Search NASA⌕ Search

SEARCH · Search NASA

Results for “ADVISORY COMMITTEES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

System for the Management of Trauma and Emergency Surgery in Space

The need to develop a systems approach to the management of trauma and other major clinical medical events in space along with appropriate development and evaluation of surgical techniques and required hardware was investigated. A prototype zero gravity surgical module was constructed and tested aboard a KC-135 aircraft during parabolic arc zero G flight. To insure parity of quality care to that available on Earth, it was recommended that a clinical medical and bioengineering advisory committee define and help develop the necessary components of the clinical medical care system for the space station and lunar base. Key components of the system are aerospace surgical training, medical equipment development, including support hardware and software, rapid access to a network of specialty expertise, and continued research and development.

Houtchens, B.↗

Unsteady flow in turbomachinery: An overview

The importance of understanding and modeling the unsteady flow phenomena in turbomachinery is discussed. Historical events in the application and development of gas turbines for aircraft propulsion are traced. Technology advancements over the years are highlighted with focus on the compression system components. Trends in compressor research within the National Advisory Committee for Aeronautics (NACA)/National Aeronautics and Space Administration (NASA) are noted. The impact of technology advancements on the increased occurrences of unsteady flow related problems in advanced engine development programs is discussed. The impact of the new and more demanding requirements being imposed on the propulsion system to meet advanced aircraft mission needs are also noted. Brief discussions on the present day understanding and modeling capability of the unsteady flow phenomena are presented to include discussions on rotating stall, surge, flutter, forced response and noise generation.

Source record↗

NASA, the first 25 years: 1958 - 1983

Because it is impossible to describe the 25 years of NASA's research and missions in detail, this book is designed to provide a reference base from which teachers can develop classroom concepts and activities. It begins with a prologue, a brief history of the National Advisory Committee for Aeronautics, NASA's predecessor. Succeeding chapters are devoted to major NASA programs, in alphabetical order; within the chapters projects are listed chronologically. Each chapter concludes with ideas for the classroom and space for notes and new information the user may wish to add.

Dalelio, J.↗

NASA's role in aeronautical research

Past and current research in the aeronautical field conducted by NASA is reviewed. The first national center for aeronautical research, the Langley Memorial Aeronautical Laboratory, was established in 1917 by the then formed National Advisory Committee for Aeronautics (NACA). Two other research centers established later by NACA (Lewis and Ames) were staffed with research cadres from Langley. These three research centers formed the nucleus of NASA when it was established in 1958. Studies conducted today by NASA's research centers include: a concept for commuter-style aircraft, turbofan engines for military supersonic fighter aircraft, strength and durability of man-made fiber materials, and maneuverability problems in high speed aircraft. In addition, at Ames, research is being conducted on short-haul aviation, and short and vertical takeoff while at Lewis studies concentrate on propulsion system and engines. At Langley the emphasis is on basic research, stressing aircraft structure improvements, stall avoidance and noise abatement. Finally, the importance of NASA's educational program is discussed.

Parker, M.↗

Advancing automation and robotics technology for the Space Station and for the US economy, volume 2

In response to Public Law 98-371, dated July 18, 1984, the NASA Advanced Technology Advisory Committee has studied automation and robotics for use in the Space Station. The Technical Report, Volume 2, provides background information on automation and robotics technologies and their potential and documents: the relevant aspects of Space Station design; representative examples of automation and robotics; applications; the state of the technology and advances needed; and considerations for technology transfer to U.S. industry and for space commercialization.

Source record↗

Supersonic Cruise Technology

The history and status of supersonic cruise research is covered. The early research efforts of the National Advisory Committee for Aeronautics and efforts during the B-70 and SST phase are included. Technological progress made during the NASA Supersonic Cruise Research and Variable Cycle Engine programs are presented. While emphasis is on NASA's contributions to supersonic cruise research in the U.S., also noted are developments in England, France, and Russia. Written in nontechnical language, this book presents the most critical technology issues and research findings.

Mclean, F. Edward↗

Space station automation and robotics study. Operator-systems interface

This is the final report of a Space Station Automation and Robotics Planning Study, which was a joint project of the Boeing Aerospace Company, Boeing Commercial Airplane Company, and Boeing Computer Services Company. The study is in support of the Advanced Technology Advisory Committee established by NASA in accordance with a mandate by the U.S. Congress. Boeing support complements that provided to the NASA Contractor study team by four aerospace contractors, the Stanford Research Institute (SRI), and the California Space Institute. This study identifies automation and robotics (A&R) technologies that can be advanced by requirements levied by the Space Station Program. The methodology used in the study is to establish functional requirements for the operator system interface (OSI), establish the technologies needed to meet these requirements, and to forecast the availability of these technologies. The OSI would perform path planning, tracking and control, object recognition, fault detection and correction, and plan modifications in connection with extravehicular (EV) robot operations.

Source record↗

Advancing automation and robotics technology for the space station and for the US economy

In April 1985, as required by Public Law 98-371, the NASA Advanced Technology Advisory Committee (ATAC) reported to Congress the results of its studies on advanced automation and robotics technology for use on the Space Station. This material was documented in the initial report (NASA Technical Memorandum 87566). A further requirement of the Law was that ATAC follow NASA's progress in this area and report to Congress semiannually. This report is the second in a series of progress updates and covers the period between October 4, 1985, and March 31, l986. NASA has accepted the basic recommendations of ATAC for its Space Station efforts. ATAC and NASA agree that thrust of Congress is to build an advanced automation and robotics technology base that will support an evolutionary Space Station Program and serve as a highly visible stimulator effecting the U.S. long-term economy. The progress report identifies the work of NASA and the Space Station study contractors, research in progress, and issues connected with the advancement of automation and robotics technology on the Space Station.

Source record↗

University participation via UNIDATA, part 1

The UNIDATA Project is a cooperative university project, operated by the University Corporation for Atmospheric Research (UCAR) with National Science Foundation (NSF) funding, aimed at providing interactive communication and computations to the university community in the atmospheric and oceanic sciences. The initial focus has been on providing access to data for weather analysis and prediction. However, UNIDATA is in the process of expanding and possibly providing access to the Pilot Climate Data System (PCDS) through the UNIDATA system in an effort to develop prototypes for an Earth science information system. The notion of an Earth science information system evolved from discussions within NASA and several advisory committees in anticipation of receiving data from the many Earth observing instruments on the space station complex (Earth Observing System).

Dutton, J.↗

Evaluation of the need for a large primate research facility in space

In the summer of 1983, an advisory committee was organized that would be able to evaluate NASA's current and future capabilities for nonhuman primate research in space. Individuals were chosen who had experience in four key research areas: cardiovascular physiology, vestibular neurophysiology, musculo-skeletal physiology, and fluid and electrolyte balance. Recommendations of the committee to NASA are discussed.

Sulzman, F. M.↗

A crisis in the NASA space and earth sciences programme

Problems in the space and earth science programs are examined. Changes in the research environment and requirements for the space and earth sciences, for example from small Explorer missions to multispacecraft missions, have been observed. The need to expand the computational capabilities for space and earth sciences is discussed. The effects of fluctuations in funding, program delays, the limited number of space flights, and the development of the Space Station on research in the areas of astronomy and astrophysics, planetary exploration, solar and space physics, and earth science are analyzed. The recommendations of the Space and Earth Science Advisory Committee on the development and maintenance of effective space and earth sciences programs are described.

Lanzerotti, Louis, J.↗

Advancing automation and robotics technology for the space station and for the US economy: Submitted to the United States Congress October 1, 1987

In April 1985, as required by Public Law 98-371, the NASA Advanced Technology Advisory Committee (ATAC) reported to Congress the results of its studies on advanced automation and robotics technology for use on the space station. This material was documented in the initial report (NASA Technical Memorandum 87566). A further requirement of the Law was that ATAC follow NASA's progress in this area and report to Congress semiannually. This report is the fifth in a series of progress updates and covers the period between 16 May 1987 and 30 September 1987. NASA has accepted the basic recommendations of ATAC for its space station efforts. ATAC and NASA agree that the mandate of Congress is that an advanced automation and robotics technology be built to support an evolutionary space station program and serve as a highly visible stimulator affecting the long-term U.S. economy.

Source record↗

Advancing automation and robotics technology for the space station and for the US economy: Submitted to the United States Congress May 15, 1987

In April 1985, as required by Public Law 98-371, the NASA Advanced Technology Advisory Committee (ATAC) reported to Congress the results of its studies on advanced automation and robotics technology for use on the space station. This material was documented in the initial report (NASA Technical Memorandum 87566). A further requirement of the Law was that ATAC follow NASA's progress in this area and report to Congress semiannually. This report is the fourth in a series of progress updates and covers the period October 1, 1986 to May 15, 1987. NASA has accepted the basic recommendations of ATAC for its space station efforts. ATAC and NASA agree that the will of Congress is to build an advanced automation and robotics technology base that will support an evolutionary space station program and serve as a highly visible stimulator affecting the long-term U.S. economy. The progress report identifies the work of NASA and the space station study contractors, research in progress, and issues connected with the advancement of automation and robotics technology on the space station.

Source record↗

Advancing automation and robotics technology for the space station and for the US economy

In April 1985, as required by Public Law 98-371, the NASA Advanced Technology Advisory Committee (ATAC) reported to Congress the results of its studies on advanced automation and robotics technology for use on the Space Station. This material was documented in the initial report (NASA Technical Memo 87566). A further requirement of the law was that ATAC follow NASA's progress in this area and report to Congress semiannually. This report is the sixth in a series of progress updates and covers the period between October 1, 1987 and March 1, 1988. NASA has accepted the basic recommendations of ATAC for its Space Station efforts. ATAC and NASA agree that the thrust of Congress is to build an advanced automation and robotics technology base that will support an evolutionary Space Station program and serve as a highly visible stimulator affecting the U.S. long-term economy. The progress report identifies the work of NASA and the Space Station study contractors, research in progress, and issues connected with the advancement of automation and robotics technology on the Space Station.

Nunamaker, Robert↗

Automation and robotics for the Space Station - An ATAC perspective

The study of automation and robotics for the Space Station by the Advanced Technology Advisory Committee is surveyed. The formation of the committee and the methodology for the Space Station automation study are discussed. The committee's recommendations for automation and robotics research and development are listed.

Nunamaker, Robert R.↗

Advancing automation and robotics technology for the space station Freedom and for the US economy

In April 1985, as required by Public Law 98-371, the NASA Advanced Technology Advisory Committee (ATAC) reported to Congress the results of its studies on advanced automation and robotics technology for use on the Freedom space station. This material was documented in the initial report (NASA Technical Memorandum 87566). A further requirement of the law was that ATAC follow NASA's progress in this area and report to Congress semiannually. This report is the eighth in a series of progress updates and covers the period between October 1, 1988, and March 31, 1989. NASA has accepted the basic recommendations of ATAC for its Space Station Freedom efforts. ATAC and NASA agree that the thrust of Congress is to build an advanced automation and robotics technology base that will support an evolutionary Space Station Freedom program and serve as a highly visible stimulator, affecting the U.S. long-term economy. The progress report identifies the work of NASA and the Freedom study contractors. It also describes research in progress, and it makes assessments of the advancement of automation and robotics technology on the Freedom space station.

Robotics↗

Advancing automation and robotics technology for the Space Station Freedom and for the US economy

In April 1985, as required by Public Law 98-371, the NASA Advanced Technology Advisory Committee (ATAC) reported to Congress the results of its studies on advanced automation and robotics technology for use on the Freedom space station. This material was documented in the initial report (NASA Technical Memorandum 87566). A further requirement of the law was that ATAC follow NASA's progress in this area and report to Congress semiannually. This report is the seventh in a series of progress updates and covers the period between April 1, 1988 and September 30, 1988. NASA has accepted the basic recommendations of ATAC for its Space Station Freedom efforts. ATAC and NASA agree that the thrust of Congress is to build an advanced automation and robotics technology base that will support an evolutionary Space Station Freedom program and serve as a highly visible stimulator, affecting the U.S. long-term economy. The progress report identifies the work of NASA and the Freedom study contractors. It also describes research in progress, and it makes assessments of the advancement of automation and robotics technology on the Freedom space station.

Source record↗