Search NASA⌕ Search

SEARCH · Search NASA

Results for “Boundary actions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

257 records · Page 15

Gas-Liquid Flow Modeling for Renewable Fuels Production

Aerobic/anaerobic and gas fermentation pathways have emerged as promising new technologies for the generation of renewable fuels/chemicals from biomass derived sugars, and mixtures of greenhouse/energy rich gas streams (CO2/CH4/H2/CO) via microbial action. Example pathways include sugars-to-ethanol conversion, biomethanation (CO2/H2 to CH4), biogas upgrading, CO fermentation and wet-waste conversion. Gas and liquid phase transport, mass-transfer, and mixing physics at large length scales can significantly affect microbial conversion rates, particularly when the microbial reaction requires a narrow set of conditions. These phenomena are difficult to study in small-scale bench-top reactors that are typically well-mixed. Predictive computational fluid dynamics (CFD) based simulations can therefore aid in the scale-up, design and optimization of these reactors. This work presents multiphase Euler-Euler CFD simulations of at-scale (~500 m3) bioreactors. Our mathematical model treats the gas and liquid as interpenetrating phases. This approach reduces the computational complexity of tracking individual gas bubbles that are several orders of magnitude smaller than reactor dimensions. We solve the Reynolds averaged Navier-Stokes (RANS) multiphase equations that account for phase and chemical species transport, interphase mass and momentum transfer and uses a phenomenological model for gas uptake by microbes. We use a customized solver derived from open-source CFD toolbox, OpenFOAM [1], to perform these simulations, which has been validated against small-scale reactors in our previous work [2]. There is currently a knowledge-gap regarding bubble-size distributions when using gas mixtures with vastly different properties, which can have a significant impact overall mass-transfer. For example, hydrogen bubbles are more buoyant compared to other relatively heavier gases (CO2/CH4/CO), resulting in a large distribution of residence times and bubble sizes. This work therefore develops a deeper understanding of bubble dynamics and interphase mass transfer in such heterogenous gas mixtures through well-resolved computational models. We use a population balance model (PBM) for bubble-size-distribution modeling that is validated against small-scale experiments in our solver with an uncertainty quantification study for bubble coalescence and break-up model parameters. Results pertaining to multiple simulations of gas-fermentation reactors are presented where gas mixtures with varying compositions of CO2/CH4/CO/H2 are imposed at the sparger boundaries. The spatio-temporal variations in bubble-size distribution and mass transfer coefficient are analyzed for varying superficial velocities and gas-compositions for varying sizes of bubble-column and airlift reactors. This work will also examine the performance of different reactor designs, viz. bubble column reactor, airlift reactor with an internal draft tube, and a stirred-tank reactor with Rushton impellers. Reactor mass-transfer coefficient, gas hold-up, and dissolved gas distribution are critically analyzed among reactors, and sensitivity studies pertaining to gas flow rates and reactor geometry will be presented. [1] Weller, H., Tabor, G., Jasak, H. and Fureby, C., A tensorial approach to computational continuum mechanics using object-oriented techniques, Computers in physics, 12, 6, 620--631, 1998. [2] Rahimi, M., Sitaraman, H., Humbird, D. and Stickel, J., Computational fluid dynamics study of full-scale aerobic bioreactors: Evaluation of gas-liquid mass transfer, oxygen uptake, and dynamic oxygen distribution, Chemical Engineering Research and Design, 139: 283-295.

BIOMASS FUELS↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 Solid Waste Management Unit #041 Year 4 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 4 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 4 PMR extends from November 2022 through September 2023. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 4 reporting period was approximately 94%, with the majority of downtime attributed to associated groundwater sampling events, maintenance, and Hurricane Nicole. Almost five million gallons of groundwater were treated during Year 4 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 99%. This PMR describes the activities that were performed during Year 4 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 4 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 4 plume conditions. A supplemental DPT study conducted in 2022 and 2023. This study indicated that low-concentration plume conditions, where concentrations exceed State of Florida Groundwater Cleanup Target Levels, expanded westward to Kennedy Parkway North and northward to the vicinity of the railroad tracks. Based on these results, recommendations were made to install 14 wells to monitor the downgradient and boundary conditions of the expanded LCP. The contents of this Year 4 PMR were presented during the November 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 SWMU #041 Year 3 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 3 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 3 PMR extends from September 2021 through October 2022. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 3 reporting period was approximately 91%, with the majority of downtime attributed to system maintenance and repair. This is generally consistent with Year 1 and Year 2 runtimes of 85% and 92%, respectively. To help reduce downtime, an anti-scaling amendment, Redux 390, has been used to reduce scaling and help maintain system design parameters. Over nine million gallons of groundwater were treated during Year 3 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 97%. This PMR describes the activities that were performed during Year 3 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 3 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 3 plume conditions. Therefore, it can be assumed that the projected path remains valid for transition to MNA in one to two years of continuous HCS operation. The contents of this Year 3 PMR were presented during the February 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Replacement of MW0019 and VMP04 was also recommended, as well as additional direct-push technology sampling to further delineate the downgradient plume and confirm overall site-wide low-concentration plume boundaries. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Risk to Ecological Resources on Burial Waste Sites on the Hanford Site, Washington - 20248

The US and other nations have a large nuclear and chemical waste remediation task remaining from World War II, the Cold War, and industrial activities. The US Department of Energy (DOE) has the largest task in the U.S., with Hanford (Washington State) being the most contaminated site, with the longest and most costly cleanup program projected to extend to the end of the century. One of the greatest remediation problems at Hanford are the burial waste facilities, some of which are inside the 200 Areas on the Central Plateau, while others are outside the 200 Areas. These areas are associated with waste sites, pipes, and contaminated trenches, posing technical cleanup challenges to meet DoE's remediation goals, including protection of human health and the environment commensurate with Tri- Party Agreement and current regulatory requirements. In this paper we select one of the legacy waste sites (the BC Cribs and Trenches) as a case study to explore how risk to ecological resources varies during and as a consequence of remediation on sites primarily considered legacy waste sites. We used the risk methodology developed by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP) during the Hanford Site-wide Risk Review. The CRESP methodology included evaluating the risk to receptors, including human health, the Columbia River, groundwater, and ecological and cultural resources. The risk evaluation process for ecological receptors included defining the boundaries of each evaluation unit (EU) to be remediated, definition of a suitable buffer area that might be affected, and consideration of the known resource value based on field work. This information, coupled with known remediation options or strategies, allowed us to develop a risk rating for ecological resources. Site risks were evaluated on a scale of 'not discernible' to 'very high' risk. Consideration of the risks at the buried waste sites was complicated by uncertainties in remediation methods and the degree of restoration that would occur as part of the remediation process. We use the BC Cribs and Trenches as a case study to explore why the risks are low currently but increase during remediation. The current 'not discernible to low' risk rating is due to the lack of high quality ecological resources on the BC Cribs and Trenches EU, except for edge areas (with some state-listed species). During remediation the risks increase to 'medium', mainly due to high quality resources on adjacent buffer lands, which could be disrupted during active remediation. Medium and high quality resources on the edge of the site are continuous with higher quality native shrub-steppe habitat on the buffer. Ecological resources on some of the areas surrounding the 200 East and West Areas are some of the highest quality shrub-steppe areas on the Hanford Site, and risk to these resources could be prevented by planning before and during remediation to minimize disruption. For example, lay down areas for the BC Cribs and Trenches can be minimized by careful planning. Heavy truck and other vehicular traffic can be minimized. Spread of the noxious weeds now on some of the site can be prevented, and the spread of invasive species into the site (particularly near undisturbed shrub-steppe habitat) can be reduced. Further, the areas around and between the 200 East and West Areas have been largely undisturbed and can serve as a source of seeds and propagules for any revegetation that occurs as part of the remediation process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing Concepts of Operations Using Multi-Step Tool Techniques With Large Language Models

The National Aeronautics and Space Administration (NASA) Air Mobility Pathfinders (AMP) project is developing and evaluating concepts of operations (ConOps) for safe, secure, and scalable Urban Air Mobility (UAM) operations. The AMP project’s Operational Concepts, Architecture, and Requirements Integration (OCARI) Team is using a Model Based System Engineering (MBSE) approach for integration, interoperability, and traceability of Advanced Air Mobility (AAM) ecosystems centered around urban air taxi services. The team’s goal is to define structures and behaviors needed for system feasibility, readiness, and interoperability, establish a UAM knowledge base, and trace and validate assumptions and requirements relevant to AAM. NASA Langley Research Center (LaRC) is spearheading an innovative digital engineering approach to integrate, communicate, and facilitate the research of multi-modal transportation systems. The Knowledge-based Digital Platform (KbDP) is a concept being developed that ties the workflows of Project Managers (PM), Principal Investigators (PI), and System Engineers together across organizational boundaries. It does so through the management of an information database defined by mathematical, data science, and system engineering principles. Machine Learning (ML) algorithms play a key role in this concept by extracting meaningful knowledge from relational and graph databases, document repositories, and system artifacts, which the human user leverages to greatly improve the efficiency and effectiveness of their research. Recent advancements in the field of Large Language Models (LLMs), specifically models trained for tool use, such as Command-R , now allow for the reliable implementation of single-step and multi-step tool-centric systems. These techniques provide the LLM with a set of tools, in our case Python functions, that can be called on to answer a much wider range of questions compared to LLMs implemented using a traditional single-source or Retrieval Augmented Generation (RAG) approach. Through this method, the LLM can pull information from multiple data sources, such as relational or graph databases, document repositories, application programming interfaces (APIs), and SysML artifacts depending on the user’s question. The LLM can also output the information in a variety of different formats, using output generation tools, such as CSV, UML, or SysML artifacts. Additionally, tools can be assigned roles and can work together to provide answers to queries in an “agent” like approach, similar to that implemented by Microsoft’s AutoGen framework where different agents can converse with each other to accomplish tasks. Previously, our team developed a chatbot system with “agent like” functionality in the form of different “modes” the user could select from a user interface (UI), this architecture can be seen on the left in figure 1. Three different modes were implemented, the first mode allowed the LLM to utilize the structures and algorithms within a graph database to trace UAM requirements. The second mode gave the LLM access to a vector search capable of providing relevant information from thousands of document pages related to UAM ConOps and requirements. The third mode served as a general assistant where users could enter open-ended questions and custom prompts to utilize the LLM for different use-cases. This system improved the process surrounding generating and analyzing information related to UAM requirements, however, the implementation provided a clunky user experience. Users were required to know what mode to select within the UI in advance before entering their question to the selected tool. Moreover, the different tools were isolated from each other, they lacked bidirectional links that would allow for tools to collaborate to generate better responses. Our team is working on a new architecture, seen on the right in the below figure, with the goal to address many of the UX shortcomings of our original system while improving the accuracy and depth of responses from the LLM. This new system will automatically select the appropriate tool to use based off the user’s question. Each tool will be capable of calling on any of the other tools available to the LLM, resulting in a collaborative pipeline where tools can pass data between other tools until enough data is received to generate an answer to the user’s question. Using a locally deployed, open-source, LLM, the NASA OCARI team, in collaboration with Collins Aerospace, will implement a prototype application that will bridge knowledge across multiple sources to assist System Engineers (SEs) with requirements discovery and tracing, research question and use case identification, and assumption validation. Such a system will also allow SEs to more easily, and intuitively, explore the AAM ecosystem, ultimately improving the efficiency and effectiveness of the SE's research and decision-making processes surrounding ConOps development and validation. In this session, our team will provide a video demonstration of our new prototype architecture in action. We will also present an overview of our prototype system architecture and talk about its advantages over traditional LLM deployments along with how those advantages can provide additional value to the field of System Engineering.

systems engineering↗