characterization (groundwater and soil gas sampling) and geologic characterization (seismic survey) were initiated to inform development of a UIC Class VI-compliant MVA plan compliant with a North Dakota CO2 SFP. Designs (well and geologic testing) were completed for a stratigraphic test well compliant with a North Dakota CO2 SFP. In addition, the outreach plan was executed, including community open houses, meetings with city/county/state officials, and development of public materials. Although other entities continued to mature incentive programs in 2019–2020, California and the Internal Revenue Service (IRS) currently provide the most advanced economic opportunities for CCS integrated with fuel production. The California Low-Carbon Fuel Standard (LCFS) adopted a CCS Protocol in January 2019, allowing submittal of a design-based pathway (DBP) application for an approved temporary (not certified) carbon intensity value for a fully engineered facility. An ethanol–CCS DBP application to the California LCFS Program (officially approved February 28, 2020) was developed to show that the RTE CCS effort meets LCFS requirements. The approved DBP provides confidence to advance the project and supports potential investments. Other entities continue to mature incentive programs. The IRS issued guidance in February 2020 that addresses the definition of beginning of construction and revenue procedure on partnerships for the Enhancement of Carbon Dioxide Sequestration Credit (a.k.a. Section 45Q) CCS tax credit program; the IRS anticipates issuing further guidance on issues such as secure geologic storage, utilization qualifications, and recapture of claimed credits. Maturing incentive programs coupled with workable permitting regulations provide confidence to advance CCS projects in North Dakota and support financial investment to proceed with designing, constructing, and implementing CCS projects at small-scale fuel production facilities. The largest hurdles for CCS implementation at small-scale industrial systems are often business/economic-related (i.e., not technical). Market uncertainty already exists for agriculture-based alternative fuels such as corn ethanol, for which production has increased by ~33%, and prices have correspondingly lowered since 2015. Passing the Section 45Q tax credit program improves economic feasibility for CCS but may require external investors for a small business to achieve maximum benefits. Public–private partnerships with NDIC and DOE have resulted in foundational technical and regulatory knowledge, growing stakeholder confidence, and a pathway to implementation that enables similar industrial CCS projects in the region to advance. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by NDIC and RTE. The authors would also like to thank CMG, ESRI, IHS, Neuralog, and Schlumberger for allowing the use of their software packages in support of this work.

42 ENGINEERING↗

Big Sky Regional Carbon Sequestration Partnership (Phase III Final Scientific/Technical Report)

The Big Sky Carbon Sequestration Partnership (BSCSP) pursued a Phase III demonstration project at Kevin Dome in north central Montana. Kevin Dome covers approximately 700 square miles and is a naturally occurring CO 2 reservoir that is flanked by oil and gas fields. The carbon dioxide (CO 2 ) is in the upper Devonian Duperow (carbonate) formation and does not reach the spill point of the dome; therefore, the dome has potential as a CO 2 sequestration reservoir, a CO 2 supply, or as both if anthropogenic sources and enhanced oil recovery (EOR) operations are associated with the dome. Kevin Dome could potentially act as a buffer to continue accepting anthropogenic CO 2 when EOR flooding operations are interrupted or completed. The project objective was to produce one million tonnes of CO 2 from the gas cap of Kevin Dome, pipe it laterally, inject, and re-store it in the brine leg of the same formation to test the hub / buffer storage concept. This was to be accomplished by drilling up to five production wells, building a short pipeline and compression facilities, and drilling an injection well and several monitoring wells. BSCSP commenced outreach and site characterization activities including acquiring baseline data for near-surface insurance monitoring, acquiring 3-dimensional, 9-component surface seismic over the project area, drilling two test wells (one in the production area and one in the injection area), coring key intervals, and performing comprehensive logging. Well tests of those wells revealed two barriers to the project. The production (Danielson 33-17) well was perforated in multiple zones but failed to produce any significant CO 2 . This was despite being drilled in the near vicinity of a historic well that had produced 3700 MCF per day in a drill stem test. Modeling indicated that this was likely due to a phase change during production causing a temperature drop resulting in hydrate and/or water ice formation that clogged the formation. Tests of the injection zone (Wallewein 22-1) well indicated total dissolved solids (TDS) slightly below the EPA required 10,000 parts per million (ppm) for a Class VI underground injection control permit. While the project was initiated before Class VI rules were promulgated, and this was an experimental project (seemingly qualified for a Class V permit), the Environmental Protection Agency (EPA) indicated that injection would require a Class VI permit. The low salinity result was unexpected as contours plotted based on regional formation water quality data indicated an expected TDS above 20,000 ppm, and wells between the recharge zone and the Wallewein well tested above 10,000 ppm. Faced with the inability to obtain an injection permit, the demonstration project could not proceed. However, the project had generated valuable samples and data on a large natural analog including 32 sq. mi. of 3-D, 9-C seismic, 430 ft. of carbonate core covering seven different depositional environments taken from areas with, and without the presence of CO 2 , 30 ft. of core of two caprocks, a tight carbonate and an anhydrite, a full set of modern logs on both wells, and well tests. DOE decided to re-scope the project around completing studies utilizing this data. This report covers both the initial scope and the re-scope (Task / Section numbers preceded with an R). While the report covers a wide range of project activities, highlights of this work include: Development of a geostatic model using neural nets to match well logs to facies and using multi-waveform seismic to inform reservoir heterogeneity; Unique mechanical testing of permeability – stress relationship in two caprock materials; Development of full waveform inversion to generate a high resolution velocity model; Model development for dual permeability (fracture and matrix) systems to better account for matrix-matrix interactions; Joint seismic wave inversion (including the first quadr-joint inversion) exhibiting better imaging of a challenging reservoir zone in stiff rock; Core flow and core flood results on a reactive carbonate; and Innovative laboratory measurements of seismic response of fractured core as a function of fluid fill.

54 ENVIRONMENTAL SCIENCES↗

Improving scalability of electronic structure code for molecular simulations in the presence of environment

A scalable density functional electronic code with Gaussian basis set, called UTEP-NRLMOL, is developed to perform simulations of molecular systems in the presence of the environment with particular attention to the memory requirements. In the electronic structure calculations, the memory and computation time are proportional to the number of atoms. Memory requirements for density functional calculations scale as N*N, where N is the number of atoms. While the recent advances in HPC offer platforms with large numbers of cores, the limited amount of memory available on a given node and poor scalability of the electronic structure codes hinder their efficient usage of these platforms. We have introduced new scaling and parallelization paradigms using MPI-3 shared-memory functionality combined with usage of sparse algebra and storage of matrices in sparse format. This extends the range of applicability of the UTEP-NRLMOL code to large systems over 10,000 atoms, or using up to 67,000 basis functions, and making use of HPC architectures using over 6,000 processors utilizing all available cores. We have also interfaced code with effective fragment potential and polarizable continuum model libraries. The code was used in simulations of several applications which are published in reputed scientific journals.

74 ATOMIC AND MOLECULAR PHYSICS↗

Giant polarization in nanodielectrics

The relative permittivity of a material is a scaling factor for capacitors and the devices based upon them; the larger the relative permittivity, the greater the degree of miniaturization, or potential for energy storage. Materials with a relative permittivity than that of silicon nitride (approximately 7) are referred to as high-dielectric constant materials. Values of about 100 are typical in titanium dioxide rutile. Values of about 10,000 are observed in barium titanate in the region of the ferroelectric transition, which while impressive, is not very useful due to the strong temperature dependence. The observation of a relative permittivity of over 100,000 in the calcium copper titanate material sparked considerable interest because it showed little temperature dependence between 100 and 600 K over most of the radio-frequency range. Further investigation revealed that this material appears to be naturally nanotextured and that the colossal permittivity was likely due to the surface and/or internal barrier layer capacitance effect, although the issue is not settled. Unfortunately, the dielectric losses in this class materials are relatively high. A new strategy to achieve high dielectric permittivity with low loss involves using localized lattice defect states through ambipolar co-doping; these intrinsic defect complexes give rise to strong dipoles that are responsible for a relative permittivity of 10,000 with exceptionally low dielectric losses over most of the radio frequency range and excellent thermal stability.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Progress in High-Dielectric Constant Materials

The relative permittivity of a material is a scaling factor for capacitors and the devices based upon them; the larger the relative permittivity, the greater the degree of miniaturization, or potential for energy storage. Materials with a relative permittivity than that of silicon nitride (approximately 7) are referred to as high-dielectric constant materials. Values of about 100 are typical in titanium dioxide rutile. Values of about 10,000 are observed in barium titanate in the region of the ferroelectric transition, which while impressive, is not very useful due to the strong temperature dependence. The observation of a relative permittivity of over 100,000 in the calcium copper titanate material sparked considerable interest because it showed little temperature dependence between 100 and 600 K over most of the radio-frequency range. Further investigation revealed that this material appears to be naturally nanotextured and that the colossal permittivity was likely due to the surface and/or internal barrier layer capacitance effect, although the issue is not settled. Unfortunately, the dielectric losses in this class materials are relatively high. A new strategy to achieve high dielectric permittivity with low loss involves using localized lattice defect states through ambipolar co-doping; these intrinsic defect complexes give rise to strong dipoles that are responsible for a relative permittivity of 10,000 with exceptionally low dielectric losses over most of the radio frequency range and excellent thermal stability.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Achieving American Leadership in the Electric Grid Supply Chain Factsheet

The U.S. electric grid consists of more than 22,000 generators; 55,000 substations; 642,000 miles of high-voltage lines; and 6.3 million miles of distribution lines that serve 153 million customers. To date, much of the smart grid transformation has focused on applying advanced digital information and communication technologies to the power grid to improve the system’s efficiency, flexibility, and security. To achieve the full value of grid modernization, we also need advances in grid hardware. Many critical components supporting the power grid have limited to no domestic manufacturing capacity and face complex challenges in supporting a rapid expansion of the grid to meet multiple objectives, including decarbonization goals.

Source record↗

Snowmass2021 CMB-HD White Paper

CMB-HD is a proposed millimeter-wave survey over half the sky that would be ultra-deep (0.5 uK-arcmin) and have unprecedented resolution (15 arcseconds at 150 GHz). Such a survey would answer many outstanding questions about the fundamental physics of the Universe. Major advances would be 1.) the use of gravitational lensing of the primordial microwave background to map the distribution of matter on small scales (k~10 h Mpc^(-1)), which probes dark matter particle properties. It will also allow 2.) measurements of the thermal and kinetic Sunyaev-Zel'dovich effects on small scales to map the gas density and velocity, another probe of cosmic structure. In addition, CMB-HD would allow us to cross critical thresholds: 3.) ruling out or detecting any new, light (< 0.1 eV) particles that were in thermal equilibrium with known particles in the early Universe, 4.) testing a wide class of multi-field models that could explain an epoch of inflation in the early Universe, and 5.) ruling out or detecting inflationary magnetic fields. CMB-HD would also provide world-leading constraints on 6.) axion-like particles, 7.) cosmic birefringence, 8.) the sum of the neutrino masses, and 9.) the dark energy equation of state. The CMB-HD survey would be delivered in 7.5 years of observing 20,000 square degrees of sky, using two new 30-meter-class off-axis crossed Dragone telescopes to be located at Cerro Toco in the Atacama Desert. Each telescope would field 800,000 detectors (200,000 pixels), for a total of 1.6 million detectors.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Solar Decathlon Celebrates 20 Years of Building Impact

The U.S. Department of Energy Solar Decathlon® is a collegiate competition that has inspired students worldwide to enter the clean energy workforce since its inception. Celebrating its 20th anniversary in 2022, the Solar Decathlon has challenged more than 25,000 students to create efficient, affordable buildings powered by renewables, while promoting student innovation, STEM education, and workforce development opportunities in the buildings industry. Compelling graphics, videos, and visuals are being developed to launch a 20th anniversary campaign in January 2022. These graphics include an interactive 20th anniversary infographic, a "Solar Decathlon - By the Numbers" video, and a graphic highlighting the diverse group of more than 25,000 past participants. In presenting these graphics at the ACEEE summer 2022 panel, attendees will be exposed to the latest communications techniques to apply to their own work. The Solar Decathlon invests in compelling visuals to recruit and inspire an imaginative and diverse group of participants each year - something that organizations of all sizes in the energy efficiency sector also need to do as they recruit for new talent. The Virtual Village of the 2020 Build Challenge homes (with more than 11,000 unique views) and the map of past competition houses highlight the competition's emphasis on multimedia that connects with competitors and the general public. Using more than 4,400 publicly available photos, including engaging virtual event snapshots with Department of Energy leaders, the Solar Decathlon captures the innovate ideas of the Build Challenge and Design Challenge teams in a way that everyone can understand.

collegiate competition↗

Expanding Accurate Person Recognition to New Altitudes and Ranges: The BRIAR Dataset

Face recognition technology has advanced significantly in recent years due largely to the availability of large and increasingly complex training datasets for use in deep learning models. These datasets, however, typically comprise images scraped from news sites or social media plat-forms and, therefore, have limited utility in more advanced security, forensics, and military applications. These applications require lower resolution, longer ranges, and ele-vated viewpoints. To meet these critical needs, we collected and curated the first and second subsets of a large multi-modal biometric dataset designed for use in the research and development (R&D) of biometric recognition technolo-gies under extremely challenging conditions. Thus far, the dataset includes more than 350,000 still images and over 1,300 hours of video footage of approximately 1,000 sub-jects. To collect this data, we used Nikon DSLR cameras, a variety of commercial surveillance cameras, specialized long-rage R&D cameras, and Group 1 and Group 2 UAV platforms. The goal is to support the development of algorithms capable of accurately recognizing people at ranges up to 1,000 m and from high angles of elevation. These ad-vances will include improvements to the state of the art in face recognition and will support new research in the area of whole-body recognition using methods based on gait and anthropometry. This paper describes methods used to col-lect and curate the dataset, and the dataset's characteristics at the current stage.

Brogan, Joel↗

Potential for Transport of Cesium as Bio-colloids in a High Ionic Strength System

The Waste Isolation Pilot Plant (WIPP) is a deep geologic repository for long-term disposal of transuranic, radioactive waste that is a byproduct from the nation's nuclear defense program. Most likely release scenario → human intrusion (potentially through drilling) (US DOE 1995; 1996). Brine may proceed through the Rustler formation (the most transmissive layer) (Perkins et al., 1999). There is a need to investigate halophilic microbes including their mobility in the Rustler formation and the potential for enhancing transport of cesium as a bio-colloid. Objectives: To quantify the change in mobility of Cs by interaction with microbes (Chromohalobacter) that may be present near Waste Isolation Pilot Plant. What is Chromohalobacter?: a halophilic microbe, isolated from near the WIPP site, able to thrive in the high salt concentrations relevant to the repository. Does the microbe growth phase effect uptake of Cs? Experiments conducted with actively growing and stationary phase Chromohalobacter. Uptake may differ if Cs{sup +} is mistaken for K{sup +} in an actively growing (Log) phase versus stationary phase microbes (not actively reproducing). Materials: 1'' Teflon column packed with 1 gram of dolomite [355-500 μm, CaMg(CO{sub 3}){sub 2}] connected to a syringe pump and fraction collector via Teflon tubing. Chromohalobacter (100 million cells/mL) and dolomite collected near the WIPP. Synthetic brine - 15% NaCl (w/v ∼2.78 M) + 3 mM NaHCO{sub 3}. Methodology: Negative Control 5,000 ppb Cs initially injected into mini-columns with brine. Injection solution was then switched to only brine. Cs Experiments with Stationary Phase Chromo: Set 1: Viable stationary Chromo injected into minicolumns after reaction with 200 ppb Cs. Injection solution was then switched to only brine (without Cs or microbes). Set 2: Stressed stationary Chromo initially injected into mini-columns after reaction with 200 ppb Cs. Then, switched to brine only. Cs Experiments with Log phase Chromo: Set 1: Chromo injected into mini-columns after reaction with 5,000 ppb Cs. Injection then switched to only brine (without Cs or microbes). Set 2: Chromo grown with 5,000 ppb Cs and spiked with additional Cs before injection into columns. Preliminary Conclusions: Cs was not taken up or mobilized by Chromohalobacter in the actively growing or stationary phases or under stressed conditions. Competition may have occurred between Cs and K{sup +} at lower ionic strength, significantly greater concentrations of K{sup +} were present. Results suggest that Chromohalobacter can selectively uptake K{sup +} in the presence of Cs{sup +}. Future Research: K{sup +} and Cs{sup +} uptake will be monitored at high ionic strength in K{sup +} depleted media to consider uptake of Cs in the absence of K.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low Level Calibration of Liquid Scintillation Counting

Liquid Scintillation Counting (LSC) is an analytical laboratory method that quantifies the concentrations of alpha and beta emitting isotopes. The LSC method can be utilized for the detection of tritium, both environmentally and at nuclear facilities. Most LSC samples are aqueous-based and prepared as a radioactive sample dissolved or suspended in a high efficiency scintillation cocktail that converts radioactive energy into light pulses. When placed in counting vials, the liquid scintillation cocktail allows for optical coupling in which energy is released from the samples radioactive decay, and transferred to the scintillator. That energy is then absorbed to produce excited electrons that fall back to their ground-state and emit a pulse of light that is detected by the liquid scintillation analyzers photomultiplier tubes. Quench is a signal attenuation due to physical, chemical, or color interferences. To compensate for quench, quench standards of a known concentration are implemented at increasing increments of quench per vial to create a quench curve. Quench standards can be purchased pre-made or customized from the manufacturer, however, there are several issues that arise from purchasing the pre-made quench standards. The main issues with ordering pre-made quench standards is that they use higher count values, between 30,000 and 250,000 disintegrations per minute (dpm) of tritium per vial and only come in glass vials. Using higher counting standards in glass vials makes it hard to see lower concentrations in plastic vials. Additionally, when using higher energy standards the accuracy of the calibration readings tend to be lower. On the other hand, making a set of quench standards in-house allows for the customization of the dpm concentration to roughly 1,500-3,000 and preparation in plastic vials. This allows for lower activity readings that results in closer precision of the samples' true concentration. Technical Objectives: Create a quench curve and calibrate the LSA for tritium. Verify the calibration of the quench curve prior to cross sample runs. Check calibration against Quality Control (QC) reference value. Conclusion: a tritium quench curve calibration was performed using a scintillation cocktail with ultima gold (AB and AB/F), acetone (only with AB), and water (only with AB/F). By performing the tritium quench curve calibration, the counting efficiency was correlated to various levels of quench. Calibration checks with quality control standards were also performed to verify that the calibration was correct. The observed results provided acceptable values that matched the quality control standard reference values with an acceptable uncertainty. The next step will be fine tuning and cross comparison checks with legacy instrumentation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Using Resin to Reduce Silica in Borated Fluid - 20072

The Electric Power Research Institute (EPRI) strongly recommends the concentration of silica in the reactor coolant be limited, potential ingress be carefully controlled, and frequently monitored to assess potential silica deposits on fuel cladding surfaces. Boraflex is a product with silicone rubber encasing a neutron absorber for criticality control, and it was installed in the majority of nuclear power plant spent fuel pools. Over time and in the presence of radiation, the silicone rubber lining degrades into silica (SiO{sub 2}) and hydrogen gas. Silica is somewhat soluble in water and spent fuel pool water communicates with other plant systems during refueling outages, leading to a buildup of silica in the reactor coolant and connected systems. Due to the prevalence of Boraflex racks in spent fuel pools, the presence of silica is a chronic nuclear industry concern. To address this concern, many nuclear plants have installed reverse osmosis skid systems to remove the silica from their spent fuel pools and, by extension, from reactor coolant. These skids are expensive to install and maintain. Arcadis personnel demonstrated that an iron-impregnated resin could be used to remove silica from borated systems without impacting the water quality. The resin was readily available, inexpensive, and easy to install in existing plant equipment. During a nuclear power plant's refueling outage the iron-impregnated resin proved to be effective in reducing the need for feed and bleed operations, with concurrent cost savings and reduction in required outage water management activities. Thus, the following savings were realized: - Eliminated the need to purchase, install, and maintain a reverse osmosis system avoiding more than $10 million in up-front capital cost and ongoing operating and maintenance costs. - Removed 9.57 kilograms (21 pounds) of silica dioxide from the primary system fluid. - Reduced the volume of feed and bleed from 70,000 gallons (2.65 E+05 liters) to 35,000 gallons (1.32 E+05 liters). - Saved $380,000 in water production and disposal costs. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MH-1A Sturgis Decommissioning and Dismantlement - 20281

The U.S. Army Corps of Engineers (USACE) with its prime contractor, Aptim Federal Services, LLC (APTIM), recycled 5,260 metric tons (11.6 million pounds) of material from Sturgis Barge (Sturgis) during the Decommissioning and Dismantlement of the MH-1A nuclear power reactor. The overall objective of the project was to reduce residual radioactivity associated with MH-1A to levels that permitted release of Sturgis for dismantlement and termination of the Army Reactor Office permit. By effectively applying waste hierarchy's three Rs - reduce, reuse and recycle - the Sturgis project not only minimized the amount of waste that required disposal at landfills, but also reduced the potential for long-term environmental liability emanating from these landfills. The project team completed the physical decommissioning efforts in June 2018 in Galveston, TX. In September 2018, radiological surveys were completed to demonstrate the vessel could be released for shipbreaking. Sturgis was towed from Galveston, TX to Brownsville, TX in late September 2018. Shipbreaking, dismantlement and recycling efforts began in early October 2018 and were completed on 15 March 2019. As part of the decommissioning effort in Galveston, the team shipped 69 shipments (860 metric tons) of low-level radioactive waste and radioactive components to the Waste Control Specialist (WCS) facility in Andrews TX for disposal. Certain radioactive components had to be transferred to the Department of Energy prior to placing the materials into the Federal Waste Facility located within WCS. However, most of the radioactive waste was characterized, profiled, approved and managed under the WCS permitted radioactive waste exemption process authorized and implemented by the Texas Commission on Environmental Quality (TCEQ) and the Radioactive Materials Division. This allows LLRW and LLMW to be shipped as regulated waste and then upon receipt at WCS through satisfying the relevant waste acceptance criteria the waste is exempted and placed into the WCS RCRA permitted cell. An additional 35 shipments (544 metric ton) of contaminated hazardous waste water were transported to U.S. Ecology in Robstown, TX for treatment/disposal. An additional 36 shipments (500 metric tons) of non-hazardous wastewater was sent to Republic Waste Services' facility in Fresno, TX. The disposal of these materials required close coordination with State of Texas regulators. During decommissioning, the project team recycled approximately 270 metric tons (600,000 pounds) of lead and steel. As part of the dismantlement in Brownsville, TX the team recycled approximately 5,000 metric tons (11 million pounds) of ferrous and non-ferrous material, limiting our disposal requirements to about 180 metric tons (400,000 pounds) of material (<4% from entire shipbreaking activity). Although the primary hazard being mitigated by this project was radiological, recycling was always a priority for the project. The team strived to achieve sustainability goals as we implemented this one of a kind project. Scrap metal recycling has a large positive impact on the environment and can also favorably impact project disposal costs. Steel is among the most recycled material in the world. Nearly 40% of the world's steel production is made from scrap. Recycling steel also requires 75% less energy than producing it from raw materials. By using recycled steel rather than virgin materials, 2.33 kg of carbon emissions are eliminated per kg of steel [1]. The project recycled more than 4,500 metric tons (10 million pounds) of steel, which eliminated about 10,400 metric tons (23 million pounds) of CO{sub 2}. By implementing a recycling initiative for the Sturgis project, the team was able to realize cost avoidance for disposal of scrap, cost savings from the metals recycled, plus the project provided benefits to the environment through our recycling efforts. Once the dismantlement was complete, the team prepared a detailed decommissioning closure report, which allowed for the termination of the Army Reactor Decommissioning Permit. While it not only reduced any potential long-term environmental liability, this project to decommission and dismantle a floating nuclear power plant is truly unprecedented - it is a prime example of the USACE mission which is: 'Engineering solutions for the Nation's toughest challenges'. This unique, one of a kind, historical power plant was never designed to be taken apart, and the available information about its construction was lacking in many details. The hazards that required mitigation dictated a painstaking and deliberate process in order to avoid any release to the environment and the community, and to protect the health and safety of the workers involved while keeping the waste hierarchy's three R's - reduce, reuse and recycle at the forefront. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Idaho National Laboratory’s Mobile Hot Cell Transportation: Engineering Solutions for Global Disused Sealed Radioactive Sources.

Title: Idaho National Laboratory’s Mobile Hot Cell Transportation: Engineering Solutions for Global Disused Sealed Radioactive Sources. Abstract: The Mobile Hot Cell (MHC), currently under development by Idaho National Laboratory (INL) for the Off-Site Source Recovery Project (OSRP), is designed to help international partners meet the unique challenges of end-of-life radioactive material management. The MHC will provide a critical resource for countries that require assistance securing and disposing of Disused Sealed Radioactive Sources (DSRS) and orphaned sources in challenging environments, allowing these sources to be secured against misuse and nefarious activities. The MHC is a rapidly deployable system for conditioning and preparing end-of-life radioactive sources for transportation or storage. It is designed to handle sources of up to 1,000 Ci Co-60 equivalent while maintaining full radiological and biological containment. It will be deployable within 48 hours of an alert, making it ideal for emergency situations. The MHC features an operational suite for control, support racks for electronics, pneumatics, and welding systems, and a modular robust steel structure providing radiological shielding and internal robotic support. This design allows configurations for multiple device types to be conditioned and the ability to safely manage routine issues such as leaking or damaged sources. The MHC has been designed with the transportation challenges of rapid deployment to difficult environments in mind. The system weighs approximately 150,000 pounds, with individual systems breaking down into pieces not exceeding 20,000 pounds. Components are to be transportable on standard 20ft ISO containers, with shielding shells on 20ft flat racks. It is estimated that a total of eight containers and flat racks will be required. The use of 20ft containers, as opposed to 40ft containers, minimizes the impact on less developed road infrastructures, enabling the MHC to be positioned in constrained environments such as hospital parking lots. The system’s modularity also allows for deployment using smaller equipment, such as a 10-ton boom truck or forklift, which is crucial given the potential logistical challenges in different countries. This transportation strategy, evaluated in collaboration with Utah State University, ensures the MHC can be deployed via ground, rail, sea, or air, addressing the primary concern of international transport logistics.

99 - GENERAL AND MISCELLANEOUS↗

Heat Transfer Experiments of Ribbed, Serpentine Cooling Passages with Supercritical CO2

The results of heat transfer experiments with supercritical CO2 (sCO2) to capture the performance of ribbed, serpentine cooling passages for Reynolds numbers in the range of 100,000 - 400,000 are presented. The oxy-combustion turbine operating in an Allam-Fetvedt cycle has a turbine inlet temperature exceeding 1100°C, necessitating internally cooled turbine blades due to material creep strength limits. Reynolds numbers for sCO2, with its combination of high fluid density and low viscosity, can be up to an order of magnitude higher than comparable internal cooling conditions for an air-breathing engine where the majority of experimental data exists. To improve the prediction of cooling performance through turbulated passages, a test rig was designed and constructed with interchangeable insert capability for operation in sCO2 with heat transfer from a heater outlet flow stream to a lower temperature recuperator outlet flow stream. The inserts included serpentine passage geometry with five passes, one of the inserts including chevron ribs and the other a plain wall. The multi-pass serpentine geometry allowed for the evaluation of the effects 180 deg. tip turns have on the return passage flow characteristics, as they can depart significantly from fully-developed flow characteristics. The test procedure included the use of a modified Wilson plot method, with hot flow stream conditions kept effectively constant so that monitored changes in the overall thermal resistance could be attributed to manipulations in cooling flow stream conditions. Conditions during testing consisted of test section pressures of approximately 180 bar, cooling flow stream temperature of 175°C and hot flow stream temperature of 410°C. Test points at discrete cool flow Reynolds numbers up to 400,000 demonstrated an expected trend of decreased fluid thermal resistance with increasing Reynolds number, while at comparable Reynolds number there was an exhibited lower thermal resistance and higher passage pressure drop for the ribbed insert compared to the plain-walled insert. Processing of test data included establishment of Nusselt number enhancement ratios, so that for different internal cooling passage dimensions in the actual turbine blade at comparable Reynolds number the ratio could be applied to predict cooling performance.

Marshall, Michael↗

Experimental and Computational Heat Transfer Study of sCO2 Single Jet Impingement

The present study experimentally investigates the heat transfer capability of supercritical carbon dioxide (sCO2) single-jet impingement. The evaluated jet Reynolds number range is between 80,000 and 1,000,000, with a non-dimensional jet-to-target surface spacing of 2.8. CO2- impinging jet stagnation conditions were maintained at approximately 20 MPa and a temperature of 673 K for most experiments. The goal is to understand how changes in the aforementioned parameters influence heat transfer between the working fluid and the heated surface. Additionally, due to the elevated Reynolds numbers and difference in thermodynamic properties between air and CO2, air-derived impingement correlations may not be appropriate for CO2 impingement; these correlations will be evaluated against experimental sCO2 impingement data. At the time of this study, no sCO2 impingement data was available relevant to sCO2 power cycles. The target surface is a 1.5-inch diameter copper block centered on the 3mm jet orifice. A mica heating element bolted to the bottom of the copper block provides a uniform heat flux. Thermocouples embedded in the copper block are used to determine the surface temperature. Nusselt numbers obtained from experimental sCO2 data are compared to area-averaged Nusselt numbers from air-derived correlations. The comparisons showed that air correlations drastically underpredict the heat transfer when sCO2 is used as the working fluid. A modified sCO2 correlation using experimental data at discussed conditions is derived based on an existing air correlation.

Richardson, John↗

Agent-Based Model of Combined Community- and Jail-Based Take-Home Naloxone Distribution

Importance Opioid-related overdose accounts for almost 80 000 deaths annually across the US. People who use drugs leaving jails are at particularly high risk for opioid-related overdose and may benefit from take-home naloxone (THN) distribution. Objective To estimate the population impact of THN distribution at jail release to reverse opioid-related overdose among people with opioid use disorders. Design, Setting, and Participants This study developed the agent-based Justice-Community Circulation Model (JCCM) to model a synthetic population of individuals with and without a history of opioid use. Epidemiological data from 2014 to 2020 for Cook County, Illinois, were used to identify parameters pertinent to the synthetic population. Twenty-seven experimental scenarios were examined to capture diverse strategies of THN distribution and use. Sensitivity analysis was performed to identify critical mediating and moderating variables associated with population impact and a proxy metric for cost-effectiveness (ie, the direct costs of THN kits distributed per death averted). Data were analyzed between February 2022 and March 2024. Intervention Modeled interventions included 3 THN distribution channels: community facilities and practitioners; jail, at release; and social network or peers of persons released from jail. Main Outcomes and Measures The primary outcome was the percentage of opioid-related overdose deaths averted with THN in the modeled population relative to a baseline scenario with no intervention. Results Take-home naloxone distribution at jail release had the highest median (IQR) percentage of averted deaths at 11.70% (6.57%-15.75%). The probability of bystander presence at an opioid overdose showed the greatest proportional contribution (27.15%) to the variance in deaths averted in persons released from jail. The estimated costs of distributed THN kits were less than $\$$15 000 per averted death in all 27 scenarios. Conclusions and Relevance This study found that THN distribution at jail release is an economical and feasible approach to substantially reducing opioid-related overdose mortality. Training and preparation of proficient and willing bystanders are central factors in reaching the full potential of this intervention.

Tatara, Eric [Argonne National Laboratory (ANL), A↗